02.02.01 - Pricing Table (attachment 2)v2.xlsx
XLSX spreadsheet 88 KB Posted
- Attached to
- Alternative Transportable Temporary Housing Unit (ATTHU) Purchase, Transportation, and Installation
- Solicitation number
- 70FBR925Q00000026
- Issued by
-
Federal Emergency Management Agency
About this file
The file is a detailed Pricing Table (attachment 2) for FEMA's Alternative Transportable Temporary Housing Unit (ATTHU) contract for DR-4724-HI (Fire Recovery) in Maui, Hawaii. The pricing document outlines a comprehensive breakdown of contract line items (CLINs) for purchasing, transporting, and installing temporary housing units, with pricing structured across three main categories: Purchase (CLIN 0001), Installation (CLIN 0002), and Furniture, Fixtures, Appliances, and Equipment (CLIN 0003).
The contract covers 4 base units and 5 optional units, including 1-bedroom and 2-bedroom modular units that must meet specific size requirements (minimum 245-315 sq. ft). Pricing is set as "Not To Exceed Firm Unit Price" with an inflation factor of 1.1. Key installation services include permits, transportation up to 50 miles, utility connections, foundation preparation, and a 12-month transferable installation warranty. The market research indicates a cost of approximately $260 per square foot, with temporary foundations ranging from $9,703 to $12,584 depending on unit size. The units are intended to be steel-framed or non-wood modular structures that can fit inside a 40' standard shipping container.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Costs
| DR-4724-HI |
| Alternative Transportable Temporary Housing Unit (ATTHU) - Purchase /Install- Volumetric |
| Independent Government Cost Estimate (IGCE) |
Total Cost: $ - 0 Base 7/1/25 thru 12/31/25
| DR-4724-HI (Fire) | ||
| Qty | 4 | |
| CLIN # | Contract Line Item Number (CLIN) Title | Base |
(6 Months)
| x0001 | Purchase | $ - 0 |
| x0001 | Transportation | $ - 0 |
| x0002 | Installation | $ - 0 |
| x0003 | Furniture, Fixtures, Appliances, and Equipment | $ - 0 |
| Total | $ - 0 |
Sign:
Unit Pricing Summary ATTHU Unit Pricing Summary
CLIN # CLIN Title Value of Issue Type Unit of Issue Time Negotiated Base (6 Months)
| CLIN 0001 | Purchase | |||||
| 0001A | 1-bedroom ATTHU Ready for Transport and Installation | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0001B | 2-bedroom ATTHU Ready for Transport and Installation | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0001D | Transportation (Plant to port in Maui, HI) | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0001E | Transportation Miscellaneous | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| CLIN 0002 | Installation | |||||
| 0002A | Permits | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| 0002B | Ready for Occupancy | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0002C | Basic Installation | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0002D | Installation Warranty | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0002E | Foundation | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0002F | Electric Overage Footage (Above Ground) | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| 0002G | Electric Overage Footage (Buried) | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| 0002H | Water Overage Footage (Above Ground) | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| 0002J | Water Overage Footage (Buried) | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| 0002K | Sewer Overage Footage (Above Ground) | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| 0002L | Sewer Overage Footage (Buried) | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| 0002M | Installation Miscellaneous | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| CLIN 0003 | Furniture, Fixtures, Appliances, and Equipment | |||||
| 0003A | Furniture, Fixtures, Appliances, and Equipment (FFAE) | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
| 0003B | Furniture | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0003C | Fixtures | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0003D | Appliances | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0003E | Equipment | Not To Exceed | Firm Unit Price | Each | Contract | $ - 0 |
| 0003F | FFAE Miscellaneous | Not To Exceed | Firm Unit Price | 0.0 | 0.0 | $ - 0 |
* Peach rows are NTE work the contractor shall develop a cost proposal and approval of COR required.
Purchasing CLIN X001
| DR-4724-HI | ATTHU Unit Price Inflation | Base | ||||
| Alternative Transportable Temporary Housing Unit (ATTHU) - Purchase /Install- Volumetric | 0001A | 1 Bedroom | $ - 0 | |||
| 0001B | 2 Bedroom | $ - 0 | ||||
| Cost Basis at bottom of table. | Do Not Delete => Inflation: | 1.1 | 0001D | Transportation | $ - 0 |
| Base | Option 1 | |||||
| Total Base ATTHUs | 4 | Base | ||||
| Total Option 1 ATTHUs | 5 | Option 1 |
Year 2
| Base Qty ATTHUs | 4 | Opt 1 Qty | 5 | |||||||||||||
| CLIN # | Title | Description | Value of Issue | Type | Unit of Issue | Time Negotiated | Base Qty | Base Unit Price | Base Subtotal | Total Base Cost | Option 1 | |||||
| Qty | Option 1 | |||||||||||||||
| Unit Price | Options 1 Subtotal | Total Option Cost | ||||||||||||||
| CLIN 0001 | Purchase | $ - 0 | $ - 0 | |||||||||||||
| 0001A | 1-bedroom ATTHU Ready for Transport and Installation | Units must be a minimum of 245 Sq. Ft and not exceed 14 Ft. x 40 Ft. (PWS Reference Description of Work) | Not To Exceed | Firm Unit Price | Each | Contract | 2 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 0001B | 2-bedroom ATTHU Ready for Transport and Installation | Units must be a minimum of 315 Sq. Ft and not exceed 15 Ft. x 40 Ft. (PWS Reference Description of Work) | Not To Exceed | Firm Unit Price | Each | Contract | 2 | $ - 0 | 2 | $ - 0 | $ - 0 | |||||
| CLIN 0001 | Transportation | $ - 0 | $ - 0 | |||||||||||||
| 0001D | Transportation (Plant to port in Maui, HI) | Contractor is responsible for transportation of units, including required permits, from the manufacturing location to one or more group sites or other as directed by the FEMA COR, located in a location as directed by the FEMA COR. Cost should include all shipping, holding on island and all transportation. | Not To Exceed | Firm Unit Price | Each | Contract | 4 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||
| 0001E | Transportation Miscellaneous | Items or work that is required the transport of the ATTHUs which does not fit into any other CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$1,500. | Not To Exceed | Firm Unit Price | $ - 0 | $ - 0 | $ - 0 |
Cost Basis:
* Peach rows are NTE work the contractor shall develop a cost proposal and approval of COR required.
* Contractor is responsible for all costs for Transportation includes from manufacture to site.
* Transportation for Purchase Phase only. Transportation cost is from FEMA Transportation
* Purchase price includes warranty.
* Transportation from plant to port.
* No site inspection will be required.
Installation CLIN X002
| DR-4724-HI |
| Alternative Transportable Temporary Housing Unit (ATTHU) - Purchase /Install- Volumetric |
| Cost Basis is at bottom of table. | ||
| Do Not Delete => Inflation: | 1.1 |
| Base | Option 1 | ||||
| Total Base ATTHUs | 4 | Base | Total Option 1 ATTHUs | 5 | Option 1 |
Year 2
| Total Base ATTHUs | 4 | Total Option 1 ATTHUs | 5 | |||||||||||||
| CLIN # | Title | Description | Value of Issue | Type | Unit of Issue | Time Negotiated | Base Qty | Base Unit Price | Base Subtotal | Total Base Cost | Option 1 | |||||
| Qty | Option 1 Unit Price | Options 1 Subtotal | Total Option Cost | |||||||||||||
| CLIN 0002 | Installation | $ - 0 | $ - 0 | |||||||||||||
| 0002A | Permits | The contractor is responsible for pulling all required permits for unit and foundation and/or blocking and utility connections and occupancy permits from the appropriate authority having jurisdiction (AHJ). | Not To Exceed | Firm Unit Price | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 0002B | Ready for Occupancy | The contractor shall call FEMA for a joint inspection after all permits and quality control inspections have been completed and passed. Joint inspection ensure ATTHU is safe, secure and habitable for FEMA applicant(s). | Not To Exceed | Firm Unit Price | Each | Contract | 4 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||
| 0002C | Basic Installation | Basic Install. Includes transportation from port to site up to 50 miles, electrical/water/sewer connection/installation (up to 50 feet), 1 set of stairs, HVAC installation, skirting and clean and make ready for occupancy. Pest control to treat foundation. | Not To Exceed | Firm Unit Price | Each | Contract | 4 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||
| 0002D | Installation Warranty | The contractor is responsible for providing a 12-month transferable installation warranty. | Not To Exceed | Firm Unit Price | Each | Contract | 4 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||
| 0002E | Foundation | The contractor is responsible for providing a foundation for each ATTHU. | Not To Exceed | Firm Unit Price | Each | Contract | 4 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||
| 0002F | Electric Overage Footage (Above Ground) | Over 25 Linear Feet | Not To Exceed | Firm Unit Price | $ - 0 | 200 | $ - 0 | $ - 0 | ||||||||
| 0002G | Electric Overage Footage (Buried) | Over 25 Linear Feet - Includes trenching through rock. | Not To Exceed | Firm Unit Price | $ - 0 | 200 | $ - 0 | $ - 0 | ||||||||
| 0002H | Water Overage Footage (Above Ground) | Over 25 Linear Feet | Not To Exceed | Firm Unit Price | $ - 0 | 200 | $ - 0 | $ - 0 | ||||||||
| 0002J | Water Overage Footage (Buried) | Over 25 Linear Feet - Includes trenching through rock. | Not To Exceed | Firm Unit Price | $ - 0 | 200 | $ - 0 | $ - 0 | ||||||||
| 0002K | Sewer Overage Footage (Above Ground) | Over 25 Linear Feet | Not To Exceed | Firm Unit Price | $ - 0 | 200 | $ - 0 | $ - 0 | ||||||||
| 0002L | Sewer Overage Footage (Buried) | Over 25 Linear Feet - Includes trenching through rock. | Not To Exceed | Firm Unit Price | $ - 0 | 200 | $ - 0 | $ - 0 | ||||||||
| 0002M | Installation Miscellaneous | Items or work that is required to complete installing ATTHUs which does not fit into any other CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$1,500. | Not To Exceed | Firm Unit Price | $ - 0 | $ - 0 | $ - 0 |
Contractor will have to Stub-Up utilities (electric, water & sewer) and Foundation will be included in the Installation.
FFAE CLIN X003
| DR-4724-HI |
| Alternative Transportable Temporary Housing Unit (ATTHU) - Purchase /Install- Volumetric |
Do Not Delete => Inflation: 1.1
| Base | Option 1 | |||||||||||||||
| Total Base ATTHUs | 4 | Total Option ATTHUs | 5 | |||||||||||||
| Total Qty ATTHUs | 4 | Total Qty ATTHUs | 5 | |||||||||||||
| CLIN # | Title | Description | Value of Issue | Type | Unit of Issue | Time Negotiated | Base Qty | Base Unit Price | Base Subtotal | Total Base Cost | Option 1 | |||||
| Qty | Option 1 Unit Price | Options 1 Subtotal | Total Option Cost | |||||||||||||
| CLIN 0003 | Furniture, Fixtures, Appliances, and Equipment | $ - 0 | $ - 0 | |||||||||||||
| 0003A | Furniture, Fixtures, Appliances, and Equipment (FFAE) | The contractor shall procure all FFAE needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR. | Not To Exceed | Firm Unit Price | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 0003B | Furniture | The contractor shall procure all furniture needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR. | Not To Exceed | Firm Unit Price | Each | Contract | 4 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||
| 0003C | Fixtures | The contractor shall procure all fixtures needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR. | Not To Exceed | Firm Unit Price | Each | Contract | 4 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||
| 0003D | Appliances | The contractor shall procure all appliances needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR. | Not To Exceed | Firm Unit Price | Each | Contract | 4 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||
| 0003E | Equipment | The contractor shall procure all equipment needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR. | Not To Exceed | Firm Unit Price | Each | Contract | 4 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||
| 0003F | FFAE Miscellaneous | Items or work that is required to complete FFAE to support ATTHUs which does not fit into any other CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$1,500. | Not To Exceed | Firm Unit Price | $ - 0 | $ - 0 | $ - 0 |
* Costs are based on direct research from readable available sources.
Old=>
Housing Table CLIN X001
| Acutal from disaster KY. | |||||
| Cost used for HI Modular Home Purchase for group site. | |||||
| Type | Unit Price | Unit Price | Ratio | Unit Price Used for IGCE | |
| # of Bdr Rooms | Market Research Cost | Historical with Inflation | Contractor Difference | Highest Cost To Be Used for Estimate | |
| 1 Bdr Room | $ 127,640.63 | $ 125,851.26 | 1% | $ 127,640.63 | |
| 2 Bdr Room | $ 200,578.13 | $ 206,719.72 | -3% | $ 206,719.72 | |
| 3 Bdr Room | $ 255,282.25 | $ 261,910.32 | -3% | $ 261,910.32 | |
| Market Research Costs | |||||
| Cost per Square foot from this estimate is $260 dollars per square foot. |
| Cost are provided by Market Reseach done by contractor. | |
| Temporary Foundations: | |
| 1 bedroom | $9,703.00 |
| 2 bedroom | $ 12,584.00 |
| 3 bedroom | $15,995.00 |
| Permanent Foundations: | ||
| 1 bedroom | $24,487.00 | |
| 2 bedroom | $32,650.00 | |
| 3 bedroom | $40,812.00 | => Using largest cost. |