This specification covers the requirements for installing termite control barriers at a federal project. The contractor shall furnish and install stainless steel mesh and basaltic sand barriers to prevent termite entry. The steel mesh must be 316 marine grade stainless steel with 0.007 inch diameter wire and 0.026 by 0.018 inch mesh openings. The basaltic sand must be crushed basalt rock between 45-100 sieve sizes with a specific gravity of 2.8 or greater and 20% maximum abrasion loss. Installation shall follow the manufacturer's instructions to place barriers at slabs, foundations, utility trenches, and other entry points. The contractor must provide one year warranty against termite infestation and repair any damage found. Submissions are required for shop drawings, samples, test reports, qualifications, and warranty. This project is scheduled for award between $5-10 million under an 8(a) set-aside by the US Coast Guard.

View the file

Other files

File Type Posted
21PAC131 Abstract of Offers Construction.pdf PDF
J13 Section 05 51 00 Metal Stairs.pdf PDF
J11 Section 31 31 16.13 Chemical Termite Control.pdf PDF
J10 Site Visit Sign In Sheet March 22 2022.pdf PDF
J15 C8601 D Pre alteration Hazardous Materials Survey Report REV.pdf PDF
Amend 3 Q A 21PAC131 pg 2 to 10.pdf PDF
J9 Site Visit Sign In Sheet March 15 2022.pdf PDF
J14 Section 05 52 00 Metal Railings.pdf PDF
Amend Three 21PAC131 SF30-16.pdf PDF
Amend Two 21PAC131 SF30-16 032822.pdf PDF
Amend One 21PAC131 SF30-16.pdf PDF
Amend One pg 2 to 4 031622.pdf PDF
J2 Specifications PN 11731512.pdf PDF
J7 CEUC EQUIPMENT ENROLLMENT FORM.xlsx XLSX spreadsheet
J4 C7003 - Reference DWG 6.pdf PDF
J7 CEUC USCG APPROVED EQUIPMENT ENROLLMENT CATALOG.pdf PDF
J3 C8601-D Sheets 16-30 of 134.pdf PDF
J3 C8601-D Sheets 31-45 of 134.pdf PDF
J4 C8540 - Reference DWG 10.pdf PDF
J3 C8601-D Sheets 76-90 of 134.pdf PDF
J1 SF1442 21PAC131 022822.pdf PDF
J5 WD NC20220069 02252022.PDF PDF
J4 C7219 - Reference DWG 7.pdf PDF
J3 C8601-D Sheets 121-134 of 134.pdf PDF
J3 C8601-D Sheets 91-105 of 134.pdf PDF
J8 Contractor_Responsibility_Questionair_-_New.rtf RTF text file
J4 C8316 - Reference DWG 9.pdf PDF
J1 21PAC131 IFB pages 3 to 53.pdf PDF
J4 C8600-D - Reference DWG 11.pdf PDF
J3 C8601-D Sheet 106 of 134.pdf PDF
J3 C8601-D Sheets 107-120 of 134.pdf PDF
J3 C8601-D Sheets 1-15 of 134.pdf PDF
J4 C3840 - Reference DWG 2.pdf PDF
J4 C6646 - Reference DWG 3.pdf PDF
J3 C8601-D Sheets 46-60 of 134.pdf PDF
J4 C050385 - Reference 1.pdf PDF
J4 C7943 DWG SET Reference DWG 8.pdf PDF
J5 WD NC20220062 02252022.PDF PDF
J4 C6875 - Reference DWG 5.pdf PDF
J7 C8601-D CZMA Consistency Letter.pdf PDF
J3 C8601-D sheets 61-75 of 134.pdf PDF
J6 RFI 21PAC131.docx DOCX document
J4 C6827 - Reference DWG 4.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P/N 11731512

SECTION 31 31 16.19

TERMITE CONTROL BARRIERS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced.

The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A478 (1997; R 2019) Standard Specification for Chromium-

Nickel Stainless Steel Weaving and Knitting Wire

ASTM A580/A580M (2018) Standard Specification for Stainless Steel Wire

ASTM C128 (2015) Standard Test Method for Density, Relative

Density (Specific Gravity), and Absorption of Fine

Aggregate

ASTM C131/C131M (2020) Standard Test Method for Resistance to

Degradation of Small-Size Coarse Aggregate by

Abrasion and Impact in the Los Angeles Machine

ASTM C136/C136M (2019) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

1.2 ADMINISTRATIVE REQUIREMENTS

A. Pre-Installation Meetings

Convene a pre-installation meeting at least one week prior to beginning installation to review conditions of preparation, storage and handling, installation procedures, sequencing, protection, and coordination with other related work. The project superintendent, installer, installer's crew leader, and representatives of the trades affected by this work are required to attend. Notify the Contracting Officer’s

Representative (COR) at least 10 calendar days before the meeting.

1.3 SUBMITTALS

The Contractor shall submit the following in accordance with Section 01 33 00, “SUBMITTAL PROCEDURES”. Note that approval of the submittals by the Designer or Contracting Officer’s Representative (COR) shall not be construed as relieving the

Contractor from responsibility for compliance with the specifications nor from responsibility of errors of any sort in the submittals.

A. Shop Drawings

Steel Mesh Shop Drawings; G

Basaltic Sand Shop Drawings; G

B. Product Data

Steel Mesh Materials

Accessories

Steel Mesh System

Written Warranty

C. Samples

Steel Mesh Materials; G

D. Test Reports

Basaltic Sand; G

E. Certificates

System Installers

Steel Mesh Materials

Written Verification

F. Manufacturer's Instructions

Manufacturer's Installation Instruction Manual

Manufacturer's Guidance

Manufacturer's Installation Instructions

G. Manufacturer's Field Reports

Site Conditions

H. Closeout Submittals

Written Warranty

1.4 QUALITY CONTROL

A. Qualifications

1. Only employee system installers trained in the behavior of termites and installation techniques of the mesh barrier, and accredited by the system's manufacturer. Submit certification that system installers meet the requirements specified and for the effective time period of accreditation.

2. Only employ workers trained and accredited at the appropriate level by the system's manufacturer.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the site in original, unbroken packaging and containers, with original labels in place, to include any U.S. Environmental Protection Agency (EPA) designation.

Store materials in conformance with system manufacturer's recommendations.

Store and handle the material so as to prevent contamination by dirt, water, and organic material.

1.6 SITE CONDITIONS

A. Environmental Requirements

In addition to the manufacturer's installation instructions and before placing material, ensure project site is free from standing water.

1.7 WARRANTY

Provide a minimum 1-year written warranty against infestations or re-infestation by subterranean termites of existing buildings with barrier installed during repair or renovation. Written warranty must be jointly signed by an officer of the Contractor and the supplier. Perform annual inspections of the building[s] or building addition[s]. If live subterranean termite infestation or subterranean termite damage is discovered during the warranty period, and building conditions have not been altered in the interim, take the following actions:

A. Correct defective steel mesh basaltic sand installation and perform other treatment as may be necessary to eliminate subterranean termite infestation.

B. Repair damage caused by termite infestation.

C. Reinspect the building approximately 180 calendar days after the repair.

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

A. Steel Mesh System Description

A complete termite control barrier system encompasses a fine steel mesh placed across all termite entry points to the building. Principal entry points include all cracks, joints, penetrations and other termite entry points within the concrete slabs and cavities in walls. The steel mesh and fastening system physically prevents the termites from entering the building. The mesh is too fine for the termites to squeeze through, too hard to chew through, and highly corrosion resistant for future break down.

B. Basaltic Sand System Description

A complete termite control barrier system encompasses a graded basaltic sand as a physical barrier below the concrete slab or foundation of a structure to prevent the entry of Formosan ground termites into wood components of the structure, similar to laying down a chemical barrier of soil termiticide treatments. The use of this preventive measure does not preclude the use of other preventive measures such as chemical treatment, steel mesh barrier system and pressure treated lumber for construction to provide maximum protection to the structure. In fact, it is recommended that this material be used in conjunction with chemical treatments of vulnerable areas such as around electrical conduits, plumbing pipes that penetrate the slab, and the shoulder portions of the barrier and with pressure treated lumber to provide maximum protection to the structure.

2.2 MATERIALS

A. Asbestos Prohibition

No asbestos containing materials or equipment are permitted at the job site. Ensure materials proposed for the project are asbestos free.

B. Steel Mesh Materials

1. Provide stainless steel mesh that conform to ASTM A478 and ASTM

A580/A580M, Type A1AA marine grade 316 stainless steel mesh of 0.007 inches diameter wire with mesh openings of 0.026 by 0.018 inches.

2. Steel Mesh Material Submittals

a. Submit statements signed by responsible officials of the manufacturer of material attesting that material meets specification requirements. These statements must be dated after award of the project contract and clearly name the project.

b. Submit samples of steel mesh materials. Provide 4 by 4 inches samples of steel mesh to be used in this work.

C. Accessories

Provide parging adhesives, bonding cement, high grade stainless steel clamps, ties, and other accessories as recommended by system's manufacturer.

D. Basaltic Sand

Provide clean, dry sand material manufactured from crushed basalt rock that meets the following requirements.

1. Material gradation, ASTM C136/C136M.

Sieve Size Percent Passing

No. 4 100

No. 8 95-100

No. 10 75-95

No. 12 35-50

No. 16 1-10

2. Specific gravity, ASTM C128, 2.80.

3. Silica (S102) content, 45 percent.

4. Abrasion loss, after 500 revolutions, 20 percent, when tested in accordance with

ASTM C131/C131M.

PART 3 EXECUTION

3.1 EXAMINATION

Examine the substrates and conditions under which work of this section will be performed. Coordinate with this specification all work related to final grades, landscape plantings, foundations, or any other alternations to finished construction that might alter the condition of the site. Do not proceed until any unsatisfactory conditions detrimental to timely and proper completion of the work have been corrected. Submit written verification that site conditions are as required and other site work will not disturb the installation.

3.2 PREPARATION

In addition to the manufacturer's requirements and before placing material, remove any visible plant roots, construction wood scraps such as ground stakes, form boards, and scrap lumber, and standing water from the excavated area. Inspect the utility trenches to ensure they are sufficiently wide to permit adequate cover under, around, and over pipes and conduit that will be encapsulated with the basaltic sand materials. In addition, inspect the foundation perimeter to ensure there is sufficient room between the sides of the excavations and the edges of the foundations to provide the required barrier depth and width. Provide finished or temporary site grading to remove standing water from the project site (i.e., excavated areas or adjacent areas). Grading must provide positive drainage towards temporary, new or existing drainage features. Grading must not result in low spots that hold water or direct water towards new or existing facilities.

A. Surface Preparation

Perform work related to final grades, landscape plantings, foundations, or any other operations that might alter the condition of the site, in accordance with this specification. Before installing the steel mesh, ensure that the following have been completed:

1. Eliminate termite food sources by removing wood debris, such as ground stakes, form boards, and scrap lumber from the work area.

2. The work area has been filled with finely graded soil consisting of particle sizes no larger than 1 inch and compacted to eliminate soil movement. Ensure the site conditions meet the manufacturer's recommendations for installing the steel mesh.

3. Footings, foundations, and outer forms are in place.

4. Penetrating pipes for communications, electrical, and plumbing are in place.

5. Submit site conditions certificate documenting that the site conditions are acceptable for the steel mesh barrier system.

3.3 INSTALLATION

Install a basaltic sand system in accordance with the manufacturer's installation instructions.

Submit basaltic sand shop drawings of the basaltic sand installation at all interior and perimeter foundations, joints, and penetration conditions to the Contracting Officer’s

Representative (COR) for approval before installation.

A. Steel Mesh Instructions

Strictly follow the manufacturer's instructions published in Manufacturer's

Installation Instruction Manual. In addition to the system manufacturer's instructions, place the stainless steel mesh across all openings, joints, penetrations, and other termite entry points to the building (including all shrinkage cracks in concrete slabs and built penetrations in slabs and walls that termites may use for access points)and in accordance with manufacturer's recommendations. Clamp, parge adhere, bond, or embed the steel mesh to the material surrounding the opening in accordance with the manufacturer's recommendations. Install with no gaps, penetrations, or damage to the mesh system. Submit steel mesh shop drawings of the termite steel mesh installation at all perimeter foundations, joints, and penetration conditions to the Contracting

Officer’s Representative (COR) for approval before installation.

To avoid an electrolytic reaction, do not place dissimilar metals in contact with the steel mesh.

1. Installation Sequence

a. Install the steel mesh barrier in accordance with the manufacturer's recommendations. Fit and clamp the mesh around all pipe penetrations, and terminate the mesh at the perimeters, as appropriate for the building construction and as described in the manufacturer's installation manual. Lap joint the mesh 0.39 to 0.59 inches and the joint may be strengthened by using bonding cement for a minimum distance of 20 inches along the joint.

b. Install special fittings that are appropriate to the construction, as described in manufacturer's installation manual.

c. Following installation of mesh and vapor barrier, install reinforcing steel and concrete, as specified under other sections. Seal penetrations and shrinkage cracks through concrete slabs in accordance with manufacturer's recommendations.

d. To maintain resistance to termites, complete the system and do not disturb, penetrate, or damage during the remaining contract time period.

2. Steel Mesh Integration

Where required, integrate mesh into subsequent construction, as described in manufacturer's installation manual.

B. Placement

Place the basaltic sand barrier under slabs, in utility trenches, along edges of concrete pavement, in concrete masonry unit (CMU) cells, along retaining walls, and other areas that termites may use for access points and in accordance with manufacturer's recommendations.

Place material in one lift for thicknesses of 6 inches or less and in successive lifts of 4 to 6 inches where the indicated thickness is greater than 6 inches. Compact each lift prior to placing successive lifts. Use power driven, vibrating-plate type tampers for large areas and rod-and-plate type hand tampers for small areas such as utility trenches and foundation and walk edges.

1. Slab on Grade

Provide a barrier of the depth indicated. Rake smooth and machine tamp, making at least three passes over the entire area. Hand tamp around pipe and conduit risers.

a. Utility Trenches

Place the required depth of material for bedding in the trenches prior to placing pipes and conduits and hand tamp the material. For pipes 3 inches and larger in diameter: After placing the pipe, bring material up to the top of the pipe and carefully hand tamp the material. Then, bring the material up to the top of the trench and tamp. For pipes smaller than 3 inches in diameter and for conduit: Bring material up to the top of the trench and tamp.

b. Edges

After concrete is placed and the form is removed, remove any dirt, loose concrete, and other debris and hand place and tamp additional material to the existing grade

2. CMU Block Walls

Place the material in non-grouted cells at a height of at least one course above grade of the wall.

3. Fence Posts and Utility Poles

Line the designated hole with a geotextile or similar material before proceeding with the work.

Once the geotextile is in place, put a 4 to 6 inches layer of the basaltic sand at the bottom of the hole. Hand tamp the material. After positioning the fence post or utility pole in the middle of the hole, fill around the sides, compacting the material after successive lifts of 6 to 12 inches until the hole is completely filled. Ensure that a 4 to 6 inches basaltic sand barrier exists around the perimeter of the post or pole.

4. Retaining Walls

Place the required amount of material below the footing and up to the grade level of the wall. Place lifts of 4 to 6 inches with compaction of each lift prior to placing successive lifts.

3.4 FIELD QUALITY CONTROL

A. Inspection

Provide Manufacturer's Guidance for performing a visual inspection of the installed mesh to ensure the steel mesh provides the designed termite physical barrier.

B. Manufacturer Field Services

Before installing the steel mesh, verify that final grades are as indicated and smooth grading has been completed. Provide written verification that the site conditions under the proposed slabs are proper for the installation of the termite barrier system in accordance with the manufacturer's recommendations.

3.5 PROTECTION

Protect the installed steel mesh system, attachments, and accessories before, during, and after the work of all trades, as required by the system manufacturer or as directed by the

Contracting Officer’s Representative.

In the event that subsequent trades on the site move or damage the mesh, clamps, or parging mix, immediately contact the mesh installer for a recommendation of the necessary repairs.

END OF SECTION 31 31 16.19