Attached to
Renovations+Addition to Existing Building, New Storage Garage and Salt Storage Building
Solicitation number
US.261682
Issued by
York County, Pennsylvania

About this file

This is a Project Manual and bidding documents package for Jackson Township, York County, Pennsylvania, regarding renovations and additions to the existing Township Municipal Building, construction of a new free-standing storage garage, and construction of a new salt storage building. The work is divided into four separate construction contracts: General Construction, Plumbing Construction, Mechanical Construction, and Electrical Construction. Sealed bids are due online via the PennBid Program by 1:00 PM EST on Tuesday, December 8, 2026, with public electronic opening at the same time and date. Bidding documents are available at no cost via PennBid beginning November 4, 2026. A mandatory pre-bid conference is scheduled for Tuesday, November 10, 2026, at 10:00 AM EST on-site at 439 Roths Church Road, Spring Grove, Pennsylvania 17362. Contract award is scheduled for a regularly scheduled Jackson Township Board of Supervisors meeting on January 4, 2027. The contract time for completion is four hundred calendar days from the date specified in the Notice to Proceed.

Each bidder must submit a bid bond or certified check in an amount equal to 10 percent of the maximum bid price, payable to Jackson Township. Bidders must demonstrate their qualifications to perform the work, including submitting financial data, previous experience documentation, project superintendent resumes, current contracts list, and a list of proposed subcontractors. The project is subject to Pennsylvania Prevailing Wage Act requirements (Act 442, P.L. 987, as amended), and contractors must verify employee work authorization through the Federal E-Verify program in compliance with Pennsylvania's Public Works Employment Act. All bidders are required to comply with Pennsylvania's Steel Products Procurement Act and various environmental and nondiscrimination statutes. Jackson Township, as a municipal authority, is exempt from Pennsylvania sales and use taxes. The Township reserves the right to accept any bid, waive informalities, or reject any or all bids.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

PREPARED BY

ARCHITECTURE WORKSHOP INC

ONE SOUTH RAILROAD STREET

HANOVER PENNSYLVANIA 17331

717 632 5688

BARRY ISETT + ASSOCIATES

TWO MARKET PLAZA WAY

MECHANICSBURG PENNSYLVANIA 17055

717 795 8575

C S DAVIDSON INC

38 NORTH DUKE STREET

YORK PENNSYLVANIA 17401

717 846 4805

JACKSON TOWNSHIP

MUNICIPAL BUILDING CENTER

439 ROTHS CHURCH ROAD

SPRING GROVE PENNSYLVANIA 17362

SECTION 00 00 00.00 TABLE OF CONTENTS

JACKSON TOWNSHIP TABLE OF CONTENTS SECTION 00 00 00.00

SECTION 00 00 00.00

TABLE OF CONTENTS

PROCUREMENT CONTRACTING AND GENERAL REQUIREMENTS

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 00.0 LIST OF DRAWINGS

00 11 13.00 INVITATION TO BID

00 21 13.00 INSTRUCTIONS TO BIDDERS

00 21 13.10 PUBLIC WORKS EMPLOYMENT VERIFICATION FORM

00 31 32.00 GEOTECHNICAL DATA

00 41 13E ELECTRICAL CONTRACT BID FORM

00 41 13G GENERAL CONTRACT BID FORM

00 41 13M MECHANICAL CONTRACT BID FORM

00 41 13P PLUMBING CONTRACT BID FORM

00 41 17.00 AGREEMENT OF SURETY

00 43 13.00 BID BOND

00 43 14.00 CERTIFICATE AS TO CORPORATE PRINCIPAL

00 43 36.00 LIST OF PROPOSED SUBCONTRACTORS

00 45 13.00 EXPERIENCE QUESTIONNAIRE

00 45 19.00 AFFIDAVIT OF NON-COLLUSION

00 45 20.00 CONTRACTOR'S CERTIFICATION OF AUTHORITY QUALIFICATION TO DO BUSINESS IN PENNSYLVANIA

00 61 13.00 PERFORMANCE BOND

00 61 15.00 PAYMENT BOND

00 61 72.00 WAIVER OF LIENS / MECHANICS LIEN WAIVER

00 70 00.00 GENERAL CONDITIONS INCLUDING SUPPLEMENTARY CONDITIONS

00 73 00.50 PENNSYLVANIA STEEL PRODUCTS PROCUREMENT ACT FORMS

00 73 19.00 HEALTH AND SAFETY REQUIREMENTS

00 73 43.00 PENNSYLVANIA PREVAILING WAGE RATE REQUIREMENTS

00 73 46.10 PA L+I FORM LLC-25 BLANK

00 73 46.13 PREVAILING WAGE RATE DETERMINATION SCHEDULE

DIVISION 01 GENERAL REQUIREMENTS

01 10 00.00 SUMMARY OF WORK

01 14 00.00 WORK RESTRICTIONS

01 23 00.00 ALTERNATES

01 26 00.00 CONTRACT MODIFICATION PROCEDURES

01 29 00.00 PAYMENT PROCEDURES

01 31 00.00 PROJECT MANAGEMENT AND COORDINATION

01 31 16.00 MULTIPLE CONTRACT COORDINATION

01 32 00.00 CONSTRUCTION PROGRESS DOCUMENTATION

01 33 00.00 SUBMITTAL PROCEDURES

01 40 00.00 QUALITY REQUIREMENTS

01 42 00.00 REFERENCES

01 50 00.00 TEMPORARY FACILITIES AND CONTROLS

01 66 00.00 PRODUCT STORAGE AND HANDLING REQUIREMENTS

01 73 00.00 EXECUTION REQUIREMENTS

01 73 29.00 CUTTING AND PATCHING

01 77 00.00 CLOSEOUT PROCEDURES

01 78 39.00 PROJECT RECORD DOCUMENTS

DIVISION 02 EXISTING CONDITIONS

02 41 00.00 DEMOLITION

02 65 00.00 UNDERGROUND PROPANE TANK REMOVAL

02 82 33.00 ASBESTOS CONTAINING MATERIALS

02 83 19.00 LEAD BASED PAINT AWARENESS

SITE CIVIL SPECIFICATIONS

DIVISION 01 GENERAL REQUIREMENTS

01 10 00.00 SITEWORK SCOPE OF WORK AND COORDINATION

01 22 00.00 UNIT PRICES

01 57 23.00 TEMPORARY STORM WATER POLLUTION CONTROL

DIVISION 02 EXISTING CONDITIONS

02 41 19.00 SELECTIVE SITE DEMOLITION

DIVISION 10 SPECIALTIES

10 14 53.00 TRAFFIC SIGNAGE

DIVISION 31 EARTHWORK

31 10 00.00 SITE CLEARING

31 20 00.00 EARTH MOVING

DIVISION 32 EXTERIOR IMPROVEMENTS

32 12 16.00 ASPHALT PAVING

32 13 13.00 CONCRETE PAVING

32 13 73.00 CONCRETE PAVING JOINT SEALANTS

32 17 13.00 PARKING BUMPERS

32 17 23.00 PAVEMENT MARKINGS

32 91 13.00 SOIL PREPARATION

32 92 00.00 TURF AND GRASSES

DIVISION 33 UTILITIES

33 05 00.00 COMMON WORK RESULTS FOR UTILITIES

33 31 15.00 SITE SANITARY SEWERAGE PIPING

33 42 00.00 SITE STORMWATER CONVEYANCE

33 46 00.00 SUBDRAINAGE

ARCHITECTURAL SPECIFICATIONS

DIVISION 03 CONCRETE

03 30 00.00 CAST IN PLACE CONCRETE

DIVISION 04 MASONRY

04 20 00.00 UNIT MASONRY

04 22 13.00 CONCRETE UNIT MASONRY INSULATED

04 43 16.00 INTERIOR SLATE WINDOW SILLS

04 73 00.00 ANCHORED MANUFACTURED CONCRETE STONE VENEER

DIVISION 05 METALS

05 12 00.00 STRUCTURAL STEEL FRAMING

05 21 00.00 STEEL JOIST FRAMING

05 31 00.00 STEEL DECKING

05 40 00.00 COLD-FORMED METAL FRAMING

05 51 33.00 METAL LADDERS AND FALL PROTECTION

05 52 00.00 METAL RAILINGS

DIVISION 06 WOOD PLASTICS AND COMPOSITES

06 10 00.00 ROUGH CARPENTRY

06 16 00.00 SHEATHING

06 17 53.00 SHOP FABRICATED WOOD TRUSSES

06 41 16.00 PLASTIC LAMINATE CLAD CABINETS

06 61 00.00 CAST POLYMER SHOWER SYSTEM

06 61 16.00 SOLID SURFACE COUNTERTOPS

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 19 16.00 SILANE WATER REPELLENTS

07 21 00.00 THERMAL INSULATION

07 21 16.00 SOUND BATT INSULATION

07 27 26.00 FLUID APPLIED MEMBRANE AIR BARRIERS

07 40 00.00 PAINTED STEEL SIDING AND ROOFING

07 44 33.00 POLYCARBONATE ROOF PANELS

07 53 23.00 MEMBRANE ROOFING

07 71 23.10 CAST IRON DOWNSPOUT BOOTS

07 72 33.00 ROOF HATCHES

07 72 53.00 ROOF EDGE FALL PROTECTION

07 84 00.00 FIRESTOPPING

07 92 00.00 JOINT SEALANTS

DIVISION 08 OPENINGS

08 11 13.00 HOLLOW METAL DOORS AND FRAMES

08 33 23.00 COILING STEEL FIRE DOORS

08 36 13.00 INSULATED SECTIONAL OVERHEAD DOORS

08 41 13.00 ALUMINUM ENTRANCES AND STOREFRONTS

08 43 13.00 ALUMINUM FRAMED FIXED WINDOWS

08 56 53.00 BULLET RESISTANT TRANSACTION WINDOW SYSTEMS

08 71 00.00 DOOR HARDWARE

DIVISION 09 FINISHES

09 21 16.00 GYPSUM BOARD ASSEMBLIES

09 28 13.00 CEMENTITIOUS BACKING BOARD

09 30 13.00 CERAMIC TILING

09 51 00.00 ACOUSTICAL PANEL CEILINGS

09 65 13.00 RESILIENT BASE AND ACCESSORIES

09 65 19.00 LUXURY VINYL PLANK FLOORING

09 68 13.00 TILE CARPETING

09 91 00.00 PAINTING

DIVISION 10 SPECIALTIES

10 14 16.00 REFLECTIVE ALUMINUM CLEARANCE SIGNS

10 14 23.00 TACTILE ACRYLIC PANEL SIGNAGE

10 26 00.00 STAINLESS STEEL CORNER PROTECTORS

10 28 00.00 TOILET ACCESSORIES

10 44 13.00 FIRE EXTINGUISHERS CABINETS

10 44 16.00 FIRE EXTINGUISHERS

10 75 00.00 ALUMINUM FLAGPOLES AND SOLAR UPLIGHTING

10 81 13.00 BIRD CONTROL DEVICES

DIVISION 12 FURNISHINGS

12 24 13.00 MANUAL ROLLER SHADES

DIVISION 13 SPECIAL CONSTRUCTION

13 47 13.00 BULLET RESISTANT WALL SHEATHING

DIVISION 31 EARTHWORK

31 23 16.00 EXCAVATION AND FILL FOR BUILDINGS

DIVISION 32 EXTERIOR IMPROVEMENTS

32 31 00.00 GALVANIZED STEEL SWING BARRIER GATE

PLUMBING SPECIFICATIONS

DIVISION 22 PLUMBING

22 05 00.00 COMMON WORK RESULTS FOR PLUMBING

22 05 13.00 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

22 05 16.00 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING

22 05 17.00 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

22 05 18.00 ESCUTCHEONS FOR PLUMBING PIPING

22 05 19.00 METERS AND GAGES FOR PLUMBING PIPING

22 05 23.00 GENERAL DUTY VALVES FOR PLUMBING PIPING

22 05 29.00 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

22 05 48.00 VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

22 05 53.00 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22 07 19.00 PLUMBING PIPING INSULATION

22 08 00.00 PLUMBING SYSTEMS COMMISSIONING

22 11 16.00 DOMESTIC WATER PIPING

22 11 19.00 DOMESTIC WATER PIPING SPECIALTIES

22 11 23.00 DOMESTIC WATER PUMPS

22 11 26.00 FACILITY LIQUID PROPANE (LP) GAS PIPING

22 13 16.00 SANITARY WASTE AND VENT PIPING

22 13 19.00 SANITARY WASTE PIPING SPECIALTIES

22 13 23.00 SANITARY WASTE INTERCEPTORS

22 15 13.00 GENERAL-SERVICE COMPRESSED-AIR PIPING

22 33 00.00 ELECTRIC, DOMESTIC-WATER HEATERS

22 34 00.00 FUEL-FIRED, DOMESTIC-WATER HEATERS

22 42 13.13 COMMERCIAL WATER CLOSETS

22 42 13.16 COMMERCIAL URINALS

22 42 16.13 COMMERCIAL LAVATORIES

22 42 16.16 COMMERCIAL SINKS

22 42 23.00 COMMERCIAL SHOWERS

22 45 00.00 EMERGENCY PLUMBING FIXTURES

22 47 13.00 DRINKING FOUNTAINS

MECHANICAL SPECIFICATIONS

DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING

23 05 00.00 COMMON WORK RESULTS FOR HVAC

23 05 13.00 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 05 17.00 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

23 05 18.00 ESCUTCHEONS FOR HVAC PIPING

23 05 29.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 05 48.00 VIBRATION CONTROLS FOR HVAC

23 05 53.00 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93.00 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 13.00 DUCT INSULATION

23 07 19.00 HVAC PIPING INSULATION

23 23 00.00 REFRIGERANT PIPING

23 31 13.00 METAL DUCTS

23 33 00.00 AIR DUCT ACCESSORIES

23 33 46.00 FLEXIBLE DUCTS

23 34 23.00 HVAC POWER VENTILATORS

23 37 13.00 DIFFUSERS, REGISTERS, AND GRILLES

ELECTRICAL SPECIFICATIONS

DIVISION 26 ELECTRICAL

26 00 00.00 ELECTRICAL DEMOLITION

26 05 11.00 REQUIREMENTS FOR ELECTRICAL SYSTEMS

26 05 19.00 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26.00 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29.00 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33.00 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 43.00 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

26 05 44.00 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

26 05 53.00 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 08 00.00 ELECTRICAL SYSTEMS COMMISSIONING

26 09 23.00 LIGHTING CONTROL DEVICES

26 22 00.00 LOW-VOLTAGE TRANSFORMERS

26 24 16.00 PANELBOARDS

26 27 02.00 EQUIPMENT CONNECTIONS.

26 27 26.00 WIRING DEVICES

26 28 16.00 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 32 13.00 DIESEL-ENGINE-DRIVEN GENERATOR SETS

26 32 14.00 EMERGENCY ENGINE GENERATORS - OPERATIONS

26 36 00.00 TRANSFER SWITCHES

26 51 19.00 LED INTERIOR LIGHTING

26 56 19.00 LED EXTERIOR LIGHTING

DIVISION 27 COMMUNICATIONS

27 05 28.00 PATHWAYS FOR COMMUNICATIONS SYSTEMS

27 05 36.00 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 05 44.00 SLEEVES AND SEALS FOR COMMUNICATIONS PATHWAYS AND CABLING

27 11 00.00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

27 11 16.00 COMMUNICATIONS, RACKS, FRAMES, AND ENCLOSURES

27 13 00.00 COMMUNICATION BACKBONE CABLING

27 15 00.00 COMMUNICATIONS HORIZONTAL CABLING

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

28 05 13.00 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

28 05 28.00 PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY

28 05 44.00 SLEEVES AND SEALS FOR ELECTRONIC SAFETY AND SECURITY PATHWAYS AND CABLING

28 31 11.00 DIGITAL ADDRESSABLE FIRE-ALARM SYSTEM

END OF SECTION 00 00 00.00

SECTION 00 01 00.0 LIST OF DRAWINGS

JACKSON TOWNSHIP LIST OF DRAWINGS SECTION 00 01 00.0

SECTION 00 01 00.0

LIST OF DRAWINGS

SITE CIVIL DRAWING SHEETS

SITE PLAN

1 OF 12 COVER SHEET

2 OF 12 GENERAL NOTES

3 OF 12 EXISTING CONDITIONS + DEMOLITION PLAN

4 OF 12 SITE PLAN

5 OF 12 GRADING + UTILITY PLAN

6 OF 12 STORM SEWER PROFILES

7 OF 12 SITE CONSTRUCTION DETAILS

8 OF 12 POST CONSTRUCTION STORMWATER MANAGEMENT-NOTES + DETAILS

9 OF 12 POST CONSTRUCTION STORMWATER MANAGEMENT-DETAILS

10 OF 12 POST CONSTRUCTION STORMWATER MANAGEMENT-DETAILS

11 OF 12 SOIL EROSION + SEDIMENTATION CONTROL-DETAILS

12 OF 12 SOIL EROSION + SEDIMENTATION CONTROL-DETAILS

SOIL EROSION + SEDIMENTATION CONTROL

1 OF 7 COVER SHEET

2 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-EXISTING CONDITIONS + DEMOLITION PLAN

3 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-SITE PLAN

4 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-GRADING + UTILITY PLAN

5 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-DETAILS

6 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-DETAILS

7 OF 7 SOIL EROSION + SEDIMENTATION CONTROL-FLOW PATH EXHIBIT

POST CONSTRUCTION STORMWATER MANAGEMENT

1 OF 6 COVER SHEET

2 OF 6 POST CONSTRUCTION STORMWATER MANAGEMENT-GRADING + UTILITY PLAN

3 OF 6 POST CONSTRUCTION STORMWATER MANAGEMENT-STORM SEWER PROFILES

4 OF 6 POST CONSTRUCTION STORMWATER MANAGEMENT-NOTES + DETAILS

5 OF 6 JACKSON TWP MUNICIPAL BLDG (MAJOR AMENDMENT)-SPRING GROVE, PA, USA

6 OF 6 ARCADIA AR6PC-CONCRETE MANHOLE

ARCHITECTURAL DRAWING SHEETS

A0.0 COVER SHEET

A0.1 CODE ANALYSIS SITE PLAN

A0.2 MAIN BUILDING — CODE PLAN + DATA

A0.3 ACCESSIBILITY NOTES + DETAILS

A0.4 INTERIOR SIGN PLANS

A0.5 INTERIOR SIGN SCHEDULES + DETAILS

A1.1 ARCHITECTURAL SITE VIEWS

A1.2 EXISTING - DEMO ARCHITECTURAL SITE PLAN

A1.3 ARCHITECTURAL SITE PLAN

A2.1 MAIN BUILDING — EX-DEMO + COORDINATION PLANS

A2.2 MAIN BUILDING — EX- DEMO ROOF PLAN

A3.1 MAIN BUILDING — OVERALL FLOOR PLAN + DETAILS

A3.2 MAIN BUILDING — ENLARGED OFFICE AREA PLAN

A3.3 MAIN BUILDING — MEETING ROOM PLAN + ELEVATIONS

A4.1 MAIN BUILDING — EXTERIOR VIEWS

A4.2 MAIN BUILDING — OVERALL ROOF PLAN + DETAILS

A4.3 MAIN BUILDING — EXTERIOR ELEVATIONS + DETAILS

A4.4 MAIN BUILDING — FLASHING DETAILS

A5.1 MAIN BUILDING — CROSS SECTIONS X1 - X3

A5.2 MAIN BUILDING — CROSS SECTIONS X4 - X7

A5.3 MAIN BUILDING — WALL SECTIONS W1 - W7

A5.4 MAIN BUILDING — WALL SECTIONS W8 - W15

A5.5 MAIN BUILDING — WALL SECTIONS W16 - W22

A5.6 MAIN BUILDING — INTERIOR PARTITION DETAILS

A6.1 MAIN BUILDING — DOOR + WINDOW SCHEDULES

A6.2 MAIN BUILDING — EXTERIOR DOOR DETAILS

A6.3 MAIN BUILDING — EXTERIOR GLAZING FRAME DETAILS

A6.4 MAIN BUILDING — INTERIOR DOOR + WINDOW DETAILS

A6.5 MAIN BUILDING — ROOM FINISH PLAN + SCHEDULE

A6.6 MAIN BUILDING — CEILING PLAN + SCHEDULE

A7.1 MAIN BUILDING — ENLARGED PLANS + DETAILS

A7.2 MAIN BUILDING — ENLARGED PLANS + DETAILS

A8.0 STORAGE GARAGE — CODE PLAN + DATA

A8.1 STORAGE GARAGE — PLANS + DETAILS

A8.2 STORAGE GARAGE — EXTERIOR ELEVATIONS

A8.3 STORAGE GARAGE — CROSS SECTIONS + DETAILS

A8.4 STORAGE GARAGE — SCHEDULES + DETAILS

A9.0 SALT SHED — PLANS + CODE DATA

A9.1 SALT SHED — ELEVATIONS + SECTIONS

STRUCTURAL DRAWING SHEETS

S0.1 FOUNDATION SITE PLAN

S1.1 FOUNDATION PLAN

S1.2 FOUNDATION PLAN

S1.3 FOUNDATION NOTES

S1.4 FOUNDATION SCHEDULE AND DETAILS

S1.5 FOUNDATION DETAILS

S2.1 ROOF FRAMING PLAN

S2.2 ROOF FRAMING PLAN

S2.3 LINTEL PLAN

S2.4 MASONRY NOTES SCHEDULES AND DETAILS

S2.5 MASONRY DETAILS

S2.6 STEEL NOTES AND DETAILS

S2.7 STEEL SCHEDULES AND DETAILS

S2.8 WOOD NOTES AND DETAILS

S3.1 SECTIONS

S4.1 ROOF LOADING PLAN

PLUMBING DRAWING SHEETS

P0.0 PLUMBING INFORMATION SHEET

P1.0 FIRST+ MEZZ FLOOR PLANS - DOMESTIC WATER

P1.1 STORAGE GARAGE FLOOR PLAN - DOMESTIC WATER

P2.0 FIRST & MEZZANINE FLOOR PLANS - SANITARY

P2.1 ROOF PLANS - PLUMBING

P2.2 STORAGE GARAGE FLOOR PLAN - SANITARY

P3.0 ENLARGED PLANS - PLUMBING

P4.0 PLUMBING DETAILS

P4.1 PLUMBING DETAILS

P5.0 PLUMBING DIAGRAMS + SCHEDULES

PD1.0 BASEMENT PLAN - DEMOLITION - DOMESTIC WATER

PD1.1 FIRST FLOOR PLAN - DEMOLITION - DOMESTIC WATER

PD1.2 BASEMENT PLAN - DEMOLITION - SANITARY

PD1.3 FIRST FLOOR PLAN - DEMOLITION - SANITARY

PD1.4 ROOF PLAN - DEMOLITION - SANITARY

MECHANICAL DRAWING SHEETS

M0.0 MECHANICAL INFORMATION SHEET

M1.0 FIRST FLOOR PLAN - MECHANICAL

M1.1 STORAGE GARAGE PLANS - MECHANICAL

M2.1 ROOF PLAN - MECHANICAL DUCT

M4.0 MECHANICAL DETAILS

M5.0 MECHANICAL SCHEDULES

MD1.1 FIRST FLOOR PLAN - DEMOLITION - MECHANICAL

ELECTRICAL DRAWING SHEETS

E0.0 ELECTRICAL INFORMATION SHEET

E0.1 SITE PLAN - ELECTRICAL

E1.0 FIRST+MEZZ FLOOR PLANS - LIGHTING

E2.0 FIRST+MEZZ FLOOR PLANS - POWER

E2.1 ROOF PLANS - POWER

E3.0 ENLARGED PLANS - ELECTRICAL

E4.0 ELECTRICAL DETAILS

E5.0 ONE-LINE DIAGRAM AND PANEL SCHEDULES

ED1.0 FIRST FLOOR PLAN - DEMOLITION

END OF SECTION 00 01 00.0

SECTION 00 21 13.00 INSTRUCTIONS TO BIDDERS

JACKSON TOWNSHIP INSTRUCTIONS TO BIDDERS SECTION 00 21 13.00

SECTION 00 21 13.00

INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

ARTICLE 1 - DEFINED TERMS

ARTICLE 2 - COPIES OF BIDDING DOCUMENTS

ARTICLE 3 - QUALIFICATIONS OF BIDDERS

ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE

ARTICLE 5 - PRE-BID CONFERENCE

ARTICLE 6 - SITE AND OTHER AREAS

ARTICLE 7 - INTERPRETATIONS AND ADDENDA

ARTICLE 8 - BID SECURITY

ARTICLE 9 - CONTRACT TIMES

ARTICLE 10 - LIQUIDATED DAMAGES

ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS

ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS

ARTICLE 13 - PREPARATION OF BID

ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS

ARTICLE 15 - SUBMITTAL OF BID

ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID

ARTICLE 17 - OPENING OF BIDS

ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

ARTICLE 20 - CONTRACT SECURITY AND INSURANCE

ARTICLE 21 - SIGNING OF AGREEMENT

ARTICLE 22 - SALES AND USE TAXES

ARTICLE 23 - NONDISCRIMINATION IN EMPLOYMENT

ARTICLE 24 - LAWS AND REGULATIONS

TABLE OF ARTICLES (Alphabetical by Subject)

Subject Article

Award of Contract

Basis of Bid; Comparison of Bids

Bid Security

Bids to Remain Subject to Acceptance

Contract Security and Insurance

Contract Times

Copies of Bidding Documents

Defined Terms

Evaluation of Bids and Award of Contract

Examination of Bidding Documents, Other Related Data, and Site

Interpretations and Addenda

Laws and Regulations

Modification and Withdrawal of Bid

Nondiscrimination in Employment

Opening of Bids

Pre-Bid Conference

Preparation of Bid

Qualifications of Bidders

Sales and Use Taxes

Signing of Agreement

Site and Other Areas

Subcontractors, Suppliers and Others

Submittal of Bid

Substitute and “Or-Equal” Items

ARTICLE 1 - DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office – The Township’s office at 439 Roths Church Road Spring Grove Pennsylvania 17362 which will be the location from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.

ARTICLE 2 - COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents as stated in the Advertisement or Invitation to Bid may be obtained from the via Penn Bid at their website www.pennbid.com

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Architect assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 Owner and Architect, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.

ARTICLE 3 - QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, within five (5) days of Owner’s request, Bidder shall submit written evidence such as financial data, previous experience, present commitments, and such other data as may be called for below.

A. Financial data

B. Previous experience with name of contact and project name.

C. Project superintendent resume.

D. Current contracts.

E. List of proposed subcontractors.

ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE

4.01 Subsurface and Physical Conditions

A. The Project Manual identifies:

1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Architect has used in preparing the Bidding Documents.

2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that Architect has used in preparing the Bidding Documents.

B. Copies of reports and drawings referenced in Paragraph 4.01.A will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the General Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.

4.02 Underground Facilities

A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Architect by owners of such Underground Facilities, including Owner, or others.

4.03 Hazardous Environmental Condition

A. The Project Manual identifies those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that Architect has used in preparing the Bidding Documents.

B. Copies of reports and drawings referenced in Paragraph 4.03.A will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.06 of the General Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions.

4.05 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.

4.06 Following is a list of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.

A. Refer to the Contract Drawings and Summary of Work.

4.07 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any Addenda;

B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in §4.02 of the General Conditions, and (2) reports and drawings of Hazardous Environmental Conditions at the Site which have been identified in §4.06 of the General Conditions;

E. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;

F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;

H. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;

I. promptly give Architect written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Architect is acceptable to Bidder; and

J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.

4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Architect written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Architect are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

ARTICLE 5 - PRE-BID CONFERENCE

5.01 A Pre-Bid conference will be held as stated in the Advertisement and Notice to Bidders. Representatives of Owner and Architect will be present to discuss the Project. Bidders are required to attend and participate in the conference.

Architect will transmit to all prospective Bidders present at the conference such Addenda as Architect considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

ARTICLE 6 - SITE AND OTHER AREAS

6.01 The Site is identified in the Bidding Documents.. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.

ARTICLE 7 - INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Architect in writing via PennBid’s “Public Q&A” tab. Interpretations or clarifications considered necessary by Architect in response to such questions will be issued by Addenda and posted within PennBid’s “Public Notice’s” and “Files” tab. An email notification will be sent to all planholders. Questions received after the deadline for questions as indicated in the Advertisement, Notice to Bidders and PennBid may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Architect.

ARTICLE 8 - BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10%) percent of Bidder’s maximum Bid price and in the form of a cashier’s check or a Bid bond (on the form attached) issued by a surety meeting the requirements of §§5.01 and 5.02 of the General Conditions.

8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within fifteen (15) days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of the three apparent lowest Bidders will be returned upon the signing of the Agreement and furnishing of acceptable bonds and other documents by the successful Bidder.

8.03 Bid security of all Bidders except the three apparent lowest Bidders will be returned within thirty (30) days after the Bid opening.

ARTICLE 9 - CONTRACT TIMES

9.01 The number of days within which, or the dates by which the Work is to be substantially completed and ready for final payment are set forth in the Agreement.

ARTICLE 10 - LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.

ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Architect, application for such acceptance will not be considered by Architect until after the Effective Date of the Agreement. Refer to General Conditions Paragraph 6.05 for requirements on substitute and “or equal”.

ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 A list of proposed Subcontractors and Suppliers is required to be submitted to Owner with the bid. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor and Suppliers. Contractor shall also submit evidence that Subcontractors and Suppliers are qualified to do business in the Commonwealth of Pennsylvania or covenant to obtain such qualification prior to and as a condition of award of a Contract. If Owner or Architect, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid. No substitutions for Subcontractors shown on the list shall be made by Contractor without prior written approval of Owner or Architect.

12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors or Suppliers. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier so listed and against which Owner or Architect makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Architect subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions.

12.03 Contractor shall not be required to employ any Subcontractor or Supplier against whom Contractor has reasonable objection.

12.04 Note that Contractor is responsible to assure compliance by its subcontractors with various provisions within the Contract Documents and may have to present certifications and documents from the subcontractors to show compliance.

ARTICLE 13 - PREPARATION OF BID

13.01 The Bid Form and required supplements are included with the Bidding Documents. Bids must be submitted online via PennBid’s “Submissions” tabs. Scanned copies of the Bid Form will not be considered.

13.02 A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein, or the words “No Bid,” “No Change,” or “Not Applicable” entered within the Comment field adjacent to the line item.

13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign and attested by the secretary or an assistant secretary.

13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner accompanied by evidence of authority to sign.

13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign.

13.06 A Bid by an individual shall show the Bidder’s name and official address.

13.07 A Bid by a joint venture shall be executed by each joint venturer and accompanied by evidence of each venturer’s authority to sign.

13.08 Proof of a partner’s, or agent’s, authority to obligate the Contractor must be attached to the Bid.

13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

13.10 The address and telephone number for communications regarding the Bid shall be shown.

13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the Commonwealth of Pennsylvania or covenant to obtain such qualification prior to award of the Contract. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.

13.12 Unless specifically provided in the Contract Documents, bids containing substitutions or combinations of alternates will not be considered unless such substitutions or combinations are specifically authorized by the Owner.

ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS

14.01 Lump Sums

A. Bidders shall submit a Bid on a lump sum basis for each Lump Sum Bid Item listed in the Bid Form.

B. The Bid for all Lump Sum Bid Items shall be included in the Total Base Bid.

14.02 Alternates

A. When Alternate Bid Items are included in the Project, Bidders shall include a separate lump sum or unit price allowance price for each Alternate Bid Item described in the Bidding Documents as provided for in the Bid Form. The price for each alternate will be the amount added to or deleted from the Total Base Bid if Owner selects the alternate.

14.03 Comparison of Bids

A. For determination of the apparent low Bidder, Bids will be compared on the basis of the Total Base Bid, plus, in the order of priority listed on the Bid Form, the additive/deductive alternate Bid prices for determination of the apparent low Bidder.

ARTICLE 15 - SUBMITTAL OF BID

15.01 Sealed bids shall be submitted online via the PennBid Program, https://pennbid.bonfirehub.com/

15.02 A Bid shall be submitted no later than the date and time prescribed in the Advertisement, Notice to Bidders and on PennBid.

ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bidder may withdraw their Bid from consideration after the Bid opening without forfeiture of the cashier's check, surety bid bond or other security filed with the Bid if the price bid was submitted in good faith, and the Bidder submits credible evidence that the reason for the price bid being substantially lower was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional and substantial arithmetical error or an unintentional omission of a substantial quantity of work, labor, material or services made directly in the compilation of the Bid.

Withdrawal is allowed only if (i) notice of a claim of the right to withdraw such Bid is made in writing with the Owner within two (2) business days after the opening of Bids; and (ii) the withdrawal of the Bid would not result in the awarding of the contract on another Bid of the same Bidder, their partner, or to a corporation or business venture owned by or in which he has a substantial interest. No Bidder who is permitted to withdraw a Bid shall supply any material or labor to, or perform any subcontract or other work agreement for any person to whom a contract or subcontract is awarded in the performance of the contract for which the withdrawn Bid was submitted, without the written approval of the Owner.

16.02 If a Bid is withdrawn in accordance with the provisions of §16.01, the Owner may award the contract to the next lowest Bidder or reject all Bids and resubmit the project for bidding. In the event the Owner resubmits the project for bidding the withdrawing Bidder shall pay the costs, in connection with the resubmission, of printing new contract document, required advertising, and printing and mailing notices to prospective Bidders, if the Owner finds that such costs would not have been incurred but for such withdrawal. In no event shall the withdrawing Bidder be permitted to resubmit a Bid for the Project.

16.03 Prior to the Bid opening date and time a Bidder may modify or withdraw its Bid at anytime via PennBid’s “Submissions” tabs.

ARTICLE 17 - OPENING OF BIDS

17.01 Bids will not be opened and read aloud publicly. An abstract of the amounts of the Total Base Bid and major alternates, if any, will be made available to Bidders after the opening of Bids using PennBid’s “Public Notices” tab.

ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible or responsive. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.

19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.

19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.

19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in §12.01.

19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors and Suppliers to perform the Work in accordance with the Contract Documents.

19.06 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.

19.07 Owner reserves the right to cancel the award of any Contract at any time prior to its execution of the Agreement by Owner without incurring any liability to any of the Bidders.

ARTICLE 20 - CONTRACT SECURITY AND INSURANCE

20.01 Article 5 of the General Conditions, as modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds and appropriate insurance certificates.

ARTICLE 21 - SIGNING OF AGREEMENT

21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within fifteen (15) days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within ten (10) days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.

ARTICLE 22 - SALES AND USE TAXES

22.01 Owner, as a municipal authority, is exempt from the Pennsylvania Sales and Use Tax. Certificates of Exemption will be furnished to the Contractor for its purchase of materials for which the Authority’s exemption is transferable, upon Contractor’s request; however, it is Contractor's responsibility to determine for which materials the tax exemption is applicable prior to submitting its Bid. Said taxes shall not be included in the Bid. Contractor shall pay all other sales, consumer, use and other similar taxes required to be paid by Contractor in accordance with the Laws and Regulations of the Commonwealth of Pennsylvania which are applicable during the performance of the Work. Said taxes shall not be included in the Bid. Refer to Paragraph 6.10 of the General Conditions for additional information, if any.

ARTICLE 23 - NONDISCRIMINATION IN EMPLOYMENT

23.01 Contractor agrees that:

A. Neither it nor any subcontractor that Contractor uses for the Contract will discriminate against any employee or applicant for employment because of race, color, religion, sex, gender identity, sexual orientation, veteran’s status, political opinions or affiliations, lawful activity in any employee organization, national origin, age, disability or marital status. Contractor and subcontractors will take affirmative action to ensure that applicants and employees are treated fairly during employment without regard to race, color, religion, sex, gender identity, sexual orientation, veteran's status, political opinions or affiliations, lawful activity in any employee organization, national origin, age, disability or marital status. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer, recruitment, or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.

(1) Contractor/subcontractor shall comply with all applicable federal, state and local laws regarding non-discrimination, including: (a) the Civil Rights Act of 1964, 42 U.S.C. §2000 et seq. (1981); (b) the Civil Rights Act of 1991, P.L. 102-166; (c) Executive Order Number 11246, 30 Fed. Reg. 12,319 (1965), reprinted in 42 U.S.C.

§2000(e) note, as amended by Executive Order Number 11375, 32 Fed. Reg. 14,303 (1967) and by Executive Order Number 12086, 43 Fed. Reg. 46,501 (1978); (d) the Age Discrimination Act, 42 U.S.C. §§6101-6106 (1981);

(e) the Age Discrimination in Employment Act, 29 U.S.C. §§621-34 (1967); (f) the Rehabilitation Act of 1973, 29 U.S.C. §§793-794 (1981); (g) the Americans with Disabilities Act, 42 U.S.C. §12101 et seq. (1990); and (h) the Pennsylvania Human Relations Act, Act of October 27, 1955 (P.L. 744, No. 222) as amended, 43 P.S. §§951-963.

(2) Contractor/subcontractor shall establish and maintain a written sexual harassment policy and shall inform its employees of the policy. The policy must contain a notice that sexual harassment will not be tolerated and employees who practice it will be disciplined.

(3) Contractor/subcontractor shall not discriminate for any of the reasons set forth above against any subcontractor or supplier who is qualified to perform the work to which the contract relates.

B. The Contract may be canceled or terminated by the Owner, and all money due or to become due under the Contract may be forfeited, for a violation of the terms or conditions of these nondiscrimination provisions.

23.02 Contracts for Work under this Bid will obligate the Contractor and Subcontractor to be nondiscriminatory in employment practices. Bidders, if requested, must submit with their Bid any information or documents required by state, federal or local statutes or regulations applicable to nondiscrimination in employment; including, if necessary, a compliance report concerning their employment practices and policies in order to maintain their eligibility to receive the award of the Contract.

A. To the extent allowed by law the Contractor/subcontractor shall furnish all necessary employment documents and records to and permit access to its books, records, and accounts by Owner, the City or their agents for purposes of investigation to ascertain compliance with these equal opportunity and nondiscrimination provisions. If the Contractor does not possess documents or records reflecting the necessary information requested, it shall furnish such information on reporting forms supplied by Owner or the City.

23.03 Bidders must submit a list of all Subcontractors who will perform work on the Project and written signed statements from authorized agents of the labor pools with which it will or may deal for employees on this Work, together with supporting information to the effect that these labor pools will affirmatively cooperate in or offer no hindrance to the recruitment, employment and equal treatment of employees who are seeking employment and are performing work under the

Contract. If such agents or labor pools have failed or refused to furnish the necessary statements prior to the award of the Contract, Bidder shall provide certification as to what efforts have been made to secure such statements.

ARTICLE 24 - LAWS AND REGULATIONS

24.01 The Bidder’s attention is directed to the fact that all applicable laws, ordinances, and rules and regulations having jurisdiction over construction of the Project shall apply to the Contract throughout; are the Bidder’s/Contractor’s responsibility to ascertain; and will be deemed to be included in the Contract the same as though herein written in full, whether or not specified in the Contract Documents.

24.02 PREVAILING WAGE ACT. The Pennsylvania Prevailing Wage Act applies to the work to be performed under the Contract;

therefore, the Contractor must pay to its workers the minimum wage rate established by the Secretary of Labor and Industry and specified in the Contract Document - Prevailing Wage Act and Predetermination - and further the Contractor must assure that its Subcontractors also pay the Subcontractor’s workers these same minimum wage rates.

24.03 STEEL PRODUCTS PROCUREMENT ACT. Special attention is drawn to the provisions of Pennsylvania’s Steel Products Procurement Act, which includes cast iron in the definition of steel products. The Contractor is advised that only steel products as defined in said Act shall be used or supplied in the performance of the Contract The Act defines Steel Products as "Products rolled, formed, shaped, drawn, extruded, forged, cast, fabricated or otherwise similarly processed, or processed by a combination of two or more of such operations, from steel made in the United States by the open hearth, basic oxygen, electric furnace, Bessemer or other steel making process and shall include cast iron products and shall include machinery and equipment listed in United States Department of Commerce Standard Industrial Classification 25 (furniture and fixture), 35 (machinery, except electrical) and 37 (transportation equipment) and made of, fabricated from, or containing steel components. If a product contains both foreign and United States steel, such product shall be determined to be a United States steel product only if at least seventy-five (75%) percent of the cost of the articles, materials and supplies have been mined, produced or manufactured, as the case may be, in the United States.

Transportation equipment shall be determined to be a United States steel product if it complies with section 165 of Public Law 97-424 (96 Stat. 2136)". Contractor shall provide steel origin certifications of compliance in conjunction with shop drawing submittals, which certification shall be on forms to be provided by the Owner.

24.04 PUBLIC WORKS EMPLOYMENT ACT. Pennsylvania’s Public Works Employment Act requires contractors and subcontractors performing work on public works projects in this Commonwealth to comply with the Federal E-Verify program (the EVP) to ensure employees are authorized to work in the United States. The EVP is a free Internet-based program operated by the United States Department of Homeland Security that compares information from an employee's Form I-9, Employment Eligibility Verification, to data from the United States Department of Homeland Security and Social Security Administration records to confirm employment eligibility. As a result, every contractor and subcontractor performing work under a public works contract shall utilize the EVP system to verify the employment eligibility of each new employee hired after January 1, 2013; shall submit the official Public Employment Verification Form to the Authority to ensure compliance with the act; and shall maintain documentation of continued compliance with the act by utilizing the EVP for new employees hired throughout the duration of the public work contract. The Pennsylvania Department of General Services is responsible for administering the program and information, as well as establishing the official Public Works Employment Verification Form that needs to be completed by contractors and subcontractors, can be obtained on their website. This has been the appropriate link to that website, although the Authority does not warrant its current accuracy -http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/public_work s_employment_verification/1357211.

24.05 ENVIRONMENTAL LAWS. According to the Commonwealth Procurement Code, Act of May 15, 1998, P.L. 358, No. 57, 62 Pa.C.S.A. §3301, all invitations for bids and requests for proposals for construction projects issued by any government agency shall set forth any provision of federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and the preservation of public natural resources that affect the projects. This is the list entitled Environmental Statement as prepared by the Commonwealth of Pennsylvania, Department of General Services, 1999 Edition, for its standard contract forms, although revised to eliminate acts which don’t apply because of geographic location. The Bidder is hereby notified that this project is subject to those statutes, rules and regulations shown on the following list, and the work must be carried out in compliance with these statutes, rules and regulations.

STATE LAW

I. Purdon's Statutes - Title 3 (Agriculture)

• Pennsylvania Fertilizer Law of 1956, Act of May 29, 1956 (P.L.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .