7-Liquidated Damages Form.pdf

PDF 84 KB Posted

Attached to
Mandel Recreation Center Fitness Room Flooring Project
Solicitation number
ITB No. 2026-044
Issued by
Palm Beach County, Florida

About this file

This is a Liquidated Damages Form for the Town of Palm Beach, Florida, establishing the contractual framework for penalty assessment related to the Mandel Recreation Center Fitness Room Flooring Project. The project involves removing existing flooring, preparing the subfloor and surface, and installing new rubber flooring at the recreation center located at 340 Seaview Ave, Palm Beach, Florida. Work is scheduled to commence and conclude between August 1-10, 2026. A non-mandatory pre-bid meeting and site visit will be held on Tuesday, May 26, 2026, at 2:00 PM EST at the Mandel Recreation Center, with attendance strongly encouraged for clarification from the Project Manager and Town staff. Award will be made to the lowest responsive and responsible bidder meeting the specified requirements, with the Town reserving the right to accept or reject any bids and to award on an all-or-none or line-by-line basis. Bid prices must remain valid for ninety days from the bid closing date.

The Liquidated Damages Form requires the contractor and contractor's surety to acknowledge that time is of the essence and to accept liability for liquidated damages at the rate specified in the attached Florida Department of Transportation schedule (paragraph 8-10). Damages accrue daily for each calendar day after the scheduled completion date, including any approved time extensions documented in written change orders, and continue to accumulate if the contractor is terminated for default prior to project completion. Contractors must sign the form confirming their understanding of and compliance with these liquidated damages terms as a condition of bidding.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF PALM BEACH

Liquidated Damages Form

Contractor is aware of Town's requirement that the Work achieve timely Completion, time being of the essence. Town and Contractor recognize and hereby acknowledge the difficulty and uncertainty of computing the damages that would be realized by Town in the event the Completion is not timely achieved. It is therefore agreed by Town and Contractor, that the Contractor and the Contractor's surety, shall be liable to and shall pay Town liquidated damages in the amount per attached list - Town adopted Florida Department of Transportation schedule, paragraph 8-10, see attached - for each calendar day after the date on which Completion was to have been achieved (including any Time Extension in approved, written Change Order(s) until Completion of the Work is achieved. In the event Contractor is terminated by reason of default prior to Completion being achieved, any liquidated damages shall continue to accrue and be charged against Contractor until Completion is achieved.

I hereby confirm that our company understands and will comply with Liquidated Damages Term above:

Company Name: Name:

Date: Authorized Signature:

TOWN OF PALM BEACH – Liquidated Damages Form

Company Name:
Name:
Date: