Attachment_I_Work_Order_Priority_Classifications.pdf

PDF 132 KB Posted

Attached to
CDP Facility Operations and Support Services Federal contract opportunity
Solicitation number
70FA2019R00000001
Issued by
Federal Emergency Management Agency Preparedness Section

About this file

Attachment I Work Order Priority Classifications

View the file

Other files for this federal contract opportunity

Other files attached to CDP Facility Operations and Support Services, newest first.
File Type Posted
Attachment_S_Recycling_Locations.pdf PDF
70FA2019R00000001_A00004.pdf PDF
70FA2019R00000001_A00003_Questions_&_Answers_2.docx DOCX document
Attachment_S_Recycling_Locations.pdf PDF
70FA2019R00000001_A00003.pdf PDF
Attachment_A_Performance_Work_Statement_4-11-19.pdf PDF
70FA2019R00000001_P00002_Questions_&_Answers_1.docx DOCX document
70FA2019R00000001_A00002.pdf PDF
COBRATF_Facility_Notes_(V1_18_Mar_19).docx DOCX document
70FA2019R00000001_A00001.pdf PDF
SiteVisitAttendanceList.xlsx XLSX spreadsheet
Attachment_H_Government_Furnished_Equipment.pdf PDF
Attachment_G_Govt_Furnished_Facilities.pdf PDF
Attachment_B_CDP_Facilities_Description.pdf PDF
Attachment_P_CDP_Radiation_Safety_Program.pdf PDF
Attachment_N_Workplace_Safety_&_Health_directive.pdf PDF
Attachment_FF_Toxic_Agent_Exposure_Plan.pdf PDF
Attachment_GG_COBRATF_Safety_Plan.pdf PDF
Attachment_D_Maps_and_Floor_Plans.pdf PDF
Attachment_E_Schedule_of_Deliverables.pdf PDF
Attachment_R_Annual_Lodging_Occupants.pdf PDF
Attachment_Z_DoL_CBA_Wage_Determinations.pdf PDF
Attachment_T_Custodial_Schedule.pdf PDF
Attachment_C_Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_K_Vehicle_Fleet_Inventory.pdf PDF
Attachment_V_Vehicle_Management_Procedures.pdf PDF
Attachment_Y_CTF_Hazardous_Materials_List.pdf PDF
Attachment_HH_Collective_Bargaining_Agreements.pdf PDF
Attachment_F_Visitor_Access_Directive.pdf PDF
Attachment_BB_Incident_Mgmt_Manual.pdf PDF
Attachment_EE_COBRATF_Quality_Management_Procedure.pdf PDF
Attachment_W_CTF_Preventive_Maintenance.pdf PDF
Attachment_Q_Annual_Work_Orders.pdf PDF
Attachment_AA_EOP-COOP_Plan.pdf PDF
Attachment_A_Performance_Work_Statement_3-5-19.pdf PDF
Attachment_U_Mail_Center_Operating_Procedures.pdf PDF
Attachment_DD_Technical_Library_Index.pdf PDF
Attachment_L_Keyless_Entry_Devices.pdf PDF
Attachment_J_Equipment_Maintenance_Requirements.pdf PDF
Attachment_X_Chemicals_Management_Procedures.pdf PDF
Attachment_M_Workplace_Attire_directive.pdf PDF
Attachment_CC_COBRATF_Calibration_Checklist.pdf PDF
70FA2019R00000001_FINAL.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CENTER FOR DOMESTIC PREPAREDNESS

FACILITY OPERATIONS AND SUPPORT SERVICES

ATTACHMENT I

Work Order Priority Classifications

Attachment I Work Order Priority Classifications

Priority 1 Emergency Priority 2 Urgent

Response Time: 15 minutes after receipt of call during normal working hours, or 1 hour after receipt of call at all other times.

Response Time: 2 hours after receipt of call during normal working hours.

Generally, emergency calls will consist of correcting failures which constitute an immediate danger to personnel, threaten to damage property, or threaten to disrupt activity operations and/or training. All emergency conditions shall be resolved before departing the site.

Urgent conditions are those which do not immediately endanger personnel or threaten to damage property, but would soon inconvenience and affect the health or wellbeing of personnel or disrupt scheduled training.

Contractor shall work continuously to complete the work before departing the site.

Examples (but not limited to the following):

Leaking pipe Clogged drain (toilet, bathtub, floor, etc.)

Doors not closing securely Locks not locking Gates inoperable Lights at gates not operable Utility outages (i.e., power, gas, water) Gas leaks Electrical defects/hazards Roof leeks Repairs to food service equipment

Examples (but not limited to the following):

Toilets not filling Outside water leaks A/C or heat inoperative in critical areas

(i.e., classrooms, computer server areas, CAMS, etc.)

Priority 3 Routine (High) Priority 4 Routine (Low)

Response Time: Work must begin within 4 hours after receipt of the call (or by the following workday if receipt of call occurs after 12:00 Noon)

Response Time: 2 days after receipt of call during normal working hours.

Service calls will be classified as routine, high priority when work does not qualify as an emergency or urgent call.

Service calls will be classified as routine, low priority when work does not qualify as an emergency, urgent, or routine high priority call.

Examples (but not limited to the following):

Relamping Inoperative electrical switches or outlets Dripping faucets Broken glass Repairs of mechanical equipment A/C or heat inoperative in non-critical areas (i.e., administrative offices)

Examples (but not limited to the following):

Ceiling tile replacement Broken floor tile Sign fabrication Furniture repairs or assembly Installation of monitor mounts, dry erase boards, etc.

Replacing room/building numbers

Priority 5 Time Permitting

Response Time: When higher priority work does not take precedence.

Service calls will be classified as time permitting when work does not dictate a classified response time.

Examples (but not limited to the following):

Touch-up painting and decorating (e.g., hanging pictures, plaques, diplomas, etc.)

Fabrication of special components for non-mission essential activities