02.02.01 - Pricing Table (attachment 2).xlsx

XLSX spreadsheet 88 KB Posted

Attached to
Alternative Transportable Temporary Housing Unit (ATTHU) Purchase, Transportation, and Installation
Solicitation number
70FBR925Q00000026
Issued by

About this file

The file is a detailed Pricing Table (attachment 2) for FEMA's Alternative Transportable Temporary Housing Unit (ATTHU) contract (Solicitation Number 70FBR925Q00000026) related to disaster recovery efforts in Hawaii following a fire event. The pricing document outlines a comprehensive Cost Line Item Number (CLIN) structure for purchasing, transporting, and installing temporary housing units, with specific pricing categories for 1-bedroom and 2-bedroom units, transportation, installation, permits, foundations, utility connections, and furniture/fixtures/appliances.

The contract covers a base period of 6 months from 7/1/25 through 12/31/25, with provisions for 4 base units and an option for 5 additional units. Key installation requirements include transportation from manufacturing plant to Maui port, utility connections up to 50 feet, foundation preparation, HVAC installation, and a 12-month transferable installation warranty. The pricing methodology is based on market research, with unit costs ranging from approximately $125,851 to $206,720 depending on unit size, and additional costs for foundations, utilities, and miscellaneous installation requirements. All pricing is structured as "Not To Exceed Firm Unit Price" with contractor-developed cost proposals subject to FEMA Contracting Officer's Representative (COR) approval.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Costs

DR-4724-HI
Alternative Transportable Temporary Housing Unit (ATTHU) - Purchase /Install- Volumetric
Independent Government Cost Estimate (IGCE)

Total Cost: $ - 0 Base 7/1/25 thru 12/31/25

DR-4724-HI (Fire)
Qty4
CLIN #Contract Line Item Number (CLIN) TitleBase

(6 Months)

x0001Purchase$ - 0
x0001Transportation$ - 0
x0002Installation$ - 0
x0003Furniture, Fixtures, Appliances, and Equipment$ - 0
Total$ - 0

Sign:

Unit Pricing Summary ATTHU Unit Pricing Summary

CLIN # CLIN Title Value of Issue Type Unit of Issue Time Negotiated Base (6 Months)

CLIN 0001Purchase
0001A1-bedroom ATTHU Ready for Transport and InstallationNot To ExceedFirm Unit PriceEachContract$ - 0
0001B2-bedroom ATTHU Ready for Transport and InstallationNot To ExceedFirm Unit PriceEachContract$ - 0
0001CTransportation (Plant to port in Maui, HI)Not To ExceedFirm Unit PriceEachContract$ - 0
0001DTransportation MiscellaneousNot To ExceedFirm Unit Price0.00.0$ - 0
CLIN 0002Installation
0002APermitsNot To ExceedFirm Unit Price0.00.0$ - 0
0002BReady for OccupancyNot To ExceedFirm Unit PriceEachContract$ - 0
0002CBasic InstallationNot To ExceedFirm Unit PriceEachContract$ - 0
0002DInstallation WarrantyNot To ExceedFirm Unit PriceEachContract$ - 0
0002EFoundationNot To ExceedFirm Unit PriceLinear FeetContract$ - 0
0002FElectric Overage Footage (Above Ground)Not To ExceedFirm Unit PriceLinear FeetContract$ - 0
0002GElectric Overage Footage (Buried)Not To ExceedFirm Unit PriceLinear FeetContract$ - 0
0002HWater Overage Footage (Above Ground)Not To ExceedFirm Unit PriceLinear FeetContract$ - 0
0002JWater Overage Footage (Buried)Not To ExceedFirm Unit PriceLinear FeetContract$ - 0
0002KSewer Overage Footage (Above Ground)Not To ExceedFirm Unit PriceLinear FeetContract$ - 0
0002LSewer Overage Footage (Buried)Not To ExceedFirm Unit PriceLinear FeetContract$ - 0
0002MInstallation MiscellaneousNot To ExceedFirm Unit Price0.00.0$ - 0
CLIN 0003Furniture, Fixtures, Appliances, and Equipment
0003AFurniture, Fixtures, Appliances, and Equipment (FFAE)Not To ExceedFirm Unit Price0.00.0$ - 0
0003BFurnitureNot To ExceedFirm Unit PriceEachContract$ - 0
0003CFixturesNot To ExceedFirm Unit PriceEachContract$ - 0
0003DAppliancesNot To ExceedFirm Unit PriceEachContract$ - 0
0003EEquipmentNot To ExceedFirm Unit PriceEachContract$ - 0
0003FFFAE MiscellaneousNot To ExceedFirm Unit Price0.00.0$ - 0

* Peach rows are NTE work the contractor shall develop a cost proposal and approval of COR required.

Purchasing CLIN X001

DR-4724-HIATTHU Unit Price InflationBase
Alternative Transportable Temporary Housing Unit (ATTHU) - Purchase /Install- Volumetric0001A1 Bedroom$ - 0
0001B2 Bedroom$ - 0
ERROR:#REF!3 BedroomERROR:#REF!
Cost Basis at bottom of table.Do Not Delete => Inflation:1.10001CTransportation$ - 0
BaseOption 1
Total Base ATTHUs4Base
Total Option 1 ATTHUs5Option 1

Year 2

Base Qty ATTHUs4Opt 1 Qty5
CLIN #TitleDescriptionValue of IssueTypeUnit of IssueTime NegotiatedBase QtyBase Unit PriceBase SubtotalTotal Base CostOption 1
QtyOption 1
Unit PriceOptions 1 SubtotalTotal Option Cost
CLIN 0001Purchase$ - 0$ - 0
0001A1-bedroom ATTHU Ready for Transport and InstallationUnits must be a minimum of 245 Sq. Ft and not exceed 14 Ft. x 40 Ft. (PWS Reference Description of Work)Not To ExceedFirm Unit PriceEachContract2$ - 0$ - 0$ - 0
0001B2-bedroom ATTHU Ready for Transport and InstallationUnits must be a minimum of 315 Sq. Ft and not exceed 15 Ft. x 40 Ft. (PWS Reference Description of Work)Not To ExceedFirm Unit PriceEachContract2$ - 02$ - 0$ - 0
CLIN 0001Transportation$ - 0$ - 0
0001CTransportation (Plant to port in Maui, HI)Contractor is responsible for transportation of units, including required permits, from the manufacturing location to one or more group sites or other as directed by the FEMA COR, located in a location as directed by the FEMA COR. Cost should include all shipping, holding on island and all transportation.Not To ExceedFirm Unit PriceEachContract4$ - 05$ - 0$ - 0
0001DTransportation MiscellaneousItems or work that is required the transport of the ATTHUs which does not fit into any other CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$1,500.Not To ExceedFirm Unit Price$ - 0$ - 0$ - 0

Cost Basis:

* Peach rows are NTE work the contractor shall develop a cost proposal and approval of COR required.

* Contractor is responsible for all costs for Transportation includes from manufacture to site.

* Transportation for Purchase Phase only. Transportation cost is from FEMA Transportation

* Purchase price includes warranty.

* Transportation from plant to port.

* No site inspection will be required.

Installation CLIN X002

DR-4724-HI
Alternative Transportable Temporary Housing Unit (ATTHU) - Purchase /Install- Volumetric
Cost Basis is at bottom of table.
Do Not Delete => Inflation:1.1
BaseOption 1
Total Base ATTHUs4Base
Year 1Total Option 1 ATTHUs5Option 1

Year 2

Total Base ATTHUs4Total Option 1 ATTHUs5
CLIN #TitleDescriptionValue of IssueTypeUnit of IssueTime NegotiatedBase QtyBase Unit PriceBase SubtotalTotal Base CostOption 1
QtyOption 1 Unit PriceOptions 1 SubtotalTotal Option Cost
CLIN 0002Installation$ - 0$ - 0
0002APermitsThe contractor is responsible for pulling all required permits for unit and foundation and/or blocking and utility connections and occupancy permits from the appropriate authority having jurisdiction (AHJ).Not To ExceedFirm Unit Price$ - 0$ - 0$ - 0
0002BReady for OccupancyThe contractor shall call FEMA for a joint inspection after all permits and quality control inspections have been completed and passed. Joint inspection ensure ATTHU is safe, secure and habitable for FEMA applicant(s).Not To ExceedFirm Unit PriceEachContract4$ - 05$ - 0$ - 0
0002CBasic InstallationBasic Install. Includes transportation from port to site up to 50 miles, electrical/water/sewer connection/installation (up to 50 feet), 1 set of stairs, HVAC installation, skirting and clean and make ready for occupancy. Pest control to treat foundation.Not To ExceedFirm Unit PriceEachContract4$ - 05$ - 0$ - 0
0002DInstallation WarrantyThe contractor is responsible for providing a 12-month transferable installation warranty.Not To ExceedFirm Unit PriceEachContract4$ - 05$ - 0$ - 0
0002EFoundationThe contractor is responsible for providing a foundation for each ATTHU.Not To ExceedFirm Unit PriceLinear FeetContract4$ - 05$ - 0$ - 0
0002FElectric Overage Footage (Above Ground)Over 25 Linear FeetNot To ExceedFirm Unit PriceLinear FeetContract25$ - 0200$ - 0$ - 0
0002GElectric Overage Footage (Buried)Over 25 Linear Feet - Includes trenching through rock.Not To ExceedFirm Unit PriceLinear FeetContract25$ - 0200$ - 0$ - 0
0002HWater Overage Footage (Above Ground)Over 25 Linear FeetNot To ExceedFirm Unit PriceLinear FeetContract25$ - 0200$ - 0$ - 0
0002JWater Overage Footage (Buried)Over 25 Linear Feet - Includes trenching through rock.Not To ExceedFirm Unit PriceLinear FeetContract25$ - 0200$ - 0$ - 0
0002KSewer Overage Footage (Above Ground)Over 25 Linear FeetNot To ExceedFirm Unit PriceLinear FeetContract25$ - 0200$ - 0$ - 0
0002LSewer Overage Footage (Buried)Over 25 Linear Feet - Includes trenching through rock.Not To ExceedFirm Unit PriceLinear FeetContract25$ - 0200$ - 0$ - 0
0002MInstallation MiscellaneousItems or work that is required to complete installing ATTHUs which does not fit into any other CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$1,500.Not To ExceedFirm Unit Price$ - 0$ - 0$ - 0

Contractor will have to Stub-Up utilities (electric, water & sewer) and Foundation will be included in the Installation.

FFAE CLIN X003

DR-4724-HI
Alternative Transportable Temporary Housing Unit (ATTHU) - Purchase /Install- Volumetric

Do Not Delete => Inflation: 1.1

BaseOption 1
Total Base ATTHUs4Total Option ATTHUs5
Total Qty ATTHUs4Total Qty ATTHUs5
CLIN #TitleDescriptionValue of IssueTypeUnit of IssueTime NegotiatedBase QtyBase Unit PriceBase SubtotalTotal Base CostOption 1
QtyOption 1 Unit PriceOptions 1 SubtotalTotal Option Cost
CLIN 0003Furniture, Fixtures, Appliances, and Equipment$ - 0$ - 0
0003AFurniture, Fixtures, Appliances, and Equipment (FFAE)The contractor shall procure all FFAE needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR.Not To ExceedFirm Unit Price$ - 0$ - 0$ - 0
0003BFurnitureThe contractor shall procure all furniture needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR.Not To ExceedFirm Unit PriceEachContract4$ - 05$ - 0$ - 0
0003CFixturesThe contractor shall procure all fixtures needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR.Not To ExceedFirm Unit PriceEachContract4$ - 05$ - 0$ - 0
0003DAppliancesThe contractor shall procure all appliances needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR.Not To ExceedFirm Unit PriceEachContract4$ - 05$ - 0$ - 0
0003EEquipmentThe contractor shall procure all equipment needed for the ATTHUs per the requirements outlined in Appendix A. This CLIN may be applied to Installation as needed and approved by the FEMA COR.Not To ExceedFirm Unit PriceEachContract4$ - 05$ - 0$ - 0
0003FFFAE MiscellaneousItems or work that is required to complete FFAE to support ATTHUs which does not fit into any other CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$1,500.Not To ExceedFirm Unit Price$ - 0$ - 0$ - 0

* Costs are based on direct research from readable available sources.

Old=>

Housing Table CLIN X001

Acutal from disaster KY.
Cost used for HI Modular Home Purchase for group site.
TypeUnit PriceUnit PriceRatioUnit Price Used for IGCE
# of Bdr RoomsMarket Research CostHistorical with InflationContractor DifferenceHighest Cost To Be Used for Estimate
1 Bdr Room$ 127,640.63$ 125,851.261%$ 127,640.63
2 Bdr Room$ 200,578.13$ 206,719.72-3%$ 206,719.72
3 Bdr Room$ 255,282.25$ 261,910.32-3%$ 261,910.32
Market Research Costs
Cost per Square foot from this estimate is $260 dollars per square foot.
Cost are provided by Market Reseach done by contractor.
Temporary Foundations:
1 bedroom$9,703.00
2 bedroom$ 12,584.00
3 bedroom$15,995.00
Permanent Foundations:
1 bedroom$24,487.00
2 bedroom$32,650.00
3 bedroom$40,812.00=> Using largest cost.

image1.png image2.png