Attachment_E_Schedule_of_Deliverables.pdf

PDF 125 KB Posted

Attached to
CDP Facility Operations and Support Services
Solicitation number
70FA2019R00000001
Issued by

About this file

Attachment E Schedule of Deliverables

View the file

Other files

File Type Posted
Attachment_S_Recycling_Locations.pdf PDF
70FA2019R00000001_A00004.pdf PDF
70FA2019R00000001_A00003_Questions_&_Answers_2.docx DOCX document
70FA2019R00000001_A00003.pdf PDF
Attachment_A_Performance_Work_Statement_4-11-19.pdf PDF
Attachment_S_Recycling_Locations.pdf PDF
70FA2019R00000001_A00002.pdf PDF
70FA2019R00000001_P00002_Questions_&_Answers_1.docx DOCX document
COBRATF_Facility_Notes_(V1_18_Mar_19).docx DOCX document
70FA2019R00000001_A00001.pdf PDF
SiteVisitAttendanceList.xlsx XLSX spreadsheet
Attachment_C_Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_EE_COBRATF_Quality_Management_Procedure.pdf PDF
Attachment_T_Custodial_Schedule.pdf PDF
Attachment_L_Keyless_Entry_Devices.pdf PDF
Attachment_F_Visitor_Access_Directive.pdf PDF
Attachment_BB_Incident_Mgmt_Manual.pdf PDF
Attachment_W_CTF_Preventive_Maintenance.pdf PDF
Attachment_H_Government_Furnished_Equipment.pdf PDF
Attachment_G_Govt_Furnished_Facilities.pdf PDF
Attachment_U_Mail_Center_Operating_Procedures.pdf PDF
Attachment_A_Performance_Work_Statement_3-5-19.pdf PDF
Attachment_CC_COBRATF_Calibration_Checklist.pdf PDF
Attachment_X_Chemicals_Management_Procedures.pdf PDF
Attachment_M_Workplace_Attire_directive.pdf PDF
Attachment_P_CDP_Radiation_Safety_Program.pdf PDF
Attachment_GG_COBRATF_Safety_Plan.pdf PDF
Attachment_D_Maps_and_Floor_Plans.pdf PDF
Attachment_FF_Toxic_Agent_Exposure_Plan.pdf PDF
Attachment_AA_EOP-COOP_Plan.pdf PDF
Attachment_Q_Annual_Work_Orders.pdf PDF
Attachment_Z_DoL_CBA_Wage_Determinations.pdf PDF
Attachment_B_CDP_Facilities_Description.pdf PDF
Attachment_J_Equipment_Maintenance_Requirements.pdf PDF
Attachment_DD_Technical_Library_Index.pdf PDF
Attachment_N_Workplace_Safety_&_Health_directive.pdf PDF
Attachment_R_Annual_Lodging_Occupants.pdf PDF
70FA2019R00000001_FINAL.pdf PDF
Attachment_V_Vehicle_Management_Procedures.pdf PDF
Attachment_HH_Collective_Bargaining_Agreements.pdf PDF
Attachment_Y_CTF_Hazardous_Materials_List.pdf PDF
Attachment_I_Work_Order_Priority_Classifications.pdf PDF
Attachment_K_Vehicle_Fleet_Inventory.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment E Schedule of Deliverables

Note: Deliverables required by this contract are summarized, but not limited to the following list:

Frequency Legend: I = Immediate, D = Daily, W = Weekly, B = Biweekly, M = Monthly, Q = Quarterly, A = Annually, AS = When changes occur / upon occurrence

Deliverable Frequency Other Reference

Notification of Change in Key Personnel AS 3052.215-70 Background Information Package AS C-1.4.5 Phase-In Plan I C-1.5.1 Key Contract Points Names/Addresses I 3052.215-70(b) GFE/GFP Damage Report AS 24 Hours C-5.7 Subcontracts AS 52.244-2 Technical Progress Report M 10th C-8.1 Quality Control Plan (Includes Access control Plan) I C-5.2.

Contract Discrepancy Notice / Response AS 5 Days C-5.2.4 Security Applications I 3052.237-70 IT Access Forms I 3052.237-71 (a) IT Security Plan I Section H Safety Program (includes Risk Assessment and required standard operating procedures) I 10 Days C-1.4.13.1

Non-Hazardous Waste Shipment Records AS 3 Days C-1.4.13.9 & 7.5.5 Lock and Key Control Plan I 30 Days C-1.4.11 Accident Reporting AS C-1.4.13 Liability Insurance I 3052.228-70 Government Property Report A 9/15 3052.245-70 Inventories I C-1.5.3

GFE/GFP Condition of Property I 10 Days C-3.2 and 3.3 (After Phase-in)

Lost, Damaged, Destroyed or Stolen Report AS C-3.3.2 Test and Measurement Equipment List I C-4.1.2 Completed Work Authorization AS C-7.2 (File Only) Unscheduled Work Accomplished W C-1.8 Contingency Plan AS C-1.12.3.3

Work Control Status Report AS C-5.3 (Upon Request)

After Hours Call-In Report AS C-7.1.5 Scheduled Outages AS C-7.1.9.1 Unscheduled Outages AS C-7.1.9.2 UPS Test Report M w/TPR C-7.8.14 Sandblasting AS C-7.11.3 Preventive Maintenance Plan I 30 Days C-7.17.1 Janitorial Services Work Schedule I 30 Days C-7.18.3 Waste Collection Plan I 30 Days C-7.18.7.2 Housekeeping Work Schedule I 10 Days C-7.24.3

Attachment E Schedule of Deliverables

Hospitality Desk Daily Report D 24 Hours C-7.24.3.4 Progress Meeting Minutes AS 5 Days C-1.9 Phase-In Plan I C-1.5.1 Access Control Plan I C-1.12.2 Pest Control Annual Inspection Report A C-7.16.9 Wood-Destroying Organism (termite) Inspection A 15 Days C-7.16.9

Frequency Legend: I = Immediate, D = Daily, W = Weekly, B = Biweekly, M = Monthly, Q = Quarterly, A = Annually, AS = When changes occur / upon occurrence

File details come from the government source that posted it.