QUESTIONS and ANSWERS for Frank Drew.docx

DOCX document 14 KB Posted

Attached to
Dry Dock (DD): USCGC Frank Drew FY21 Repairs
Solicitation number
70Z08521QP4533000
Issued by

About this file

This document contains questions and answers related to a solicitation for dry dock repairs of the USCGC Frank Drew, a 175-foot buoy tender, issued by the U.S. Coast Guard. The solicitation seeks ship repair and associated support work to be completed from June 15, 2021 through August 24, 2021 at the contractor's facilities. Questions address performance period extensions, report requirements, equipment replacements, and temporary equipment installations. Answers provide clarification on timelines, corrective actions, and flexibility on equipment replacements to reduce costs.

View the file

Other files

File Type Posted
QUESTIONS and ANSWERS P00006 for 70Z08521QP4533000 (Frank Drew).docx DOCX document
SF-30 Solicitation Amendment 00006 70Z08521QP4533000.pdf PDF
FRANK DREW (WLM 175) DD FQ3 MAS 21R2.pdf PDF
SF-30 Solicitation Amendment 0005 70Z08521QP4533000.pdf PDF
P00005 Attachment 1 - FRANK DREW DD FY21 SoSS.xls XLS spreadsheet
SF-30 Solicitation Amendment 0004 70Z08521QP4533000.pdf PDF
QUESTIONS and ANSWERS P0004 for 70Z08521QP4533000 (Frank Drew).docx DOCX document
Rev 2 Spec FRANK DREW (WLM 175) DD FQ3 MAS 21R2.pdf PDF
SF-30 Frank Drew Amendment 0003.pdf PDF
QUESTIONS and ANSWERS P0003 for 70Z08521QP4533000 (Frank Drew).docx DOCX document
SF-30 Solicitation Amendment 0001 70Z08521QP4533000.pdf PDF
SF-30 Solicitation Amendment 0002 70Z08521QP4533000.pdf PDF
QUESTIONS and ANSWERS P0002 for 70Z08521QP4533000 (Frank Drew).docx DOCX document
Attachment 4 - Request for Clarification Form.docx DOCX document
Attachment 3 - Past Performance Information Form.docx DOCX document
Attachment 5 - USCG Ombudsman Notice.pdf PDF
Attachment 2 - FRANK DREW (WLM 175) DD FY21 Specification Rev1.pdf PDF
FRANK DREW DD FY21 Solicitation.pdf PDF
Attachment 1 - FRANK DREW DD FY21 SoSS.xls XLS spreadsheet
Attachment 6 - FRANK DREW DD FY21 J_As (Redacted).pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for Solicitation # 70Z08521QP4533000

USCGC FRANK DREW

DD FY21 (06/15/2021- 08/24/2021)

QUESTION #1: The government has assigned a normal OCCM performance period of 71 days to this solicitation. In this instance, the vessel is getting two GFM Z-drives installed. The vessel is also having preservation completed in some fashion to the underwater hull, freeboard, buoy deck and buoy port areas. This package also includes a SSMEB inspection which will disrupt production work. The contractor requests that the performance period be extended to 150 days to accommodate those items that conflict with the completion of other work items in this package.

ANSWER: Extension of the contract to 150 days is very unlikely at this point in the planning process. If justifiable, a shorter extension may be considered.

QUESTION #2: Paragraph 3.1.1 calls out a report for the post surface preparation cleaning and inspection of the Z-drive wells prior to coating. This currently means that the government is requesting a report after removal of the soft patch, disconnection and disassembly of both Z-drives, removal of the Z-drives from the vessel, fabrication and installation of Z-drive well covers, and the abrasive blasting or water jet cleaning of the Z-drive wells in 14 days after the vessel arrives at the contractors facility. The contractor believes that this is unrealistic and recommends removal of the CIR requirement.

ANSWER: Removing CIR is unreasonable. Contractors on same platform have completed Work Item requirements in appropriate timeline. Contractor may submit CFR to change CIR date once project is started if necessary.

QUESTION #3: Paragraph 3.2 directs the contractor to “renew and test the designated strainers (see paragraph 1.1(Intent))”. These strainers are (2) each, 8 inch Simplex Model 72-44F, Flanged Krassil Strainers. Paragraph 1.2 Government Furnished Property indicates that the government is supplying (1) each 3 inch duplex Mueller strainer. Is the contractor to remove (2) each 8 inch simplex strainers and install (1) each, 3 inch duplex strainer? This would require extensive piping modifications.

ANSWER: The 8” strainer should be replaced with an 8” strainer. The government will determine action to correct Work Item verbiage and way forward following award.

QUESTION #4: Paragraph 3.2 directs the contractor to “provide a temporary replacement CO2 cylinder and associated components and install them in place of removed components”. Would the government consider leaving the installed cylinders and components in place until such time that the contractor can replace each cylinder and hose assembly? The end result would be the same, newly hydro and charged cylinders with new hoses. This would reduce the cost of the work item by not having to supply temporary hoses and cylinders.

ANSWER: This implies that the cylinders will be replaced with new cylinders. If contractor chooses to replace instead of renew, requested changes are acceptable.

The Spec indicates that the removed cylinders will be transported to a test facility, inspected, cleaned, and tested. The intent is to reuse the same cylinders and reinstall them, so long as they meet all standards. In such a scenario, the system must have a temporary replacement in place to maintain safety onboard the ship.