This Performance Work Statement (PWS) details FEMA's requirements for purchasing, transporting, and installing Alternative Transportable Temporary Housing Units (ATTHUs) in Maui, Hawaii, in response to the August 2023 wildfire. The contract requires the manufacture and delivery of four modular housing units - two 1-bedroom and two 2-bedroom models - each between 245-315 square feet, designed to fit inside a 40-foot shipping container. The units must be steel-framed or equivalent, compliant with International Building Code and Maui County codes, and equipped with utilities, furniture, fixtures, appliances, and safety equipment.

The contractor will be responsible for comprehensive tasks including design registration with Maui County, manufacturing units with specific quality standards, transportation to designated sites, installation on foundations, utility connections, and ensuring units are ready for occupancy. Key requirements include meeting stringent building codes, providing a 12-month warranty, conducting quality control inspections, and completing installation within a timeframe specified in the contractor's technical proposal. The units are intended to provide temporary housing for disaster survivors, with potential for future expansion to additional Hawaii counties.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Alternative Transportable Temporary Housing Unit (ATTHU)

Purchase, Transportation, and Installation

U.S. Department of Homeland Security Federal Emergency Management Agency

Table of Contents

1. Background

2. General

3. Scope

4. General Roles and Responsibilities

5. Contract Construct

6. Contractor Requirements

7. Stopping the Clock

8. Purchase

9. Transportation

10. Installation

11. Description of Work

12. Unit Specifications

13. Planning Requirements

14. ATTHU Warranty

15. Contractor(s) Personnel

16. Government Acceptance

17. Tasks/Deliverables

18. Security Requirements

19. HSAR CFR 3004.470-4(a)

20. Records Management Obligations

21. Clauses

22. Appendices

1. Background

The Robert T. Stafford Disaster Relief and Emergency Assistance Act, as amended and related authorities, as of June 12, 2019, authorizes the U.S. Department of Homeland Security (DHS) Federal Emergency Management Agency (FEMA) to provide alternative transportable temporary housing units (ATTHUs), acquired by purchase or lease, directly to individuals or households who, because a lack of available housing would be unable to make use of financial assistance. The Stafford Act also describes the decision criteria for determining which types of assistance will be provided; Stafford Act, Section (408) (b)(2)(B). Considerations include cost effectiveness, convenience to the individuals and households, and other factors the President may deem appropriate.

2. General

The effects of the August 2023 wildfire impacted the State of Hawaii causing widespread damage throughout large portions of the State. On August 10, 2023, President Biden issued a Major Disaster Declaration for Hawaii, designated as FEMA-DR-4724-HI, that authorized Individual Assistance (IA) for one (1) county in the State after the wildfire devastated State infrastructure in the impacted the county. The event exceeded State and local resource capacity. In response to this disaster, the Federal Emergency Management Agency (FEMA) was entrusted with procuring temporary housing for disaster survivors. Beginning in 2023, FEMA began coordinating temporary housing in the form of ATTHUs to accommodate those affected. Other Hawaii counties may be added and included in this Performance Work Statement (PWS) in the future. All direct housing options are authorized under Section 408 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act as amended (Stafford Act).

3. Scope

The contractor shall be responsible for transporting and installing transportable housing units. For purposes of this contract, FEMA calls these units Alternative Transportable Temporary Housing Units (ATTHUs). The ATTHUs shall be modular steel-framed or non-wood material of equivalent strength, and must fit inside a 40’ standard height shipping container for transport. The ATTHUs shall be delivered to an installation location on the island of Maui (county of Maui), to be determined at the time of award. The contractor shall provide a full design package and build the ATTHUs in compliance with the requirements in this contract and the applicable Federal, state, and local laws and regulations. The contractor shall be responsible for obtaining design approval with the County of Maui using the Design Registration process described in Appendix B, if needed. Key factors to keep in mind during the design and construction of the ATTHUs is to ensure the units are easy to connect to local utilities and use standard components for ease of maintenance. The ATTHUs shall be delivered to an installation location that FEMA is building on the island of Maui (county of Maui). Applicable codes are provided in Appendix B, Specifications for Modular Temporary Housing, however, FEMA does not represent that this is all inclusive.

The contractor is responsible for ensuring all applicable laws and regulations are followed. Definitions as defined in:

“Appendix H, “Glossary of Terms.” ATTHU housing type units shall be used as defined in Appendix B.

The contractor shall provide all personnel, facilities, tools, equipment, material, supplies, transporting, and installing that are necessary to, or incident to, performing and providing the items as required in the PWS included in the contract. The proposed ATTHU designs including floor plans, elevations, and renderings provided as part of the contractor’s proposal shall be incorporated into this PWS. All staging or laydown yards as required are the responsibility of the contractor. The port of Maui cannot be used for staging.

The contractor shall be responsible for the manufacture, transportation, and installation of up to four (4) ATTHUs. The ATTHUs will be modular steel-framed or non-wood material of equivalent strength with two (2) 1-bedroom and two (2) 2-bedroom models. The 1-bedroom and 2-bedroom units shall have a single full bath. All ATTHUs will be compliant with the International Building Code (IBC), as well as all applicable Maui County codes. All ATTHUs will be connected to potable water, sanitary sewer, and local electricity. The ATTHUs will not be equipped with propane or natural gas and will include required furniture, fixtures, appliances, and equipment (FFAE).

The contractor must be able to conduct all services as outlined in this contract for sites on the island of Maui. The location of these site shall be shared with contractor once confirmed.

Where there is a conflict, the contractor shall use the most stringent requirements when building ATTHUs. If there is a voluntary standard that exceeds but does not conflict with the applicable laws and regulations, the contractor shall follow those standards.

The contractor shall begin delivery of units after established lead time. The contractor shall propose a detailed timeline for the manufacturing and delivery of units, factoring in any required lead-time. The final timeline must be approved by the government. Proposed timelines that demonstrate the ability to complete the project in an expedited manner without compromising quality will be viewed more favorably. The contractor may utilize space at the FEMA Kilohana group site, if desired and feasible. FEMA’s definition of delivery is that the ATTHUs shall be ready for a disaster survivor to occupy the unit (defined as “ready for occupancy,” or RFO). This includes working connections to all utilities (water, sanitary sewer, and electric). The ATTHUs shall additionally have all FFAE unboxed and set up. The delivery requirements are further outlined below.

Basic installation is defined as setting the ATTHUs in accordance with FEMA’s instructions and parameters, as described in this contract and all associated appendices and attachments. Installation on other types of sites will require the contractor to provide a list of the change in conditions and proposed price to install ATTHUs on said site.

4. General Roles and Responsibilities The contractor roles and responsibilities are contingent on the services required specific to the disaster event and subject to the Long Term Recovery Office (LTRO) guidance via direction from the Contracting Officer (CO) or Contracting Officer Representative (COR). The categories of services required may include: ATTHU manufacturing, ATTHU transportation, and ATTHU installation.

The contractor shall comply with the following (reference PWS Tasks/Deliverables Section for applicable timelines):

1. Prepare and submit a subcontracting plan providing, at a minimum the company name and their role within the contractor’s work plan. The contractor is encouraged to use local subcontractors to the maximum extent possible.

2. Actively coordinate with the FEMA COR or designee and notify COR or designee immediately of any potential constraints regarding any of the work provided for in this contract.

3. Ensure that contractor and subcontractor staff always display appropriate identification while in the field and during interactions with applicants.

4. Obtain and provide appropriately licensed staff and/or subcontractors, where required, to perform the work provided for in this PWS. This includes, for example, drivers, laborers, carpenters, electricians, plumbers, pest control specialists, construction workers, engineers, and/or appliance technicians (and other disciplines not listed here), as needed, for the performance of the work outlined herein. Work is to be performed in accordance with all Federal, state, and local laws, rules, and regulations or of any other legitimate political subdivision or authorities having jurisdiction (AHJs) where the work is being performed.

5. Obtain design approval for ATTHUs from the County of Maui. The contractor shall provide drawings to the County for Design Registration and approval, if needed.

6. Perform work and task order activities on time. Ensure contractor performance meets the requirements outlined in this contract.

7. Furnish all labor, tools, and equipment necessary to fulfill the requirements of the contract.

8. Attend Ready for Occupancy (RFO) inspection between the Government and the ATTHU installation contractor for each unit. The comprehensive maintenance contractor shall familiarize themself with the unit during the RFO but shall not have authority to accept or reject a unit—which is incumbent upon the Government.

9. Dispose of all waste associated with any work performed pursuant to this PWS in compliance with all Federal, state, and local laws, regulations, and rules in accordance with the FEMA approved Disposal Plan submitted by the contractor to the COR within seven (7) days after award. This includes, but is not limited to, construction debris, any ATTHU contents designated for disposal, as well as spent fuels, batteries, refrigerants, tires, etc.

Under no circumstances will tires and other hazardous materials be stored on FEMA sites occupied by disaster survivors. The contractor shall pay any fees associated with the removal and disposal of any waste, including hazardous or special waste, generated by the contractor in performance of this contract and its associated tasks.

10. Comply with all contractor safety guidelines, as summarized below:

A. The contractor shall furnish all required safety equipment and/or clothing, which may be required for personnel as mandated by Federal, State, and local code, whichever is more stringent. This will include maintaining a safe working environment for the contractor’s employees, unit occupants, FEMA staff, other contractors, and the general public. At no time will the contractor leave unattended or otherwise unprotected, any excavation or safety hazard that might cause injury to persons.

B. The contractor shall comply with the Department of Labor and the Occupational Safety and Health Administration (OSHA) safety regulations, U.S. Army Corps of Engineers Safety Manual EM 385-1-1 rules and requirements, as well as any other Federal, state, county and local laws, codes and ordinances, whichever is more stringent. OSHA regulations can be found on the internet at: https://www.osha.gov/laws-regs. The current U.S. Army Corps of Engineers manual can be found on the internet at:

https://www.publications.usace.army.mil/usace-Publications/engineer-manuals/.

C. The contractor is responsible for keeping their employees safe and for developing policies and procedures for notifying FEMA of any potential security or safety issue, and for immediately contacting the COR should any security or safety issues arise. FEMA will then notify the contractor if and when the contractor can return to the location at issue.

11. Coordinate among all participants and entities, including but not limited to local building official(s), permit office(s), applicable ports of call, and Federal, state, and local law and code enforcement.

Provide reports, as defined by the Tasks/Deliverables section of the contract, and by the COR. Maintain accurate records and provide all documents as required in the contract.

12. Adhere to all applicable Federal, state, and local (Maui) building regulations, codes, and ordinances, as referenced in Appendix B. This is necessary to ensure that the acquired housing units meet rigorous standards, and that the well-being of residents and the broader community is safeguarded.

13. Assume responsibility for confirming the accuracy of all written and oral information provided.

14. Comply with the Contract Project Management (CPM) schedule, as described below:

A. The contractor shall enter the actual daily progress on the chart and upon doing so shall immediately deliver the annotated schedule to the CO/COR. This is called the Daily Report, which is a situational reporting each day. Items included in the daily report are: island weather updates, weather delays, and work progress including manufacture, transportation, and installation. If, in the opinion of the CO, the contractor falls behind the approved schedule, the contractor shall take steps necessary to improve its progress, including those that may be required by the CO, without additional cost to the Government. In this circumstance, the CO may require the contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the CO deems necessary to demonstrate how the approved rate of progress will be regained.

B. Failure of the Contractor to comply with the requirements of the CO under this clause shall be grounds for a determination by the CO that the contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the CO may terminate the contractor’s right to proceed with the work, or any separable part of it.

The SCOPE of services provided by FEMA may vary based on the need of the event, and SCOPE of services provided by the contractor or other agencies. To support contractor activities related to manufacture, transportation, and installation, FEMA will perform the following tasks:

1. Identify potential lots and pads for unit installation.

2. Provide instructions to the contractor for appropriate courses of action concerning differing and unforeseen site conditions.

3. Provide the contractor with approvals and applicable feedback regarding contractor submitted cost proposals, clock stops, miscellaneous inquiries, and written reporting.

4. Provide the contractor with responses to contractor Requests for Information (RFI) within 24 hours of submittal.

5. FEMA will not furnish any tools or equipment to the contractor. The contractor shall furnish all labor, tools, and equipment necessary to fulfill the requirements of the contract.

5. Contract Construct

The contract is constructed such that Sections of each major area of work needed are defined as can be managed http://www.osha.gov/laws-regs http://www.osha.gov/laws-regs http://www.publications.usace.army.mil/usace-Publications/engineer-manuals/ effectively by the JFO. These are listed below:

• Section 8 - Purchase: This section contains all that is required for the purchase of the ATTHUs.

Purchase means manufacture of a new ATTHU complete and ready to transport to install location.

All materials and components used in the production of the ATTHUs under this contract shall be new.

• Section 9 - Transportation: This section contains all that is required for the transportation of the ATTHUs. Transportation means transport of completed new ATTHU from the manufacture location to the FEMA designed site in the County of Maui, HI and delivered to the ATTHU pad ready for installation as described below.

• Section 10 - Installation: Installation means blocking/foundation, utility connections, skirting, placement of FFAE, clean and make ready, etc. resulting in a complete ATTHU ready for occupancy.

6. Contractor Requirements

1. The contractor shall ensure adherence to all applicable Federal, state, and local (Maui) building regulations, codes, and ordinances, as described throughout this PWS.

2. The contractor is to obtain all permits, bonds, and insurance (as applicable), permits, and licenses for transport and installation, as required, including all licenses necessary to do business in the state of Hawaii.

The expenses incurred for the licenses and/or permits will be included in the base bid.

3. Contractor workmanship shall be of professional quality, resulting in a new construction finish, ready for occupancy, with all systems fully functioning and aesthetically acceptable.

4. The contractor shall provide professional, courteous, timely services, activities, and management to ensure that all work identified in this PWS is completed. This include employing a flexible and transparent performance management system that includes performance measures of contractor staff, subcontractors, and other representatives. The contractor shall effectively collaborate with all AHJs to pass all Federal, state, and local requirements.

5. The contractor may have responsibilities related to transporting ATTHUs and all related contents including living kits, furniture, and other contents of the ATTHUs.

6. The contractor shall obtain and provide appropriately licensed staff and/or subcontractors, where required, to perform the work provided for in this PWS. Work is to be performed in accordance with all Federal, state, and local laws, rules, and regulations or of any other legitimate political subdivision or AHJ where the work is being performed. This includes but is not limited to manufacturers, transportation shipping and drivers, installation laborers, carpenters, electricians, plumbers, pest control specialists, construction workers, engineers, and/or appliance technicians (and other disciplines not listed here), as needed for the performance of the work outlined herein. Work is to be performed in accordance with all Federal, state, and local laws, rules, and regulations or of any other legitimate political subdivision or AHJ where the work is being performed.

7. Ensure that contractor staff always display appropriate identification while in the field and during interactions with applicants. Contractor badging shall have employee name, photograph, and company they represent at a minimum.

8. Actively coordinate with the FEMA COR and notify COR immediately of any potential constraints regarding any of the work provided for in this PWS. Ensure that contractor staff always display appropriate identification while in the field and during interactions with applicants.

9. The contractor shall submit to the COR their Quality Control Plan within two (2) days of award.

10. The Contractor shall maintain Quality Control management system to ensure that the ATTHUs meet the requirements of this contract. Inspection records shall be submitted to the CO/COR weekly or as requested.

11. The Government shall conduct Quality Assurance (QA) inspections across all aspects of the contract, as determined by the CO. The Contractor shall provide access and coordination with the CO to allow QA inspections at the time and place requested by the government. QA inspections shall be conducted per the

Management Quality Assurance Plan (QASP). Reference Appendix H, Attachment 1007.

12. The contractor Project Manager shall be available on-ground and via telephone to the COR between the hours of 7:00am and 5:00pm Hawaii time, Monday through Friday, on-call Saturday and Sunday, and shall respond to a request for discussion or resolution of technical problems. Any calls outside of normal business hours will be for emergencies and the response will be required to get back to the COR within one (1) hour.

13. When an issue that requires a clock stop has been resolved, the contractor shall notify the COR, in writing, and request that the clock be restarted. Clock stops are at the discretion of the COR. If the COR makes this determination notification documented in writing to the contractor and the CO. If clock stop system is abused (excessive, unwarranted, or improper usage), the COR may determine that there will be no additional clock stops during the period of performance for the subject task order or the subject work order.

14. During the warranty period the manufacturer shall make necessary repairs/replacements within 48 hours, unless approved for more time. Approval shall be provided by the FEMA CO or COR.

7. Stopping the Clock Stopping the clock will be used as part of the calculations for contractor performance. Stopping the clock is a request from the contractor to FEMA to turn the performance clock off for delays that are outside of the contractor’s control. Due to the nature of the work, circumstances may occur beyond the contractor’s control which hinder the completion of work within the timeframe required. Examples of stopping the clock include waiting for the local utility to provide electricity or waiting for the local AHJ to provide a required permit. When such issues are encountered, the contractor may request that the time performance clock be stopped until such time as the issue is no longer a factor. In order to accommodate a clock stop request, the contractor shall make such request in writing (either hard copy or email) to the COR to include: 1) the installation location 2) the reason to stop the clock and 3) the anticipated length of the clock stop. If there are known pre-defined issues that would hinder the completion of work within the timeframe required, the contractor may request a modification to the task order in advance for the time performance clock to be stopped for these issues. Once the COR approves the clock stop, the time lapse during the clock stop may not count against the contractor’s performance requirement for the deliverable.

8. Purchase

1. Purchase Base: The contract anticipates purchasing four (4) manufactured ATTHUs, two (2) 1-bedroom and two

(2) 2-bedroom models.

2. Permitting and Design Registration: The contractor shall submit all design drawings to the County of Maui for Design Registration and approval within 2 days after Notice to Proceed (NTP), if needed. The contractor shall provide responses or revisions to county comments or questions within 2 days of receipt until final designs are approved. See Section 4 and 6.1 for additional details on design registration approval and permitting.

In addition to receiving county approval, the contractor shall also submit approved designs to FEMA CO and COR for review to ensure there is no deviation from the PWS. This shall include all final approved engineered stamped designs for the ATTHU, approved anchoring/footing and foundation specifications, etc. The contractor shall also include up-to-date drawings as requested, so FEMA is aware of changes throughout the process.

3. ATTHU Manufacturing: The ATTHUs shall be manufactured as complete units and/or complete modules to be rapidly assembled onsite within one day to provide housing for all disaster survivors. The ATTHUs shall be newly constructed or not previously used 1 and 2-bedroom models as requested by FEMA. After government notice to proceed (NTP), the contractor shall manufacture or inspect and modify existing stock as needed to meet requirements, and successfully completed required inspection of, ATTHUs. This must occur within the timeframe in the contractor’s technical proposal and accepted by the government as basis for contract award. Manufactured units will be inspected prior to transportation and installation (see “Manufacturing Site Inspection” section below).

The ATTHUs shall be manufactured to comply with all Federal, state and Maui County codes and requirements (Reference Appendix B). The contractor is responsible for ensuring:

A. Manufactured ATTHUs: The Contractor shall ensure that all ATTHUs are manufactured to meet the definition of Fit and Finish (within the standards of ICC/MBI 1200-2021 Standard for Off-site Construction:

Planning, Design, Fabrication and Assembly and ICC/MBI 1205-2021 Standard for Off-site Construction:

Inspection and Regulatory Compliance) below:

B. Fit: Fit is defined as quality of workmanship, new and free of defects, fully functioning product, and applicable components. Fit deficiencies include defects in material or workmanship that materially or visually affect the functionality or appearance of a feature, product, or component of a dwelling, in whole or in part.

For example, two components’ improper fit includes either too loose (e.g., gap, play, flex, rattle, etc.) or too tight (e.g., hard to operate, difficult to open, scratches caused by rubbing, etc.).

C. Finish: Finish is defined as the completeness of the work in the intended manner. Finish deficiencies include visible scuffs, scratches, smudges, chips, stained surfaces, or finishes, but does not include minor imperfections of finishes (natural or synthetic) that do not materially detract from the appearance of the finish or impede the function. The decision of the CO or COR shall be final. Poor finish includes visible surface imperfections, burrs, spots, etc.

D. Fit and Finish Inspection: FEMA will utilize “The Residential Construction Performance Guidelines, version 6,” which is published by the National Association of Home Builders (Available for purchase from National Association of Home Builders) as the basis for the parameters to conduct evaluations for Fit and Finish inspections. Performance standards, tolerances, or guidelines, including those applicable to the “fit and finish” of cabinets, flooring, interior and exterior walls, countertops, paint finishes, and trim will be used. If no specific standard, tolerance, or guideline is contained in any of the contract documents, accepted building practices and industry standards shall apply.

Quality “Fit and Finish” applies to both the exterior and interior. All cabinets, flooring, interior and exterior walls, windows, doors, shutters, countertops, appliances, HVAC units, paint finishes and trim in the ATTHU units must be new and free of any defects from the manufacturers.

All materials and components used in producing the ATTHUs under this contract shall be new.

E. Defects: FAR 46.706. See “Manufacture and Installation Warranty” for warranty timeframes.

The above requirements, including materials, can be modified by the contractor. If the contractor proposes any changes the contractor must explain the changes in clear enough detail for FEMA to evaluate and approve the applicability of the change. In addition, the contractor shall provide FEMA with a justification for the proposed change and a rational explaining, in detail, how the change is beneficial to the government.

Manufacturing Site Inspection: The government shall require one or more inspections of the units to ensure compliance with all design and code requirements prior to shipping and installation. The government shall coordinate with the contractor to schedule and execute any inspections following contract award. The contractor shall be expected to provide third party ICC-accredited inspectors to access any relevant facilities required to complete a thorough inspection.

9. Transportation

1. The contractor shall provide all permitting, transportation, escort, labor, equipment, and materials required to accomplish transportation of the ATTHUs to sites. Units shall fit in 40’ standard height shipping containers for overseas transportation. The contractor shall be responsible for all damages to the ATTHU while the unit is in their possession. All ATTHUs shall be delivered to FEMA and installed on-site at the pre- designated pads in a safe condition, free from defects and hazards, including hazardous sharp edges.

2. FEMA may conduct quality assurance inspections anywhere during the process.

3. The contractor shall furnish appropriate equipment that may be needed to transport an ATTHU to a designated site. Heavy Tow is included as part of the Installation Phase.

4. The contractor shall obtain and provide appropriately licensed staff and/or subcontractors, where required, to perform the work provided for in this PWS. This includes, for example, transportation, drivers, laborers, carpenters, electricians, plumbers, pest control specialists, construction workers, engineers, and/or appliance technicians (and other disciplines not listed here), as needed, for the performance of the work outlined herein.

Work is to be performed in accordance with all Federal, state, and local laws, rules, and regulations or of any other legitimate political subdivision or AHJ where the work is being performed.

5. The contractor shall actively coordinate with the FEMA COR and notify COR immediately of any potential constraints regarding any of the work provided for in this PWS.

6. The contractor shall ensure that contractor staff always display appropriate identification while on site.

7. The contractor shall be in coordination with FEMA and its constructor(s) to provide the delivery/installation work at https://www.nahb.org/blog/2022/08/new-edition-residential-construction-guidelines the appropriate time(s) given completeness of work and safety of the site.

8. The contractor shall perform work in a timely manner. After FEMA provides notice to proceed (NTP) for the transportation of units to installation sites (once units have completed inspection and the sites are ready for installation), the contractor shall transport and complete installation for each ATTHU within the timeframe in the contractor’s technical proposal and accepted by the government as basis for contract award. Successful installation is defined as units being deemed ready for occupancy (RFO) by FEMA. Ensure contractor performance meets the requirements outlined in this PWS.

9. During the transportation of an ATTHU, there may be issues that cannot be foreseen but require action to complete the transportation. This is only to be used if the work required does not fit within the definition of any other Contract Line Item (CLIN). The contractor shall develop a price proposal, which includes all expenses related to the unforeseen work and present the estimate to the CO/COR for review. Once the CO has agreed to a price for the work, the final price will become a fixed unit price.

10. Damages to the ATTHU during transport are the responsibility of the contractor. Repairs determined by the COR not to be the responsibility of the contractor that occur during transportation will be as directed and authorized by the CO. The contractor may provide the COR with information that could allow the COR to discern responsibility.

The COR’s determination of responsibility shall be final.

11. The contractor may require utilizing the Olowalu tunnel on the island of Maui, and contact/permitting required.

a. This tunnel is owned by the Hawaii Department of Transportation (HDOT), not Maui County DOT

b. Refer to accompanying image for visual reference in Appendix C.

c. Hawaii DOT contacts of relevance:

HDOT - Maui County Oversize & Overweight Permits

DOT.HWYM.Permits@hawaii

.gov (808) 873-3535

Highways | Oversized and Overweight Vehicles on State Highways (hawaii.gov)

HDOT – Maui County Engineering

Ferdinand Cajigal Engineering Program Manager (808) 873-3538

Highways | Function of Maui District (hawaii.gov)

10. Installation

1. Site Preparation and Enhancement:

A. Timeline for Site Preparation: FEMA anticipates locating ATTHUs on micro-sites, which may require initial preparation (such as grading and leveling) by the US Army Corps of Engineers (USACE). This shall be completed prior to the contractor being requested to complete site preparation. Contractor site preparation must be completed prior to transportation and installation of any ATTHU on the site. The contractor shall be responsible for completing site preparation within ten (10) days of request. See Attachment #: Luakini Site Plan as an example of the potential site plan. Note that the site plan included is provided for reference purposes only and the final site plan will be issued at a later date.

B. Differing Site Conditions / Design: Each group site may contain very different conditions (including rocky soil) which will be assessed by the contractor to meet the requirements of this PWS.

C. Foundations and Slope: The contractor shall be responsible for assessing and addressing slopes of up to 5% on portions of the site where housing units will be placed. Road grades may exceed 5% if approved by CO/COR. The contractor must design stable foundations and prepare a level base to support modular units, plumb and level, even on sloped terrain. Maui County Code requires Compliance with building codes and safety standards is required, and documentation of compliance must be provided. Foundations shall be engineered and deployed to accommodate rapid installation and removal. The design shall incorporate applicable requirements outlined in the building codes of Maui County (reference Appendix B), guaranteeing that the units are securely positioned while providing a safe, habitable, and secure living environment for their occupants.

D. Ground Cover: as determined by FEMA, site preparation by the ATTHU contractor may include ground cover installation which must conform to County of Maui code regarding fire prevention which may limit the mailto:DOT.HWYM.Permits@hawaii.gov mailto:DOT.HWYM.Permits@hawaii.gov https://hidot.hawaii.gov/highways/home/doing-business/guide-to-permits/oversized-and-overweight-vehicles-on-state-highways/ https://hidot.hawaii.gov/highways/home/doing-business/guide-to-permits/oversized-and-overweight-vehicles-on-state-highways/ https://hidot.hawaii.gov/highways/home/doing-business/guide-to-permits/oversized-and-overweight-vehicles-on-state-highways/ https://hidot.hawaii.gov/highways/home/doing-business/guide-to-permits/oversized-and-overweight-vehicles-on-state-highways/ https://hidot.hawaii.gov/highways/home/maui/function-of-maui-district/ https://hidot.hawaii.gov/highways/home/maui/function-of-maui-district/ https://hidot.hawaii.gov/highways/home/maui/function-of-maui-district/ type of ground cover allowable to non-flammable materials.

E. Site Protection: Much of the sites may contain concrete curbing, sidewalks, asphalt or aggregate parking, or other features common to single family, residential developments. As such, the contractor shall utilize measures such as ramps, at grade bridging/mats, etc. to protect previously installed site improvements.

The Contractor shall repair all damages at no additional cost to the Government. Additionally, the contractor shall submit pre-construction video to the COR documenting existing conditions prior to work.

F. Site preparation and finishing: Housing lots will be provided with generally constant slopes. Lot slopes may vary appreciably across individual sites. The contractor will be required to establish final ground cover as defined elsewhere. The contractor shall establish hard surface travel ways between access paths between ATTHU stairs and the closer of either parking areas or sidewalks. The contractor shall provide minor fine grading as required to install or prevent ponding or excessive erosion around foundations, walkways, or other site improvements.

G. Unit Location: Units shall be placed in accordance with possible locations shown on the overall site plan, prepared by the US Army Corps of Engineers, and as directed by the COR. The final location to be determined at time of award.

H. Miscellaneous: The contractor shall submit a cost proposal to the COR for the approval of miscellaneous site preparation and installation materials/work should there be the need to provide work to a particular site to prepare it properly for the ATTHU installation.

2. Utility Connections:

A. General Design Considerations:

1) Public utility service line terminations will be available near lot frontages. The number of individual housing units connected to each termination shall not exceed the capacity of the termination. The Contractor shall route and manifold together individual ATTHU service lines in accordance with applicable local codes. Inspections and tests will be conducted to ensure quality installations, and any modifications or changes must be approved. Upon completion, a comprehensive handover package including documentation and test reports will be provided to the relevant authority.

B. Electric Connections for all ATTHUs:

1) The contractor shall install all electric connections for ATTHUs. Connections may be either above or below ground so long as they are the most cost-effective approach which meets all applicable codes and regulations as referenced in this PWS.

2) Electric connection requirements for all types of ATTHUs include the following:

a. All components shall be installed in accordance with the NEC. All conduit connections shall be watertight. Service entrance cables shall comply with all National, state, and local codes and regulations.

b. The summation of electrical loads for (2) one-bedroom units and (1) two--bedroom unit shall not exceed two hundred (200) amperes (amps) for each type of ATTHU.

c. The point of connection to utility power will be an above grade disconnect located near the edge of each lot. The disconnect will be provided and installed by others prior to installation of ATTHU’s.

d. ATTHUs shall be grounded per NFPA 70 Article 250 and local codes.

e. The conduit shall be securely attached to racks, and the disconnects and boxes will be placed on racks or pedestals by the USACE contractor, in accordance with accepted methods and standards and all National, State, and local codes and regulations. Sweeps shall be used at the junction box and meter loop assembly. The contractor shall obtain prior approval for work order modification from the COR for any additional requirements concerning the placement of disconnects on racks or pedestals placed by the USACE contractor.

f. All electrical work shall be conducted by a licensed [in the State of Hawaii] electrician and shall be certified safe and ready for use.

g. When a power pole and meter loop is required:

i. The contractor shall furnish and install power pole and meter loop with the appropriately sized service.

ii. The contractor shall install an overhead electric assembly if required by the utility provider.

iii. Power Pole for the ATTHU scheduled to be installed with a weatherproof, rain-tight meter box containing the main circuit breaker. All conduit connections on the meter pole shall be watertight.

h. Additional Power Line Support: The contractor shall install power poles without a meter loop that supports overhead electrical lines as required.

i. When a power pedestal is required, the contractor shall obtain prior approval for work order modification from the COR.

j. Electric runs beyond twenty-five feet (25’) for FEMA prepared group sites shall be documented and approval obtained from the COR.

i. Additional wiring: Additional wiring over basic install to be installed as required.

k. The contractor shall pay the fees associated with connecting the ATTHU to any local utility and will be reimbursed at actual expense only if the proper documentation and receipts are provided to the COR. Utility charges accrued by the applicant prior to the installation of the ATTHU and the disaster is not the responsibility of the contractor.

3) Underground electric connections, when made by the contractor, shall be done in accordance with the manufacturer’s standard connection procedures. Additional requirements for underground connections include the following:

a. The measurement for underground electric line installation is from the closest exterior wall of the ATTHU to the underground electrical connection source for each ATTHU.

b. Only the horizontal underground run will be calculated for the actual measurement. Any vertical runs will not be counted as part of the total linear feet of underground electric line installed.

c. The cables shall be properly buried and encased in the appropriate conduit in compliance with all National, State, and local codes and regulations. This includes the cable for the A/C breaker and burial cable.

d. The contractor shall bury electric cables at a depth in accordance with the National Electric Code (NEC) or a minimum of eighteen inches (18”) below the surface, whichever requirement is greater, and the disconnects and boxes shall be placed on racks or pedestals (USACE contractor).

e. If the contractor does not have authorization for additional underground electric work that is not included in the original work order, the contractor shall request a modification to the work order from the CO or COR depending on the estimated price of the modification.

Additional work is not authorized unless approved by the CO or COR, with written approval from the CO, or until the contractor has a modified work order.

C. Water Connection Requirements for all ATTHUs

1) The contractor shall install all water connections for ATTHUs. Connections may be either above or below ground so long as they are the most cost-effective approach which meets all applicable codes and regulations as referenced in this PWS.

2) All plumbing work shall be conducted by a licensed [in the State of Hawaii] plumber and shall be certified safe and ready for use.

3) The connection to the utility service lines may be up to 1-1/2” copper or CTS HDPE piping.

4) The contractor shall install water connections for all types of ATTHUs. Requirements include:

a) The contractor shall provide water runs of up to twenty-five feet (25’) for FEMA prepared group sites.

i. Water line installation is measured from the closest exterior wall of the ATTHU to the water connection source for each ATTHU.

ii. ONLY the horizontal run will be calculated for the actual measurement. Any vertical runs will not be counted as part of the total linear feet of water line installed.

b) For underground water connections, the contractor shall adhere to the following:

i. The water line shall meet all county requirements for minimum excavation depth and shut-off valves.

ii. The water service line shall be placed in a trench separate from the sewer line and at a distance that is in compliance with state and local codes, or three feet (3’) apart, whichever is greater.

iii. Backfill materials shall be free of rocks and other debris and shall include a bed of compacted sand six inches (6”) above and below the water line.

iv. The contractor shall work with State and local officials to ensure water lines are installed at an appropriate depth.

v. Parallel service lines feeding individual ATTHU’s from a common utility connection point may be installed in the same trench.

Note: All excavations greater than forty-eight inches (48”) deep require prior approval from the COR.

c) A shut-off valve shall be located adjacent to the unit connecting point and shall be in a convenient location to facilitate shut-off of water to unit.

d) If the ATTHU is not equipped with a hose bib, the contractor shall install a hose bib appropriate for the weather conditions.

e) Water lines shall be three-quarter inches (3/4”) type K or L copper tubing, ASTM B88-74A;

or schedule 40 PVC plastic pipe, ASTM D-1785, three-quarter inch (3/4”) subject to pressure testing for leaks as required by code, subject to prior approval. Other waterline materials should be in compliance of code and approved by local code, back flow preventer valve shall be properly installed if required by code.

f) The contractor shall test the installed service line for leakage, and any leaks shall be repaired at no additional expense.

g) Hydrostatic Test: The water line shall be tested by the contractor after the pipe is laid, the joints completed, and the trench partially backfilled. The hydrostatic test shall meet the requirements of the local public utility services jurisdiction.

h) The contractor shall contact the COR for instruction and approval if pavement shall be removed and replaced.

i) Where local water pressure is in excess of the manufacturer’s recommended maximum psi, the contractor shall install an approved and appropriate water pressure-reducing (pressure regulator) device to safeguard the unit’s plumbing system.

j) Service lines beneath the ATTHU shall be installed clear of the ground, made with the minimum number of joints, be of the shortest practical length, and be supported at a maximum of four-foot (4’) intervals.

k) Water piping shall be installed in accordance with State and local codes, and the Uniform Plumbing Code.

l) If the contractor does not have authorization for additional water connection work that is not included in the original work order, the contractor shall request a modification to the work order from the CO or COR.

m) Water runs beyond twenty-five feet (25’) for FEMA prepared group sites shall be documented and approval obtained from the COR.

i. Additional buried water line: ¾’’ water line extension, buried (over basic install included buried water line) to be installed as required.

n) All excavations greater than forty-eight inches (48”) deep require prior approval from the

COR, as authorized by the CO.

D. Sewer Line Installation

1) The contractor shall install all sewer connections for ATTHUs. Connections may be either above or below ground so long as they are the most cost-effective approach which meets all applicable codes and regulations as referenced in this PWS.

2) All plumbing work shall be conducted by a licensed [in the State of Hawaii] plumber and shall be certified safe and ready for use.

3) The contractor is responsible for all types of ATTHUs requirements include:

a. The contractor shall provide utility runs (as part of basic installation) of up to twenty-five feet (25’) for FEMA prepared group sites.

i. Sewer line installation is measured from the closest exterior wall of the ATTHU to the sewer connection source for each ATTHU.

ii. ONLY the horizontal run will be calculated for the actual measurement. Any vertical runs will not be counted as part of the total linear feet of sewer line installed.

b. The contractor shall run either properly supported above grade sewer lines, buried sewer lines at an excavation depth up to forty-eight inches (48”) below the surface (Excavations beyond forty-eight inches (48”) requires COR approval), or a combination of both. A sewer line may be installed both above and below grade to maintain proper pitch.

i. Below ground sewer lines shall be placed in a trench separate from the water line and at a distance that is in compliance with state and local codes, or three feet (3’) apart, whichever is greater.

ii. Contractor shall work with State and local officials to ensure that below ground sewer lines are installed at an appropriate depth.

iii. Documentation indicating that sewer lines are installed at the appropriate depth and meet state and local regulations shall be provided to the COR within four (4) days of completion of the installation.

iv. Above grade service lines beneath the ATTHU shall be installed clear of the ground, made with the minimum number of joints, be of the shortest practical length, and be supported at a maximum of four-foot (4’) intervals with steel strapping.

v. Note: All excavations greater than forty-eight inches (48”) deep require prior approval from the COR before excavation begins.

c. A clean-out fitting will be installed immediately outside the footprint of the ATTHU, in an accessible location, to facilitate snaking-out a clogged line from the connection point, through the riser and into the main or service line. The pipe fitting that attaches the sewer connection to the drain outlet of the ATTHU shall be threaded and screwed or installed with a removable adapter for the drain outlet. The nominal inside diameter of the unit sewer connection shall not be less than three inches (3”). The slope of the sewer line shall be continuous and at least one-quarter inch (1/8’’ to 1/4”) per foot. Above ground sewer lines shall be supported at four-foot (4’) intervals (maximum) to prevent any deflections.

d. The fitting between the unit sewer line and sewer riser (placed above ground) will comply with all appropriate plumbing, safety, and health codes and requirements. This includes:

i. An approved and appropriate four inch by three-inch (4”x3”) adapter (ASTM D1785 Schedule 40). The lower end of the unit sewer line shall extend at least four inches (4”) below the rim of the riser with an airtight connection provided using a rubber ring.

ii. Pipe shall be an approved and appropriate rigid PVC sewer pipe utilizing proper primer and cement. Solvent cement joints shall be made in a two-step process with primer conforming to ASTM F 656 and solvent cement conforming to ASTM D 2564.

iii. Absolutely no flex-hose shall be allowed.

iv. The line shall be of the shortest practical length and include a clean-out “Y” that would allow cleaning and/or clearing of the line from and to the unit as well as from and to the connection or sewer drop point.

The contractor shall test the sewer line for leakage, (5 PSI air test with no leakage in 30 minutes) and any leaks shall be repaired at no additional expense to the extent the installation or materials were deficient. The contractor is responsible for expenses to repair sewer lines that they install. All sewer piping and installation shall be installed in accordance with local codes and the Uniform Plumbing Code. If the unit has multiple sewer drop points, they will be interconnected to a single unit drop point.

e. If the contractor does not have authorization for additional sewer line installation that is not included in the original work order, the contractor shall request a modification to the work order from the CO or COR.

f. Sewer runs beyond twenty-five feet (25’) for FEMA prepared group sites shall be documented and approval obtained from the COR.

i. Additional sewer line (above ground): 4-Inch lateral sewer line, above ground (over basic install included sewer line) to be installed as required.

ii. Additional sewer line (below ground): 4-Inch lateral sewer line, buried (over basic install included buried sewer line) to be installed as required.

g. All excavations…