Attachment 1 - SOW_Amendment 0004.pdf

PDF 388 KB Posted

Attached to
U. S. Coast Guard MH-60T Jayhawk Helicopter Advanced Aircrew Training Systems
Solicitation number
70Z02326R93150001
Issued by

About this file

Statement of Work Summary: MH-60T Advanced Aircrew Training Systems

This is a Statement of Work (SOW) for the design, fabrication, delivery, installation, and support of three advanced training devices for the United States Coast Guard (USCG). The primary deliverables include: one MH-60T Level 7 Flight Training Device (FTD) meeting FAA 14 CFR Part 60 standards with high-fidelity cockpit replication, motion systems, collimated visual displays, and mixed reality headset capability; one full-size Hoist Training Simulator (HTS) for rear-crew search and rescue operations with realistic cable dynamics and environmental effects; and one Deployable Hoist Training Simulator (D-HTS) with portable, modular design capable of rapid assembly and transport. All devices will be delivered and installed at USCG Aviation Training Center (ATC) in Mobile, Alabama. The contract includes seven Contract Line Item Numbers (CLINs): CLIN 0001 for the FTD, CLIN 0002 for the HTS, CLIN 0003 for the D-HTS, CLIN 0004 for training and documentation, CLIN 0005 for program management, CLIN 0006 for optional extended warranty coverage, and CLIN 0007 for spare parts, tools, and logistics support.

The total performance period shall not exceed 36 months from contract award, with key milestones including System Requirements Review at 90 days, Preliminary Design Review at 180 days, Critical Design Review at 300 days, and Factory Acceptance Testing completion by 680 days for the FTD. The Contractor is responsible for all program management, configuration management, cybersecurity compliance (NIST SP 800-53, DISA STIGs, and RMF processes), technical documentation delivery, initial and extended warranty (minimum one year standard, optional one-year extension), and transition to long-term sustainment. The FTD must feature a 4-channel electric control loading system, 6-degree-of-freedom motion platform, 200-degree horizontal visual field, mixed reality capability with 40 pixels-per-degree resolution, and real-time interoperability with hoist trainers at 50 millisecond latency. All devices require comprehensive cybersecurity artifacts including System Security Plan, Security Control Traceability Matrix, Software Bill of Materials, and Plan of Action and Milestones prior to Site Acceptance Testing. The warranty covers parts, labor, software updates, and technical support, with availability targets of 95 percent and maximum Mean Time to Repair of four hours for critical failures.

View the file

Other files

File Type Posted
RFP_70Z02326R93150001_Amendment 0007.pdf PDF
SF30_Amendment 0007.pdf PDF
SF 1449 70Z02326R93150001_Amendment 0007.pdf PDF
Questions and Responses 24AUG2026_Amendment 0006.xlsx XLSX spreadsheet
Attachment 1 - SOW_Amendment 0006.pdf PDF
SF30_Amendment 0006.pdf PDF
RFP_70Z02326R93150001_Amendment 0006.pdf PDF
SOW Enclosure 2 Installation ICD - MH-60T FTDs_Amendment 0006.pdf PDF
Attachment 1 - SOW_Amendment 0005.pdf PDF
SF30_Amendment 0005.pdf PDF
SF30_Amendment 0004.pdf PDF
SF 1449 70Z02326R93150001_Amendment 0004.pdf PDF
Attachment 2 - Price Schedule_Amendment 0004.xlsx XLSX spreadsheet
SOW Enclosure 4 - Delivery Payment Schedule_Amendment 0004.pdf PDF
RFP_70Z02326R93150001_Amendment 0004.pdf PDF
Attachment 1 - SOW_Amendment 0003.pdf PDF
Attachment 2 - Price Schedule_Amendment 0003.xlsx XLSX spreadsheet
SF 1449 70Z02326R93150001_Amendment 0003.pdf PDF
SF30 Amendment 0003.pdf PDF
RFP_70Z02326R93150001_Amendment 0003.pdf PDF
Questions and Responses 24July2026_Amendment 0003.xlsx XLSX spreadsheet
SOW Enclosure 4 - Delivery Payment Schedule_Amendment 0003.pdf PDF
SF30 Amendment 0002.pdf PDF
RFP_70Z02326R93150001_Amendment 0002.pdf PDF
Attachment 7 - CDRLs_ Amendment 0001.zip ZIP file
SOW Enclosure 1 - Govt Furnished Resources - H60T FTDs_Amendment 0001.pdf PDF
Attachment 1 - SOW_Amendment 0001.pdf PDF
SOW Enclosure 4 - Delivery Payment Schedule_Amendment 0001.pdf PDF
SF30 70Z02326R93150001_Amendment 0001 10July26.pdf PDF
RFP_70Z02326R93150001_Amendment 0001.pdf PDF
SOW Enclosure 3 - USCG Air Stations and Airfields_Amendment 0001.pdf PDF
Attachment 5 - Questions and Responses_Amendment 0001.xlsx XLSX spreadsheet
Attachment 1 - SOW.pdf PDF
RFP_70Z02326R93150001.pdf PDF
Attachment 2 - Price Schedule.xlsx XLSX spreadsheet
SOW Enclosure 1 - Govt Furnished Resources - H60T FTDs.pdf PDF
SF 1449 70Z02326R93150001.pdf PDF
Attachment 4 - Evaluation Definitions and Adjectival Ratings.pdf PDF
SOW Enclosure 2 Installation ICD - MH-60T FTDs.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW) FOR MH-60T ADVANCED AIRCREW TRAINING SYSTEMS

Amendment 0004

Contents

SECTION 1: GENERAL INFORMATION, BACKGROUND, AND OBJECTIVE

1.1 Introduction

1.2 Background

1.3 Program Objective

SECTION 2: Detailed Tasks and Requirements

2.1 MH-60T Level 7 Flight Training Device (FTD) (CLIN 0001)

2.1.1 Cockpit Replication and Structure

2.1.2 Flight Dynamics and Motion Systems

2.1.3 Visual and Display Systems

2.1.4 Image Generator and Special Visual Effects

2.1.5 Avionics and Systems Integration

2.1.6 Simulated Mission Equipment

2.1.7 Instructor Operator Station (IOS)

2.1.8 Aural Cueing and Communications System

2.2 Hoist Training Simulator (HTS) (CLIN 0002)

2.3 Deployable Hoist Training Simulator (D-HTS) (CLIN 0003)

2.4 Training and Documentation (CLIN 0004)

2.5 Extended Warranty and Support (CLIN 0006) (Optional)

SECTION 3: Environmental and Facility Requirements

SECTION 4: Testing Requirements

4.1 Factory Acceptance Testing (FAT)

4.2 Site Acceptance Testing (SAT)

4.3 Final Acceptance

4.4 Test Documentation

4.5 Correction of Deficiencies

SECTION 5: Program Management Requirements, Roles & Responsibilities (CLIN 0005) ..15

5.1 Contractor Roles and Responsibilities

5.2 Program Management Deliverables

5.3 Communication and Coordination

SECTION 6: Warranty

6.1 Standard Warranty Period

6.2 Coverage

6.3 Response and Resolution Time

6.4 Exclusions

6.5 Extended Warranty

6.6 Warranty Documentation

6.7 Transition to Sustainment

SECTION 7: Deliverables and Contract Data Requirements

7.1 Contract Data Requirements List (CDRL)

SECTION 8: Data, Cybersecurity, and Technology Management

8.1 Data Rights and Intellectual Property

8.2 Configuration Management and Change Control

8.3 Cybersecurity and Information Assurance

8.4 Interoperability and Integration

8.5 Obsolescence Management, Technology Refresh, and Sustainability

Section 9: Safety, Logistics, Performance and Risk Management

9.1 Environmental, Health, and Safety Requirements

9.2 Spare Parts, Tools, Consumables, and Logistics Support (CLIN 0007)

9.3 Performance Metrics and Risk Management

9.4 Escalation, Dispute Resolution, and Contract Closeout

9.5 Government Furnished Property

SECTION 10: Packaging and Marking

10.1 Packaging

10.2 Marking

SECTION 11: Inspection and Acceptance

11.1 Inspection

11.2 Acceptance

SECTION 12: Performance and Deliveries

12.1 Performance

12.2 Deliveries

SECTION 13: Special Contract Requirements

Acronym List

Enclosures

©E9 ±fá Äمك]ك EÄE• � xكfÄ[ á • ~ � ±fá Ä7كل � 9 u] • á ∂ Ä? كل � Ä? áك 7sE9±f…Eك لكfτ╤╗→×╩ð╤ň→τ The United States Coast Guard (USCG) is undertaking a critical modernization of its rotary-wing training infrastructure to support the MH-60T fleet growth and to enhance aircrew and rear-crew operational readiness.

The Contractor shall provide the design, fabrication, delivery, installation, and support of three advanced training devices:

• One (1) MH-60T Level 7 Flight Training Device (FTD): A high-fidelity simulator replicating the MH-60T cockpit, avionics, and mission systems for pilot and aircrew training.

• One (1) Hoist Training Simulator (HTS): A full-size, immersive, mixed-reality hoist trainer for rear-crew Search and Rescue (SAR) and hoist operations training.

• One (1) Deployable Hoist Training Simulator (D-HTS): A transportable, modular hoist trainer enabling mobile and distributed SAR/hoist training.

The Contractor will be responsible for the MH-60T Level 7 FTD and for managing the delivery and integration of the HTS and D-HTS. They will be responsible for all aspects of program management, device integration, delivery, installation, acceptance testing, documentation, training, and warranties (standard and or extended warranties).

All devices will be delivered and installed at the USCG Aviation Training Center (ATC) in Mobile, AL.

لÏ7ك ðŹě╗→╩τ× The USCG operates the MH-60T Jayhawk helicopter as its primary medium-range recovery (MRR) platform for search and rescue (SAR), law enforcement, homeland security, and disaster response missions. Historically, USCG aircrew training has relied on a combination of classroom instruction, part-task trainers, and operational flight time. While these methods provide valuable experience, they are limited in their ability to safely and cost-effectively replicate the full range of mission scenarios, emergency procedures, and complex SAR operations encountered in the field.

To address these challenges, the USCG has previously invested in fixed-base flight simulators and procedural trainers. However, the current training infrastructure does not fully meet the evolving needs of the MH-60T fleet, particularly in the areas of rear-crew hoist/SAR training and distributed/mobile training capability.

The primary objective of this program is to establish an organic, ground-based hoist simulation and rear-crew training capability for USCG rotary-wing flight mechanics and aircrews. Historically, the USCG has relied on an outsourced, third-party system for simulator-based hoist training. By transitioning to an in-house simulation system, the USCG will centralize training control and directly align flight mechanic proficiency with real-time fleet requirements.

This organic capability will be heavily leveraged by the USCG’s Standardization (STAN) instructor cadre based at ATC in Mobile, AL. Because the STAN team routinely travels across all units to evaluate fleet trends and operational execution, housing a ground-based simulator organically allows these instructors to rapidly integrate their field observations into the training curriculum. This ensures that emerging trends, operational deficiencies, and best practices are immediately reflected in an adaptable, in-house training program.

Currently, the USCG lacks a ground-based training environment that natively integrates pilots and rear-aircrew. The acquisition of this system addresses a critical gap in Crew Resource Management (CRM). Providing an interoperable, synthetic environment where pilots and flight mechanics can train simultaneously will enable crews to safely rehearse complex hoisting operations, review recent real-world cases, and build a more robust safety culture for missions executed in the most dangerous and remote environments.

The USCG faces a critical and rapidly emerging requirement to expand organic proficiency opportunities for rotary-wing aircrews following recent operational losses. Three Class A mishaps within the H-60 fleet—resulting in two destroyed aircraft and one fatality—have underscored the inherent hazards of hoist operations and amplified the urgency to mitigate risk through enhanced training . The integration of high-fidelity hoist simulation reflects the Coast Guard’s unwavering dedication to training innovation, operational risk management, and producing the safest, most capable aviation workforce possible.

ě╗Ï→╗¢كل σ áك ¦ ů¾ð╤ň◘¾ The Contractor shall design, fabricate, deliver, install, integrate, test, and support three (3) advanced training devices that collectively provide comprehensive, high-fidelity training for MH-60T pilots, aircrew, and rescue swimmers. These devices will enhance USCG operational readiness by enabling safe, repeatable, and realistic training for a full spectrum of mission scenarios. The Contractor shall ensure that all devices are interoperable, maintainable, and compliant with current USCG selected Security and Privacy Controls and operational requirements. The devices will be provided with the technical documentation referenced in the Contract Data Requirements List (CDRL) list (Table 1).

©E9 ±fá Ä?كمك ¾╤Ï ňΓ¾×ك±Ï ╛Ź╛كÏ τ×ك• ¾╖╩ň╗¾σ ¾τ╤╛ The Contractor shall provide all personnel, labor, materials, and equipment, required to design, fabricate, deliver, install, integrate, test, and support a MH-60T Level 7 FTD, a Hoist Training Simulator (HTS), and a Deployable Hoist Training Simulator (D-HTS) for the United States Coast Guard (USCG).

The Contractor shall also provide all required logistics support, technical documentation, training, warranty, and program management services as specified herein.

The Contractor shall deliver, install, and integrate all three (3) devices at the designated USCG site(s) to ensure they are fully operational, tested, and accepted. Each deliverable below corresponds to a specific Contract Line Item Number (CLIN) for pricing and invoicing purposes.

The Contractor shall design all systems to support future expansion, including the addition of new training devices or software modules.

ك~ل c ]ككx¾◘¾Γك±ي ΓňěŃ╤ك±╗Ï ňτňτěك? ¾◘ňð¾لاك[ ±? 9لاك� xfÄ�ك Scope: The Government intends to provide a spare non-operational MH-60T aircraft hull to serve as the physical reference and framework for the FTD. The Contractor shall design and build one (1) fixed-site, high-fidelity simulator replicating the MH-60T cockpit, avionics, and mission systems.

Requirements: The device shall be designed, manufactured, and tested to meet or exceed the technical criteria of the Federal Aviation Administration (FAA) 14 CFR Part 60 for a Level 7 Flight Training Device. These standards shall serve as the objective technical baseline for the device’s fidelity and performance. The U.S. Coast Guard, as a public aircraft operator, will serve as the sole evaluating and self-certifying authority. The device must also support all relevant training scenarios for pilot and aircrew (normal, abnormal, and emergency procedures, instrument flight, and mission scenarios). The device shall replicate the MH-60T cockpit, avionics, and mission systems and include full cockpit controls, switches, indicators, and panels “switchology” as per the current USCG MH-60T configuration, a high-fidelity visual system that is night vision goggle (NVG) compatible, and a fully functional instructor/operator station (IOS). The system shall be maintainable and upgradable. (Note:

See fidelity requirements in Section 2.1.1-2.1.8) Form, Fit and Function: The Contractor may utilize replicated hardware and rehosted software provided all components achieve full functional and physical equivalence to the H- 60 aircraft avionics and parts. All replicated equipment must provide a one-for-one match in tactile feedback, visual appearance, and operational logic to the original aircraft equipment.

Any rehosted software must execute with the same latency, fidelity, and response characteristics as the flight-certified version, ensuring the pilots interface is indistinguishable from the actual aircraft environment.

2.1.1 Cockpit Replication and Structure

a. The Government intends to make available one (1) retired, non-operational MH-60T helicopter fuselage, which the Contractor shall use as the structural basis for the FTD cockpit to ensure the highest possible physical fidelity.

b. The FTD shall be equipped with physical replicas of the pilot and copilot stabilator check mirrors. The reflection in each mirror shall be a simulated image of the aircraft's stabilator, achieved by integrating small, high-resolution display screens.

2.1.2 Flight Dynamics and Motion Systems

a. The FTD shall be equipped with a digital, 4-channel electric control loading system (CLS) utilizing Moog E-series or equal high-performance electric actuators. The CLS must be fully digital, electric, provide accurate and rapid force feedback, deliver a minimum continuous force of 50 lbs. per channel, and integrate with simulator software using standard communication protocols. Any proposed equal product must meet or exceed the performance, reliability, and integration capabilities of the Moog E-series actuators.

b. The cockpit assembly shall be mounted on a compact, commercial-off-the-shelf (COTS), high-fidelity, six-Degree-of-Freedom (6-DOF) electric motion platform utilizing an all-electric (electromechanical) hexapod architecture. The entire motion system must be capable of operating within the facility footprint specified in the Installation Facility Interface Control Document (ICD, Enclosure 2). The platform must be capable of high-frequency vibration cueing up to at least 30 Hz, and provide smooth, low-latency motion cueing across all translational (heave, surge, sway) and rotational (pitch, roll, yaw) axes.

Any proposed equal motion platform must meet or exceed the specified frequency response, reliability, and integration requirements. The motion base must be governed by a dedicated, standalone digital motion controller cabinet that interfaces directly with the host simulation computer via standard Ethernet protocols (UDP/TCP).

c. To ensure minimal maintenance and eliminate hazards associated with hydraulic fluid, the system must utilize high-response electric linear actuators. For personnel safety and equipment protection, the system must include integrated hardware and software fail-safes, including fail-safe mechanical braking on all actuators, absolute position feedback sensors, mechanical over-travel stops, and an automated, gravity-assisted "return-to-home" or settle function in the event of total power loss or emergency stop activation.

2.1.3 Visual and Display Systems

a. The FTD shall be equipped with a Q4 Services SupraVue® MAX or equal collimated visual display system, providing a minimum field of view of 200 degrees horizontal by 60 degree vertical. The visual display system must utilize a continuous, monolithic vacuum-formed metalized film mirror paired with a seamless overhead back-projection screen to eliminate parallax errors and provide true depth perception for a multi-crew cockpit. The system must deliver uninterrupted Out-The-Window (OTW) imagery focused at optical infinity, free of physical seams, joints, or noticeable optical distortions in the primary viewing areas. The display framework must be constructed from ultra-lightweight composite materials optimized for direct integration onto a 6-DOF motion platform without negatively impacting the motion system’s payload capacity or center of gravity.

The visual display system shall be paired with Norxe P-series or equal projectors, capable of delivering high-resolution, high-brightness imagery with minimal latency to ensure accurate, real-time visual cueing during all phases of simulator operation.

b. The FTD shall also be equipped with a Mixed Reality (MR) system utilizing the latest generation Varjo Extended Reality (XR) series or equal professional headsets for Government/offline use. The MR system must be fully functional on an air-gapped network and support rapid system calibration and alignment procedures. The headset must be professional-grade, capable of high-fidelity, low-latency video pass-through mixed reality, and feature ultra-high-resolution displays providing a minimum of 40 Pixels Per Degree (PPD) in the central viewing area to ensure the legibility of highly detailed virtual cockpit instrumentation and physical Electronic Flight Bags (EFBs). The system must utilize dual front-facing cameras with active depth-sensing technology to seamlessly composite the virtual flight environment with physical cockpit elements, providing real-time depth awareness and dynamic occlusion so the pilot can naturally see their hands, flight controls, and EFB layered over the virtual world. The headset must also integrate native, high-frequency eye-tracking technology to support dynamic foveated rendering, maximizing graphical fidelity where the user is looking while optimizing host computer performance. All components must be robust to withstand operational stresses associated with frequent motion platform movements, and any proposed equal MR system must meet or exceed the specified optical quality, integration, and durability requirements.

c. FTD Visual System Operating Modes: The FTD shall be designed to support two distinct, instructor-selectable visual training modes. The domed collimated display and the mixed reality (MR) headset will not be utilized concurrently by the same pilot. The system architecture must allow for seamless transition between the following modes:

d. Mode 1: Collimated Display Mode. This is the primary mode for core flight training, including aircraft checklists, normal and emergency procedures, and instrument flight rules (IFR) training. In this mode, the pilot utilize only the physical out-the-window (OTW) collimated dome display.

e. Mode 2: Mixed Reality (MR) Mode. This mode is reserved for tactical and high-workload operational training requiring an expanded Field of View (FOV) and enhanced depth perception, such as SAR search patterns, vertical reference/hoist operations, and

Confined Area Landings (CALs). In this mode, the pilot utilizes the MR headset to view the simulated external environment superimposed over the physical cockpit.

f. Chin Window Visual Requirements: Physical chin windows are required as part of the structural cockpit replication. The visual display requirements for these windows are dependent on the selected operating mode as follows:

g. Collimated display mode: No active visual projection or display is required through the chin windows. They may remain unprojected/blank during this mode.

h. Mixed Reality (MR) mode: Visual imagery must be fully rendered through the chin windows. The MR headset must dynamically superimpose the virtual environment over the physical chin window openings to support down-and-in chin-window visibility (e.g., during hoists and confined area landings).

2.1.4 Image Generator and Special Visual Effects

i. The FTD shall incorporate a high-performance, COTS GPU-based image generator (IG), such as Aechelon Nucleus or equal, capable of real-time, multi-channel, and multi-spectral rendering. The IG must ingest, process, and render global-scale geospatial databases – including high-resolution satellite imagery, elevation data, and 3D cultural models, with continuous Level of Detail (LOD) management to ensure smooth transitions without visual artifacts. The visual database must include all USCG Air Stations as high-fidelity airfields. Enclosure (3) provides a list of the required USCG Air Stations and their correlating airfields. The following further describes the definition of ‘high fidelity’ airfield:

j. At a minimum, this includes: Accurate Runway and Taxiway Placement: All runways, taxiways, and parking areas must be accurately placed and oriented, with correct markings, lighting (including approach lighting systems), and signage. Geospecific 3D Models: All significant airfield structures (e.g., hangars, terminals, control towers, and unique/prominent buildings on or adjacent to the airfield) must be modeled with realistic, geospecific textures. Realistic Terrain and Environment: The immediate surrounding terrain must be realistically modeled with appropriate textures, vegetation, and cultural lighting. Dynamic Elements: The model must support dynamic environmental effects, including weather (rain, fog, snow), time of day, and appropriate lighting. The contractor's proposed solution must be capable of generating a visual scene that is immediately recognizable to a pilot familiar with the airfield and is suitable for conducting all required training tasks, including circling approaches, visual patterns, and ground operations.

k. The IG must generate OTW visuals and physics-based sensor simulations (Electro-

Optical, Infrared/FLIR, Night Vision Goggles, Synthetic Aperture Radar) from a single, unified database to ensure absolute correlation and eliminate discrepancies. Advanced visual effects must include dynamic brownout/whiteout modeling, rotor wash airflow modeling on surfaces, and real-time CFD airflow modeling for wind interaction, weather transitions, and environmental lighting.

l. The IG must support real-time distortion correction and edge-blending for collimated dome projections, as well as low-latency, high-frame-rate outputs for mixed reality headsets. The projector visual display system shall include an integrated, automated image alignment and color/brightness balancing system (auto-alignment system). Any proposed equal IG must meet or exceed the specified fidelity, correlation, integration, and performance requirements.

2.1.5 Avionics and Systems Integration

a. The FTD's Military-Standard (MIL-STD)-1553B and Aeronautical Radio, INC (ARINC) 429 data bus architectures shall be implemented as physically separate, external buses managed by dedicated hardware with accessible breakout panels.

b. The FTD shall provide a full and accurate simulation of the Traffic Collision Avoidance System (TCAS) II and the aircraft's standby magnetic ('wet') compass.

c. The system must provide a Bluetooth-based Global Positioning System (GPS) spoofing capability for use with actual Government-provided Electronic Flight Bags (EFBs)/IPAD.

The Bluetooth module itself must be “turned off” or “shielded” when not in use to satisfy the Authority to Operate (ATO).

2.1.6 Simulated Mission Equipment

a. The Contractor shall provide a fully functional simulation of the Honeywell Radar RDR-

7000 or equal weather radar and the Teledyne FLIR ESS-M or equal Electro- Optical/Infrared (EO/IR) sensor system. The simulated systems must replicate all operational modes, controls, displays, and performance characteristics of the actual aircraft-installed equipment.

2.1.7 Instructor Operator Station (IOS)

a. General Requirements: The IOS shall achieve maximum commonality with existing

Operational Flight Trainer (OFT) Instructor Stations at ATC Mobile, utilizing a Government-provided IOS software baseline or provide equivalent functionality as approved by the Government. It must be an enclosed environment for at least three (3) personnel and include remote tablet control, a 3D After-Action Review (AAR) system, multi-camera cockpit video/audio recording, and simulated air traffic and communications environments.

b. 3D After-Action Review (AAR) System: The AAR system shall meet the following minimum baseline performance requirements:

m. Data Recording: Synchronized recording of all simulated flight data (ownship parameters, flight path, switchology/inputs), visual OTW scenes, cockpit instrument displays, and all instructor-student audio communication for the duration of the training event.

n. Playback Control: The ability for the instructor and crew to pause, fast-forward, rewind, and bookmark specific events during the debriefing playback.

o. 3D Tactical Viewing: A graphical user interface (GUI) that allows for viewing the recorded flight path in a 3D simulated environment, with the ability to manipulate the viewing angle (tethered to ownship, free-roaming camera, and ‘pilot eye’ view)

p. Exportability: The capability to export debriefing session files to standard, unclassified commercial media formats (.mp4, .avi) for standalone review outside the simulator facility.

2.1.8 Aural Cueing and Communications System

a. Aural cueing shall be provided by an ASTi Telestra-series or equal system, capable of fully simulating the aircraft’s radio suite (ARC-210, ARC-220, RT-5000) and internal intercom system (ICS), including all operational models, controls, and audio fidelity requirements.

The simulation system must incorporate a dedicated, network-based audio and communications platform using a software-defined, model-based architecture to generate realistic, physics-based 3D spatial audio—including aerodynamic noise, engine acoustics, environmental sounds, and warning tones—synchronized with the host vehicle's dynamic state in real time. The system must provide high-fidelity simulation of multi-channel radios (VHF, UHF, SATCOM), secure/crypto voice emulation, and ICS, accurately modeling radio frequency physics, including Line-of-Sight propagation, terrain masking, atmospheric degradation, and distance-based signal attenuation. The platform must support Distributed Mission Operations (DMO) and be compliant with standard interoperability protocols, including Distributed Interactive Simulation (DIS) and High Level Architecture (HLA) for seamless, networked voice integration with external simulator nodes.

cكل →ň╛╤ك±╗Ï ňτňτěك©ňσ ╩ΓÏ╤→╗لاكc 9لاك�©± xfÄ�ك Scope: The Contractor shall provide one (1) full-size, immersive, mixed-reality hoist trainer replicating the MH-60T cabin environment for rear-crew SAR and hoist operations.

Requirements: The HTS shall provide realistic cable physics, haptic feedback, environmental effects (rotor wash, sea state, night/NVG), support for a full range of SAR mission profiles (including overwater, shipboard, and confined-area operations) and include an instructor/operator station with scenario authoring, malfunction insertion, and after-action review (AAR) capabilities.

q. The system must replicate key hoist controls and tasks with realistic cable dynamics.

r. Provide a portable, rapidly deployable training capability suitable for use at locations without permanent simulator infrastructure.

s. Provide a representative hoist operator station/interface that replicates the controls, indications, and operator tasks necessary to conduct helicopter hoist operations.

t. Provide immersive visual representation of the operating environment, including the aircraft, hoist area, recovery surface, personnel/load, and relevant environmental conditions.

u. Simulate hoist cable/load dynamics and mission-relevant environmental effects, to the extent required to provide meaningful operator training.

v. Support instructor-generated and/or configurable training scenarios, including normal, abnormal, and emergency hoist operations.

w. Provide real-time instructor monitoring and control of training events and scenario

x. Capture trainee and crew performance data and provide after-action review capabilities.

y. Support crew coordination training between hoist operators and other rear-crew/aircrew personnel.

z. Support future software, scenario, and training-content updates without requiring replacement of the complete system.

?كل ¾╔Γ→♣Ï ¦ Γ¾كc →ň╛╤ك±╗Ï ňτňτěك©ňσ ╩ΓÏ╤→╗لاك? cي 9لاك�©± xfÄ�ك Scope: The Contractor shall provide one (1) transportable, modular hoist trainer for mobile and distributed SAR and hoist training. This system shall be designed for rapid assembly, disassembly, and transport to diverse Coast Guard units without the need for specialized civilian freight or heavy lifting equipment.

Requirements: The D-HTS shall provide core hoist and rear-crew training capabilities in a rapidly deployable form factor, support setup and teardown by two personnel, and include the same instructional and scenario capabilities as the HTS. The D-HTS shall include an IOS, be scaled for mobile use and be operable in a variety of facilities.

a. The system must replicate key hoist controls and tasks with realistic cable dynamics.

b. Provide a portable, rapidly deployable training capability suitable for use at locations without permanent simulator infrastructure.

c. Provide a representative hoist operator station/interface that replicates the controls, indications, and operator tasks necessary to conduct helicopter hoist operations.

d. Provide immersive visual representation of the operating environment, including the aircraft, hoist area, recovery surface, personnel/load, and relevant environmental

e. Simulate hoist cable/load dynamics and mission-relevant environmental effects, to the extent required to provide meaningful operator training.

f. Support instructor-generated and/or configurable training scenarios, including normal, abnormal, and emergency hoist operations.

g. Provide real-time instructor monitoring and control of training events and scenario

h. Capture trainee and crew performance data and provide after-action review capabilities.

aa. Support crew coordination training between hoist operators and other rear-crew/aircrew personnel.

i. Be capable of transport, setup, operation, breakdown, and redeployment without requiring permanent facility modifications.

j. Support future software, scenario, and training-content updates without requiring replacement of the complete system.

k. D-HTS should incorporate forklift pockets and casters for movement.

bb. D-HTS shall be transportable within a nominal 4ft x 8ft pallet footprint

Ï╗±كل ňτňτ ěكÏ τ×ك? →ð╩σ ¾τ╤Ï╤ň→τ9لاك xfÄ�ك Scope: The Contractor shall develop and deliver all initial operator/instructor and maintainer training, training manuals, and all final “as-built” technical manuals and data for all three devices.

Requirements: Device operator/instructor and maintainer training shall include classroom instruction provided by the vendor, hands-on practice, and deliver a “train-the-trainer” program tailored for the USCG (CDRL A014). This training is only intended for vendor to Government as initial instructor / initial operator / initial maintainer training. Documentation shall include operator/instructor and maintenance manuals, and all cybersecurity deliverables required by Section 8.3.

Õك×¾×τ¾╤♠Eكل Ï╗╗Ï τ╤♣كÏ τ×9لاك╤╗→╔╔╩©ك xfÄáلاك�ك ╔╤ň→τÏ Γ�ك Scope: Provide option for one (1) additional year of warranty on all three (3) devices, commencing upon formal USCG final acceptance of each training device in accordance with Section 4.3.

Requirements: Extended warranty shall cover all parts and labor for failures as well as hardware, software, components, and subsystems, including technical support, software updates, and hardware repair/replacement. The warranty must allow for USCG-applied security patches and configuration changes without voiding warranty support.

©E9 ±fá ÄكمكEτ◘ň╗→τσ ¾τ╤Ï ΓكÏ τ×ك[ Ï ðňΓň╤♣ك• ¾╖╩ň╗¾σ ¾τ╤╛

a. The Contractor shall specify all environmental, power, HVAC, and facility requirements for each device and coordinate with USCG to ensure all site preparations are completed prior to delivery.

b. The Contractor shall perform all installation and integration activities in accordance with the Installation Facility Interface Control Document (ICD), provided as Enclosure 2. The ICD specifies all facility interfaces, including power, HVAC, network, structural, and safety requirements. The Contractor shall coordinate with USCG facility personnel to ensure compliance with all ICD requirements prior to delivery and installation.

©E9 ±fá Äكمك±¾╛╤ňτěك• ¾╖╩ň╗¾σ ¾τ╤╛ The Contractor shall be responsible for comprehensive testing and acceptance activities to ensure that all delivered devices meet or exceed USCG requirements for functionality, fidelity, safety, and maintainability.

ك[ل Ï ð╤→╗♣ك� ðð¾╔╤Ï τð¾ك±¾╛╤ňτěلاك[ � ±�

a. The Contractor shall conduct FAT for each device at the manufacturing/integration facility prior to shipment, witnessed by USCG representatives.

b. FAT shall include verification of all hardware and software functionality, execution of a comprehensive test plan (CDRL A006) covering all normal and emergency procedures, validation of system performance against contract specifications, and demonstration of all IOS features. The Contractor shall also provide the draft Operator and Maintenance manuals (CDRL A013) to the Government for review.

�ك¾╤ň©كل ðð¾╔╤Ï τð¾ك±¾╛╤ňτěلاك©� ±�

a. Upon delivery and installation at ATC Mobile, the Contractor shall conduct a formal SAT for each device, witnessed and verified by USCG representatives.

b. SAT shall include verification of proper installation and integration that meets all performance requirements of Section 2. This includes execution of a comprehensive test plan (CDRL A007) including site-specific scenarios, and validation of system interfaces with USCG infrastructure.

c. Cybersecurity controls and RMF artifact verification are specified in Section 8.3.

d. The Contractor shall document all SAT results, including a Master License Appendix that the 3-year term for all items commences on the date of SAT completion, in a SAT Report (CDRL A009) for USCG approval.

]كل ňτ Ï Γك� ðð¾╔╤Ï τð¾

a. Final USCG acceptance of each device will occur only after the successful completion of SAT, resolution of all critical deficiencies, and delivery of all required documentation and training.

b. The Contractor shall provide a Certificate of Compliance (CDRL A015) for each device.

?ك╤╛¾±كل →ð╩σ ¾τ╤Ï╤ň→τ

a. The Contractor shall develop and deliver a Factory Acceptance Test Plan (CDRL A006) and Report (CDRL A008), a Site Acceptance Test Plan (CDRL A007) and Report (CDRL A009), and a Discrepancy/Deficiency Tracking Log (CDRL A010).

?كĚ→كð╤ň→τ¾╗╗→9كل ¾ĭ ðň¾τðň¾╛

a. The Contractor shall correct all deficiencies identified during FAT, SAT, or within the warranty period at no additional cost to the Government.

©E9 ±fá Äكمك¢╗→ě╗Ï σ ~ك Ï τ Ï ě¾σ ¾τ╤ك• ¾╖╩ň╗¾σ ¾τ╤╛كل

• →Γ¾╛ك�ك• ¾╛╔→τ╛ň¦ ňΓň╤ň¾╛9لاك xfÄ�ك Scope: The Contractor shall establish and maintain a robust program management structure to ensure the successful execution of all contract requirements, effective communication with the Government, and delivery of all products and services.

Requirements: The Contractor shall designate a Program Manager (PM), a Site Lead, and a Cybersecurity Lead to ensure the successful execution of all contract requirements. The individual roles and responsibilities are described below.

ك9→τ╤╗Ïل ð╤→╗ك• →Γ¾╛كÏ τ×ك• ¾╛╔→τ╛ň¦ ňΓň╤ň¾╛

a. Contractor Program Manager: The PM is the primary point of contact for all contract activities and is responsible for contract execution. The PM shall provide project oversight, schedule management, risk management, quality assurance, reporting, and regular communication with the USCG. The PM shall ensure submission of all deliverables, coordinate and lead project meetings and reviews, and manage all subcontractor activities (if applicable).

b. Contractor Site Lead(s): The Contractor Site Lead oversees all on-site activities at ATC Mobile. The Site Lead coordinates with the designated USCG Project Liaison, and ensures the proper installation, integration, and testing of each device.

c. Contractor Cybersecurity Lead: The Cybersecurity Lead (Information Assurance Systems Architecture and Engineering IASAE Level II or equivalent) is responsible for cybersecurity deliverables and coordination as specified in Section 9.

d. Subcontractor Management (if applicable): The Contractor shall manage all subcontractors, ensuring their performance aligns with all contract requirements and project schedules. The Contractor is fully responsible for the integration of all subcontractor-delivered systems.

Ï╗ě→╗¢كل σ ~ك Ï τ Ï ě¾σ ¾τ╤ك? ¾Γň◘¾╗Ï ¦ Γ¾╛

a. The Contractor shall provide a detailed Project Management Plan (PMP) as specified in

CDRL A001, outlining the organizational structure, roles, responsibilities, communication protocols, and risk management strategies.

b. The Contractor shall provide a detailed Integrated Master Schedule (CDRL A002), with milestones, deliverables, and critical path activities.

c. The Contractor shall submit Monthly Status Reports (CDRL A005) summarizing progress, risks, issues, and upcoming activities.

d. The Contractor shall participate in regular program reviews, design reviews, and technical interchange meetings (TIMs) as scheduled by the Government.

e. The Contractor shall develop and maintain a Quality Control Plan (CDRL A004) and provide regular updates on quality assurance activities.

f. The Contractor and the Government will convene quarterly for a Program Management Review (PMR) to discuss program status, accomplishments, schedule, issues, risks, planned actions. The PMR will provide an opportunity for stakeholders to review progress, address challenges, and ensure alignment with program objectives.

Successful completion of the Quarterly PMR and Government acceptance of the associated Quarterly Progress, Performance, and Financial Report (CDRL A025).

σ→9كل σ ╩τňðÏ ╤ň→τكÏ τ×9ك→→╗×ňτ Ï ╤ň→τ

a. The Contractor shall maintain regular and open communication with the designated

Government points of contact (Contracting Officer, Contracting Officer Representative, USCG Liaison, and FTD Program Manager).

b. The Contractor shall provide advance notice for all major activities, including deliveries, installations, training sessions, and acceptance testing.

c. The Contractor shall promptly notify the Government of any issues, risks, or delays that may impact contract performance or schedule.

©E9 ±fá ÄكمكÕ Ï╗╗Ï τ╤♣ The Contractor shall provide a comprehensive warranty for all delivered training devices, components, software, and associated materials to ensure that the USCG receives fully functional, reliable, and supportable systems. The warranty shall cover defects in materials, workmanship, and performance, as specified below.

ك©╤Ïل τ×Ï Õك×╗ Ï╗╗Ï τ╤♣ك¢¾╗ň→×

a. The Contractor shall provide a minimum warranty period of one (1) year / 12 months from the date of final Government acceptance of each device.

b. The warranty period for each device shall begin upon written notice of final acceptance by the Government following successful completion of Site Acceptance Testing (SAT).

Ï╗¾◘→9كل ě¾

a. The warranty shall cover all hardware, software, components, and subsystems provided under this contract, including the MH-60T Level 7 FTD, Hoist Training Simulator (HTS), and Deployable Hoist Training Simulator (D-HTS).

b. The warranty shall include:

1. Repair or replacement of defective parts, components, or software at no additional cost to the Government.

2. All labor, travel, shipping, and associated costs required to correct standard warranty issues.

3. On-site support for troubleshooting and repairs, as required.

4. Software bug fixes, patches, and updates necessary to maintain compliance with

ATO.

5. Technical support (remote and on-site as needed) for diagnosing and resolving standard warranty issues.

6. Cybersecurity patching and technical support for RMF compliance.

7. Unresolved warranty issues shall be escalated to the Contracting Officer within ten

(10) business days.

c. Warranty Performance Standards: To be considered fully functional and compliant with the warranty, the delivered systems shall meet the following minimum performance standards throughout the entire warranty period (standard and optional).

1. Reliability (Availability): The system shall demonstrate a minimum of 95% availability during all scheduled training periods. Availability is defined as the total time the system is fully mission capable, divided by the total scheduled training time, as tracked in the monthly status reports.

2. Maintainability (Mean Time to Repair – MTTR): The system shall have a MTTR of no more than four (4) hours for any critical failure that renders the system non-operational. This time is measured from the contractor’s acknowledgment of the failure to the time the system is returned to a fully mission capable state.

•كل ¾╛╔→τ╛¾كÏ τ×ك• ¾╛→Γ╩╤ň→τك±ňσ ¾

a. The Contractor shall acknowledge all warranty claims within two (2) business days of notification.

b. The Contractor shall provide an initial assessment and corrective action plan within five

(5) business days of notification.

c. The Contractor shall use commercially reasonable efforts to resolve all warranty issues as expeditiously as possible.

╛E♠ðΓ╩╛ň→τكل

a. Any warranty claim shall not apply to defects or failures resulting from unauthorized modifications or repairs made or performed by the USCG, accidental damage, misuse, neglect, or operation outside of specified environmental parameters.

b. GFE provided and installed in the simulator is not subject to any warranty.

Õك×¾×E♠╤¾τكل Ï╗╗Ï τ╤♣ك

a. The Contractor shall accommodate extended warranty coverage beyond the initial one-year period, for a one-year extension at the government’s option. (CLIN 0006) The Contractor shall ensure a seamless transition from standard to extended warranty coverage, if exercised.

ÕÏ╗╗Ïكل τ╤♣ك? →ð╩σ ¾τ╤Ï╤ň→τ

a. The Contractor shall provide a written warranty statement for each device, specifying the terms, coverage, exclusions, and procedures for submitting any warranty claims. (CDRL A020)

b. The Contractor shall provide points of contact for any warranty support.

Ï╗±كل τ╛ň╤ň→τك→╤ك©╩╛╤Ï ňτσ ¾τ╤

a. The Contractor shall design and document all systems to facilitate a seamless transition to long-term sustainment.

b. The Contractor shall deliver a comprehensive technical data package (TDP) (CDRL A019) sufficient for future operation, maintenance, and modification by USCG or its designated sustainment Contractor.

c. The Contractor shall provide recommendations for sustainment, including preventive maintenance schedules, spare parts lists, and obsolescence management strategies.

d. The Contractor shall participate in knowledge transfer activities with USCG or its designated sustainment manager. The Contractor shall deliver a formal Sustainment Transition Plan (CDRL A021), including a checklist of tasks, training sessions, and documentation to ensure seamless transition. A Training Completion Roster (CRDL A018) shall be submitted following all Contractor provided training to the Government.

e. The Vendor shall ensure all devices integrate with the Government cyber management server (CMS) to facilitate credentialed vulnerability scanning and patching.

f. In accordance with CDRL A021, prior to the expiration of the standard warranty period (or extended warranty if optional CLIN 0006 is exercised), the Contractor shall support the transition to a follow-on sustainment contract or Government-managed support, including knowledge transfer and participation in sustainment planning meetings for each device. The report is a comprehensive guide to ensure that the knowledge and responsibilities for maintaining a system are effectively passed on, preventing disruptions and ensuring the long-term success of the project.

©E9 ±fá Äكمك? ¾Γň◘¾╗Ï ¦ Γ¾╛كÏ τ×9ك→τ╤╗Ï ð╤ك? Ï╤Ï ك

• ¾╖╩ň╗¾σ ¾τ╤╛ This section defines all required deliverables, and the Contract Data Requirements List (CDRL) in Table 1. The Contractor shall provide all deliverables in accordance with the approved Integrated Master Schedule (IMS).

ك9→τ╤╗Ïل ð╤ك? Ï╤Ï •ك ¾╖╩ň╗¾σ ¾τ╤╛كxň╛╤9لاك ? • x�

a. The Contractor shall provide the following key deliverables, in electronic format. The following table defines all contractually required data deliverables. Each CDRL item is a binding requirement subject to Government review and acceptance.

Table 1: Contract Data Requirements List (CDRL)

CDRL # Data Item Title SOW Ref. DID Ref. Format/ Media Due Date

A001 Project Management Plan

(PMP)

5.2.a DI-

MGMT-

80004A

PDF/Word 30 Days After Contract Award

(DACA)

A002 Integrated Master Schedule (IMS)

5.2.b DI-

MGMT-

81650

MS Project 30 DACA, with monthly updates

A003 Configuration Management Plan

8.2.c DI-SESS- 80858

PDF/Word 60 DACA

A004 Quality Control Plan 5.2.e 9.3.a

DI-QCIC-

80701

PDF/Word 60 DACA

A005 Monthly Status Reports

5.2.c 9.3.b

N/A PDF/Word Monthly, by the 5th day

A006 Factory Acceptance Test (FAT)Procedures

4.1.b 4.4.a

DI-NDTI-

80603A

PDF/Word 90 days prior to each scheduled

FAT

A007 Site Acceptance Test (SAT) Procedures

4.2.b 4.4.a

DI-NDTI-

80603A

PDF/Word 60 days prior to each scheduled

SAT

A008 FAT Report 4.4.a DI-NDTI- 80603A

PDF/Word 15 days after completion of each FAT

Table 1: Contract Data Requirements List (CDRL)

CDRL # Data Item Title SOW Ref. DID Ref. Format/ Media Due Date

A009 SAT Report 4.2.d 4.4.a

DI-NDTI-

80603A

PDF/Word 15 days after completion of each SAT

A010 Discrepancy/ Deficiency Tracking Log

4.4.a N/A Excel/PDF Delivered with each FAT/SAT Report

A011 Logistics Support Plan

9.2.b N/A PDF/Word Due at Critical Design Review

(CDR)

A012 Recommended Spare Parts/Tools List

9.2.c N/A Excel/PDF Due at Critical Design Review

(CDR)

A013 Operator and Maintenance Manuals (Draft)

4.1.b N/A PDF/Word Due at Factory Acceptance Test

(FAT)

A014 Training Materials (Draft)

2.4 N/A PDF/Word/PP

T

Due 60 days prior to training start

A015 Certificate of Conformance

4.3.b DI-MISC- 81356A

PDF Delivered with each system at

SAT

A016 RMF Artifact Package (SSP, SCTM, SBOM, POA&M)

8.3 N/A PDF/Digital Due at start of

each Site Acceptance Test

(SAT) PDR, CDR,

and Final

A017 Operator and Maintenance Manuals (Final)

2.4 N/A PDF/Word Due at Final

Acceptance

A018 Training Completion Roster

6.7.d N/A Excel/PDF 15 days after completion of training

Table 1: Contract Data Requirements List (CDRL)

CDRL # Data Item Title SOW Ref. DID Ref. Format/ Media Due Date

A019 Technical Data Package (TDP)

6.7.b DI-SESS- 80776B

PDF/Digital Due at Final Acceptance

A020 Warranty Statement 6.6.a N/A PDF Due at Final Acceptance of each device

A021 Sustainment Transition Plan

6.7.d N/A PDF/Word 30 days prior to end of each warranty period for each device.

A022 Software Bill of Materials (SBOM)

8.3.c.5 DI-SESS- 82433

Machine- Readable

Due 30 days prior to FAT

A023 Vulnerability Scan Results (ACAS/Nessus)

8.3.c.9 N/A .xml / .nessus At FAT and SAT

A024 STIG Compliance Checklists

8.3.c.9 N/A .ckl / XCCDF Due with FAT Report

A025 Quarterly Progress, Performance, and Financial Report

5.2.f N/A PDF/Word Quarterly 7 days prior to the Quarterly PMR

©E9 ±fá Äكمك? Ï╤Ï 9كل ♣¦ ¾╗╛¾ð╩╗ň╤♣كلÏ τ×ك±¾ðŃτ→Γ→ě♣ك ~ Ï τ Ï ě¾σ ¾τ╤ ك?ل Ï╤Ï •ك ňěŃ╤╛كÏ τ×كfτ╤¾ΓΓ¾ð╤╩Ï Γك¢╗→╔¾╗╤♣

a. The Contractor shall deliver all technical data, software, source code, interface documentation, and configuration management records necessary for the operation, maintenance, modification, and integration of the delivered systems.

b. For all replicated components, the Contractor shall provide high-fidelity digital models in a neutral format (STEP or STL) to support future Government additive manufacturing (3D printing) for maintenance.

c. The USCG shall receive, at minimum, Government Purpose Rights for all delivered technical data, software, source code, interface documentation, and configuration management record deliverables, in accordance with FAR 52.227-14 unless otherwise negotiated.

d. The Contractor shall clearly identify and justify any proprietary or restricted data in advance.

τ→9كل ĭ ě╩╗Ï╤ň→τك~ Ï τ Ï ě¾σ ¾τ╤كÏ τ×9كŃÏ τě¾9ك→τ╤╗→Γ

a. The Contractor shall implement a formal configuration management (CM) process for all hardware, software, and documentation, including version control, change tracking, and delivery of as-built configuration baselines.

b. All proposed changes to system configuration after baseline approval shall be submitted for Government review and approval.

c. The Contractor shall provide a Configuration Management Plan (CDRL A003).

¦♣9كل ¾╗╛¾ð╩╗ň╤♣كÏ τ×كfτĚ→╗σ Ï╤ň→τك� ╛╛╩╗Ï τð¾

a. The Contractor shall ensure that all delivered systems, including all hardware, software, operating systems, applications, and network components, are configured and hardened in accordance with the latest applicable Security Technical Implementation Guides (STIGs) issued by the Defense Information Systems Agency (DISA). In the absence of a specific STIG, the Contractor shall adhere to the applicable Security Requirements Guide (SRG).

b. The Contractor shall implement “Security by Design” principles and provide all documentation and engineering support necessary to achieve a full ATO for all delivered systems under the Risk Management Framework (RMF) process.

c. The specific security Requirements Include:

1. Security Control Baseline: The systems shall be designed to meet the security controls defined in NIST SP 800-53 Revision 5. The applicable baseline is the Committee on National Security Systems (CNSS) Instruction No. 1253, Low Baseline (Confidentiality: Low; Integrity: Low; Availability: Low), with the Non-National Security Systems (Non-NSS) Overlay applied. The final tailoring of this baseline will be a collaborative effort finalized post-award and documented in the System Security Plan (SSP).

2. Use of FIPS 140-3 validated cryptographic modules for any cryptography.

3. System hardening of all OS, BIOS, applications, and network components per applicable DISA STIGs.

4. Data-at-rest (DAR) encryption is not required for the internal, non-removable storage of the standalone training devices (FTD, HTS, D-HTS). DAR encryption is required for any data being transferred from a training device via removable media (USG drives, external hard drives). Any such media must be encrypted using a FIPS 140-2/3 compliant solution.

5. Delivery of a Software Bill of Materials (SBOM) (CDRL A022) for all proprietary and third-party software.

6. Devices must remain standalone (air-gapped) or utilize a Government-approved secure gateway. The FTD must also be capable of connecting to the USCG ATC Maintenance Network as specified in Section 8.4.b.

7. The Government shall have System Administrator access to the system as required to conduct credentialed vulnerability scanning (ACAS/Nessus) at FAT and SAT.

8. All Category I and II vulnerabilities must be remediated prior to acceptance. A Government-approved POA&M must be in place at time of acceptance for all open Category I and II vulnerabilities.

9. Delivery of a comprehensive RMF Artifact Package (CDRL A016), including System Security Plan (SSP), Security Control Traceability Matrix (SCTM), and Plan of Action and Milestones (POA&M), Vulnerability Scan results (CDRL A023), STIG compliance checklists (CDRL A024) and SCAP scan results.

10. Technical support for continuous monitoring and monthly security patch impact assessments shall be provided during the warranty period. After the expiration of the warranty (including any extended warranty), the Contractor’s responsibility for cybersecurity patching and vulnerability remediation will cease unless otherwise specified in a follow-on sustainment contract.

d. The H-60 Flight Training Device and associated hoist training devices are categorized as Low-Impact Systems (Low Confidentiality, Low Integrity, Low Availability) in accordance with Federal Information Processing Standards (FIPS) 199.

e. To ensure the security, integrity, and resilience of Government information systems and services, both Government entities and vendors must work together to implement robust cybersecurity policies and practices. The vendor and the Government will collaborate on building a framework of the following policies that define shared responsibilities and support ongoing coordination to effectively protect critical assets and sensitive information:

1. Access Control Policy - Defines how users and devices are granted access to system resources, including authentication, authorization, and least privilege principles.

2. Configuration Management Policy - Outlines procedures for managing system configurations,…