This is a Question and Answer document for federal contract 6982AF27B000002, AZ BL COLO 7528(1) Burro Creek Road, issued between October 26, 2026 and November 5, 2026.

The document addresses contractor inquiries regarding site access, construction operations, seeding specifications, material sourcing, staffing requirements, and bid submission deadlines. Key clarifications include: the site is open to the public for subcontractor site visits; contractors must refer to Sections 105 and 158 for construction water sourcing guidance; the correct seeding quantity is 7.2 acres for Schedule A and 0.1 acre for Option X per the bid schedule (not the plan quantities); turf establishment requirements are specified in Section 625 with no fertilizer requirement mandated; alternate seed sources may be submitted to the Contracting Officer for approval despite not appearing on the approved vendors list; Rolled Erosion Control materials must comply with the 5B specification as shown in the plans with no substitutions; CAD files are referenced in SCR Subsections 102.02A and 152.04; a Quality Control Manager must be provided under Section 153.04 of FP-24 with exclusive QC responsibilities and no project management or operational duties; and the bid due date remains November 17 with no extension to November 20.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6982AF27B000002

AZ BL COLO 7528(1) BURRO CREEK ROAD

QUESTION & ANSWER

October 26, 2026

Question Answer

1. Can you confirm if the site is open to the public? One of our subcontractors would like to visit and review the existing conditions.

The site is open to the public.

November 5, 2026

Question Answer

Will contractors be able to draft water out of the creek for construction water?

Refer to Sections 105 and 158 regarding construction water sources.

Regarding the seeding, the bid schedule, and the plan quantities don't line up...

Bid schedule calls for 7.2 acres for Schedule A, and 0.1 acre for Option X while the plans call for 3.4 acres with a 0.1 acre allowance for Schedule A and 0.1 acre for Option X. Which Quantity is correct?

The Bid schedule quantity is correct. The Plan quantity for Schedule A was doubled to account for two applications if necessary.

Refer to sheets B2 and B7 in the Plans for Seeding quantity information.

Do you have a specified rate or specific call out for fertilizer, tackifier or any other amendments?

Refer to Section 625 and 625 items in the bid schedule for turf establishment requirements.

There is no requirement in the contract for fertilizer.

The seed vendor that we utilize is not listed on the approved vendors list, but they are approved by ADOT, will we be able submit them and have the Government consider approving them as vendor? OR it is strictly limited to the vendors on the approved list?

Alternate seed sources may be submitted to the CO for approval.

In regards to the Rolled Erosion Control, we have a TRM that exceeds the requirements of the 5B that is called out. Will the Government consider approval of this product as an approved equal?

Please bid the Plans as shown.

6982AF27B000002

AZ BL COLO 7528(1) BURRO CREEK ROAD

QUESTION & ANSWER

Are there any existing CAD files?

Refer to SCR Subsections 102.02A and

152.04 for physical data provided in the contract.

Can one person fulfill the role of superintendent, QC manager and site safety health officer? Or must those roles be filled by individual people?

Per Section 153.04 of the FP-24, provide a QCM with no responsibilities for managing or superintending the project or performing operations other than managing the QC.

Can the bid due date be extended to Friday 11/20?

No, bids are due on the original date of 11/17.