This is Amendment 0010 to solicitation 70Z04724RPCNI0006 for the design-build demolition and construction of Fort Wadsworth Family Housing Facilities at USCG Sector New York, Staten Island. The amendment provides numerous technical clarifications and updates including revised requirements for natural gas appliances, utility metering, window specifications with Marvin Elevate Windows as basis of design, and fire protection requirements aligned with NFPA standards.
The amendment revises housing unit construction details across 8 buildings containing 37 units total, with optional bid items for additional buildings (Units 9-11). Key updates include changes to design flood elevation requirements, utility service configurations, and acoustical/sound transmission requirements between units. The bid submission deadline is extended to January 22, 2025 at 4:30 PM EST, with RFI submission deadline of October 29, 2024. The amendment includes allowances for utility connections/disconnections and clarifies that units should not be individually metered. A revised Price Proposal Form and multiple updated specification sections and drawings are provided as attachments.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 0010
70Z04724RPCNI0006
SOLICITATION 70Z04724RPCNI0006 IS AMENDED AS FOLLOWS:
TASK ORDER ANNOUNCEMENT: __________________________
1. Replace Price Proposal Form on page 27 and 28 in the Task Order Announcement with the Revised Price Proposal Form (attached).
Deadline for submissions of Request for Information (RFI(s)) remains 4:30 PM (EST) October 29, 2024.
CLOSING DATE remains January 22, 2025, at 4:30 PM (EST).
NO ADDITIONAL RFIs WILL BE ACCEPTED. OFFERORS ARE INSTRUCTED TO PROVIDE
THEIR BEST OFFER BASED ON THE TASK ORDER ANNOUNCEMENT AND ALL
AMENDMENTS.
RFI QUESTIONS & RESPONSES LOG/SPREADSHEET:
Due to Adobe to Excel conversion issue, RFI numbers 104 through 111 are missing from the RFI log/spreadsheet. RFI questions and Responses are NOT missing. ONLY the numbers are missing.
RFP GUIDE SPECIFICATIONS 21-14089081 (Phase I): _________________________
1. RFI #30, RFP Specification 01800, 1.7.2.1 Exterior Walls DELETE: First paragraph in its entirety.
ADD, WHERE REMOVED: “Building envelope systems with improved performance are encouraged. To ensure energy performance and durability, the threshold R-Value for all walls is R-20. The minimum acceptable R- Value for all roofs that cover conditioned spaces is R-49. The contractor is responsible for detailing the assembly including wall penetrations for windows, doors, and utilities, etc. Continuous planes of air tightness and water and vapor management are required. Housing unit building envelopes shall attain an air tightness rating of 2.0 air changes per hour at 50 Pascals in accordance with independent third-party blower door tests. A building envelope specialist (BECxS) with qualifications in accordance with ASTM E2947-21a is required on the design team.”
2. RFI #96, RFP Specifications 1800- 1.12.1.3.10 ADD: Provide outdoor ceiling fans per RFP drawings. Outdoor fans and fan blade materials shall be wet rated and have motors rated for the outside design criteria. Ensure proper air movement (air change) is taken into consideration. Provide corrosion resistance in harsh outdoor weather. Provide wall control, integrated LED bulb, and Energy star rated.
3. RFI #256, RFP Specifications 1800-1.1.1, starting at paragraph (b) Construction
DELETE:
1. Construct a mix of 3-bedroom and 4-bedroom multi-plex residential units and 3-bedroom ADA accessible and 4-bedroom ADA accessible duplex residential units as noted in the table below.
Unit
BDRM
BDRM
4 BDRM
Accessible
3 BDRM
Accessible Subtotal 1 3 3 6 2 2 2 4 4 2 6 5 4 2 6 6 1 3 4 7 2 3 5 8 3 3 6 9 2 2
Subtotal 17 16 2 2 37
OPTIONAL BID ITEM-1
(a) Construction: Construct a new residential unit as noted below.
Unit
BDRM
BDRM
4 BDRM
Accessible
3 BDRM
Accessible Subtotal 3 2 3 5
Subtotal 19 19 42
OPTIONAL BID ITEM-2
(b) Construction: Construct a new residential unit as noted below.
Unit
BDRM
BDRM
4 BDRM
Accessible
3 BDRM
Accessible Subtotal 10 2 2 4
Subtotal 21 21 46
OPTIONAL BID ITEM-3
(a) Construction: Construct a new residential unit as noted below.
Unit
BDRM
BDRM
4 BDRM
Accessible
3 BDRM
Accessible Subtotal 11 2 3 5
Subtotal 23 24 51
ADD: Replace deleted section with the following:
2. Construct eight buildings with a mix of 3-bedroom, 4-bedroom, 3-bedroom ADA accessible, 4-bedroom ADA accessible residential units as noted in the table below.
BLDG
BDRM
BDRM
4 BDRM
Accessible
3 BDRM
Accessible Subtotal 1 thru 8 17 16 2 2 37
OPTIONAL BID ITEM-1
(c) Construction: Construct a new residential building with 5-units, as shown below.
BLDG
BDRM
BDRM
4 BDRM
Accessible
3 BDRM
9 2 3 5
OPTIONAL BID ITEM-2
(a) Construction: Construct a new residential building with 4-units, as shown below.
BLDG
BDRM
BDRM
4 BDRM
Accessible
3 BDRM
10 2 2 4
OPTIONAL BID ITEM-3
(a) Construction: Construct a new residential building with 5-units, as shown below.
BLDG
BDRM
BDRM
4 BDRM
Accessible
3 BDRM
11 2 3 5
4. RFI #101, #102, #247 RFP Specification 01800-1.1.3 ADD: (ddd) DOD Unified Facilities Criteria - UFC 1-200-01
ADD: (eee) DOD Unified Facilities Criteria - UFC 1-300-06
ADD: (fff) SILC-CSTO-36-11 31 17 11-01 Advanced Metering Infrastructure (Rev A).
5. RFI #115 RFP SPECIFICATION 01800, 1.10.3.1
ADD: Provide separate domestic and fire services utility lines.
6. RFI #117, RFP Specifications 01800-1.10.1.1 DELETE: ‘Provide a secondary battery power supply with capacity for system operation for a minimum of 60 hours standby followed by 5 minutes of alarm.’
ADD: Where removed, add ‘Provide a secondary battery power supply with capacity for system operation for a minimum of 48 hours standby followed by 15 minutes of alarm.’
7. RFI #119, RFP Specifications 01802-3.6.1(a) and 01802-3.6.1(b) DELETE: ‘Inventory list of existing FFE to be relocated for concurrence’
8. RFI #130, RFP Specifications 01800-1.7.5.6 Windows, 1.7.5.6.2 DELETE: Subsection in its entirety.
ADD:
1.7.5.6.2 Exterior windows shall be operable double hung windows that tilt in for ease of maintenance.
Window configuration (arrangement of additional mullions) shall be coordinated and compatible with the Contractor’s exterior design proposal or as indicated on the RFP.
(a) Thermal Transmittance: Provide vinyl windows with a whole-window, U-factor maximum indicated at 15-mph exterior wind velocity and winter condition temperatures when tested according to NFRC.
U-Factor: 0.25 Btu/sq. ft x h x deg F or less
(b) Solar Heat-Gain Coefficient (SHGC): Provide windows with a whole-window SHGC maximum of 0.30 determined according to NFRC 200 procedures.
(c) Air Infiltration: Maximum rate not more than 0.3 cfm/sq. ft of area at an inward test pressure of 1.57 lbf/sq. ft when tested according to AAMA/WDMA 101/I.S.2/NAFS, Air Infiltration Test.
(d) Water Resistance: No water leakage as defined in AAMA/WDMA referenced test methods at a water test pressure equaling that indicated, when tested according to AAMA/WDMA 101/I.S.2/NAFS, Water Resistance Test.
(e) Test Pressure: 15 percent of positive design pressure, but not less than 2.86 lbf/sq. ft. or more than 15 lbf/sq. ft.
The window shall have successfully passed the impact and cycle requirements of South Florida protocols, TAS-201, TAS-202 and TAS-203, and have NOA’s and Florida Product Approval for large missile impact.
Windows shall meet AAMA/NWWDW 101/I.S. 2-08 Structural Performance testing for CW 50 class windows.
Window and other exterior glass shall be low “E” and meet the requirements of the Large Missile Test of ASTM E 1996. Laminated glass used to fabricate insulating glass units shall consist of not less than two 1/8” thick panes of glass bonded together with a minimum 0.09 inch thick polyvinyl-butyral (PVB) interlayer.
Insulating glass units shall be installed in frames using structural silicone sealant.
Design windows and hardware to accommodate screens in a tight-fitting, removable arrangement, with a minimum of exposed fasteners and latches. Fabricate insect screens to fully integrate with window frame.
Locate screens on inside of windows and provide for each operable exterior sash or ventilator. Provide tight-fitting screen for operating sash with hardware to allow easy removal. Screen cloth shall be charcoal colored fiberglass mesh and frames shall be cambered formed aluminum with rigid plastic corner keys. Mechanism for screen removal shall be roll formed integral pull rail or metal lever pin. Color match screen frame to window frame and sash color.
Basis of Design: Marvin Elevate Windows.
Provide windows with screens and/or fall prevention window guard devices meeting requirements of ASTM F 2020-21 Standard Specification for Window Fall Prevention Devices with Emergency Escape (Egress) Release Mechanisms.
9. RFI #209, RFP Specifications 01802-3.7.1 DELETE: Design work and shop drawings shall be prepared by a licensed engineer or a NICET (National Institute for Certification in Engineering Technologies) Level III or Level IV technician.
ADD: Design work and shop drawings shall be prepared by a NICET (National Institute for Certification in Engineering Technologies) Level III or Level IV technician and sealed by a licensed professional engineer.
10. RFI #209, RFP Specifications 01802-3.7.2 DELETE: Design work and shop drawings shall be prepared by a licensed engineer or a NICET (National Institute for Certification in Engineering Technologies) Level IV sprinkler technician.
ADD: Design work and shop drawings shall be prepared by a NICET (National Institute for Certification in Engineering Technologies) Level IV sprinkler technician and sealed by a licensed professional engineer.
11. RFI #236, RFP Appendix F (Individual Space Criteria Sheets)
Building Type Duplex – 3 Bedroom and 4 Bedroom
RFP Space No. To Be Determined (TBD) by final design.
RFP Space Name: Master Bathroom, Full Bathroom, and Half-bathroom.
Section 6. Contractor Furnished and Contractor Installed (CFCI) Equipment:
DELETE: Lavatory – Full Bath: Provide an accessible, wall-hung lavatory with an approximately 60” wide by 20.375” deep solid surface/quartz lavatory top with two undermount lavatories (undermount or alternatively, the two lavatory basins may be integrally molded into the countertop. Sink basins shall be approximately 10” L by 15” W by 7” D. Vanity cabinet shall include storage (drawers and cabinet). Wood lavatory base may be natural wood or HPL finish. Provide faucet sets. Basis of design selection: Lucera 60” wall Mounted Double Basin Vanity Set with Cabinet and Quartz Vanity Top.
Lavatory for half-bath shall be minimum 36” wide with one undermount lavatory (plumbing fixture) and faucet set.
Lavatories and Countertops including undermount sinks and faucets are specified in the 01800.11 PLUMBING Specification.
ADD: Lavatory – Full Bath: Provide an accessible, wall-hung lavatory with an approximately 60” wide by 20.375” deep solid surface/quartz lavatory top with two undermount lavatories. Lavatory basins shall be approximately 10” L by 15” W by 7” D. Vanity cabinet shall include storage (drawers and cabinet). Wood lavatory base may be natural wood or HPL finish. Provide faucet sets. Basis of design selection: Lucera 60” wall Mounted Double Basin Vanity Set with Cabinet and Quartz Vanity Top.
Lavatory for half-bath shall be minimum 36” wide with one undermount lavatory (plumbing fixture) and faucet set.
Lavatories and Countertops including undermount sinks and faucets are specified in the 01800.11 PLUMBING Specification.
Building Type Townhouse – 3 Bedroom and 4 Bedroom
RFP Space No. To Be Determined (TBD)
RFP Space Name: Full Bathroom, Three-Quarter Bathroom and Half-bathroom.
Section 6. Contractor Furnished and Contractor Installed (CFCI) Equipment:
DELETE: Lavatory – Approximately 60” wide by 25” deep solid surface lavatory top with two undermount lavatories (plumbing fixtures). Alternatively, the two lavatory basins may be integrally molded into the countertop.
Lavatory base may be natural wood or HPL finish. Base shall provide storage and feature doors.
Lavatory for half-bath shall be minimum 36” wide with one undermount lavatory (plumbing fixture).
Lavatories, countertops with undermount sinks, and faucets are specified in the 01800 1.11 Plumbing specification.
ADD: Lavatory – Approximately 60” wide by 25” deep solid surface lavatory top with two undermount lavatories (plumbing fixtures). Lavatory base may be natural wood or HPL finish. Base shall provide storage and feature doors.
Lavatory for half-bath shall be minimum 36” wide with one undermount lavatory (plumbing fixture).
Lavatories, countertops with undermount sinks, and faucets are specified in the 01800 1.11 Plumbing specification.
12. RFI #239, #240 SPECIFICATION 01800, 1.7.2.3.11
DELETE: Delete this subsection in its entirety.
ADD: “The Attic spaces of both the multi-level dwelling unit townhouses and the accessible dwelling units shall be wood framed with a minimum 3:12 roof pitch.
Attic spaces of both the multi-level dwelling unit townhouses and the accessible dwelling units shall be designed as a fully sealed, conditioned attic. The thermal barrier shall be located at the roof line, creating a sealed, insulated, and conditioned attic space.
The key to creating an unvented roof assembly is to keep the roof deck—the principle condensing surface in roof assemblies—sufficiently warm throughout the year such that condensation will not occur or to control interior moisture-laden air. This is created by using air-impermeable insulation such as rigid foam board on top of the roof sheathing or by using closed-cell spray foam insulation on the underside of the roof sheathing.
Comply with International Residential Code Section 806.5 and provide a ratio of 30% rigid or air-impermeable insulation to total roof assembly R-Value to ensure moisture control in attic spaces.
13. RFI #245 SPECIFICATION 01800, 1.1.2.2
DELETE: “The new units shall be individually metered.”
ADD: Where deleted, replace with; “The new units should not be individually metered.”
14. RFI #255 SPECIFICATION 01800, 1.12.1.3.9
DELETE: This section in its entirety.
ADD: “In each regular dwelling unit kitchen, provide a combination over the range microwave oven, exhaust hood, exhaust fan, and LED cooking light. In accessible dwelling unit kitchens, provide a combination exhaust hood, exhaust fan, and LED cooking light. Reference Appendix K for additional requirements. Range hood and combination unit shall be sized must provide a maximum Sones rating of 4.5 when operating at maximum speed and shall be sized per the IRC. Exhaust shall be to the outdoors.”
15. RFI #255 SPECIFICATION – Appendix F
Building Type Duplex – 3 Bedroom and 4 Bedroom
RFP Space No. To Be Determined (TBD)
RFP Space Name: Kitchen Area and Pantry
DELETE: This RFP Individual Space Criteria section (5 pages) in its entirety.
ADD: Where deleted, replace with attached “Amendment 0010 – Appendix F – Duplex_Kitchen Area & Pantry.PDF” (5 pages)
16. RFI #63, #255 SPECIFICATION – Appendix K DELETE: Appendix K in its entirety (22 pages)
REPLACE: Appendix K with the attached “Appendix K – Equipment Tags.PDF” (22 pages)
17. RFP SPECIFICATION 01800, 1.7.6.5.2 Guard Rail
DELETE:
Provide a metal guard rail between the 3-BR and 4-BR third floor level hallway and the stairway. Top of the guard shall be 34” to 38” high. Metal guard rail may have a powder coated finish or a painted finish.
ADD:
Provide a metal guard rail between the 3-BR and 4-BR third floor level hallway and the stairway. Top of the guard shall be 34” to 38” and in accordance with International Residential Code (IRC) Section 1015. Metal guard rail may have a powder coated finish or a painted finish.
RFP Drawings (CAD files) ___________________________________________________
1. RFI #96, RFP Drawing A-101
REPLACE: Replace Sheet A-101 with “Amendment 010 – A101_3BR TH POC_REV plan”. Provided are *.pdf and *DWG file formats.
2. RFI #96, RFP Drawing A-102 REPLACE: Replace Sheet A-102 with “Amendment 010 – A102_4BR TH POC_REV plan”.
Provided are *.pdf and *DWG file formats.
3. RFI #96, RFP Drawing A-103 REPLACE: Replace Sheet A-103 with “Amendment 0010 - A103_3BR HC RFP POC_REV plan”.
Provided are *.pdf and *DWG file formats.
4. RFI #96, RFP Drawing A-104 REPLACE: Replace Sheet A-104 with “Amendment 0010 - A104_4 BR HC POC PLAN_REV”. Provided are *.pdf and *DWG file formats.
5. RFI #256, RFP Drawing C-103 REPLACE: Replace Sheet C-103 with “Amendment 0010 - C103_CONCEPT SITEPLAN”.
6. RFI #258, RFP Drawing G-001 REPLACE: Replace Sheet G-001 with “Amendment 0010 - G001_RFP CONCEPT”.
7. RFI # 92, #231, #232, #233, and #234, Price Proposal From REPLACE: Replace Price Proposal Form ‘Amendment 0010 – Price Proposal Form.pdf’
AMENDMENT 005 RESPONSE TO QUESTIONS___________________________
DELETE: RFI Response #30 clarification text
ADD: The following RFI Response #30 clarification text:
“RFP states ‘The minimum acceptable R-Value for all roofs or ceilings that cover conditioned spaces is R-49.’
This language is standard for building codes which typically refer to roof or ceiling R-values because it allows designers to adhere to building code while allowing for different attic designs. This RFP is prescriptive in requiring an unvented attic, however: Reference Section 01800, 1.7.2.3.11 for additional requirements.”
AMENDMENT 0010 ATTACHMENTS_________________________________
1. RFI Questions and Responses Log/Spreadsheet (attached)
2. Amendment 0010 - Revised Price Proposal Form (attached and via SAM.gov)
3. Amendment 0010 – A101_3BR TH POC_REV plan (via DoD SAFE)
4. Amendment 0010 – A102_4BR TH POC_REV plan (via DoD SAFE)
5. Amendment 0010 - A103_3BR HC RFP POC_REV (via DoD SAFE)
6. Amendment 0010 - A104_4 BR HC POC PLAN_REV (via DoD SAFE)
7. Amendment 0010 - C103_CONCEPT SITEPLAN (via DoD SAFE)
8. Amendment 0010 - G001_RFP CONCEPT (via DoD SAFE)
9. Amendment 0010 – Appendix F – Duplex_Kitchen Area & Pantry (via DoD SAFE & SAM.gov)
10. Amendment 0010 - Appendix K – Equipment Tags (via DoD SAFE & SAM.gov)
END OF AMENDMENT LANGUAGE
Note
Failure to acknowledge amendments may be cause for rejection of your offer.
PRICE PROPOSAL FORM
(Revised as per Amendment 0010)
PROJECT 21-14089081
REBUILD FAMILY HOUSING FORT WADSWORTH (PHASE 1)
AT USCG SECTOR NEW, STATEN ISLAND, NY
Task Order Announcement #: 70Z04724RPCNI0006
IMPORTANT NOTE: Contractors that include language in their proposals containing conditions may be rejected.
BASE ITEM 0001: Provide all services and materials necessary to design and construct in accordance with RFP Guide Specifications to complete the design and build the project entitled, ‘Rebuild Family Housing (Phase 1)’. The base bid scope includes:
(a) Demolition
1. Demolish existing fencing and miscellaneous site work, as shown in the RFP specifications and drawings.
2. Demolish residential units #423, #427, #428, #430, #431, and #432, including the carport/storage structures, as shown in the RFP specifications and drawings.
(b) Construction
1. Construct a new fence and gates, as shown in the RFP specifications and drawings.
2. Construct eight buildings that house 37 units. Those units include a mix of 3-bedroom, 4-bedroom, 3-bedroom ADA accessible, and 4-bedroom ADA accessible residential units, as shown in the RFP specifications and drawings.
Item Design Price ($) Construction Price ($) Total Item Price ($) New construction of the four ADA units including all associated utilities and site work within the 5-ft of the building.
New construction of Building #6, including all associated utilities and site work within the 5-ft of the building.
New construction of the remaining units, excluding those in the two rows above, and including all associated utilities, site work within the 5-ft of the building.
All site work outside of the 5-ft line, including all associated utilities, site work for all 8 buildings, plus all project demolition, fencing and gate work.
The TOTAL BASE ITEMS shall be deemed to include all costs required for the specific work to be completed in accordance with the plans and specifications.
Total for BASE ITEM 0001: $
BASE ITEM 0002: Allotment to all Contactors for all utility disconnection and connection fees and related service activities in accordance with Specification 01110, Paragraph 1.11 (New Utility Services).
Base Item 0002 will be negotiated and incorporated into the contract via a modification at a later date. An equitable adjustment will be made to the Contractor in the event this effort’s total cost is above $92,5000.
A credit will be due back to the Government in the event these efforts total cost is less than $92,500.00.
Total for BASE ITEM 0002: $ 92,500.00
Total for BASE ITEMS 0001+ 0002: $ _____
OPTION ITEMS
NMACC III Contractors are required to provide pricing for all Bid Option Items. If awarded, options shall be completed within the contract performance period. Options will be considered in accordance with FAR 52.217-5 Evaluation of Options (JULY 1990).
BID OPTION 1, ITEM 0001: Provide all services and materials necessary to design and construct a five-unit multi-plex housing building (Unit #9) and tree removal in accordance with RFP Guide Specifications.
Item Design Price ($) Construction Price ($) Total Item Price ($) New construction including utilities and site work.
BID OPTION 1, ITEM 0002: Allotment to all Contractors for all utility disconnection and connection fees and related service activities in accordance with Specification 01110, Paragraph 1.11 (New Utility Services). Bid Option 1, Item 0002 will be negotiated and incorporated into the contract via a modification at a later date. An equitable adjustment will be made to the Contractor in the event this effort’s total cost is above $12,500.00. A credit will be due back to the Government in the event these efforts total cost is less than $12,500.00.
Total for BID OPTION 1, ITEM 0002: $ 12,500.00
Total for BID OPTION 1, ITEMS 0001+ 0002: $ _____________
BID OPTION 2, ITEM 0001: Provide all services and materials necessary to design and construct a four-unit multi-plex housing building (Unit #10) and tree removal in accordance with RFP Guide Specifications.
BID OPTION 2, ITEM 0002: Allotment to all Contactors for all utility disconnection and connection fees and related service activities in accordance with Specification 01110, Paragraph 1.11 (New Utility Services). Bid Option 2, Item 0002 will be negotiated and incorporated into the contract via a modification at a later date. An equitable adjustment will be made to the Contractor in the event this effort’s total cost is above $10,000.00. A credit will be due back to the Government in the event these efforts total cost is less than $10,000.00.
Total for BID OPTION 2, ITEM 0002: $ 10,000.00
Total for BID OPTION 2, ITEMS 0001+ 0002: $ _______________
BID OPTION 3, ITEM 0001: Provide all services and materials necessary to design and construct a five-unit multi-plex housing building (Unit #11), tree removal, and street resurfacing in accordance with RFP Guide Specifications.
BID OPTION 3, ITEM 0002: Allotment to all Contactors for all utility disconnection and connection fees and related service activities in accordance with Specification 01110, Paragraph 1.11 (New Utility Services). Bid Option 3, Item 0002 will be negotiated and incorporated into the contract via a modification at a later date. An equitable adjustment will be made to the Contractor in the event this effort’s total cost is above $12,500.00. A credit will be due back to the Government in the event these efforts total cost is less than $12,500.00.
Total for BID OPTION 3, ITEM 0002: $ 12,500.00
Total for BID OPTION 3, ITEMS 0001+ 0002: $ _______________
PROPOSAL TOTAL
Base Item 0001, 0002 + Totals Bid Option Items 1, 2 and 3: $ _
AMENDMENTS ACKNOWLEDGED
Amendment No.
Date Amendment No.
Date
Offeror:
Address:
Phone #:
Fax #:
Email:
Name:
Signature:
Date:
RFI
Date ReceivedRFP RFI Questions Government response Amendment
0 30-Sep-24 Attachment D file has an error when trying to open. See amendment 0004 for file re-upload. 0004
1 2-Oct-24 01 80 00, 1.3.1, 1.3.2, and 1.4.10
1.4.10 specifies the use of natural gas for residential appliances (ranges/stoves and/or dryers), and mechanical and plumbing equipment. 1.3.1 Sustainable Design specifies project compliance with Executive Order 13514, dated October 5, 2009. The stated goal of EO 13514 is "to establish an integrated strategy towards sustainability in the Federal Government and to make reduction of greenhouse gas emissions (GHG) a priority for Federal agencies." Please confirm the use of natural gas as specified in 1.4.10 is compliant with EO 13514.
Comply with 01800-1.4.10 that specifies natural gas for residential appliances. 0005
2 2-Oct-24 01 80 00, 1.3.2, and 1.4.10
1.4.10 specifies the use of natural gas for residential appliances (ranges/stoves and/or dryers), and mechanical and plumbing equipment. 1.3.2 LEED for Homes Certification specifies the Mandatory requirement EQc2.2 Enhanced Combustion Venting Measures - Install no combustion equipment in the homes. Natural gas appliances and mechanical and plumbing equipment are combustion equipment requiring combustion venting. Please confirm whether all electric appliances and mechanical and plumbing equipment are to be provided to comply with 1.3.2.
Due to site constraints, use of natural gas is authorized. 0005
3 2-Oct-24 01 80 00, 1.3.1
Please confirm whether the project site is located within an EPA radon zone, and if the buildings are to be designed and constructed with radon-resistant construction techniques in compliance with LEED for Homes v4.
Shall be determined by the DOR. 0005
4 2-Oct-24 01 80 00, 1.4.6, FEMA map 3604970331 F
1.4.6 specifies that the "Contractor shall determine the most efficient and economical main building finish floor elevation based upon the closest 100-year floodplain elevation to the site established by FEMA, the International Building Code and ASCE 24-14." "The site is in Zone X, per FEMA map 3604970331F dated September 5, 2007." No base flood elevations or depths are shown within this zone. FEMA map 3604970331F shows the closest 100-year floodplain elevation to the site as Zone AE (EL 11/ NGVD 29). Please clarify the base flood elevation to be used for the project site.
This shall be determined by the DOR. However, if flood elevation information is not provided for Zone X, the DOR can use the nearest floodplain elevation to that zone.
5 2-Oct-24 Existing Utilities
Please confirm if the Contractor should include consumption costs for existing utilities (water, electric, natural gas) used during the construction of the project?
Refer to Amendment 006. Refer to RFP 01500 -1.3.4 Utility Usage and 01110 -
1.1 New Utility Services.
6 2-Oct-24 Pre-Existing Hazardous Material
Please confirm that Owner will indemnify the Contractor for any loss, cost, expense, or fine related to any pre-existing hazardous material.
Indemnification is an inherent violation of the Anti-deficiency Act, and such clauses requiring such, are unenforceable against the government. To the extent that unknown or unforseen site conditions arise, the contractor is entitled to submit e request for equtiable adjustment, and pursue remedy through the claims process.
7 2-Oct-24 Liquidated Damages
Please confirm that Liquidated Damages will be the sole and exclusive remedy for delay.
Reference FAR 52.212-12, and our approrpropriate termination clause in the NMACC III-Pool 1 IDIQ.
8 2-Oct-24 Consequenti al Damages
Please confirm a mutual waiver of consequential damages, as listed, will be inserted into the final contract documents: “In no event shall any Indemnified Party or the Contractor be liable to the other for any indirect, special or consequential damages (including, but not limited to, loss of profits, interest, earnings or loss of use) whether arising in contract, tort or otherwise.”
Reference FAR 52.212-12, and our approrpropriate termination clause in the NMACC III-Pool 1 IDIQ.
9 2-Oct-24 Upon speaking to the NY Building and Construction Trades Council (NYBCTC), it is a lengthy process to get an executed Project Labor Agreement in place to include in our proposal. As of 10/1/24, we are still working to get a draft PLA from the NYBCTC. Once received, it will need to be reviewed and comments submitted to the NYBCTC, then negotiated, then approved by all the local trade unions, and then sent to DC for final approval by the North American Building Trades Unions, NABTU, (NYBCTC's parent company). Once we have a final PLA, we need to have our bidding subcontractors agree to the PLA prior to submitting our price proposal. This process can easily take two months from receipt of the draft PLA. Please consider adding an additional four weeks to the current due date adjusting the due date to 26 November 2024?
Change CLOSING DATE from " October 29, 2024" to "November 26, 2024". (See Amendment).
10 2-Oct-24 Specification section 01800, 1.9.3 – States there are no salvage requirements.
During the Site Visit on 9/17/24, it was indicated there maybe some appliance that USCG will want to retain prior to the start of demolition activities. If so, please confirm who (contractor or Government) will be responsible for the removal and salvage of any appliances (ranges, washers/dryers, refrigerators, dishwashers, furnaces, water heaters) USCG wants to retain. If no appliances are being retained by USCG, please confirm the contractor is responsible for removal and disposal of all appliances.
Per RFP Specification 01800-1.9.3 there is no salvage. The Contractor is responsible for demolition of all existing appliances. Refer to Amendment 006 for clarifying language in RFP Specification 01800-1.9.2.1 'Specific Demolition Requirements'.
11 2-Oct-24 We cannot find the proposal text requirements. Please provide or confirm the offerors proposal shall match the same format requirements as the NMACC III (Phase II) non-price factors which was "Text pages 8-1/2 x 11 format with 10 point minimum, Times New Roman font on text pages" and "Drawing 11 x17 inches with 9 point minimum, Times New Roman font on Drawings."
Confirmed, yes. 0005
12 2-Oct-24 Specification section 01800, 1.11 – Permits the use of gas fired water heater.
Since natural gas is on site, please confirm natural gas is allowed to be used for this project?
Confirmed, yes. 0005
13 2-Oct-24 Specification section 1800, 1.11.8 – Provides requirements for gas distribution for the project. Since natural gas is on site, please confirm natural gas is allowed to be used for this project?
Confirmed, yes. 0005
14 2-Oct-24 Specification section 1800, 1.12.1.3.1.2 – Please confirm gas furnaces are allowed for this project since natural gas is on site?
Confirmed, yes. 0005
15 2-Oct-24 Confirm it is to be assumed for bidding purposes the existing electrical service can accommodate the new building usage.
Confirmed, yes. 0005
16 2-Oct-24 Specification section 01800,1.11.3 - confirm freeze proof and not frost proof are to be provide at the exterior based on project location climate?
Confirmed that freeze proof is correct. See Amendment 0007. 0007
17 2-Oct-24 Confirm the existing housing units HVAC and water heater units are natural gas?
Furnaces and water heater utilize natural gas. 0006
18 2-Oct-24 Confirm it is to be assumed for bidding purposes the existing sanitary and water service can accommodate the new buildings usage?
Confirmed, for bidding purposes, assume the existing sanitary sewer main lines and the existing water main lines can accommodate the new buildings usage.
19 2-Oct-24 Confirm it is to be assumed for bidding purposes the existing electrical service can accommodate the new building usage.
Confirmed, for bidding purposes, assume existing electrical service can accommodate the new building usage.
20 2-Oct-24 For bidding purposes, please confirm we should assume all existing utilities we are to tie into are in good working condition?
Confirmed, for bidding purposes, assume the existing utilties are in good working condition.
21 2-Oct-24 Specification section 01800, 1.1.1.4 states residential buildings except for mechanical and equipment rooms shall be accessible to the physically handicap per ADA. Please confirm this ADA compliant accessibility is only for the residential units identified as "Accessible" on Tables in section 1.1.1 and the RFP drawings?
Provide accessibility as required by federal/state/local laws and codes including Uniform Federal Accessibility Standards, the Fair Housing Act for all residences.
AMENDMENT 0007 PRE-PROPOSAL INQUIRY/REQUEST FOR INFORMATION - Family Housing Fort Wadsworth
22 2-Oct-24 Specification section 01800, 1.2 discussed prescriptive requirements but does not specifically identify such. Please identify the prescriptive design elements provided in the RFP and RFP drawings?
RFP 01800-1.2 provides guidance on how the Contactor shall interpret the RFP drawings and specification contained herein.
23 2-Oct-24 Specification section 01800, 1.3 includes EO 13423 as Sustainable Documents we need to meet requirements and goals. This EO is very broad and generic.
Please specifically identify the requirements / goals required in this EO for this project?
EO 13423 reference has been removed. See Amendment 005. 0005
24 2-Oct-24 Specification section 01800, 1.3 includes EO 13514 as Sustainable Documents we need to meet requirements and goals. This EO is very broad and generic.
Please specifically identify the requirements / goals required in this EO for this project?
EO 13514 references has been removed. See Amendment 005. 0005
25 2-Oct-24 Specification section 01800, 1.4.5 Utility Meters states to re-use existing equipment where possible and return un- used to Facilities Engineer. Section
1.9.3 states no salvage. Does existing meters meet current RFP advanced metering requirements? For bidding purposes, please confirm we shall assume all new metering?
Please see amendment 006. 0006
26 2-Oct-24 Specification section 01800, 1.4.7. Please confirm the only family housing units to be designed for any ADA compliance is the housing units identified as "Accessible"?
All units shall be designed to meet the applicable accessibility requirements for these spaces including UFAS, the Fair Housing Act Accessibility Guidelines, and
ADA.
27 2-Oct-24 Specification section 01800, 1.4.10 Gas. Confirm we can use natural gas for HVAC and plumbing equipment?
Comply with RFP 01800-1.4.10 as written; 'Natural gas will be used for residential appliances (range/stoves and/or dryers), mechanical and plumbing equipment, see architectural, mechanical and plumbing sections for more information.'
28 2-Oct-24 Specification section 01800, 1.6.5 for bidding purposes please confirm that we should assume the percolation test will be acceptable and no corrective work resulting from the percolation test shall be included on our bid price?
Refer to clarying language in Amendment 0007. 0007
29 2-Oct-24 Specification section 01800, 1.6.7.4 for bidding purposes please confirm that we should assume the soil test will be acceptable and no corrective work resulting from the soil test shall be included on our bid price?
Shall be determined by the DOR. The Government cannot reasonably forecast the Contractor's demolition and construction activies's impact to site soil condtions.
30 2-Oct-24 Specification section 01800, 1.7.2 states minimum R value for all roofs and ceilings is R-49. Please clarify what all ceilings mean? Isn’t this just for the roof?
RFP states "The minimum acceptable R-Value for all roofs or ceilings that cover conditioned spaces is R-49." This language is present to allow contractors to determine their means & methods of how to insulate the structure. For reference, the IECC indicates a ceiling insulation minimum, however a mechanically-ventilated attic space with an insulated attic floor may also be appropriate for this RFP, as may a conditioned attic (with its insulation designed either above or below the roof structure.) This language is not meant to double the insulation requirement at the attic, but is used to allow flexibility in design consideration.
31 2-Oct-24 Specification section 01800, 1.7.2.1 states a sample wall shall be constructed on site prior to ordering and installing any exterior materials. Please provide more detail / specifics of the exterior wall mockup required?
Sample walls are a standard of practice in building construction projects. Having a wall ready for exterior finish materials, once received, is necessary to display how the construction of this building comes together and allows a complete understanding of how materials are to be attached, punctured, or connected.
32 2-Oct-24 Specification section 01800, 7.2.3 Roof systems - are downspout splash blocks allowed?
The Family Housing Design CSTO SILC-CSTO-36-11 55 13 11-01 that is a requirement for this RFP already requires splash blocks to be part of this RFP.
Where downspouts are not adjacent to sidewalks, provide precast concrete splash blocks and set splashblocks to redirect water away from the foundation along perimeter. At or adjacent to sidewalks and other hard surfaces, no splashblocks are allowed to be provided as part of this RFP: Instead, at or adjacent to concrete surfaces, provide rubber boots at downspouts to directly connect to below-grade stormwater system at bottom of downspout (assume minimum 12" from-grade boot) to prevent slippery conditions that may occur during inclement weather.
33 2-Oct-24 Specification section 01800, 1.7.4.9 states walls, partitions, and floor/ceilings separating dwelling units from public or service areas shall be no less than STC
50. Please confirm there are no public areas within these proposed buildings?
As this is an RFP for the design and construction of buildings, while public spaces may not exist in the drawings that are provided as part of this RFP, this cannot be confirmed as the decision to provide spaces leans on the contractor's expertise to determine.
34 2-Oct-24 Specification section 01800, 1.7.4.9 states walls, partitions, and floor/ceilings separating dwelling units from public or service areas shall be no less than STC
50. Please define what rooms are defined as service areas? Also if these rooms are within the dwelling unit and not adjacent to another dwelling unit what STC rating shall these walls and ceilings have?
Follow RFP as written for the entirety of this RFI line item. For additional requirements regarding STC ratings necessary to provide as part of this RFP, see Appendix F. As this is a solicitation for the design and construction of buildings, while service spaces may not exist in the particular drawings that are provided as part of this RFP solicitation, the government cannot confirm that service spaces will not be provided as part of the design decisions that the A/E will make as part of their RFP response design. If any public or service spaces exist in the A/E proposal, the Sound Transmission Class must be provided to meet this RFP minimum.
35 2-Oct-24 Specification section 01800, 1.7.5.6 states windows need to pass South Florida protocols, TAS-201, TAS-202, TAS- 203, have NOAs and Florida Product Approvals for large missel impact. Please confirm these South Florida hurricane requirements are required ?
The Contractor shall comply with 01800-1.7.5.6 as written. This is a basis of design product.
36 2-Oct-24 Specification section 01800, 1.7.5.9 states louvers are to meet Miami-Dade structural tests. Please confirm this is required?
Confirmed. 0005
37 2-Oct-24 Specification section 01800, 1.8.3.2 please confirm exposed structural steel - Steel Structures in Corrosive Environments is required for this project?
Where structural steel is used in exposed areas, comply with 01800-1.8.3.2. 0005
38 2-Oct-24 Specification section 01800, 1.9.1.3 Being a Federal project, please confirm no NY state or local permits are required?
Shall be determined by the DOR 0005
39 2-Oct-24 Specification section 01800, 1.9.6. For bidding purposes, please confirm we shall assume PFAS is not known to be present?
PFAS is not known to be present. 0005
40 2-Oct-24 Please confirm that the provided flow test in Amendment 0002, Attachment E, file name “E USCG Ft Wadsworth Transmittal 54 Hydrant Flow Test” dated April 2023 is to be used for bidding purposes.
Confirmed, yes. 0005
41 2-Oct-24 Specification section 01800, 1.11 Plumbing and 1.12 HVAC references and details out the use of natural gas for plumbing and HVAC equipment. Since natural gas is on site, please confirm natural gas fired plumbing and HVAC equipment can be used for this project.
Confirmed, yes. 0005
42 2-Oct-24 Specification section 01800, 1.11 Plumbing and 1.12 HVAC references and details out the use of natural gas for plumbing and HVAC equipment. Since natural gas is on site, please confirm natural gas fired appliances can be used for this project.
Confirmed, yes. 0005
43 2-Oct-24 Specification section 01800, 1.11.3.1 states handicap water closets and lavatories shall confirm to ADA standards. Please confirm that only Accessible dwelling units are to receive and comply with ADA standards?
Confirmed, yes. 0005
44 2-Oct-24 Specification section 01800, 1.12.1.3.7 please confirm that radiant floor heating is required for all bathrooms? Even ones that are on above floors that have conditioned space below? Even bathrooms without showers?
Confirmed. Comply with 01800-1.12.1.3.7 that requries 'radiant floor heating (electric or hydronic) for all bathrooms.' Clarification provided within Appendix F Individual Space Critiera Sheets per Amendment 007.
45 2-Oct-24 Specification section 01800, 1.12.1.3.8 calls out for exhaust in powder rooms.
What is defined as powder rooms, and is exhaust required in these rooms?
References to 'Powder Rooms' has been replaced with 'half-bathrooms'. See Amendment 007.
46 2-Oct-24 Specification section 01800, 1.12.1.6 Sea Salt Spray Resistance. Please confirm this section requirements are necessary for this project?
Confirmed, sea salt spray resistance is required. 0005
47 2-Oct-24 Specification section 01800, 1.13.1 Electrical Service. Please confirm the primary service is in good working condition and adequate for this project?
For bidding purposes, assume existing utilities will support the load demand of the new buildings. Primary service and work on it is outside the scope of this contract.
48 2-Oct-24 Specification section 01800, 1.13.1 Electrical Service. Please confirm the primary service and transformer is not part of this scope of work?
Confirmed, primary service and tranformer work is outside the scope of this contract.
49 2-Oct-24 Specification section 01800, 1.13.10 Lighting. We do not find any requirements for lighting controls. Please confirm automated lighting controls are not intended and not part of this project scope?
In paragraph 1.13 there is a reference to the design complying with the Family Housing Design CSTO SILC-CSTO-36-11 55 13 11-01. In this document there is guidance to lighting controls and references that the DOR should make note.
50 2-Oct-24 Specification section 01800, 1.13 Electrical. We do not see any requirements for lightning protection. Please confirm lightning protection is not required for the buildings?
See Amenment 0005 0005
51 2-Oct-24 Specification section 01800, 1.14.1 requires camera at Entry Gate. We cannot find any other camera locations. Please confirm only camera is at Entry Gate?
Confirmed, yes. 0005
52 2-Oct-24 Specification section 01800, 1.18 states to comply with all applicable federal, state and local environmental requirements. Being a Federal project, does NY state and local AHJ / jurisdictions apply? Are we required to obtain NY state and local permits?
Shall be determined by the DOR 0005
53 2-Oct-24 Specification section 01800, 18.2 mentions FAA and FCC. Please confirm there are no requirements with respect to FAA and FCC?
Cannot confirm. The Contractor shall be responsible for identifying and obtaining all required permits.
54 2-Oct-24 Specification section 01800, 1.18.6 for bidding purposes, please confirm we shall assume there are no cultural, historic or archaeological resources known to be on the project site?
Cannot confirm. Refer to RFP Attachment B - Environmental. 0005
55 2-Oct-24 Please confirm the Option Items will be awarded at the same time as the Base award and the contract completion time for the Options are within the project Period of Performance?
Refer to Task Order Announcement, page 3 OPTION ITEMS, page 28 OPTION ITEMS Price Sheet, and FAR Clause 52.217-5 in the NMACC II-Pool 1 IDIQ.
56 2-Oct-24 Please confirm if we need to provide just section 52.204.24(d) completed for the Reps and Certs in our proposal, or do we also need to provide in our proposal 52.204-8 provided in the TOA as well?
Yes, provide 52.204.24(d). And yes 52.204-8. as per HSAR guidelines. See amendment to add (DEVIATION JAN 2024) to FAR 52.204-8 Annual Representations and Certifications (May 2024) on page 6 of Task Order Announcement.
0005 & 0009
57 2-Oct-24 Please confirm that the only Executive Orders that are part of this RFP / Contract are the ones specifically listed in the RFP, specifically EO 13423 and
EO 13514?
EO 13514 and EO 13423 references have been removed from the RFP Specification with Amendment 005. The Task Order Announcement did not specifically list all applicable Executive Orders by numbers. Refer to Task Order Announcment page 4, PROJECT LABOR AGREEMENT, FAR Subpart 22.5.
Refer to FAR Provision 52.222-33(c)(6) and FAR Clause 52.222-34(c)(6).
Furthermore, ALL Executive Orders in the the NMACC III-Pool 1 IDIQ apply as well.
58 2-Oct-24 Non-Price Factor 1 - Conceptual Design / Site Narrative. States to provide a written narrative to describe proposed "means and methods" of the conceptual building design… Means and methods typically is for the construction approach of the design. Please confirm "means and methods" for Factor 1 means the "design approach"?
Confirmed. 0006
59 2-Oct-24 Non-Price Factor 1 - Conceptual Design / Site Narrative. Factor 1 allows for 7 pages for the narrative. Due to the numerous design disciplines, and other requirements listed in (a) through (d), please increase the narrative page count to 10 pages?
Narative page count is increased from 7 to 10 pages (see amendment). 0005
60 2-Oct-24 Non-Price Factor 2 - Sequence of Design / Construction. Factor 2 allows 3 pages for this narrative. Due to the numerous requirements listed in (a) and (b) including approach for design and construction, permitting, construction phasing, permitting, commissioning, project closeout, logistical approach, safety, etc., please consider increasing the page count to 10 pages for Factor 2?
Narative page count is increased from 3 to 10 pages (see amendment). 0005
61 2-Oct-24 RFP Drawing (C-101) shows area for laydown. Can we use the project site for trailers and parking?
Refer to RFP Specification sections 01110-1.9.4.1 "Work Restrictions' and 01110-
1.9.1 Parking for requirements and authorization provided to the Contractor for trailers and parking.
62 2-Oct-24 RFP Drawing (C-101) shows haul routes are depicted on the drawings and C- 103 only has portions of the haul routes being milled and overlay. For bidding purposes, shall we assume haul routes are in good condition and adequate and only mill and overlay will be required? Should we assume areas not shown to be milled and overlay will not require any re-surfacing?
Assume haul routes are in good and working order. For bidding purposes assume that the only milling and overlay work is shown on the RFP drawings.
63 2-Oct-24 Please confirm that the dwelling unit appliances listed in the Appendix K Outfitting Item Information Sheets are to be electric, and not gas fired appliances since there is conflicting information in the RFP?
See Amendment 0010- Basis of Design products updated for Gas Range and stackable Gas dryer.
64 4-Oct-24 Conceptual Site Plan C-103 identifies Drainage Improvements Known Problem Area 2 at the intersection of Ayers Road and USS North Carolina Road.
However, C-103 does not show any road pavement work (2" mill & overlay) at this location. Please clarify the drainage problem at Area 2, such as the omission or under sizing of storm drainage structures in the area.
Please see Attachment D, for dainage issues and improvements.