E USCG Ft Wadsworth Transmittal 54 Hydrant Flow Test.pdf
PDF 653 KB Posted
- Attached to
- REBUILD FAMILY HOUSING FORT WADSWORTH PHASE I AT U. S. COAST GUARD SECTOR NEW YORK, STATEN ISLAND, NY
- Solicitation number
- 70Z04724RPCNI0006
About this file
This document is a Contract Item Review Request from the Department of Homeland Security U.S. Coast Guard Civil Engineering Unit Providence. It relates to Contract Number HSCGG1-70Z0G118DPRV16900/70Z0G122FABCD0044 for the USCG Ft Wadsworth B440 & B438 project located in Staten Island, NY.
The submittal being reviewed is #54 from contractor TANTARA Corporation and covers a hydrant flow test as specified in Sections 21 13 13 and 21 13 16. The Contracting Officer's Representative (COR) has reviewed the submittal and approved it, subject to any applicable comments. The document notes that the government's review is intended to verify general conformance with the design intent, but does not relieve the contractor of responsibility for errors or compliance with contract requirements.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT ITEM REVIEW REQUEST
DEPARTMENT OF HOMELAND SECURITY
U.S. COAST GUARD
CIVIL ENGINEERING UNIT PROVIDENCE
CONTRACT NUMBER PROJECT TITLE: LOCATION: DATE:
HSCGG1-
70Z0G118DPRV16900/
70Z0G122FABCD0044
USCG Ft Wadsworth B440 & B438 Staten Island, NY 11-May-23
SUBMITTAL NUMBER: 54 CONTRACTOR: SUBMITTED BY (NAME):
NEW RESUBMITTAL TANTARA Corporation Eric Parrettie
ITEM
NO
SPECIFICATION SECTION AND
PARAGRAPH NO.
DESCRIPTION OF MATERIAL
(Include Type, Model Number, Catalog Number, Mfg., Etc.)
FOR GOVERNMENT USE ONLY
APPROVED REJECTED
SEE INITIAL
BELOW
497 21 13 13 / 21 13 16 Hydrant Flow Test
COMMENTS:
NOTE: Review of submittals by the Government is intended to verify general conformance with the design intent as shown on the contract drawings and in the specifications. Review by the Contracting Officer’s Representative (COR) does not relieve the Contractor of responsibility for any errors and/or omissions in the submittals, nor from the responsibility for complying with the requirements of the contract, except with respect to variations described and approved in accordance with FAR 52.243-4 CHANGES.
**FOR GOVERNMENT USE ONLY**
DESIGN ENGINEER (IF APPLICABLE)
TO: COR
REVIEWED, RECOMMEND PROCESSING AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ABOVE.
TYPED NAME & TITLE SIGNATURE (INITIALS) DATE
CONSTRUCTION PROJECT MANAGER (COR)
TO: CONTRACTOR
1. REVIEWED OR REJECTED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ABOVE.
2. REQUEST PROMPT RESUBMITTAL ON REJECTED ITEMS.
TYPED NAME SIGNATURE (INITIALS) DATE
NOTE: Copy Contracting Officer, COR, and Government Inspector on all submittals.
M.O
6/14/2023Michael Obisanya, COR
| USCG Ft Wadsworth B440 & B438_Transmittal #54 - (497) Hydrant Flow Test |
| Item #497 - Hydrant Flow Test |
| 2023-06-14T15:15:44-0400 | |
| OBISANYA.MICHAEL.FEMI.1557809453 |
File details come from the government source that posted it. Updated .