This is a Project Manual and bidding documents package for Jackson Township, York County, Pennsylvania, regarding renovations and additions to the existing Township Municipal Building, construction of a new free-standing storage garage, and construction of a new salt storage building. The work is divided into four separate construction contracts: General Construction, Plumbing Construction, Mechanical Construction, and Electrical Construction. Sealed bids are due online via the PennBid Program by 1:00 PM EST on Tuesday, December 8, 2026, with public electronic opening at the same time and date. Bidding documents are available at no cost via PennBid beginning November 4, 2026. A mandatory pre-bid conference is scheduled for Tuesday, November 10, 2026, at 10:00 AM EST on-site at 439 Roths Church Road, Spring Grove, Pennsylvania 17362. Contract award is scheduled for a regularly scheduled Jackson Township Board of Supervisors meeting on January 4, 2027. The contract time for completion is four hundred calendar days from the date specified in the Notice to Proceed.
Each bidder must submit a bid bond or certified check in an amount equal to 10 percent of the maximum bid price, payable to Jackson Township. Bidders must demonstrate their qualifications to perform the work, including submitting financial data, previous experience documentation, project superintendent resumes, current contracts list, and a list of proposed subcontractors. The project is subject to Pennsylvania Prevailing Wage Act requirements (Act 442, P.L. 987, as amended), and contractors must verify employee work authorization through the Federal E-Verify program in compliance with Pennsylvania's Public Works Employment Act. All bidders are required to comply with Pennsylvania's Steel Products Procurement Act and various environmental and nondiscrimination statutes. Jackson Township, as a municipal authority, is exempt from Pennsylvania sales and use taxes. The Township reserves the right to accept any bid, waive informalities, or reject any or all bids.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
PREPARED BY
ARCHITECTURE WORKSHOP INC
ONE SOUTH RAILROAD STREET
HANOVER PENNSYLVANIA 17331
717 632 5688
BARRY ISETT + ASSOCIATES
TWO MARKET PLAZA WAY
MECHANICSBURG PENNSYLVANIA 17055
717 795 8575
C S DAVIDSON INC
38 NORTH DUKE STREET
YORK PENNSYLVANIA 17401
717 846 4805
JACKSON TOWNSHIP
MUNICIPAL BUILDING CENTER
439 ROTHS CHURCH ROAD
SPRING GROVE PENNSYLVANIA 17362
SECTION 00 00 00.00 TABLE OF CONTENTS
JACKSON TOWNSHIP TABLE OF CONTENTS SECTION 00 00 00.00
SECTION 00 00 00.00
TABLE OF CONTENTS
PROCUREMENT CONTRACTING AND GENERAL REQUIREMENTS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 00.0 LIST OF DRAWINGS
00 11 13.00 INVITATION TO BID
00 21 13.00 INSTRUCTIONS TO BIDDERS
00 21 13.10 PUBLIC WORKS EMPLOYMENT VERIFICATION FORM
00 31 32.00 GEOTECHNICAL DATA
00 41 13E ELECTRICAL CONTRACT BID FORM
00 41 13G GENERAL CONTRACT BID FORM
00 41 13M MECHANICAL CONTRACT BID FORM
00 41 13P PLUMBING CONTRACT BID FORM
00 41 17.00 AGREEMENT OF SURETY
00 43 13.00 BID BOND
00 43 14.00 CERTIFICATE AS TO CORPORATE PRINCIPAL
00 43 36.00 LIST OF PROPOSED SUBCONTRACTORS
00 45 13.00 EXPERIENCE QUESTIONNAIRE
00 45 19.00 AFFIDAVIT OF NON-COLLUSION
00 45 20.00 CONTRACTOR'S CERTIFICATION OF AUTHORITY QUALIFICATION TO DO BUSINESS IN PENNSYLVANIA
00 61 13.00 PERFORMANCE BOND
00 61 15.00 PAYMENT BOND
00 61 72.00 WAIVER OF LIENS / MECHANICS LIEN WAIVER
00 70 00.00 GENERAL CONDITIONS INCLUDING SUPPLEMENTARY CONDITIONS
00 73 00.50 PENNSYLVANIA STEEL PRODUCTS PROCUREMENT ACT FORMS
00 73 19.00 HEALTH AND SAFETY REQUIREMENTS
00 73 43.00 PENNSYLVANIA PREVAILING WAGE RATE REQUIREMENTS
00 73 46.10 PA L+I FORM LLC-25 BLANK
00 73 46.13 PREVAILING WAGE RATE DETERMINATION SCHEDULE
DIVISION 01 GENERAL REQUIREMENTS
01 10 00.00 SUMMARY OF WORK
01 14 00.00 WORK RESTRICTIONS
01 23 00.00 ALTERNATES
01 26 00.00 CONTRACT MODIFICATION PROCEDURES
01 29 00.00 PAYMENT PROCEDURES
01 31 00.00 PROJECT MANAGEMENT AND COORDINATION
01 31 16.00 MULTIPLE CONTRACT COORDINATION
01 32 00.00 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00.00 SUBMITTAL PROCEDURES
01 40 00.00 QUALITY REQUIREMENTS
01 42 00.00 REFERENCES
01 50 00.00 TEMPORARY FACILITIES AND CONTROLS
01 66 00.00 PRODUCT STORAGE AND HANDLING REQUIREMENTS
01 73 00.00 EXECUTION REQUIREMENTS
01 73 29.00 CUTTING AND PATCHING
01 77 00.00 CLOSEOUT PROCEDURES
01 78 39.00 PROJECT RECORD DOCUMENTS
DIVISION 02 EXISTING CONDITIONS
02 41 00.00 DEMOLITION
02 65 00.00 UNDERGROUND PROPANE TANK REMOVAL
02 82 33.00 ASBESTOS CONTAINING MATERIALS
02 83 19.00 LEAD BASED PAINT AWARENESS
SITE CIVIL SPECIFICATIONS
DIVISION 01 GENERAL REQUIREMENTS
01 10 00.00 SITEWORK SCOPE OF WORK AND COORDINATION
01 22 00.00 UNIT PRICES
01 57 23.00 TEMPORARY STORM WATER POLLUTION CONTROL
DIVISION 02 EXISTING CONDITIONS
02 41 19.00 SELECTIVE SITE DEMOLITION
DIVISION 10 SPECIALTIES
10 14 53.00 TRAFFIC SIGNAGE
DIVISION 31 EARTHWORK
31 10 00.00 SITE CLEARING
31 20 00.00 EARTH MOVING
DIVISION 32 EXTERIOR IMPROVEMENTS
32 12 16.00 ASPHALT PAVING
32 13 13.00 CONCRETE PAVING
32 13 73.00 CONCRETE PAVING JOINT SEALANTS
32 17 13.00 PARKING BUMPERS
32 17 23.00 PAVEMENT MARKINGS
32 91 13.00 SOIL PREPARATION
32 92 00.00 TURF AND GRASSES
DIVISION 33 UTILITIES
33 05 00.00 COMMON WORK RESULTS FOR UTILITIES
33 31 15.00 SITE SANITARY SEWERAGE PIPING
33 42 00.00 SITE STORMWATER CONVEYANCE
33 46 00.00 SUBDRAINAGE
ARCHITECTURAL SPECIFICATIONS
DIVISION 03 CONCRETE
03 30 00.00 CAST IN PLACE CONCRETE
DIVISION 04 MASONRY
04 20 00.00 UNIT MASONRY
04 22 13.00 CONCRETE UNIT MASONRY INSULATED
04 43 16.00 INTERIOR SLATE WINDOW SILLS
04 73 00.00 ANCHORED MANUFACTURED CONCRETE STONE VENEER
DIVISION 05 METALS
05 12 00.00 STRUCTURAL STEEL FRAMING
05 21 00.00 STEEL JOIST FRAMING
05 31 00.00 STEEL DECKING
05 40 00.00 COLD-FORMED METAL FRAMING
05 51 33.00 METAL LADDERS AND FALL PROTECTION
05 52 00.00 METAL RAILINGS
DIVISION 06 WOOD PLASTICS AND COMPOSITES
06 10 00.00 ROUGH CARPENTRY
06 16 00.00 SHEATHING
06 17 53.00 SHOP FABRICATED WOOD TRUSSES
06 41 16.00 PLASTIC LAMINATE CLAD CABINETS
06 61 00.00 CAST POLYMER SHOWER SYSTEM
06 61 16.00 SOLID SURFACE COUNTERTOPS
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 19 16.00 SILANE WATER REPELLENTS
07 21 00.00 THERMAL INSULATION
07 21 16.00 SOUND BATT INSULATION
07 27 26.00 FLUID APPLIED MEMBRANE AIR BARRIERS
07 40 00.00 PAINTED STEEL SIDING AND ROOFING
07 44 33.00 POLYCARBONATE ROOF PANELS
07 53 23.00 MEMBRANE ROOFING
07 71 23.10 CAST IRON DOWNSPOUT BOOTS
07 72 33.00 ROOF HATCHES
07 72 53.00 ROOF EDGE FALL PROTECTION
07 84 00.00 FIRESTOPPING
07 92 00.00 JOINT SEALANTS
DIVISION 08 OPENINGS
08 11 13.00 HOLLOW METAL DOORS AND FRAMES
08 33 23.00 COILING STEEL FIRE DOORS
08 36 13.00 INSULATED SECTIONAL OVERHEAD DOORS
08 41 13.00 ALUMINUM ENTRANCES AND STOREFRONTS
08 43 13.00 ALUMINUM FRAMED FIXED WINDOWS
08 56 53.00 BULLET RESISTANT TRANSACTION WINDOW SYSTEMS
08 71 00.00 DOOR HARDWARE
DIVISION 09 FINISHES
09 21 16.00 GYPSUM BOARD ASSEMBLIES
09 28 13.00 CEMENTITIOUS BACKING BOARD
09 30 13.00 CERAMIC TILING
09 51 00.00 ACOUSTICAL PANEL CEILINGS
09 65 13.00 RESILIENT BASE AND ACCESSORIES
09 65 19.00 LUXURY VINYL PLANK FLOORING
09 68 13.00 TILE CARPETING
09 91 00.00 PAINTING
DIVISION 10 SPECIALTIES
10 14 16.00 REFLECTIVE ALUMINUM CLEARANCE SIGNS
10 14 23.00 TACTILE ACRYLIC PANEL SIGNAGE
10 26 00.00 STAINLESS STEEL CORNER PROTECTORS
10 28 00.00 TOILET ACCESSORIES
10 44 13.00 FIRE EXTINGUISHERS CABINETS
10 44 16.00 FIRE EXTINGUISHERS
10 75 00.00 ALUMINUM FLAGPOLES AND SOLAR UPLIGHTING
10 81 13.00 BIRD CONTROL DEVICES
DIVISION 12 FURNISHINGS
12 24 13.00 MANUAL ROLLER SHADES
DIVISION 13 SPECIAL CONSTRUCTION
13 47 13.00 BULLET RESISTANT WALL SHEATHING
DIVISION 31 EARTHWORK
31 23 16.00 EXCAVATION AND FILL FOR BUILDINGS
DIVISION 32 EXTERIOR IMPROVEMENTS
32 31 00.00 GALVANIZED STEEL SWING BARRIER GATE
PLUMBING SPECIFICATIONS
DIVISION 22 PLUMBING
22 05 00.00 COMMON WORK RESULTS FOR PLUMBING
22 05 13.00 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
22 05 16.00 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING
22 05 17.00 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
22 05 18.00 ESCUTCHEONS FOR PLUMBING PIPING
22 05 19.00 METERS AND GAGES FOR PLUMBING PIPING
22 05 23.00 GENERAL DUTY VALVES FOR PLUMBING PIPING
22 05 29.00 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 48.00 VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
22 05 53.00 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 19.00 PLUMBING PIPING INSULATION
22 08 00.00 PLUMBING SYSTEMS COMMISSIONING
22 11 16.00 DOMESTIC WATER PIPING
22 11 19.00 DOMESTIC WATER PIPING SPECIALTIES
22 11 23.00 DOMESTIC WATER PUMPS
22 11 26.00 FACILITY LIQUID PROPANE (LP) GAS PIPING
22 13 16.00 SANITARY WASTE AND VENT PIPING
22 13 19.00 SANITARY WASTE PIPING SPECIALTIES
22 13 23.00 SANITARY WASTE INTERCEPTORS
22 15 13.00 GENERAL-SERVICE COMPRESSED-AIR PIPING
22 33 00.00 ELECTRIC, DOMESTIC-WATER HEATERS
22 34 00.00 FUEL-FIRED, DOMESTIC-WATER HEATERS
22 42 13.13 COMMERCIAL WATER CLOSETS
22 42 13.16 COMMERCIAL URINALS
22 42 16.13 COMMERCIAL LAVATORIES
22 42 16.16 COMMERCIAL SINKS
22 42 23.00 COMMERCIAL SHOWERS
22 45 00.00 EMERGENCY PLUMBING FIXTURES
22 47 13.00 DRINKING FOUNTAINS
MECHANICAL SPECIFICATIONS
DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING
23 05 00.00 COMMON WORK RESULTS FOR HVAC
23 05 13.00 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 17.00 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
23 05 18.00 ESCUTCHEONS FOR HVAC PIPING
23 05 29.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 48.00 VIBRATION CONTROLS FOR HVAC
23 05 53.00 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93.00 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 13.00 DUCT INSULATION
23 07 19.00 HVAC PIPING INSULATION
23 23 00.00 REFRIGERANT PIPING
23 31 13.00 METAL DUCTS
23 33 00.00 AIR DUCT ACCESSORIES
23 33 46.00 FLEXIBLE DUCTS
23 34 23.00 HVAC POWER VENTILATORS
23 37 13.00 DIFFUSERS, REGISTERS, AND GRILLES
ELECTRICAL SPECIFICATIONS
DIVISION 26 ELECTRICAL
26 00 00.00 ELECTRICAL DEMOLITION
26 05 11.00 REQUIREMENTS FOR ELECTRICAL SYSTEMS
26 05 19.00 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26.00 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29.00 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33.00 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 43.00 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS
26 05 44.00 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING
26 05 53.00 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 08 00.00 ELECTRICAL SYSTEMS COMMISSIONING
26 09 23.00 LIGHTING CONTROL DEVICES
26 22 00.00 LOW-VOLTAGE TRANSFORMERS
26 24 16.00 PANELBOARDS
26 27 02.00 EQUIPMENT CONNECTIONS.
26 27 26.00 WIRING DEVICES
26 28 16.00 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 32 13.00 DIESEL-ENGINE-DRIVEN GENERATOR SETS
26 32 14.00 EMERGENCY ENGINE GENERATORS - OPERATIONS
26 36 00.00 TRANSFER SWITCHES
26 51 19.00 LED INTERIOR LIGHTING
26 56 19.00 LED EXTERIOR LIGHTING
DIVISION 27 COMMUNICATIONS
27 05 28.00 PATHWAYS FOR COMMUNICATIONS SYSTEMS
27 05 36.00 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 44.00 SLEEVES AND SEALS FOR COMMUNICATIONS PATHWAYS AND CABLING
27 11 00.00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS
27 11 16.00 COMMUNICATIONS, RACKS, FRAMES, AND ENCLOSURES
27 13 00.00 COMMUNICATION BACKBONE CABLING
27 15 00.00 COMMUNICATIONS HORIZONTAL CABLING
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 05 13.00 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY
28 05 28.00 PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY
28 05 44.00 SLEEVES AND SEALS FOR ELECTRONIC SAFETY AND SECURITY PATHWAYS AND CABLING
28 31 11.00 DIGITAL ADDRESSABLE FIRE-ALARM SYSTEM
END OF SECTION 00 00 00.00
SECTION 00 01 00.0 LIST OF DRAWINGS
JACKSON TOWNSHIP LIST OF DRAWINGS SECTION 00 01 00.0
SECTION 00 01 00.0
LIST OF DRAWINGS
SITE CIVIL DRAWING SHEETS
SITE PLAN
1 OF 12 COVER SHEET
2 OF 12 GENERAL NOTES
3 OF 12 EXISTING CONDITIONS + DEMOLITION PLAN
4 OF 12 SITE PLAN
5 OF 12 GRADING + UTILITY PLAN
6 OF 12 STORM SEWER PROFILES
7 OF 12 SITE CONSTRUCTION DETAILS
8 OF 12 POST CONSTRUCTION STORMWATER MANAGEMENT-NOTES + DETAILS
9 OF 12 POST CONSTRUCTION STORMWATER MANAGEMENT-DETAILS
10 OF 12 POST CONSTRUCTION STORMWATER MANAGEMENT-DETAILS
11 OF 12 SOIL EROSION + SEDIMENTATION CONTROL-DETAILS
12 OF 12 SOIL EROSION + SEDIMENTATION CONTROL-DETAILS
SOIL EROSION + SEDIMENTATION CONTROL
1 OF 7 COVER SHEET
2 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-EXISTING CONDITIONS + DEMOLITION PLAN
3 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-SITE PLAN
4 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-GRADING + UTILITY PLAN
5 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-DETAILS
6 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-DETAILS
7 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-FLOW PATH EXHIBIT
POST CONSTRUCTION STORMWATER MANAGEMENT
1 OF 6 COVER SHEET
2 OF 6 POST CONSTRUCTION STORMWATER MANAGEMENT-GRADING + UTILITY PLAN
3 OF 6 POST CONSTRUCTION STORMWATER MANAGEMENT-STORM SEWER PROFILES
4 OF 6 POST CONSTRUCTION STORMWATER MANAGEMENT-NOTES + DETAILS
5 OF 6 JACKSON TWP MUNICIPAL BLDG (MAJOR AMENDMENT)-SPRING GROVE, PA, USA
6 OF 6 ARCADIA AR6PC-CONCRETE MANHOLE
ARCHITECTURAL DRAWING SHEETS
A0.0 COVER SHEET
A0.1 CODE ANALYSIS SITE PLAN
A0.2 MAIN BUILDING — CODE PLAN + DATA
A0.3 ACCESSIBILITY NOTES + DETAILS
A0.4 INTERIOR SIGN PLANS
A0.5 INTERIOR SIGN SCHEDULES + DETAILS
A1.1 ARCHITECTURAL SITE VIEWS
A1.2 EXISTING - DEMO ARCHITECTURAL SITE PLAN
A1.3 ARCHITECTURAL SITE PLAN
A2.1 MAIN BUILDING — EX-DEMO + COORDINATION PLANS
A2.2 MAIN BUILDING — EX- DEMO ROOF PLAN
A3.1 MAIN BUILDING — OVERALL FLOOR PLAN + DETAILS
A3.2 MAIN BUILDING — ENLARGED OFFICE AREA PLAN
A3.3 MAIN BUILDING — MEETING ROOM PLAN + ELEVATIONS
A4.1 MAIN BUILDING — EXTERIOR VIEWS
A4.2 MAIN BUILDING — OVERALL ROOF PLAN + DETAILS
A4.3 MAIN BUILDING — EXTERIOR ELEVATIONS + DETAILS
A4.4 MAIN BUILDING — FLASHING DETAILS
A5.1 MAIN BUILDING — CROSS SECTIONS X1 - X3
A5.2 MAIN BUILDING — CROSS SECTIONS X4 - X7
A5.3 MAIN BUILDING — WALL SECTIONS W1 - W7
A5.4 MAIN BUILDING — WALL SECTIONS W8 - W15
A5.5 MAIN BUILDING — WALL SECTIONS W16 - W22
A5.6 MAIN BUILDING — INTERIOR PARTITION DETAILS
A6.1 MAIN BUILDING — DOOR + WINDOW SCHEDULES
A6.2 MAIN BUILDING — EXTERIOR DOOR DETAILS
A6.3 MAIN BUILDING — EXTERIOR GLAZING FRAME DETAILS
A6.4 MAIN BUILDING — INTERIOR DOOR + WINDOW DETAILS
A6.5 MAIN BUILDING — ROOM FINISH PLAN + SCHEDULE
A6.6 MAIN BUILDING — CEILING PLAN + SCHEDULE
A7.1 MAIN BUILDING — ENLARGED PLANS + DETAILS
A7.2 MAIN BUILDING — ENLARGED PLANS + DETAILS
A8.0 STORAGE GARAGE — CODE PLAN + DATA
A8.1 STORAGE GARAGE — PLANS + DETAILS
A8.2 STORAGE GARAGE — EXTERIOR ELEVATIONS
A8.3 STORAGE GARAGE — CROSS SECTIONS + DETAILS
A8.4 STORAGE GARAGE — SCHEDULES + DETAILS
A9.0 SALT SHED — PLANS + CODE DATA
A9.1 SALT SHED — ELEVATIONS + SECTIONS
STRUCTURAL DRAWING SHEETS
S0.1 FOUNDATION SITE PLAN
S1.1 FOUNDATION PLAN
S1.2 FOUNDATION PLAN
S1.3 FOUNDATION NOTES
S1.4 FOUNDATION SCHEDULE AND DETAILS
S1.5 FOUNDATION DETAILS
S2.1 ROOF FRAMING PLAN
S2.2 ROOF FRAMING PLAN
S2.3 LINTEL PLAN
S2.4 MASONRY NOTES SCHEDULES AND DETAILS
S2.5 MASONRY DETAILS
S2.6 STEEL NOTES AND DETAILS
S2.7 STEEL SCHEDULES AND DETAILS
S2.8 WOOD NOTES AND DETAILS
S3.1 SECTIONS
S4.1 ROOF LOADING PLAN
PLUMBING DRAWING SHEETS
P0.0 PLUMBING INFORMATION SHEET
P1.0 FIRST+ MEZZ FLOOR PLANS - DOMESTIC WATER
P1.1 STORAGE GARAGE FLOOR PLAN - DOMESTIC WATER
P2.0 FIRST & MEZZANINE FLOOR PLANS - SANITARY
P2.1 ROOF PLANS - PLUMBING
P2.2 STORAGE GARAGE FLOOR PLAN - SANITARY
P3.0 ENLARGED PLANS - PLUMBING
P4.0 PLUMBING DETAILS
P4.1 PLUMBING DETAILS
P5.0 PLUMBING DIAGRAMS + SCHEDULES
PD1.0 BASEMENT PLAN - DEMOLITION - DOMESTIC WATER
PD1.1 FIRST FLOOR PLAN - DEMOLITION - DOMESTIC WATER
PD1.2 BASEMENT PLAN - DEMOLITION - SANITARY
PD1.3 FIRST FLOOR PLAN - DEMOLITION - SANITARY
PD1.4 ROOF PLAN - DEMOLITION - SANITARY
MECHANICAL DRAWING SHEETS
M0.0 MECHANICAL INFORMATION SHEET
M1.0 FIRST FLOOR PLAN - MECHANICAL
M1.1 STORAGE GARAGE PLANS - MECHANICAL
M2.1 ROOF PLAN - MECHANICAL DUCT
M4.0 MECHANICAL DETAILS
M5.0 MECHANICAL SCHEDULES
MD1.1 FIRST FLOOR PLAN - DEMOLITION - MECHANICAL
ELECTRICAL DRAWING SHEETS
E0.0 ELECTRICAL INFORMATION SHEET
E0.1 SITE PLAN - ELECTRICAL
E1.0 FIRST+MEZZ FLOOR PLANS - LIGHTING
E2.0 FIRST+MEZZ FLOOR PLANS - POWER
E2.1 ROOF PLANS - POWER
E3.0 ENLARGED PLANS - ELECTRICAL
E4.0 ELECTRICAL DETAILS
E5.0 ONE-LINE DIAGRAM AND PANEL SCHEDULES
ED1.0 FIRST FLOOR PLAN - DEMOLITION
END OF SECTION 00 01 00.0
SECTION 00 21 13.00 INSTRUCTIONS TO BIDDERS
JACKSON TOWNSHIP INSTRUCTIONS TO BIDDERS SECTION 00 21 13.00
SECTION 00 21 13.00
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
ARTICLE 1 - DEFINED TERMS
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
ARTICLE 5 - PRE-BID CONFERENCE
ARTICLE 6 - SITE AND OTHER AREAS
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
ARTICLE 8 - BID SECURITY
ARTICLE 9 - CONTRACT TIMES
ARTICLE 10 - LIQUIDATED DAMAGES
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
ARTICLE 13 - PREPARATION OF BID
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
ARTICLE 15 - SUBMITTAL OF BID
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
ARTICLE 17 - OPENING OF BIDS
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
ARTICLE 21 - SIGNING OF AGREEMENT
ARTICLE 22 - SALES AND USE TAXES
ARTICLE 23 - NONDISCRIMINATION IN EMPLOYMENT
ARTICLE 24 - LAWS AND REGULATIONS
TABLE OF ARTICLES (Alphabetical by Subject)
Subject Article
Award of Contract
Basis of Bid; Comparison of Bids
Bid Security
Bids to Remain Subject to Acceptance
Contract Security and Insurance
Contract Times
Copies of Bidding Documents
Defined Terms
Evaluation of Bids and Award of Contract
Examination of Bidding Documents, Other Related Data, and Site
Interpretations and Addenda
Laws and Regulations
Modification and Withdrawal of Bid
Nondiscrimination in Employment
Opening of Bids
Pre-Bid Conference
Preparation of Bid
Qualifications of Bidders
Sales and Use Taxes
Signing of Agreement
Site and Other Areas
Subcontractors, Suppliers and Others
Submittal of Bid
Substitute and “Or-Equal” Items
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The Township’s office at 439 Roths Church Road Spring Grove Pennsylvania 17362 which will be the location from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents as stated in the Advertisement or Invitation to Bid may be obtained from the via Penn Bid at their website www.pennbid.com
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Architect assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Architect, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, within five (5) days of Owner’s request, Bidder shall submit written evidence such as financial data, previous experience, present commitments, and such other data as may be called for below.
A. Financial data
B. Previous experience with name of contact and project name.
C. Project superintendent resume.
D. Current contracts.
E. List of proposed subcontractors.
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
4.01 Subsurface and Physical Conditions
A. The Project Manual identifies:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Architect has used in preparing the Bidding Documents.
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that Architect has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.01.A will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the General Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.
4.02 Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Architect by owners of such Underground Facilities, including Owner, or others.
4.03 Hazardous Environmental Condition
A. The Project Manual identifies those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that Architect has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.03.A will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.06 of the General Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions.
4.05 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.06 Following is a list of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.
A. Refer to the Contract Drawings and Summary of Work.
4.07 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any Addenda;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in §4.02 of the General Conditions, and (2) reports and drawings of Hazardous Environmental Conditions at the Site which have been identified in §4.06 of the General Conditions;
E. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;
I. promptly give Architect written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Architect is acceptable to Bidder; and
J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Architect written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Architect are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 - PRE-BID CONFERENCE
5.01 A Pre-Bid conference will be held as stated in the Advertisement and Notice to Bidders. Representatives of Owner and Architect will be present to discuss the Project. Bidders are required to attend and participate in the conference.
Architect will transmit to all prospective Bidders present at the conference such Addenda as Architect considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 6 - SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents.. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Architect in writing via PennBid’s “Public Q&A” tab. Interpretations or clarifications considered necessary by Architect in response to such questions will be issued by Addenda and posted within PennBid’s “Public Notice’s” and “Files” tab. An email notification will be sent to all planholders. Questions received after the deadline for questions as indicated in the Advertisement, Notice to Bidders and PennBid may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Architect.
ARTICLE 8 - BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10%) percent of Bidder’s maximum Bid price and in the form of a cashier’s check or a Bid bond (on the form attached) issued by a surety meeting the requirements of §§5.01 and 5.02 of the General Conditions.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within fifteen (15) days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of the three apparent lowest Bidders will be returned upon the signing of the Agreement and furnishing of acceptable bonds and other documents by the successful Bidder.
8.03 Bid security of all Bidders except the three apparent lowest Bidders will be returned within thirty (30) days after the Bid opening.
ARTICLE 9 - CONTRACT TIMES
9.01 The number of days within which, or the dates by which the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 - LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Architect, application for such acceptance will not be considered by Architect until after the Effective Date of the Agreement. Refer to General Conditions Paragraph 6.05 for requirements on substitute and “or equal”.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 A list of proposed Subcontractors and Suppliers is required to be submitted to Owner with the bid. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor and Suppliers. Contractor shall also submit evidence that Subcontractors and Suppliers are qualified to do business in the Commonwealth of Pennsylvania or covenant to obtain such qualification prior to and as a condition of award of a Contract. If Owner or Architect, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid. No substitutions for Subcontractors shown on the list shall be made by Contractor without prior written approval of Owner or Architect.
12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors or Suppliers. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier so listed and against which Owner or Architect makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Architect subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions.
12.03 Contractor shall not be required to employ any Subcontractor or Supplier against whom Contractor has reasonable objection.
12.04 Note that Contractor is responsible to assure compliance by its subcontractors with various provisions within the Contract Documents and may have to present certifications and documents from the subcontractors to show compliance.
ARTICLE 13 - PREPARATION OF BID
13.01 The Bid Form and required supplements are included with the Bidding Documents. Bids must be submitted online via PennBid’s “Submissions” tabs. Scanned copies of the Bid Form will not be considered.
13.02 A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein, or the words “No Bid,” “No Change,” or “Not Applicable” entered within the Comment field adjacent to the line item.
13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign and attested by the secretary or an assistant secretary.
13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner accompanied by evidence of authority to sign.
13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign.
13.06 A Bid by an individual shall show the Bidder’s name and official address.
13.07 A Bid by a joint venture shall be executed by each joint venturer and accompanied by evidence of each venturer’s authority to sign.
13.08 Proof of a partner’s, or agent’s, authority to obligate the Contractor must be attached to the Bid.
13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.10 The address and telephone number for communications regarding the Bid shall be shown.
13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the Commonwealth of Pennsylvania or covenant to obtain such qualification prior to award of the Contract. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
13.12 Unless specifically provided in the Contract Documents, bids containing substitutions or combinations of alternates will not be considered unless such substitutions or combinations are specifically authorized by the Owner.
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
14.01 Lump Sums
A. Bidders shall submit a Bid on a lump sum basis for each Lump Sum Bid Item listed in the Bid Form.
B. The Bid for all Lump Sum Bid Items shall be included in the Total Base Bid.
14.02 Alternates
A. When Alternate Bid Items are included in the Project, Bidders shall include a separate lump sum or unit price allowance price for each Alternate Bid Item described in the Bidding Documents as provided for in the Bid Form. The price for each alternate will be the amount added to or deleted from the Total Base Bid if Owner selects the alternate.
14.03 Comparison of Bids
A. For determination of the apparent low Bidder, Bids will be compared on the basis of the Total Base Bid, plus, in the order of priority listed on the Bid Form, the additive/deductive alternate Bid prices for determination of the apparent low Bidder.
ARTICLE 15 - SUBMITTAL OF BID
15.01 Sealed bids shall be submitted online via the PennBid Program, https://pennbid.bonfirehub.com/
15.02 A Bid shall be submitted no later than the date and time prescribed in the Advertisement, Notice to Bidders and on PennBid.
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bidder may withdraw their Bid from consideration after the Bid opening without forfeiture of the cashier's check, surety bid bond or other security filed with the Bid if the price bid was submitted in good faith, and the Bidder submits credible evidence that the reason for the price bid being substantially lower was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional and substantial arithmetical error or an unintentional omission of a substantial quantity of work, labor, material or services made directly in the compilation of the Bid.
Withdrawal is allowed only if (i) notice of a claim of the right to withdraw such Bid is made in writing with the Owner within two (2) business days after the opening of Bids; and (ii) the withdrawal of the Bid would not result in the awarding of the contract on another Bid of the same Bidder, their partner, or to a corporation or business venture owned by or in which he has a substantial interest. No Bidder who is permitted to withdraw a Bid shall supply any material or labor to, or perform any subcontract or other work agreement for any person to whom a contract or subcontract is awarded in the performance of the contract for which the withdrawn Bid was submitted, without the written approval of the Owner.
16.02 If a Bid is withdrawn in accordance with the provisions of §16.01, the Owner may award the contract to the next lowest Bidder or reject all Bids and resubmit the project for bidding. In the event the Owner resubmits the project for bidding the withdrawing Bidder shall pay the costs, in connection with the resubmission, of printing new contract document, required advertising, and printing and mailing notices to prospective Bidders, if the Owner finds that such costs would not have been incurred but for such withdrawal. In no event shall the withdrawing Bidder be permitted to resubmit a Bid for the Project.
16.03 Prior to the Bid opening date and time a Bidder may modify or withdraw its Bid at anytime via PennBid’s “Submissions” tabs.
ARTICLE 17 - OPENING OF BIDS
17.01 Bids will not be opened and read aloud publicly. An abstract of the amounts of the Total Base Bid and major alternates, if any, will be made available to Bidders after the opening of Bids using PennBid’s “Public Notices” tab.
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible or responsive. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in §12.01.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors and Suppliers to perform the Work in accordance with the Contract Documents.
19.06 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.
19.07 Owner reserves the right to cancel the award of any Contract at any time prior to its execution of the Agreement by Owner without incurring any liability to any of the Bidders.
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
20.01 Article 5 of the General Conditions, as modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds and appropriate insurance certificates.
ARTICLE 21 - SIGNING OF AGREEMENT
21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within fifteen (15) days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within ten (10) days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.
ARTICLE 22 - SALES AND USE TAXES
22.01 Owner, as a municipal authority, is exempt from the Pennsylvania Sales and Use Tax. Certificates of Exemption will be furnished to the Contractor for its purchase of materials for which the Authority’s exemption is transferable, upon Contractor’s request; however, it is Contractor's responsibility to determine for which materials the tax exemption is applicable prior to submitting its Bid. Said taxes shall not be included in the Bid. Contractor shall pay all other sales, consumer, use and other similar taxes required to be paid by Contractor in accordance with the Laws and Regulations of the Commonwealth of Pennsylvania which are applicable during the performance of the Work. Said taxes shall not be included in the Bid. Refer to Paragraph 6.10 of the General Conditions for additional information, if any.
ARTICLE 23 - NONDISCRIMINATION IN EMPLOYMENT
23.01 Contractor agrees that:
A. Neither it nor any subcontractor that Contractor uses for the Contract will discriminate against any employee or applicant for employment because of race, color, religion, sex, gender identity, sexual orientation, veteran’s status, political opinions or affiliations, lawful activity in any employee organization, national origin, age, disability or marital status. Contractor and subcontractors will take affirmative action to ensure that applicants and employees are treated fairly during employment without regard to race, color, religion, sex, gender identity, sexual orientation, veteran's status, political opinions or affiliations, lawful activity in any employee organization, national origin, age, disability or marital status. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer, recruitment, or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
(1) Contractor/subcontractor shall comply with all applicable federal, state and local laws regarding non-discrimination, including: (a) the Civil Rights Act of 1964, 42 U.S.C. §2000 et seq. (1981); (b) the Civil Rights Act of 1991, P.L. 102-166; (c) Executive Order Number 11246, 30 Fed. Reg. 12,319 (1965), reprinted in 42 U.S.C.
§2000(e) note, as amended by Executive Order Number 11375, 32 Fed. Reg. 14,303 (1967) and by Executive Order Number 12086, 43 Fed. Reg. 46,501 (1978); (d) the Age Discrimination Act, 42 U.S.C. §§6101-6106 (1981);
(e) the Age Discrimination in Employment Act, 29 U.S.C. §§621-34 (1967); (f) the Rehabilitation Act of 1973, 29 U.S.C. §§793-794 (1981); (g) the Americans with Disabilities Act, 42 U.S.C. §12101 et seq. (1990); and (h) the Pennsylvania Human Relations Act, Act of October 27, 1955 (P.L. 744, No. 222) as amended, 43 P.S. §§951-963.
(2) Contractor/subcontractor shall establish and maintain a written sexual harassment policy and shall inform its employees of the policy. The policy must contain a notice that sexual harassment will not be tolerated and employees who practice it will be disciplined.
(3) Contractor/subcontractor shall not discriminate for any of the reasons set forth above against any subcontractor or supplier who is qualified to perform the work to which the contract relates.
B. The Contract may be canceled or terminated by the Owner, and all money due or to become due under the Contract may be forfeited, for a violation of the terms or conditions of these nondiscrimination provisions.
23.02 Contracts for Work under this Bid will obligate the Contractor and Subcontractor to be nondiscriminatory in employment practices. Bidders, if requested, must submit with their Bid any information or documents required by state, federal or local statutes or regulations applicable to nondiscrimination in employment; including, if necessary, a compliance report concerning their employment practices and policies in order to maintain their eligibility to receive the award of the Contract.
A. To the extent allowed by law the Contractor/subcontractor shall furnish all necessary employment documents and records to and permit access to its books, records, and accounts by Owner, the City or their agents for purposes of investigation to ascertain compliance with these equal opportunity and nondiscrimination provisions. If the Contractor does not possess documents or records reflecting the necessary information requested, it shall furnish such information on reporting forms supplied by Owner or the City.
23.03 Bidders must submit a list of all Subcontractors who will perform work on the Project and written signed statements from authorized agents of the labor pools with which it will or may deal for employees on this Work, together with supporting information to the effect that these labor pools will affirmatively cooperate in or offer no hindrance to the recruitment, employment and equal treatment of employees who are seeking employment and are performing work under the
Contract. If such agents or labor pools have failed or refused to furnish the necessary statements prior to the award of the Contract, Bidder shall provide certification as to what efforts have been made to secure such statements.
ARTICLE 24 - LAWS AND REGULATIONS
24.01 The Bidder’s attention is directed to the fact that all applicable laws, ordinances, and rules and regulations having jurisdiction over construction of the Project shall apply to the Contract throughout; are the Bidder’s/Contractor’s responsibility to ascertain; and will be deemed to be included in the Contract the same as though herein written in full, whether or not specified in the Contract Documents.
24.02 PREVAILING WAGE ACT. The Pennsylvania Prevailing Wage Act applies to the work to be performed under the Contract;
therefore, the Contractor must pay to its workers the minimum wage rate established by the Secretary of Labor and Industry and specified in the Contract Document - Prevailing Wage Act and Predetermination - and further the Contractor must assure that its Subcontractors also pay the Subcontractor’s workers these same minimum wage rates.
24.03 STEEL PRODUCTS PROCUREMENT ACT. Special attention is drawn to the provisions of Pennsylvania’s Steel Products Procurement Act, which includes cast iron in the definition of steel products. The Contractor is advised that only steel products as defined in said Act shall be used or supplied in the performance of the Contract The Act defines Steel Products as "Products rolled, formed, shaped, drawn, extruded, forged, cast, fabricated or otherwise similarly processed, or processed by a combination of two or more of such operations, from steel made in the United States by the open hearth, basic oxygen, electric furnace, Bessemer or other steel making process and shall include cast iron products and shall include machinery and equipment listed in United States Department of Commerce Standard Industrial Classification 25 (furniture and fixture), 35 (machinery, except electrical) and 37 (transportation equipment) and made of, fabricated from, or containing steel components. If a product contains both foreign and United States steel, such product shall be determined to be a United States steel product only if at least seventy-five (75%) percent of the cost of the articles, materials and supplies have been mined, produced or manufactured, as the case may be, in the United States.
Transportation equipment shall be determined to be a United States steel product if it complies with section 165 of Public Law 97-424 (96 Stat. 2136)". Contractor shall provide steel origin certifications of compliance in conjunction with shop drawing submittals, which certification shall be on forms to be provided by the Owner.
24.04 PUBLIC WORKS EMPLOYMENT ACT. Pennsylvania’s Public Works Employment Act requires contractors and subcontractors performing work on public works projects in this Commonwealth to comply with the Federal E-Verify program (the EVP) to ensure employees are authorized to work in the United States. The EVP is a free Internet-based program operated by the United States Department of Homeland Security that compares information from an employee's Form I-9, Employment Eligibility Verification, to data from the United States Department of Homeland Security and Social Security Administration records to confirm employment eligibility. As a result, every contractor and subcontractor performing work under a public works contract shall utilize the EVP system to verify the employment eligibility of each new employee hired after January 1, 2013; shall submit the official Public Employment Verification Form to the Authority to ensure compliance with the act; and shall maintain documentation of continued compliance with the act by utilizing the EVP for new employees hired throughout the duration of the public work contract. The Pennsylvania Department of General Services is responsible for administering the program and information, as well as establishing the official Public Works Employment Verification Form that needs to be completed by contractors and subcontractors, can be obtained on their website. This has been the appropriate link to that website, although the Authority does not warrant its current accuracy -http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/public_work s_employment_verification/1357211.
24.05 ENVIRONMENTAL LAWS. According to the Commonwealth Procurement Code, Act of May 15, 1998, P.L. 358, No. 57, 62 Pa.C.S.A. §3301, all invitations for bids and requests for proposals for construction projects issued by any government agency shall set forth any provision of federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and the preservation of public natural resources that affect the projects. This is the list entitled Environmental Statement as prepared by the Commonwealth of Pennsylvania, Department of General Services, 1999 Edition, for its standard contract forms, although revised to eliminate acts which don’t apply because of geographic location. The Bidder is hereby notified that this project is subject to those statutes, rules and regulations shown on the following list, and the work must be carried out in compliance with these statutes, rules and regulations.
STATE LAW
I. Purdon's Statutes - Title 3 (Agriculture)
• Pennsylvania Fertilizer Law of 1956, Act of May 29, 1956 (P.L.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .