Amendment 0001
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
USCG Air Station Kodiak Construction Services For Design/Build Repairs to the Hangar I Fire Protection Systems
SEE CONTINUATION PAGES
USCGCEU JUNEAU DET SEATTLE
915 SECOND AVE, RM 2664
SEATTLE, WA 98174-1011
ALL PROSPECTIVE OFFERORS
SAME AS BLOCK 6
70Z08718RPJT900
01/03/2018
12/14/2017
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
1. The proposal due date is changed from January 29, 2018 at 2:00 PM Pacific to
February 6, 2018 at 2:00 PM Pacific.
2. The due date for any questions regarding the solicitation which require an answer from the issuing office is changed from no later than January 12, 2018 to January 23, 2018.
3. Section B DELETED in its entirety and replaced with Enclosure 1.
4. Section F1, replace with the following:
52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
(APR 1984) The Contractor shall be required to (a) commence work under this contract within fifteen (15) calendar day after the date the Contractor receives the notice of award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 535 days. The time stated for completion shall include final cleanup of the premises.
5. Section F add the following paragraph:
F.6 All work to be completed in Hangar 1, to include final inspection and acceptance shall be complete by 1 September 2019, assuming an award date no later than 29 March 2018.
Work to be completed by 1 September 2019 includes any and all modifications arising from
1) Hazmat Abatement relating to soil and 2) correction of any deficiencies identified as a result of the fire suppression inspection of the two lean-tos of the Hangar.
6. Sections L &M are hereby deleted in their entirety and replace with the following:
SECTION L
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
JOINT VENTURE AGREEMENTS are allowable on competitive small business set-asides. If your firm is contemplating a joint venture on this project, your firm must advise your assigned Business Development Specialist (BDS) promptly. Any corrections and/or changes needed can be made only when your BDS has adequate time for a thorough review before the proposal due date. NO CORRECTIONS AND/OR CHANGES ARE
ALLOWED AFTER THE SUBMISSION OF PROPOSALS.
L.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE (JUN 1988)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address: http://www.arnet.gov/far
52.204-7 System for Award Management JUL 2016 52.204-16 Commercial and Entity Code JUL 2016 52.204-18 Commercial and Government Code Maintenance JUL 2016 52.215-1 Instruction to Offerors – Competitive Acquisition JAN 2014 52.232-38 Submission of Electronic Funds Transfer Information with Offer
JUL 2013
52.236-28 Preparation of Proposals – Construction OCT 1997
L.2 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
L.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS – SECONDARY
SITE OF THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222- 6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
L.4 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT –
CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American— Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs
(c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a http://www.arnet.gov/far https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html#wp1147505 https://www.acquisition.gov/sites/default/files/current/far/html/52_222.html#wp1147505 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1169273 determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225- 9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
L.5 52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Contracting Officer, U. S. Coast Guard Facilities Design and Construction Center, 915 Second Avenue, Room 2664, Seattle, WA 98174-1011.
https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1169273 https://www.acquisition.gov/sites/default/files/current/far/html/FormsStandard61.html#wp1177057 https://www.acquisition.gov/sites/default/files/current/far/html/FormsStandard61.html#wp1177057 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1169273 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2033_1.html#wp1088681
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
L.6 52.236-27 SITE VISIT (CONSTRUCTION) Alternate I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, are included in this contract. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
One organized site visit is scheduled for 11:00 AM (AK) January 9 and 10 2018, at USCG Base Kodiak, Hangar 1 – passenger terminal. The site visit will last two days. The first day, information will be provided. The remainder of the first day, and the entire second day are set aside for contractors to examine the facility. Minor destructive testing will be permitted for sampling purposes.
A Two day site visit is anticipated, as the only escorted opportunity for the contractors to obtain field information. Cameras/recording devices will be allowed. The Government will not provide ladders or other equipment for the contractors’ use during the site visit.
Contractors shall provide any required equipment needed to conduct their own site visit
Regarding Base access for site visit: RAPIDGate credentials are required for regular BASE access. Contractor’s already possessing RAPIDGate passes for Base Kodiak, should gain access for the site visit without further correspondence or government sponsorship. If any contractor/subcontractor personnel do not already have RAPIDGate credentials for Base Kodiak at the time of the site visit, they can be sponsored for a day pass by emailing the following information to Eric Zeimer (Eric.D.Zeimer@USCG.mil) five business days prior to the site visit:
• Full Name
• Driver’s License Number and State
• Employer
• Country of Citizenship
• Date(s) of visit
• Project they are bidding on Information for all personnel requiring sponsorship shall be consolidated and sent as a single email by the prime contractor.
(b) Please contact Heather Brubeck via e-mail at Heather.s.brubeck@uscg.mil with a list of attendees no later than 48 hours prior to the site visit. Although the site visit IS NOT mandatory, you are highly encouraged that you have your team and any major subcontractors attend the meeting. Any requests for site visits outside of the official site visit will only be due to extraneous circumstances and must be approved by the Contracting Officer, Heather Brubeck.
L.7 SUBMISSION OF PROPOSALS
(a) Offerors shall submit proposals, in response to this solicitation, in two separate volumes as follows:
mailto:Gabriel.d.perez@uscg.mil
VOLUME I, TECHNICAL. Include all information required for evaluation, excluding any reference to price. Address all required evaluation criteria, as specified herein.
VOLUME II, PRICE. Include all information required for evaluation as well as the required completed solicitation sections.
(b) Submit your proposal packages via email to heather.s.brubeck@uscg.mil . Proposals submitted via any other means will not be evaluated for this procurement. The sender is responsible for confirmation of receipt. The Government must receive your proposal no later than the time and date specified in Block 13 of Standard Form 1442.
(c) Proposal Format: Do not exceed the page limitations set forth below. Technical Proposals will be printed 8 ½” x 11”. A page is defined as one face of a sheet of paper containing information. Typing shall not be less than 12 font. Total page limitation for technical proposals is 20 pages. Schedule and Resumes are excluded from the page limitation. Individual resumes shall not exceed 2 pages.
(d) Requirements for Proposal Content: The proposal shall concisely describe the Offeror’s response to the requirements of the solicitation. Elaborate artwork or other aids are not necessary. Additionally, use of general or vague statements such as “standard procedures will be used” or “good business practices will be employed” is not acceptable.
L.8 VOLUME I – TECHNICAL PROPOSAL PREPARATION
The technical proposal shall address the evaluation factors listed in Section M.3, Evaluation Factors for Award, and consist of sufficient documentation to show evidence that the Offeror meets the requirements as specified below:
The government will evaluate each proposal on the following technical criteria as either ACCEPTABLE or UNACCEPTABLE in accordance with FAR Part 15 Low Price Technically Acceptable procedures. All must be technically acceptable
1. Contractor and Sub-Contractor Experience
2. Key Personnel Experience
3. Conceptual Design and Construction Schedule
4. Past Performance
TECHNICAL FACTORS
Factor 1: Contractor and Sub-Contractor Experience
Narrative: Provide a detailed written narrative describing the Contractor’s experience to address the following:
• Describing a fire protection construction project (Representative Construction
Project) in a remote austere environment that has been completed or mailto:heather.s.brubeck@uscg.mil substantially completed by the contractor or subcontractor within the past 10 years.
• The project shall be similar in project scope (fire suppression and detection) in hangars or large (greater than 20,000 SF) industrial facilities, dollar value (greater than $1M) and location (remote austere environment). The entire State of Alaska will be considered as meeting the remote austere requirement.
The term “substantially completed” shall mean a construction project more than 80% complete.
Factor 2: Key Personnel Experience:
Submittal requirements:
Provide resumes for the following key personnel:
Designer of Record: Demonstrate that the Designer of Record is a licensed Alaska engineer or licensed Alaska Architect, or is a licensed Architect with Cold regions training. The DOR shall have 10 years responsible experience on projects of similar complexity and scope, and on two multi-discipline projects greater than $1 million in construction costs performed in a remote environment.
Fire Protection Engineer: The Fire Protection Engineer’s resume shall demonstrate that the Fire Protection Engineer is a licensed Alaska engineer, has 5 years experience on projects of similar complexity and scope, and on two projects greater than $1 million in construction costs performed in a remote environment.
Environmental Professional: The Environmental Professional’s resume shall show 5 years experience with contaminated sites in the State of Alaska, and completion of one project of similar complexity and scope to the current project. In addition, the prime contractor shall acknowledge the requirement for the Environmental Professional to conform to 18 Alaska Administrative Code (AAC) 75.333.
Construction Superintendent: The Construction Superintendent’s resume shall demonstrate that the Construction Superintendent has five years responsible experience managing projects of similar complexity and scope, and has general multi-trade construction experience on a project greater than $1 million in construction costs performed in a remote environment.
Factor 3: Conceptual Design and Construction Schedule:
Submittal requirements:
• Provide a conceptual design and construction schedule from an assumed start date of March 01, 2018 to Sept. 1, 2019. Include design, construction, and contract completion. The schedule shall provide sufficient detail to clearly show stages of construction, as well as include the supply and seasonal and weather limitations of Base Kodiak. The schedule shall show design and construction activities to fully define project, show critical activities, key milestones, and realistic durations for all design and construction activities.
The schedule shall clearly show the logic and sequence of events necessary for the successful execution of the project.
Factor 4: Past Performance
• The project submitted under Factor 1 Contractor and Sub-Contractor experience must have a corresponding past performance submission in the form of a completed CPARS evaluation or Past Performance Questionnaire.
If a completed CPARS evaluation is available, it shall be submitted with the proposal. If there is not a completed CPARS evaluation, a client completed Past Performance questionnaire in the prescribed format or substantially similar shall be submitted. A narrative of no more than one page in length may accompany each past performance submission and may be used as required to provide amplifying information on the submission.
• Provide contact information including name, email address and phone number corresponding to the PPQ submitted. Provide period of performance, name of agency/company, title of contract, name, address and current telephone number of contract administrator/contracting officer.
L.8 VOLUME II – PRICE PROPOSAL PREPARATION
1. Price.
The price proposal shall consist of the following solicitation/contract section:
• Section A: Solicitation/Contract Form (SF 1442). Offerors shall complete blocks 14, 15, 16, 17, 18, 19 and 20a, b and c.
• Section B: Supplies or Services and Prices/Costs. TOTAL PROPOSAL PRICE (Sum of Line Items 0001 and 0002) with separate CLINS for design and construction.
• Section K: Representations, Certifications and Other Statements of Offerors.
This section shall be completed by the Offerors and submitted with the proposal.
• Proof of current VETS-100.
SECTION M
EVALUATION FACTORS FOR AWARD
M.1 NOTICE TO OFFERORS
The Government intends to make award without discussions. Therefore, proposals should be initially submitted on the most favorable terms, from a price and technical standpoint.
However, the government reserves the right to open up discussions should it be determined to be in the best interest of the government. The government will analyze the price proposals in accordance with FAR 15.404-1 to determine the price reasonableness of the proposals received in response to the solicitation.
M.2 EVALUATION FACTORS FOR AWARD
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation is the Lowest Price Technically Acceptable Offer (LPTA). Only the lowest priced offer will be evaluated for technical acceptability. If the lowest priced offer is found not to be technically acceptable, then the next lowest priced offer will be evaluated. This process will continue until a technically acceptable offer is identified; not all offers will be evaluated. The total evaluated price shall consist of the Base Items. Offerors are cautioned that the government intends to elect to award the contract without discussions; therefore, initial proposals should represent the best possible effort. To make a determination, the Government shall evaluate each offeror on the following criteria:
1. TECHNICAL AND PAST PERFORMANCE
Factor 1: Contractor and Sub-Contractor Experience
Evaluation Method:
To be determined technically acceptable as to contractor or subcontractor experience, the representative construction project submitted must demonstrate the capabilities of the contractor or subcontractor to complete a fire protection construction project in a remote austere environment and have been completed or substantially completed within the past ten years. The project shall demonstrate fire protection (both suppression and detection) experience performed for a similar relevant aircraft hangar, or a large (greater than 20,000 SF) industrial facility.
To be considered relevant the representative construction project shall be similar in project scope (fire suppression and detection) in hangars or large (greater than 20,000 SF) industrial facilities, dollar value (greater than $1M) and location (remote austere environment). The entire State of Alaska will be considered as meeting the remote austere requirement. The term “substantially completed” shall mean a construction project more than 80% complete.
Factor 2: Key Personnel Experience
Evaluation Method:
• Overall in this factor the Government will evaluate the proposed resumes as related to the following key personnel’s experience:
o Designer of Record o Fire Protection Engineer o Environmental Professional o Construction Superintendent.
Designer of Record: To be determined technically acceptable, the resume of the Designer of Record shall demonstrate that the Designer of Record is a licensed Alaska engineer or Architect, or is an Architect with Cold regions training. The DOR shall have 10 years responsible experience on projects of similar complexity and scope, and on two multi-discipline projects greater than $1 million in construction costs performed in a remote environment.
Fire Protection Engineer: To be determined technically acceptable, the resume of the fire Protection Engineer shall demonstrate that the Fire Protection Engineer is a licensed Alaska engineer, has 5 years experience on projects of similar complexity and scope, and on two projects greater than $1 million in construction costs performed in a remote environment.
Environmental Professional: For the Environmental Professional to be determined technically acceptable, the Environmental Professional’s resume shall show 5 years experience with contaminated sites in the State of Alaska, and completion of one project of similar complexity and scope. In addition, the Contractor shall acknowledge the requirement for the Environmental Professional’s resume to conform to 18 Alaska Administrative Code
(AAC) 75.333.
Construction Superintendent: To be determined technically acceptable, the resume of the Construction Superintendent shall demonstrate five years responsible experience managing projects of similar complexity and scope, and has general multi-trade construction experience on a project greater than $1 million in construction costs performed in a remote environment.
Factor 3: Conceptual Design and Construction Schedule
To be determined technically acceptable, the Conceptual Design and Construction Schedule shall show completion by the contract complete date. It shall logically, adequately, and reasonably recognize the seasonal and weather limitations of Base Kodiak. It shall contain design and construction activities that logically, adequately, and reasonably define the project, including critical activities, key milestones, and realistic durations for design and construction activities.
Factor 4: Past Performance
Past performance will be evaluated in accordance with FAR 15.305(a)(2). To be determined technically acceptable, all ratings for submitted past performance for the project provided under Factor 1 must be Satisfactory or better.
2. PRICE
Price Evaluation:
The lowest priced offeror shall be determined by Section B, Supplies or Services and Price/Costs, (Sum of Item 0001 and 0002).
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
The Contractor’s proposal shall be all inclusive to provide for all labor, material, supplies, transportation, supervision and all other necessary items for a complete and usable project, performing all work in complete compliance with specifications and drawings contained in this proposal.
BASE ITEM:
0001 DESIGN SERVICES:
Because of the Coast Guard’s fiscal and accounting requirements, the following work shall be included in CLIN 0001, Design Services: Support during construction, post award HAZMAT Survey, other Environmental Services ( See D018000 1.15.), soils investigation and work plans, inspection and survey of the building’s existing fire protection and suppression inspection, including the two lean-tos of the Hangar.
Proposed Price Line Item 0001 $_____________________
0002 CONSTRUCTION SERVICES.
Because of the Coast Guard’s fiscal and accounting requirements, the following work shall be included in CLIN 0002, Construction Services: Hazmat Abatement or precleaning (ACM, Lead and lead dust, etc).
Proposed Price Line Item 0002 $_____________________
TOTAL PROPOSAL PRICE (Sum of 0001 and 0002) $______________________
** The following work is not included in either CLIN 0001 or CLIN 0002 of the Base bid, but may, at a later date, be considered as a changed condition on contracting officer approval and direction. This work is included in the physical construction completion date of 1 September 2019.
Enclosure 1
1.Hazmat Abatement relating to soil.
2. Correction of any deficiencies identified as a result of the fire suppression inspection of the two lean-tos of the Hangar.
Enclosure 1
| L.7 SUBMISSION OF PROPOSALS |
| Environmental Professional: The Environmental Professional’s resume shall show 5 years experience with contaminated sites in the State of Alaska, and completion of one project of similar complexity and scope to the current project. In addition, the ... |
| SECTION B |
| BASE ITEM: |
| 0001 design services: |
| Because of the Coast Guard’s fiscal and accounting requirements, the following work shall be included in CLIN 0001, Design Services: Support during construction, post award HAZMAT Survey, other Environmental Services ( See D018000 1.15.), soils inv... |
| Proposed Price Line Item 0001 $_____________________ |
| 0002 CONSTRUCTION SERVICES. |
| Proposed Price Line Item 0002 $_____________________ |
| TOTAL PROPOSAL PRICE (Sum of 0001 and 0002) $______________________ |