Exhibit A Section 1 CLIN 0002 Scheduled_OM_Catalog.docx

DOCX document 42 KB Posted

Attached to
Aircraft Configuration Upfit and Operations & Maintenance Support
Solicitation number
70RDA326R00000003
Issued by
Not on record

About this file

This is an Exhibit A pricing schedule establishing Firm-Fixed-Unit-Prices (FFUP) for scheduled Operations & Maintenance (O&M) support of a Boeing 737-700 fleet under CLIN 0002. The contractor must maintain aircraft in a fully airworthy and dispatch-ready condition using a hybrid billing model comprised of three rate categories.

Time-Based Units cover monthly readiness and support (Item M-01) at a fixed monthly rate per aircraft, including dedicated flight line staffing with two qualified pilots, program management, hangar space, ground support equipment, daily pre/post-flight inspections, routine maintenance, and pre-mission preparation for baseline VIP missions. A separate Secure Comms Subscription rate (Item M-02) provides monthly in-flight connectivity including Wi-Fi, satellite communications, and voice services. Usage-Based Units include a Comprehensive Flight Hour rate (Item U-01) covering all aviation fuel, accelerated wear, labor toward phase checks, and routine replacement of consumables such as brake assemblies and tires, plus a Mission Specialist/Cabin Attendant surcharge (Item U-02) billed per day of assignment. Heavy Scheduled Inspections are billed as separate event-based line items including A-Check inspections (400-600 flight hours), Annual Airworthiness Inspections (12-month calendar-driven), C-Check major maintenance (24-36 months), 24-Month Avionics Certifications, and Engine Borescope & Compressor Wash services. Engine overhauls and hot section inspections are explicitly excluded and will be negotiated separately under CLIN 0004. Partial month billing shall be prorated on a 30-day basis, and contractors must record official flight logs and notify the Contracting Officer Representative prior to induction for heavy scheduled inspections.

View the file

Other files

File Type Posted
Attachment 5 Addenda RFO FAR 52-212-1 and 52-212-2 Proposal Instructions and Evaluation Criteria_Amendment 3 9.9.2026.pdf PDF
RFP 70RDA326R00000003 SF30 Amendment 3 9.9.2026.pdf PDF
Attachment 1 Performance Work Statement Amendment 3 9.9.2026.pdf PDF
RFP 70RDA326R00000003 SF1449 Amendment 3 9.9.2026.pdf PDF
DHS AIR FY26 RFP Amendment 3 9.9.2026.pdf PDF
SF30 Amendment 2 RFP 70RDA326R00000003 9.1.2026.pdf PDF
Attachment 4 DD254 Contract Security Classification Specification_Amendment 2 9.1.2026.pdf PDF
RFP QA Amendment 2 9.1.2026.pdf PDF
Attachment 1 Performance Work Statement Amendment 2 9.1.2026.pdf PDF
DHS AIR FY26 RFP Amendment 2 9.1.2026.pdf PDF
Attachment 5 Addenda RFO FAR 52-212-1 and 52-212-2 Proposal Instructions and Evaluation Criteria_Amendment 2 9.1.2026.pdf PDF
RFP 70RDA326R00000003 SF1449 Amendment 1 8.31.2026.pdf PDF
DHS AIR FY26 RFP Amendment 1 8.31.2026.pdf PDF
Attachment 1 Performance Work Statement Amendment 1 8.31.2026.pdf PDF
Attachment 5 Addenda RFO FAR 52-212-1 and 52-212-2 Proposal Instructions and Evaluation Criteria_Amendment 1 8.31.2026.pdf PDF
Attachment 3 Quality Assurance Surveillance Plan QASP_Amendment 1 8.31.2026.pdf PDF
RFP QA Amendment 1 8.31.2026.pdf PDF
RFP 70RDA326R00000003 SF30 Amendment 1 8.31.2026.pdf PDF
Attachment 4 DD254 Contract Security Classification Specification_Amendment 1 8.31.2026.pdf PDF
Exhibit A Section 1 CLIN 0002 Scheduled_OM_Catalog Amendment 1 8.31.2026.pdf PDF
RFP 70RDA326R00000003 SF1449.pdf PDF
Attachment 5 Addenda RFO FAR 52-212-1 and 52-212-2 Proposal Instructions and Evaluation Criteria.pdf PDF
Attachment 3 Quality Assurance Surveillance Plan QASP.pdf PDF
Attachment 2 CLIN 0004 OA Work Directive Form.pdf PDF
DHS AIR FY26 RFP_Final.pdf PDF
Exhibit B Section 1 CLIN 0003 Unscheduled Maintenance Catalog Complexity Tiers.docx DOCX document
Attachment 6 RFP Pricing Template.xlsx XLSX spreadsheet
Attachment 1 Performance Work Statement.pdf PDF
Attachment 4 DD254 Contract Security Classification Specification.pdf PDF
Aircraft Configuration Upfit Industry Engagement Event 8.25.2026.pdf PDF
DRAFT Performance Work Statement 8.21.2026.pdf PDF
DRAFT DHS Air Evaluation Factors 8.21.2026.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 1 — CLIN 0002 — Exhibit A: Scheduled Operations & Maintenance (O&M) Catalog This exhibit establishes the Firm-Fixed-Unit-Prices (FFUP) for scheduled maintenance and continuous flight line operations support under CLIN 0002 for the Boeing 737–700 fleet. The rates below are fully burdened, firm-fixed prices inclusive of all direct labor, indirect costs, standard tooling, routine consumables (e.g., oil, grease, safety wire), and profit necessary to maintain the aircraft in a fully airworthy and dispatch-ready condition. The Government utilizes a hybrid Scheduled O&M model. The Contractor shall bill against this CLIN using a combination of Time-Based Units (Monthly Readiness), Usage-Based Units (Flight Hours/Cycles & Mission Support), and Heavy Scheduled Inspections (Event-Based) as defined in the sections below.

Section 1: Time-Based Units (Monthly Readiness & Support) The following table defines the fixed monthly rate required to maintain baseline operational readiness for each aircraft. This rate applies regardless of how many hours the aircraft actually flies during the calendar month. It covers dedicated maintenance staffing, daily pre-flight/post-flight inspections, routine washing/cleaning, towing, and standard calendar-driven maintenance events.

Item ID
Description / Parameters
Unit of Issue
Base Year Rate
Option 1 Rate
Option 2 Rate
Option 3 Rate
Option 4 Rate
M-01
Aircraft Monthly Readiness Support

Baseline fixed price for dedicated flight line staffing (including two (2) qualified pilots per aircraft), program management, secure hangar space, Ground Support Equipment (GSE), daily pre/post-flight checks, routine washing/cleaning, maintenance records management, and standard calendar-driven inspections.

Note: This rate must also inclusively cover all pre-mission aircraft preparation, cabin configuration, and security coordination (Assume a baseline of 4 VIP missions per month, per plane).

Per Aircraft, Per Month

M-02
Secure Comms Subscription

Flat monthly fee for the provision of secure and non-secure in-flight connectivity, including Wi-Fi, satellite communications data plans, and voice services for passengers.

Per Aircraft, Per Month

The Contractor shall invoice one (1) unit of Item M-01, Monthly Readiness Support, and one (1) unit of Item M-02, Secure Comms Subscription, per active aircraft at the conclusion of each 30-day monthly billing period.

Partial Month Proration: For any calendar month in which an aircraft’s operations and maintenance (O&M) Period of Performance does not encompass the entire month, the Contractor shall prorate the M-01 and M-02 firm-fixed-unit-prices. Proration shall be calculated on a standardized 30-day month basis. The Contractor shall divide the applicable monthly rate by thirty (30) to derive a daily rate, and multiply that daily rate by the total number of calendar days the aircraft was in an active O&M status.

Section 2: Usage-Based Units (Flight Hours & Mission Support) The following table defines the fixed unit rates tied directly to aircraft usage.

Item ID
Description / Parameters
Unit of Issue
Base Year Rate
Option 1 Rate
Option 2 Rate
Option 3 Rate
Option 4 Rate
U-01
Comprehensive Flight Hour (FH)

Rate Fully burdened price per flight hour encompassing all accelerated aircraft wear-and-tear and all aviation fuel. This single rate must inclusively cover all aviation fuel (Jet-A) required for missions, routine fluid top-offs, labor accumulation toward phase checks, and all landing cycle degradation (including the routine replacement of brake assemblies, tires, and landing gear strut servicing based on normal operational tempo).

Per Flight Hour (FH)

U-02
Mission Specialist/Cabin Attendant Surcharge Price per day for the provision of a dedicated Mission Specialist or Cabin Attendant to support executive/delegation passengers. This rate is applicable for each day the specialist is assigned to a mission, including travel days.
Per Day

Billing Protocol: The Contractor shall record the official aircraft flight logs. At the conclusion of each month, the Contractor shall invoice the exact number of Flight Hours (U-01) and Mission Days (U-02) executed, multiplied by the fixed unit rates above.

Section 3: Heavy Scheduled Inspections (Event-Based, Per Aircraft) The following table defines the fixed unit rates for major, highly predictable FAA-mandated inspection intervals. Because these events require significant, distinct blocks of labor and dedicated hangar time, they are billed as separate, standalone events rather than being amortized into the monthly readiness rate.

Item ID
Description / Parameters
Unit of Issue
Base Year Rate
Option 1 Rate
Option 2 Rate
Option 3 Rate
Option 4 Rate
E-01
A-Check Inspection

Comprehensive scheduled inspection typically occurring every 400 — 600 flight hours as defined by the Boeing 737 Maintenance Planning Document (MPD).

Per Event (EA)

E-02
Annual Airworthiness Inspection

Comprehensive 12-month calendar-driven inspection verifying overall structural integrity, safety equipment, and FAA regulatory compliance.

Per Event (EA)

E-03
C-Check (Heavy Maintenance Visit)

Major structural and systems inspection governed by the Boeing 737 MPD, typically occurring every 24–36 months. Note: Excludes out-of-scope structural repairs discovered during the check, which shall fall under CLIN 0004.

Per Event (EA)

E-04
24-Month Avionics Certifications

Perform FAA-mandated testing and certification of the Altimeter/Pitot-Static System (FAA 91.411) and Transponder (FAA 91.413).

Per Event (EA)

E-05
Engine Borescope & Compressor Wash

Scheduled internal borescope inspection of both engines and a full engine compressor wash to restore EGT margins.

Per Event (EA)

Note on Engine Overhauls: Major Engine Overhauls and Hot Section Inspections (HSI) are explicitly excluded from this catalog. Due to the high volatility of internal engine component conditions, these events shall be negotiated as Firm-Fixed-Price Over & Above (O&A) actions under CLIN 0004 when they become due based on the aircraft’s maintenance program.

Billing Protocol: The Contractor shall notify the COR prior to the induction of an aircraft for a heavy scheduled inspection. Upon successful completion of the inspection and return to service, the Contractor shall invoice one (1) unit of the applicable Event.

File details come from the government source that posted it. Updated .