7-Attachment E - Evaluators Scoresheet - MH26-9 Portable Toilets.xls
XLS spreadsheet 42 KB Posted
- Attached to
- MH26-9 Portable Toilets
- Solicitation number
- MH26-9
- Issued by
- Utah
About this file
This is an RFP evaluation scoresheet for the State of Utah Division of Purchasing's procurement of portable toilets and services (MH26-9) across five regions of the state. The procurement may result in multiple contract awards based on vendors' ability to meet technical and overall scoring thresholds. The contract term is five years, with vendors required to guarantee pricing for a minimum of one year.
The evaluation scoresheet establishes a 1,000-point total scoring system comprised of 80 percent technical evaluation (800 points) and 20 percent cost evaluation (200 points). Technical scoring is divided into four criteria: Equipment Specifications and Inventory (45 points, 28.1 percent weight), Service and Maintenance Quality (40 points, 25.0 percent weight), Operational Response and Compliance (40 points, 25.0 percent weight), and Experience and Account Management (35 points, 21.9 percent weight). Vendors must achieve a minimum of 520 technical points and a combined total of 620 points to be eligible for award. Cost points are allocated based on a formula where the lowest proposed price receives 100 percent of available points, with other proposals receiving proportional credit based on their price ratio to the lowest bid. An administrative fee of 0.25 percent applies to the contract. Mandatory prerequisites for evaluation include submission of Attachment C (Cost Sheet) and Attachment D (Technical Criteria Responses).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Claim of Business Confidentiality Updated.pdf.pdf | ||
| 4-Attachment B - SOW - MH26-9 Portable Toilets.docx | DOCX document | |
| 5-Attachment C - Cost Sheet - MH26-9 Portable Toilets.xlsx | XLSX spreadsheet | |
| 2-Vendor Prerequisites - Statewide RFP.pdf | ||
| 3-Attachment A - Cooperative-Contract-GoodsServices Terms and Conditions.docx | DOCX document | |
| 6-Attachment D - Technical Criteria - MH26-9 Portable Toilets.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Score Sheet
| Attachment E - RFP EVALUATION SCORESHEET | |||||||
| MH26-9 | |||||||
| Portable Toilets | |||||||
| Score will be assigned as follows: | |||||||
| 0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed due to missing information | |||||||
| Firm Name: | 1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information | ||||||
| 2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner | |||||||
| Evaluator: | 3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner | ||||||
| 4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them | |||||||
| Date: | 5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP | ||||||
| Minimum Mandatory Requirements | RFP Section | Evaluation (Pass/Fail) | |||||
| 1 | Vendor must upload Attachment C - Cost Sheet (Completed) | Prerequisite | |||||
| 2 | Vendor must upload Attachment D - Completed Responses to Technical Criteria | Prerequisite | |||||
| 3 | |||||||
| 4 | |||||||
| 5 | |||||||
| 6 | |||||||
| 0 | |||||||
| Scoreable Technical Criteria | RFP Section | Evaluator Score (0-5) | Criteria Weight | % of Tech Criteria | Points Possible | Points |
Earned
| 1 | Equipment Specifications and Inventory | Attachment - D | 0 | 45 | 28.1% | 225.00 | 0.00 | |
| 2 | Service and Maintenance Quality | Attachment - D | 0 | 40 | 25.0% | 200.00 | 0.00 | |
| 3 | Operational Response and Compliance | Attachment - D | 0 | 40 | 25.0% | 200.00 | 0.00 | |
| 4 | Experience and Account Management | Attachment - D | 0 | 35 | 21.9% | 175.00 | 0.00 | |
| 5 | 0.0% | 0.00 | 0.00 | |||||
| 6 | 0.0% | 0.00 | 0.00 | |||||
| 7 | 0.0% | 0.00 | 0.00 | |||||
| 8 | 0.0% | 0.00 | 0.00 | |||||
| 9 | 0.0% | 0.00 | 0.00 | |||||
| 10 | 0.0% | 0.00 | 0.00 | |||||
| 11 | 0.0% | 0.00 | 0.00 | |||||
| 12 | 0.0% | 0.00 | 0.00 | |||||
| 13 | 0.0% | 0.00 | 0.00 | |||||
| 14 | 0.0% | 0.00 | 0.00 | |||||
| 15 | 0.0% | 0.00 | 0.00 | |||||
| 16 | 0.0% | 0.00 | 0.00 | |||||
| 17 | 0.0% | 0.00 | 0.00 | |||||
| 18 | 0.0% | 0.00 | 0.00 | |||||
| 19 | 0.0% | 0.00 | 0.00 | |||||
| 20 | 0.0% | 0.00 | 0.00 | |||||
| 21 | 0.0% | 0.00 | 0.00 | |||||
| 22 | 0.0% | 0.00 | 0.00 | |||||
| 23 | 0.0% | 0.00 | 0.00 | |||||
| 100.0% | 800.00 | 0.00 | ||||||
| Required Technical Point Threshold | RFP Section | Min Percent | Min Points Required | Points Earned | Percent Earned | Evaluation | ||
| Attachment - D | 65% | 520.0 | 0.0 | 0.0% | 0 | |||
| Cost | RFP Section | Low Cost Option | Offered Cost | Percent of Total | Points Possible | Points Earned | ||
| Attachment - C | 20% | 200.0 | 0.0 | |||||
| * Purchasing will use the following cost formula: The points assigned to each Vendor's cost proposal will be based on the lowest proposal price (200 Points per Region and there are 5 Regions). The Vendor with the lowest Proposed Price of each Region will receive 100% of the price points for that individual Region. All other Vendors will receive a portion of the total cost points based on what percentage higher their Proposed Price is than the Lowest Proposed Price. The formula to compute the points is: Cost Points x (Lowest Proposed Price/Proposed Price). | ||||||||
| Total Evaluation Points | Percent of Total | Points Possible | Points Earned | |||||
| Total Technical Evaluation Points | 80% | 800.0 | 0.0 | |||||
| Total Cost Evaluation Points | 20% | 200.0 | 0.0 | |||||
| Total Evaluation Points | 100% | 1,000.0 | 0.0 | |||||
| The Vendor must receive a minimum of 520 technical points with a combined(Technical + Cost points) total of 620 points in order to receive an award. |