5-2 JACKSON GC ARCHITECTURAL SPECS.pdf
PDF 2 MB Posted
- Solicitation number
- US.261682
- Issued by
- York County, Pennsylvania
About this file
This document is a comprehensive set of architectural specifications for Jackson Township's renovation, addition, and new construction project located in Spring Grove, Pennsylvania. The project encompasses renovation and addition to the existing Township Building, construction of a new Storage Garage, and a new Salt Storage Building. The specifications cover multiple trades including General Construction, Plumbing, Mechanical, and Electrical work, with sealed bids due December 8, 2026, at 1:00 PM EST via the PennBid Program. A mandatory Pre-bid conference is scheduled for November 10, 2026, at 10:00 AM EST at the project site (439 Roths Church Road, Spring Grove, PA). Contract awards will be made at a regularly scheduled Township meeting on January 4, 2027. The contract time is four hundred (400) calendar days from the Notice to Proceed. The specifications detail extensive demolition work, propane tank removal, interior slate window sills, manufactured concrete stone veneer, cold-formed metal framing, and metal ladders with fall protection systems. The project requires coordinated work among multiple prime contractors with specific responsibilities delineated for site preparation, utility disconnection, hazardous materials handling, and temporary facilities maintenance.
Bidders must submit a bid bond or certified check equal to ten percent (10%) of the maximum bid with their submission. The project is subject to Pennsylvania Prevailing Wage Act requirements (Act 442, P.L. 987, as amended). No set-asides are indicated in the contract documents. The specifications emphasize compliance with multiple codes and standards including the 2021 International Building Code, ASTM standards, OSHA regulations, and manufacturer requirements. Specific submittals required include product data, shop drawings, samples, quality assurance documentation, and delegated design calculations for structural elements. The project involves substantial coordination between the General Contractor and specialty contractors (Plumbing, Mechanical, and Electrical) for sequencing, utility isolation, temporary services, and completion verification. Jackson Township reserves the right to accept any bid, waive informalities, or reject any or all bids.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02 41 00.00 DEMOLITION
JACKSON TOWNSHIP DEMOLITION SECTION 02 41 00
.00PAGE 1 OF 5
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 SUMMARY
A. Provide complete and selective demolition at Jackson Township Municipal Center, including removal of buildings and below-grade construction, interior gut demolition of existing office area (south side), selective demolition in retained repair garage area, roof removal, temporary protection, and lawful off-site disposal.
B. Use Sheet A1.2, Existing–Demolition Architectural Site Plan, for identification and location of work areas: Wood-frame wing to be removed; Masonry portion of building to be Gut-Renovated; Repair Garage to Be Renovated and remain operational during construction; Existing Storage Building to be demolished; and existing concrete porch, vestibule and ramp to Be Removed. Coordinate limits with architectural demolition plans and Structural, Mechanical, Electrical, Plumbing, and Site Drawings.
C. GC shall completely remove wood-frame wing, including modular superstructure, CMU basement, basement slab, footings, foundations, and abandoned utilities within indicated limits after respective trades make systems safe. Completely remove existing wood-frame storage building and foundations after its authorized release.
D. Gut retained masonry office portion; remove existing floor slab and excavate for lowered floor elevation.
Coordinate underpinning and retained construction with Structural Drawings. Perform selective repair-garage demolition only as indicated; maintain garage operations.
E. Related work: Structural Drawings and specifications govern underpinning, permanent structural alterations, backfill, compaction, and testing. Sitework sections govern identified site improvement removals. New masonry infill, lintels, doors, windows, concrete slabs, and roof systems are specified in their respective sections. Include demolition and preparation necessary for that work without duplicating permanent construction requirements.
1.2 OWNER OCCUPANCY AND SEQUENCING
A. February 12, 2027 is Owner’s last day of office business in their office which includes both the wood-frame wing and retained masonry office portion. Owner will remove furniture, office equipment, records, files, boxes, and other contents. Building will be empty with no unattached contents to be removed under this Contract. All trades to begin their work to “make-safe’ and disconnect all utilities, provide written notice to authorize demolition .
B. Existing storage building, currently used for salt, may be demolished after March 8, 2027 and Owner’s removal of stored materials and equipment. Coordinate replacement salt-building construction with overall construction sequence; provide replacement building ready for Owner use by December 1, 2027, subject to completion requirements elsewhere in Contract Documents.
C. Maintain repair garage operations and clear vehicle access via south-side drive throughout construction. Short shutdowns require at least one week’s advance notice and coordination with Director of Public Works. Obtain Director’s approval of timing and duration before interruption; notice alone does not authorize shutdown.
.00PAGE 2 OF 5
1.3 MULTIPLE PRIME CONTRACT RESPONSIBILITIES
A. General Contractor: Coordinate demolition sequence with all prime contractors and Owner’s abatement vendor.
Perform physical building, slab, foundation, and interior demolition after trades complete make-safe work.
Provide temporary enclosures, structural protection, debris removal, and roof demolition under GC scope.
Perform excavation and backfill assigned to GC under Structural and site requirements; coordinate tank-excavation turnover with Plumbing Contractor under Section 02 65 00.00.
B. Electrical Contractor: Identify, de-energize, disconnect, cap or terminate, and make safe affected electrical and communications systems serving portions of the building designated for demolition. After written release to GC, affected items and system components may remain in place for GC removal and disposal with building demolition. Make generator and tower electrical connections safe before physical removal. Maintain temporary services and protect systems serving retained occupied areas.
C. Plumbing Contractor: Identify, isolate, disconnect, drain, and cap affected water and sanitary/private-sewage piping per Plumbing Drawings. Coordinate amended services, temporary arrangements, and reconnections.
Protect services required for retained garage and other operating facilities. After make-safe work and written release to GC, affected items and system components in portions of the building designated for demolition may remain in place for GC removal and disposal. PC shall separately excavate and remove the two underground propane tanks under Section 02 65 00.00; GC shall provide ultimate backfill.
D. Mechanical Contractor: Identify, isolate, disconnect, recover refrigerants and other contents as applicable, and make safe HVAC systems serving portions of the building designated for demolition. After make-safe work and written release to GC, affected items and system components may remain in place for GC removal and disposal.
Maintain and protect systems serving retained occupied areas. Underground propane tank decommissioning, excavation, and removal are by PC under Section 02 65 00.00, with ultimate backfill by GC.
E. Before GC demolition, each affected prime contractor shall confirm its systems are isolated and safe and identify any live systems remaining. GC coordination does not transfer another prime contractor’s assigned work to GC.
Resolve unclear interfaces before disturbing affected systems.
1.4 TEMPORARY FACILITIES AND PROTECTION
A. GC shall furnish, maintain, and remove temporary electric heaters for operating repair garage. Maintain minimum 65 degrees F during temporary-heating period until permanent heating is available. Electrical Contractor provides circuits and connections. Owner pays electricity consumption. Coordinate heater capacity, placement, protection, and electrical loads before disconnecting existing heat.
B. GC shall furnish and service temporary sanitary facilities for Township Public Works personnel throughout project. Place facilities in service before taking existing toilet out of use; maintain accessible approach, cleanliness, supplies, and regular servicing. Share facilities with construction trades is acceptable.
C. Protect occupied garage from demolition with secure, dust-resistant barriers and weather-tight closures as needed. Maintain safe employee routes and emergency egress. Protect vehicles, tools, retained equipment, walls, and roof structure from debris, vibration, dust, and water. Coordinate disruptive work with Director of Public Works in writing and minimum one (1) week in advance of disruptions of more than one (1) hour.
1.5 HAZARDOUS MATERIALS AND REMOVED PROPERTY
A. Asbestos report is included in Division 00. Identified asbestos removal is by Owner’s vendor before construction or in coordinated phases during construction. Review report and coordinate access, schedule, temporary protection, and necessary exploratory work. Do not disturb affected materials until Owner’s vendor provides applicable completion/release documentation.
B. If suspected additional hazardous material or contaminated soil is encountered, stop affected work, protect area, and notify Owner and Architect. Resume affected work only following identification, authorized disposition, and release. Do not mix suspected hazardous material with ordinary demolition waste.
C. Owner retains no salvage rights to propane tanks, generator, abandoned radio tower, flagpole, or other items designated for removal. Responsible contractor shall remove and lawfully dispose of removed property and recovered fluids. Recycling is permitted where lawful; no LEED certification or diversion target is required.
.00PAGE 3 OF 5
1.6 SUBMITTALS AND QUALITY ASSURANCE
A. Before demolition, submit sequence and protection plan identifying work limits, retained supports, utility isolation, temporary garage services, propane removal interface, abatement phases, south-drive access, shutdowns, weather protection, and coordination with underpinning. Submit proposed shutdown dates and durations separately for Owner coordination.
B. Provide preconstruction photographs documenting retained building, metal deck where visible, garage equipment, adjacent improvements, and existing damage. Submit written evidence of pre-demolition engineering survey by competent person in accordance with OSHA 29 CFR 1926.850. Survey does not replace project Structural Drawings or required temporary-support design.
C. Use experienced demolition personnel and qualified utility and fuel-system personnel. Comply with applicable demolition, worker-protection, disposal, and notification requirements. Obtain permits and inspections assigned to contractor. Retain disposal receipts and submit fuel/tank disposal documentation and records of utility caps at closeout.
D. Provide temporary shoring and bracing designed by a qualified professional engineer licensed in Pennsylvania where required to support retained construction or where demolition methods require temporary works beyond details shown. Architect’s review does not relieve contractors of responsibility for means, methods, sequencing, or safety.
PART 2 PRODUCTS
2.1 TEMPORARY MATERIALS
A. Provide sound materials and assemblies suitable for anticipated loads, exposure, and duration, including shoring, bracing, barriers, secure doors, insulated weather closures, floor-opening protection, and compatible temporary roofing. Temporary materials shall not damage retained work or obstruct approved access.
B. Temporary heaters shall be electric and suitable for garage use and available electrical service. Provide guards, stable placement, manufacturer-required clearances, and operating controls. Do not substitute fuel-fired temporary heaters.
2.2 PERMANENT MATERIALS AND BACKFILL
A. Permanent reconstruction materials shall comply with applicable new-work sections. Backfill and fill shall comply with Structural Drawings and Specifications, including material, placement, compaction, and testing. Do not use demolition rubble, crushed building debris, wood, or refuse as backfill.
PART 3 EXECUTION
3.1 EXAMINATION AND PREPARATION
A. Field verify conditions and demolition limits against Drawings. Identify retained bearing walls, roof supports, foundations, live utilities, and shared systems. Resolve discrepancies before proceeding. Arrange pre-demolition coordination meeting with affected primes, Owner, and abatement vendor.
B. Complete required utility isolation and hazardous-material release, establish temporary garage services and sanitary facilities, and install protection before demolition. Locate and mark utilities to remain. Maintain protected live services where needed; do not assume concealed piping or wiring is abandoned.
.00PAGE 4 OF 5
3.2 COMPLETE BUILDING AND APPURTENANCE REMOVAL
A. After authorized release, GC shall remove wood-frame wing in its entirety, including roof, walls, framing, floors, CMU basement walls, basement slab, footings, foundations, and abandoned utility components within indicated limits after trade make-safe. Protect adjoining retained masonry construction throughout separation and removal.
B. After storage-building release, GC shall remove existing wood-frame storage building, foundations, and associated components indicated. Remove materials from site. Coordinate excavation with new work and Structural backfill requirements.
C. GC shall remove emergency generator, foundation, and appurtenances after Electrical Contractor disconnection;
coordinate qualified recovery and disposal of residual fluids and batteries. GC shall remove abandoned radio tower, flagpole, their foundations, anchors, and appurtenances after affected utility connections are made safe.
Provide controlled dismantling and lifting; protect retained construction and access.
D. Plumbing Contractor shall recover remaining propane and complete safe tank preparation before lifting, cutting, or transport. Remove both underground tanks and associated components; document completion and notify GC for excavation turnover. GC shall protect open excavation and coordinate inspection of exposed ground before new foundations or backfill. Plumbing Contractor shall not backfill tank excavations. Refer suspected contamination for direction before covering. Perform tank decommissioning, excavation, removal, and closeout under Section 02 65 00.00. GC shall provide ultimate backfill under Section 31 23 16.00.
E. Secure and weather-protect exposed opening at north wall of retained CMU building immediately upon separation of wood-frame wing. Provide closure and anchorage suitable for weather exposure and occupied garage protection; coordinate replacement by permanent construction.
3.3 MASONRY OFFICE GUT DEMOLITION AND LOWERED FLOOR
A. Retain masonry bearing-wall shell and steel roof structure except portions specifically indicated for alteration.
Remove interior partitions, finishes, systems, and components indicated for gut demolition. Trades shall first make safe their respective systems; GC performs ensuing physical demolition and debris removal.
B. Remove existing vault, connected lower storage construction, and existing toilet room in adjacent repair garage within drawing limits. These elements are identified as independent of retained roof support; verify field conditions and report unexpected structural connections before removal.
C. Remove existing office-area concrete floor slab and excavate to accommodate lowered finished floor elevation and new floor assembly shown. Follow Structural underpinning sequence and excavation limits. Install required support before removing lateral restraint or excavating beside or below existing footings. Do not undermine retained foundations or exceed authorized staged excavation limits. Coordinate schedule and phasing of underpinning, staged slab removal and excavation, and placement of new floor slab with overall construction schedule and adjacent work. Refer to Structural Drawings and specifications for required sequence, phase limits, support, inspections, and prerequisites for proceeding between stages.
D. Remove all existing doors, frames, windows, and associated components in masonry office gut-renovation area.
Remove porch, stairs, ramp, railings, foundations, and appurtenances within indicated limits. Cut new openings and prepare existing openings for infill per architectural and Structural Drawings; provide required support before cutting bearing masonry.
3.4 SELECTIVE REPAIR GARAGE DEMOLITION
A. Maintain garage structure and operation. Remove doors, windows, partitions, and other components only where indicated. Coordinate repair-garage door replacement with Owner, including removal date, installation sequence, access, and temporary security. Have replacement assemblies or approved temporary closures available before removal.
B. Maintain south-side drive and approved operating routes. Do not stockpile debris, position equipment, or leave excavations in required access routes. Perform utility transfers and direct garage disruptions only during approved short shutdowns with required advance notice.
.00PAGE 5 OF 5
3.5 EXISTING ROOF REMOVAL AND DECK REVIEW
A. GC shall remove existing membrane roofing, all existing insulation, flashings, edge materials, and associated roofing components down to existing metal deck on both retained repair garage and retained masonry office portion. Coordinate limits, tie-ins, and permanent replacement under roofing section, including integration with proposed south-side addition.
B. Phase removal so exposed areas can be made weather-tight during each work period. Maintain drainage and positive temporary tie-ins. Protect occupied garage, equipment, and retained construction at all times. Do not leave open roof areas unprotected overnight or during inclement weather.
C. Inspect exposed metal deck; remove debris and roofing residue without damaging deck or attachments.
Photograph and report corrosion, perforations, loose attachment, distortion, or other concealed damage to Architect and Structural Engineer before covering. Protect and temporarily support unsafe conditions as necessary.
D. Repairs to preexisting concealed deck damage shall be directed and authorized as an addition to Contract by change order. Do not perform permanent concealed-damage repairs without authorization, except immediate protective measures required to prevent injury or further damage. Contractor-caused damage shall be repaired at responsible contractor’s expense.
E. Prepare retained deck to receive new insulation and membrane roofing in accordance with roofing requirements. Do not cover unresolved damaged areas. Coordinate inspection and acceptance of substrate before installing new roofing.
3.6 DEMOLITION METHODS AND RETAINED WORK
A. Separate construction at defined limits using controlled cutting and dismantling. Do not pull attached construction against retained walls or roof framing. Prevent unplanned collapse and excessive impact or vibration. Do not overload retained floors, roofs, or structural members with equipment or debris.
B. Provide dust control, debris containment, and protection of operating areas. Prevent dust, runoff, and demolition waste from entering drains, septic systems, or stormwater facilities. Keep work areas orderly and remove combustible debris regularly. Open burning and explosives are not permitted.
C. Protect retained work during removal, excavation, underpinning, and reconstruction. Restore accidental damage to retained construction to condition acceptable to Architect at responsible contractor’s expense. Maintain temporary supports and weather closures until permanent construction safely replaces them.
3.7 DISPOSAL BACKFILL AND COMPLETION
A. Remove demolition materials from site and transport to facilities authorized to accept the materials. Segregate regulated materials and recovered fluids. Do not bury debris or use removed materials as excavation fill.
Maintain disposal documentation and remove temporary debris stockpiles promptly.
B. Before backfill, remove remaining debris and obstructions within required limits; obtain required inspection and coordination with new foundations, underpinning, and utilities. GC shall perform backfill under Structural requirements, including required compaction and testing. Do not conceal unresolved conditions or place uncontrolled fill beneath new-building footprint.
C. Record abandoned utility cap locations and below-grade conditions that affect new work. Leave demolition areas stable, protected, and ready for following trades. Continue temporary heating, sanitary facilities, access, security, and weather protection until permanent replacements are available or Owner authorizes removal.
END OF SECTION 02 41 00
SECTION 02 65 00.00 UNDERGROUND PROPANE TANK REMOVAL
JACKSON TOWNSHIP UNDERGROUND PROPANE TANK REMOVAL SECTION 02 65 00.00
SECTION 02 65 00.00
UNDERGROUND PROPANE TANK REMOVAL
PART 1 GENERAL
1.1 SUMMARY AND CONTRACT RESPONSIBILITIES
A. Provide complete decommissioning, excavation, removal, off-site transportation, and lawful disposal of two (2) existing Township-owned underground propane tanks, nominal capacity 500 gallons each, within the proposed building addition footprint. Tanks are not designated for salvage, reuse, or reinstallation.
B. Plumbing Contractor: Include all labor, materials, equipment, qualified propane service, excavation subcontractors, lifting, loading, hauling, fees, and disposal required for this work in the Plumbing Contract base bid. Coordination with other contractors does not transfer responsibility or cost for tank removal to those contractors. The Plumbing Contractor may self-perform and/or subcontract portions of the work using appropriately qualified personnel and remains responsible for complete performance of this section.
C. Plumbing Contractor: Disconnect and demolish existing gas piping in accordance with Plumbing Plans. Protect piping indicated to remain in the existing Repair Garage and securely cap designated remaining piping at the demolition limits. Provide tank appurtenance and anchorage removal, excavation protection, and decommissioning documentation specified herein.
D. GC and Site Contractor: Following documented turnover, perform subsequent excavation for stormwater facilities, site utilities, and building foundations; provide replacement fill, placement, compaction, and testing under their respective Contract scopes and the Civil, Structural, and earthwork requirements. Plumbing Contractor shall not backfill the tank excavation under this section.
E. New aboveground propane tanks, vaporizer, and new gas piping to the building are included elsewhere in the Plumbing Contract. Coordinate interfaces with that work and Division 01 contract descriptions.
1.2 EXISTING CONDITIONS AND SCHEDULING
A. Existing tanks serve furnaces and heating equipment generally scheduled for removal under Plumbing demolition plans. Temporary propane service and continued operation of existing gas equipment are not required for this removal scope. Coordinate shutdown with Owner before interrupting service.
B. Township staff report that the tanks were self-installed and have no concrete tie-downs or metal straps.
C. Commence tank removal during the initial demolition phase. At the initial Job Conference, coordinate shutdown, propane service attendance, excavation, removal, protection, and turnover with GC, Owner, and affected primes. Complete removal before conflicting site or foundation work proceeds.
D. Remaining fuel quantity, tank burial depth, piping routes, tank condition, and actual excavation limits shall be verified in the field. Protect adjacent structures, utilities, access routes, and work to remain.
E. The Township owns both underground propane tanks outright and has no binding agreement with a propane supplier. The Plumbing Contractor may select any propane service company meeting this section’s qualification requirements and is not required to use the Township’s current propane supplier.
1.3 QUALITY ASSURANCE AND REGULATORY REQUIREMENTS
A. Retain a propane service company holding all licenses, registrations, permits, and personnel training or certifications required for the applicable work in Pennsylvania to capture and remove remaining propane and make the tanks safe for removal, transportation, and disposal. Obtain Township authorization for handling Township-owned containers and fuel. Comply with the Pennsylvania Propane and Liquefied Petroleum Gas Act and 34 Pa. Code Chapter 13, including Sections 13.7, 13.8, 13.40, and 13.41.
B. Comply with NFPA 58 and NFPA 54 to the extent applicable, using editions adopted by the governing Pennsylvania LPG authority, and applicable transportation, waste disposal, fire safety, and occupational safety requirements. Obtain required permits, notifications, approvals, and inspections; include associated costs.
Comply with applicable 49 CFR Parts 171 through 180 for off-site transportation, including Section 173.29 for tanks containing hazardous-material residue. Do not substitute the latest published NFPA edition for the edition adopted by the governing authority.
C. Provide personnel trained and experienced in LPG withdrawal, isolation, tank handling, and excavation. Comply with 29 CFR 1926 Subpart P for excavations. Provide competent-person inspections and protective systems appropriate to actual conditions.
D. These are propane tanks. Do not apply petroleum UST closure procedures solely because the tanks are underground. Determine applicable agency requirements for the actual work and any discovered release;
provide required reporting and lawful material management.
1.4 SUBMITTALS
A. Before work, submit the propane service name, qualifications, and applicable authorizations; proposed receiving facility; and a coordinated work plan addressing shutdown, fuel withdrawal, isolation, excavation, tank handling, transportation, disposal, emergency response, and turnover.
B. Identify protection of remaining piping, utility locating, excavation support, dewatering, stockpile location, access and lifting arrangements, and responsibility for excavation protection through GC acceptance. Submittal review does not relieve Contractor of responsibility for means, methods, sequencing, or safety. Identify proposed purging or inerting, testing instruments and acceptance criteria, tank closure configuration for transport, and receiving-facility acceptance requirements. Submit required permits and approvals before the affected work; do not assume a particular removal permit is required without verifying jurisdiction.
C. Submit the decommissioning report specified in Article 3.7 upon completion of removal and turnover, before final payment for this work.
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
A. Provide pressure-rated, gas-compatible caps, plugs, and fittings suitable for the existing piping, service, and applicable gas piping requirements. Temporary tape or an unsealed valve alone is not an acceptable permanent closure.
B. Provide propane transfer and monitoring equipment, lifting equipment, rigging, barriers, and excavation protection appropriate to the work. Replacement fill is furnished under the GC/Site scope; see Article 1.1.
C. Provide calibrated instruments suitable for propane and for the oxygen conditions being measured. Select any purge or inerting medium and compatible equipment through the qualified propane service’s procedure. No specific purge gas is mandated by this section.
PART 3 EXECUTION
3.1 EXAMINATION AND PREPARATION
A. Verify both tank locations, visible identification, connected piping, appurtenances, utility conflicts, access, and adjacent conditions. Arrange Pennsylvania One Call notification and locate private utilities and gas piping not covered by the utility notification service. Do not rely solely on record information.
B. Record prework conditions with photographs. Confirm demolition limits and remaining Repair Garage piping with Plumbing Plans. Resolve discrepancies with Architect and Engineer before disturbing affected work.
C. Establish exclusion zones, ignition controls, emergency access, and excavation protection before starting work.
Protect existing facilities and prevent unauthorized entry.
3.2 SHUTDOWN AND PROPANE REMOVAL
A. Use the coordinated procedure established by the qualified propane service. Sequence isolation, withdrawal, depressurization, disconnection, and excavation to suit actual conditions; do not disconnect live piping or expose workers to uncontrolled gas discharge.
B. Have the propane service capture and remove remaining liquid propane and manage residual vapor by lawful procedures. No transfer to the new project system, storage for Township reuse, or reinstallation of existing tanks is intended. Do not routinely vent propane to atmosphere as a disposal method.
C. Have the propane service establish and document safe conditions for each stage of handling, lifting, transportation, and disposal. An empty liquid gauge does not establish that a tank is free of pressure or flammable vapor. Do not cut, crush, or perform hot work on tanks on-site.
D. Have a qualified technician document pressure and atmospheric conditions appropriate to the proposed operation, including date, tank identification, instrument identification, calibration or functional-check status, readings, acceptance criteria, and limitations. Use instruments suitable for oxygen-deficient or inert atmospheres where applicable. Inerted, depressurized, and gas-free are different conditions; do not describe one as proof of another. No tank entry is included in this work.
E. Have the propane service and transporter establish compliant valve, plug, pressure-relief, marking, labeling, and shipping arrangements for each tank’s actual condition. Do not drill tank openings or improvise vent holes. Do not remove or disable safety devices except under a qualified procedure consistent with applicable requirements.
3.3 PIPING DEMOLITION
A. Disconnect and remove tank connections, regulators, valves, risers, and underground gas piping designated for demolition, including connections to mains scheduled for demolition under Plumbing Plans.
B. Protect Repair Garage piping indicated to remain. Permanently cap or plug remaining piping at designated demolition limits, identify its status, and leave it safe for subsequent work. Test retained piping affected by this work as required by applicable gas piping requirements before any later return to service.
C. Coordinate any electrical connections or cathodic-protection components with Electrical Contractor. Confirm electrical isolation before disturbing connected equipment.
3.4 EXCAVATION AND TANK REMOVAL
A. Excavate sufficiently to safely expose and remove both tanks and their associated components. Prevent damage to tanks and remaining utilities. Provide excavation support, safe access, and necessary dewatering; discharge water lawfully.
B. Stockpile suitable excavated soil on-site at a location coordinated with GC, maintaining required separation from excavation edges and protecting drainage and access. GC/Site Contractor shall determine subsequent reuse or disposal under its scope. Segregate suspected contaminated material and do not mix it with clean stockpiles.
C. Remove tanks using suitable lifting equipment and rigging after the propane service confirms conditions are safe for the proposed operation. Include removal of any discovered concrete hold-down slabs, anchors, straps, supports, and abandoned tank-related components. Verify tank condition, lifting attachment suitability, equipment capacity, and rigging arrangement before lifting; do not assume existing lifting lugs remain serviceable.
D. Remove both tanks completely. Do not abandon tanks in place or fill tanks with sand, concrete, or other material as a substitute for removal. Load and transport tanks and removal debris off-site to a lawful receiving facility.
E. If evidence of a release, suspect contamination, or unidentified hazardous material is encountered, stop affected work, secure the area, and notify Owner, Architect, and applicable authorities as required. Do not conceal or spread affected material. Obtain direction for additional investigation or remediation; address work beyond this section through Contract change procedures. Contractor-caused releases remain Contractor responsibility.
3.5 OPEN EXCAVATION PROTECTION AND TURNOVER
A. Maintain barricades, warning devices, access restrictions, excavation support, inspections, and other required protection until GC formally accepts responsibility in writing. Prevent water accumulation and unsafe access.
Coordinate continuous protection without a gap between contractors.
B. Notify GC, Architect, and Structural Engineer when tanks and associated components have been removed and the excavation is available for observation. Coordinate geotechnical observation where required before subsequent fill or foundation work conceals exposed conditions.
C. Document turnover with GC, including excavation limits and condition, remaining utilities, soil stockpiles, protection in place, unresolved conditions, date, and acceptance of ongoing protection responsibilities. GC acceptance does not relieve Plumbing Contractor of incomplete or defective work.
D. Leave the excavation open and protected for following stormwater, site utility, and foundation work. Do not place replacement fill or obstruct subsequent work. Coordinate immediate transfer of protection to GC upon acceptance.
3.6 CLEANING AND DISPOSAL
A. Remove tank-related debris, removed piping, surplus removal materials, and equipment. Repair damage caused by this work to facilities indicated to remain. Leave stockpiles and access routes orderly.
B. Arrange lawful off-site disposal or material recycling of tanks and removed components. No tank salvage for Township use, reuse as pressure vessels, or reinstallation is permitted. Deliver tanks only to facilities accepting them in their documented condition.
C. Coordinate receiving-facility acceptance before shipment. Have the receiving facility render tanks permanently unserviceable for pressure-vessel reuse under its qualified processing procedures. Obtain written confirmation identifying both tanks and their final disposal or recycling. Do not require on-site destruction or hot work as a condition of removal.
3.7 DECOMMISSIONING REPORT
A. Submit a dated report identifying the project, Plumbing Contractor, propane service, removal dates, and both nominal 500-gallon tanks. Include serial numbers or other identifiers where legible; note unavailable identification.
B. Include photographs before removal, during excavation and removal, and of the final exposed excavation;
describe piping removed, retained piping closures, and anchorage or supports encountered and removed.
C. Include propane service written confirmation of fuel capture and removal, residual-vapor management, and the condition established for safe tank transportation and disposal. Record quantity removed where measured;
identify estimates as estimates. Include the qualified technician’s pressure and atmospheric condition records and any limitations; provide documentation of the actual condition accepted for transport rather than an unsupported gas-free certificate.
D. Include transportation and disposal or recycling receipts identifying both tanks and the receiving facility, required permits or inspection records, discovered conditions and their resolution, and the documented excavation turnover to GC. Include receiving-facility confirmation that both tanks were rendered unserviceable for pressure-vessel reuse. Backfill compaction reports are furnished under the GC/Site scope, not this Plumbing removal section.
END OF SECTION 02 65 00.00
SECTION 02 83 19.00 LEAD BASED PAINT AWARENESS
JACKSON TOWNSHIP LEAD BASED PAINT AWARENESS SECTION 02 83 19.00
SECTION 02 83 19.00
LEAD BASED PAINT AWARENESS
PART 1 GENERAL
1.1 SUMMARY
A. This Section provides awareness information for work affecting existing painted surfaces. Portion of the building were constructed circa 1967, various construction has occurred since that time. This statement does not constitute a determination that existing coatings are lead-free.
B. Lead-based paint remediation or abatement is not included in the Work. Coordinate this Section with demolition, surface preparation, and other work affecting existing coatings.
1.2 WORKER PROTECTION
A. Comply with 29 CFR 1926.62, Lead, where employees may be occupationally exposed to lead. Each employer remains responsible for applicable exposure assessment, employee training, protective measures, and recordkeeping for its operations.
B. The anticipated limited quantity of lead-based paint does not waive applicable worker-protection requirements.
PART 2 PRODUCTS
2.1 NOT USED
A. No lead-paint remediation or abatement products are specified under this Section.
PART 3 EXECUTION
3.1 SUSPECT MATERIALS
A. If suspected lead-containing paint is encountered, stop only the work that would disturb the affected coating.
Protect the affected area from disturbance and promptly notify the Architect and Owner. Continue unaffected work where it can proceed safely.
B. Do not sample, scrape, sand, grind, burn, or otherwise disturb the suspect coating pending evaluation and written direction from the Owner through the Architect. The Owner will arrange evaluation as needed.
C. Resume affected work only after written direction and implementation of applicable worker-protection measures. Any required remediation or abatement shall be separately authorized in accordance with the Contract Documents before proceeding.
END OF SECTION 02 83 19.00
SECTION 04 43 16.00 INTERIOR SLATE WINDOW SILLS
JACKSON TOWNSHIP INTERIOR SLATE WINDOW SILLS SECTION 04 43 16
.00PAGE 1 OF 3
SECTION 04 43 16
INTERIOR SLATE WINDOW SILLS
PART 1 GENERAL
1.1 SCOPE
A. Provide custom-fabricated interior natural slate window sills and stools, 1 inch thick, with eased exposed edges and sealer. Include setting materials and accessories for a complete installation at locations indicated on Drawings.
B. Fabricate lengths, depths, projections, returns, and end conditions to suit window and wall details. Coordinate with window frames, finishes, and support construction.
1.2 SUBMITTALS
A. Product Data: Submit supplier, quarry/source, slate color and finish, thickness, relevant physical-property data demonstrating suitability for dimensional stone use, fabrication tolerances, setting system, and maintenance instructions. Identify proposed equivalents.
B. Shop Drawings: Show field dimensions, sill profiles, 1-inch thickness, eased edges, projections, returns, joints, substrate/support, attachment, and window/frame interfaces. Show slope and underside drip where exterior installation is indicated. Identify proposed splices before fabrication.
C. Samples: Submit representative range samples showing natural variation and honed finish. Provide minimum 6-inch-square sample of proposed stone with eased edge; treat part of sample with proposed sealer so Architect can review appearance. Submit sealer and stone supplier’s compatibility recommendations.
1.3 QUALITY ASSURANCE AND DELIVERY
A. Use a supplier and fabricator experienced with architectural slate sills. Obtain stone from one quarry/source for each visually continuous installation. Select and blend within Architect-approved color/texture range; do not mix visibly different stone sources without approval.
B. Field measure openings after adjacent construction is sufficiently complete. Deliver identified pieces protected against chipping, breakage, and staining. Store supported and dry; use nonstaining separators. Handle without prying against exposed edges.
C. Provide fabricator/installer’s written warranty for not less than one year from Substantial Completion covering defective fabrication and installation. Natural variation within approved samples is acceptable; cracks, open laminations, loose layers, and defective fabrication are not.
.00PAGE 2 OF 3
PART 2 PRODUCTS
2.1 SUPPLIERS
A. Basis of Design: Sheldon Slate Products Company, Inc.; custom architectural natural slate window sills/stools fabricated to specified thickness, finish, profile, and approved shop drawings. www.sheldonslate.com
B. Or Equals, subject to meeting specified material, color/finish approval, thickness, fabrication, sealer compatibility, and service exposure:
1. Vermont Structural Slate Company: Custom architectural slate window stools and sills.
www.vermontstructuralslate.com
2. The Natural Slate & Quartzite Company, LLC, Meadville, Pennsylvania: Custom architectural slate window sills/stools. www.natslateandquartzite.com
C. Submit substitutions under Division 01 requirements. Supplier names do not waive verification of the actual slate selected, available piece sizes, or exterior suitability where applicable. Marble, granite, engineered stone, tile assemblies, and synthetic slate are not equals to natural slate.
2.2 SLATE SILLS
A. Material: Sound, dense architectural slate suitable for dimension-stone service, complying with applicable ASTM C629 requirements. Provide flat, structurally sound pieces free of cracks, unstable seams, loose flakes, and defects that impair use or durability.
B. Thickness: 1 inch finished thickness, solid stone throughout. Do not substitute thinner stone laminated to backing or a built-up edge. Maintain consistent thickness and profile within each installation; submit fabrication tolerances with shop drawings.
C. Finish: Smooth honed top and exposed front/ends, with consistent low sheen. Color selected by Architect from supplier’s architectural slate range. Match approved samples; natural cleft or rough split exposed surfaces are not acceptable unless specifically selected.
D. Edges: Ease exposed top and bottom arrises of front edge and exposed returns/ends, approximately 1/16-inch radius, with smooth corners and no sharp edges. Maintain a substantially square profile; do not substitute a bullnose. Provide same finish at exposed edges as sill face.
E. Sizes: As indicated and field verified. Provide one piece per opening wherever available stone size and handling permit; submit joints for approval where necessary. Provide accurate notches and returns without weakening stone. Provide continuous bearing and reinforcement/support where required by span or projection.
2.3 SEALER AND INSTALLATION MATERIALS
A. Sealer: Clear, penetrating, non-film-forming water- and stain-repellent treatment approved by both slate supplier and sealer manufacturer for the selected dense/honed slate and exposure. Preserve natural color and low-sheen finish; no gloss coating, wax, or color enhancer unless approved. Provide low-odor, VOC-compliant product suitable for occupied interior use.
B. Apply sealer to exposed surfaces and edges after required curing and cleaning. Treat concealed surfaces only where the setting-system manufacturer confirms bond compatibility. Do not contaminate adhesive or sealant bond areas. Submit sample application; remove unabsorbed residue to avoid haze on dense stone.
C. Setting Materials: Manufacturer-approved, nonstaining mortar or stone-setting adhesive appropriate to the actual substrate, stone, bed thickness, and exposure. Provide full and uniform bedding without voids; setting material shall not bleed through or discolor slate.
D. Provide nonstaining elastomeric joint sealant and backer rod compatible with slate, sealer, window frames, and wall finishes. Provide required brackets, anchors, and structural backing; use corrosion-resistant components appropriate to exposure.
http://www.sheldonslate.com/ http://www.vermontstructuralslate.com/ http://www.natslateandquartzite.com/
.00PAGE 3 OF 3
PART 3 EXECUTION
3.1 EXAMINATION AND PREPARATION
A. Verify opening dimensions, sill elevations, bearing, projection, window clearance, and substrate condition.
Confirm support is sound, rigid, and suitable for stone weight and intended service. Correct irregular or inadequate backing before installation.
B. Coordinate supports and setting thickness with the 1-inch finished stone and adjacent finishes. Provide required bedding and framing without relying on gypsum board alone to support sill weight. Protect window frames, glass, and completed finishes.
C. Dry-fit and sequence pieces for uniform appearance, accurate returns, and approved joint layout. Confirm exterior flashing, slope, and drip details where applicable. Do not obstruct window weeps, drainage paths, or thermal movement.
3.2 INSTALLATION
A. Install in accordance with approved shop drawings and stone/setting-material manufacturer’s instructions. Set interior stools level unless detailed otherwise; slope exterior sills outward as shown. Maintain consistent projections and alignment within each opening and adjacent window group.
B. Provide full, even bearing on properly prepared support. Do not use isolated adhesive spots or unsupported shims as permanent bearing. Install brackets or anchors where required, avoiding point loads or restraint that could crack stone.
C. Maintain approved perimeter and intermediate joint widths. Provide flexible sealed joints at window frames, dissimilar materials, and movement locations. Do not force stone tightly between jambs or bridge building movement joints. Remove excess setting material without damaging slate or adjacent finishes.
3.3 SEALING AND FINAL CLEANING
A. After setting materials have cured, clean and dry stone as required for sealing. Apply approved sealer at manufacturer’s recommended coverage, dwell time, and number of coats. Remove excess before drying;
achieve uniform natural appearance without gloss, streaking, tackiness, or haze.
B. Protect adjacent finishes during treatment and provide required ventilation. Keep sealer out of open joints and window drainage paths. Follow manufacturer’s cure time before covering or exposing sills to water or cleaning.
C. Inspect thickness, eased edges, finish, alignment, bearing, joints, and sealer appearance. Replace cracked, chipped, delaminated, unstable, or objectionably stained stone. Do not patch exposed defects without Architect’s approval.
D. Protect completed sills against impact and staining through acceptance. Do not use as work platforms or material-storage shelves. Deliver stone/sealer product identification, cleaning instructions, maintenance/resealing guidance, and warranty to Owner.
END OF SECTION 04 43 16
SECTION 04 73 00.00 ANCHORED MANUFACTURED CONCRETE STONE VENEER
JACKSON TOWNSHIP ANCHORED MANUFACTURED CONCRETE STONE VENEER SECTION 04 73 00.00
SECTION 04 73 00.00
ANCHORED MANUFACTURED CONCRETE STONE VENEER
PART 1 GENERAL
1.1 SUMMARY
A. Provide full-bed, non-loadbearing manufactured concrete stone veneer laid in mortar and mechanically anchored to structural backup, including anchors, mortar, flashing, weeps, cavity drainage accessories, movement joints, cleaning, and protection.
B. Coordinate veneer gravity supports and lintels with Structural Drawings. Veneer carries its own weight only; do not use veneer to support building loads.
1.2 RELATED REQUIREMENTS
A. Division 01: Submittals, substitutions, quality control, and closeout.
B. Division 04 concrete unit masonry: Structural CMU backup and reinforcing. Division 05: Structural steel lintels, shelf angles, and support attachments.
C. Division 07: Continuous insulation, air and water barriers, sheet metal flashing, and joint sealants. Coordinate continuity and installation responsibilities before enclosing the wall.
1.3 REFERENCES
A. 2021 International Building Code, Chapters 14, 17, and 21, as applicable to the project; TMS 402-16, Building Code Requirements for Masonry Structures; TMS 602-16, Specification for Masonry Structures.
B. ASTM C90: Loadbearing Concrete Masonry Units; ASTM C129: Nonloadbearing Concrete Masonry Units; ASTM C1634: Concrete Facing Brick. Apply the product standard appropriate to the furnished unit geometry and classification; submit certification.
C. ASTM C140/C140M: Sampling and Testing Concrete Masonry Units and Related Units; ASTM C1262: Freeze- Thaw Durability of Dry-Cast Segmental Retaining Wall Units and Related Concrete Units; ASTM C426: Linear Drying Shrinkage of Concrete Masonry Units.
D. ASTM C144: Aggregate for Masonry Mortar; ASTM C150/C150M: Portland Cement; ASTM C207: Hydrated Lime for Masonry Purposes; ASTM C270: Mortar for Unit Masonry; ASTM C979/C979M: Pigments for Integrally Colored Concrete; ASTM C1384: Admixtures for Masonry Mortars; ASTM C1714/C1714M: Preblended Dry Mortar Mix for Unit Masonry.
E. ASTM A580/A580M: Stainless Steel Wire; ASTM A240/A240M: Stainless Steel Plate, Sheet, and Strip; ASTM C920: Elastomeric Joint Sealants.
F. CMHA TEK 03-06C, Concrete Masonry Veneers; TEK 05-01B, Concrete Masonry Veneer Details; TEK 12-01B, Anchors and Ties for Masonry; TEK 19-04A and 19-05A, masonry flashing guidance. Code requirements govern over older code references within guidance documents.
1.4 SUBMITTALS
A. Submit product data, unit classifications, current plant-specific test reports for strength, density, absorption, and freeze-thaw durability, and manufacturer installation and cleaning instructions.
B. Shop Drawings: Show coursing, unit sizes, corners, returns, supports, openings, anchor type and spacing, cavity width and insulation thickness, flashing transitions, end dams, weeps, and movement joints. Identify substrate-specific fasteners and required embedment.
C. Submit anchor-system capacity data for the actual backup and cavity configuration. Where the assembly exceeds prescriptive code limits, submit engineered design and calculations signed and sealed by a professional engineer licensed in Pennsylvania; coordinate with the project Structural Engineer.
D. Samples: Submit representative color and texture ranges, special shapes, mortar colors, and sealant colors.
Architect selects colors and approves appearance from actual samples.
JACKSON TOWNSHIP ANCHORED MANUFACTURED CONCRETE STONE VENEER SECTION 04 73 00.00
E. Substitutions: Provide side-by-side comparison with the basis of design, including material classification, texture, coursing, dimensions, density, absorption, strength, durability, and warranty. Listing a manufacturer does not constitute approval of all its products.
F. Submit written warranty terms before purchase and maintenance instructions at closeout.
1.5 QUALITY ASSURANCE AND MOCKUP
A. Use a masonry installer experienced with comparable anchored concrete stone veneer. Obtain exposed veneer units from one manufacturer and one coordinated production source for each color and finish.
B. Conduct a preinstallation meeting with masonry, backup, insulation, air-barrier, flashing, and sealant installers to resolve sequencing and interfaces.
C. Construct a minimum 4-foot by 4-foot full-depth mockup including a corner or return, typical anchor, backup, insulation, cavity, flashing, end dam, weep, sealant joint, and proposed cleaning method. Obtain Architect and Owner approval before production work. Retain as the workmanship standard; accepted mockup may remain as part of the Work if approved.
1.6 DELIVERY STORAGE AND FIELD CONDITIONS
A. Deliver labeled, protected units and unopened mortar materials. Store units on stable pallets above grade; cover tops and protect from contamination while allowing ventilation. Keep cementitious materials dry.
B. Comply with TMS 602 hot- and cold-weather construction and protection requirements. Do not lay frozen units, use frozen materials, or build on frozen substrates. Do not use chloride accelerators or antifreeze compounds.
C. Protect wall tops and unfinished work from rain and snow at the end of each day. Prevent staining, washout, and damage to adjacent construction.
1.7 WARRANTY AND EXTRA MATERIALS
A. Provide the specified 50-year manufacturer material warranty for veneer…
This is the start of the file's text. The full file is on GovTribe.