Bid Tabulation Report Summary
This is a Bid Tabulation Report for Federal Lands construction project AZ BL COLO 7528(1), Burro Creek Road, located at Burro Creek Recreation Site in Mohave County, Arizona. The solicitation (Number 6982AF27B000002) was opened on November 17, 2026, in Lakewood, Colorado, under the Central Federal Lands Division. Ten contractors submitted responsive bids for the base schedule with bid amounts ranging from $2,276,748.00 (Jud CO LLC, lowest bid) to $5,138,672.52 (AVENTUS NV, Inc., highest bid). The Engineer's Estimate was $2,624,850.00. The report provides detailed line-item pricing across all contractors for construction work including mobilization, surveying, staking, earth excavation, embankment construction, ditch work, riprap placement, slope scaling, roadway aggregate, full-depth reclamation, asphalt concrete pavement, concrete structures (headwalls and spillway), pipe culverts (18-inch, 24-inch, and 36-inch), curbing, fence removal and reset, equipment rental (various heavy machinery), general and special labor, erosion control, seeding, mulching, sign systems, pavement markings, temporary traffic control, and field office operations.
The report was digitally signed by Eric Grosskreuz on November 20, 2026, at 7:26 PM Eastern Time and spans 27 pages containing comprehensive bid comparisons for all contract line items. The document shows each contractor's unit pricing and total amounts for each pay item, enabling direct cost comparison across all bidders. No contract award recipient or award date is indicated in the report, as the bid tabulation serves as the analytical foundation for award decisions to follow.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : AZ BL COLO 7528(1) Project Name: BURRO CREEK ROAD
Contractor Responsive? Base Schedule A AVENTUS NV, Inc. $5,138,672.52 TNT General Contractors $4,238,232.96 McKenzie Construction & Site Development, LLC $3,925,828.49
Black River Asphalt, LLC $3,355,896.92
TIMS 8AJV $3,251,245.50
Central Southern Construction Corp. $3,208,413.00
Whelcon Contractors LLC. $3,095,735.94 Gunner Contracting, LLC $3,088,372.30 Cutting Edge Contractors, Inc. $2,597,599.66 Jud CO LLC $2,276,748.00 Engineer's Estimate $2,624,850.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Eric Grosskreuz
Project No. : AZ BL COLO 7528(1) Project Name: BURRO CREEK ROAD Division: Central Federal Lands
Schedule: A Schedule Type: Base Lead Designer:
Solicitation No. : 6982AF27B000002 Opened at: Lakewood, CO Opened by: Eric Grosskreuz State: AZ County: Mohave Federal Land: BURRO CREEK
RECREATION SITE
Bid Open Date and Time: 11/17/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive AVENTUS NV, Inc., 1600 Carse Drive, Boulder City, NV, 89005
$5,138,672.52
TNT General Contractors, 1358 N 200 W, Nephi, UT, 84648
$4,238,232.96
McKenzie Construction & Site Development, LLC, 2301 Calvert St NW, Washington, DC, 20008
$3,925,828.49
Black River Asphalt, LLC, 1300 S Litchfield Road, Suite 115E, Goodyear, AZ, 85338
$3,355,896.92
TIMS 8AJV,
202 S. 1st Avenue, Yuma, AZ, 85364
$3,251,245.50
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204
$3,208,413.00
Whelcon Contractors LLC., 1 W Wetmore Rd., Suite 203, Tucson, AZ, 85745
$3,095,735.94
Gunner Contracting, LLC, 2055 E. Hunt Ranch View Road, Taylor, AZ, 85939
$3,088,372.30
Cutting Edge Contractors, Inc., 10234 Willow Knock Street, Las Vegas, NV, 89141
$2,597,599.66
Jud CO LLC, 4765 W 2100, Cedar City, UT, 84721
$2,276,748.00
Engineer's Estimate $2,624,850.00
Project No. : AZ BL COLO 7528(1) Project Name: BURRO CREEK ROAD Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION TNT General Contractors $687,170.00
AVENTUS NV, Inc. $641,298.91 McKenzie Construction & Site Development, LLC
$555,659.26
Cutting Edge Contractors, Inc. $478,537.26
Whelcon Contractors
LLC. $386,165.13
TIMS 8AJV $325,000.00
Central Southern Construction Corp. $317,622.00
Gunner Contracting, LLC $311,000.00
Black River Asphalt, LLC $176,678.46
Jud CO LLC $139,400.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0020 15101-0000 MOBILIZATION Engineer's Estimate ALL LPSM LPSM $269,981.50
A0040 15210-3000 CENTERLINE,
VERIFICATION AND
STAKING
Whelcon Contractors
LLC. 1.140 $84,598.64 $96,442.45
Cutting Edge Contractors, Inc. 1.140 $60,596.74 $69,080.28
Gunner Contracting, LLC 1.140 $37,000.00 $42,180.00
Black River Asphalt, LLC 1.140 $20,856.42 $23,776.32
TIMS 8AJV 1.140 $20,000.00 $22,800.00
AVENTUS NV, Inc. 1.140 $19,153.37 $21,834.84 McKenzie Construction & Site Development, LLC
1.140 $16,790.53 $19,141.20
Jud CO LLC 1.140 $15,900.00 $18,126.00 Central Southern Construction Corp. 1.140 $15,000.00 $17,100.00
TNT General Contractors 1.140 $9,562.00 $10,900.68
Engineer's Estimate 1.140 MILE $25,000.00 $28,500.00
A0060 15210-3000 CENTERLINE,
VERIFICATION AND
STAKING (3-FT
OFFSET)
Black River Asphalt, LLC 0.140 $145,569.33 $20,379.71
Whelcon Contractors
LLC. 0.140 $99,139.00 $13,879.46
Cutting Edge Contractors, Inc. 0.140 $59,888.90 $8,384.45
Jud CO LLC 0.140 $57,000.00 $7,980.00 AVENTUS NV, Inc. 0.140 $24,625.76 $3,447.61 TNT General Contractors 0.140 $21,514.50 $3,012.03
TIMS 8AJV 0.140 $20,000.00 $2,800.00
McKenzie Construction & Site Development, LLC
0.140 $16,790.53 $2,350.67
Central Southern Construction Corp. 0.140 $15,000.00 $2,100.00
Gunner Contracting, LLC 0.140 $4,500.00 $630.00
Engineer's Estimate 0.140 MILE $25,000.00 $3,500.00
A0080 15215-1000 SURVEY AND
STAKING,
APPROACH ROAD
Gunner Contracting, LLC 4.000 $15,400.00 $61,600.00
Central Southern Construction Corp. 4.000 $5,000.00 $20,000.00
Whelcon Contractors
LLC. 4.000 $4,626.49 $18,505.96
AVENTUS NV, Inc. 4.000 $3,009.81 $12,039.24
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0080 15215-1000 SURVEY AND
STAKING,
APPROACH ROAD
Black River Asphalt, LLC 4.000 $2,547.46 $10,189.84
Jud CO LLC 4.000 $1,780.00 $7,120.00 Cutting Edge Contractors, Inc. 4.000 $1,765.92 $7,063.68
TNT General Contractors 4.000 $1,200.00 $4,800.00
TIMS 8AJV 4.000 $800.00 $3,200.00
McKenzie Construction & Site Development, LLC
4.000 $638.08 $2,552.32
Engineer's Estimate 4.000 EACH $2,500.00 $10,000.00
A0100 15215-3000 SURVEY AND
STAKING,
DRAINAGE
STRUCTURE
Gunner Contracting, LLC 5.000 $19,500.00 $97,500.00
McKenzie Construction & Site Development, LLC
5.000 $6,031.08 $30,155.40
Whelcon Contractors
LLC. 5.000 $5,287.42 $26,437.10
Central Southern Construction Corp. 5.000 $5,000.00 $25,000.00
Cutting Edge Contractors, Inc. 5.000 $3,712.27 $18,561.35
AVENTUS NV, Inc. 5.000 $3,420.24 $17,101.20 Jud CO LLC 5.000 $2,850.00 $14,250.00 Black River Asphalt, LLC 5.000 $2,445.57 $12,227.85
TNT General Contractors 5.000 $1,200.00 $6,000.00
TIMS 8AJV 5.000 $720.00 $3,600.00
Engineer's Estimate 5.000 EACH $1,900.00 $9,500.00
A0120 15301-0000 CONTRACTOR
QUALITY CONTROL
Black River Asphalt, LLC $517,182.57
TNT General Contractors $470,800.00
Gunner Contracting, LLC $260,000.00
McKenzie Construction & Site Development, LLC
$219,832.91
TIMS 8AJV $175,000.00
AVENTUS NV, Inc. $150,490.73 Central Southern Construction Corp. $150,000.00
Whelcon Contractors
LLC. $103,104.60
Jud CO LLC $101,500.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0120 15301-0000 CONTRACTOR
QUALITY CONTROL
Cutting Edge Contractors, Inc. $67,217.08
Engineer's Estimate ALL LPSM LPSM $70,000.00
A0140 15401-0000 CONTRACTOR
TESTING
TNT General Contractors $350,900.00
Central Southern Construction Corp. $150,000.00
AVENTUS NV, Inc. $143,650.24 Gunner Contracting, LLC $112,000.00
Whelcon Contractors
LLC. $92,529.77
TIMS 8AJV $90,000.00
McKenzie Construction & Site Development, LLC
$77,800.94
Jud CO LLC $60,000.00 Cutting Edge Contractors, Inc. $31,886.84
Black River Asphalt, LLC $19,116.17
Engineer's Estimate ALL LPSM LPSM $70,000.00
A0160 15501-0000 CONSTRUCTION
SCHEDULE
TIMS 8AJV $151,000.00
Black River Asphalt, LLC $54,345.88
AVENTUS NV, Inc. $38,306.73 Central Southern Construction Corp. $25,000.00
Cutting Edge Contractors, Inc. $24,941.08
Gunner Contracting, LLC $24,500.00
Whelcon Contractors
LLC. $17,221.76
McKenzie Construction & Site Development, LLC
$12,062.16
Jud CO LLC $7,250.00 TNT General Contractors $2,800.00
Engineer's Estimate ALL LPSM LPSM $12,000.00
A0180 15701-0000 SOIL EROSION
CONTROL
McKenzie Construction & Site Development, LLC
$146,019.71
Central Southern Construction Corp. $65,000.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0180 15701-0000 SOIL EROSION
CONTROL
Cutting Edge Contractors, Inc. $58,066.13
Whelcon Contractors
LLC. $51,367.66
AVENTUS NV, Inc. $51,132.64
TIMS 8AJV $43,000.00
Black River Asphalt, LLC $38,904.86
TNT General Contractors $38,000.00
Gunner Contracting, LLC $21,000.00
Jud CO LLC $14,300.00 Engineer's Estimate ALL LPSM LPSM $70,000.00
A0200 15720-0000 STORMWATER
POLLUTION
PREVENTION PLAN
Black River Asphalt, LLC $91,964.09
Cutting Edge Contractors, Inc. $55,542.53
McKenzie Construction & Site Development, LLC
$29,962.41
Central Southern Construction Corp. $25,000.00
AVENTUS NV, Inc. $24,625.76 Gunner Contracting, LLC $19,500.00
Whelcon Contractors
LLC. $17,180.50
Jud CO LLC $14,900.00
TIMS 8AJV $10,000.00
TNT General Contractors $4,800.00
Engineer's Estimate ALL LPSM LPSM $10,000.00
A0220 15802-0000 WATERING FOR
DUST CONTROL
Black River Asphalt, LLC $303,657.60
Whelcon Contractors
LLC. $216,606.45
TIMS 8AJV $200,000.00
Gunner Contracting, LLC $190,000.00
TNT General Contractors $170,000.00
McKenzie Construction & Site Development, LLC
$117,954.68
AVENTUS NV, Inc. $99,905.32
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0220 15802-0000 WATERING FOR
DUST CONTROL
Central Southern Construction Corp. $75,000.00
Jud CO LLC $71,500.00 Cutting Edge Contractors, Inc. $40,566.10
Engineer's Estimate ALL LPSM LPSM $65,000.00
A0240 20101-0000 CLEARING AND
GRUBBING
Whelcon Contractors
LLC. 3.900 $24,983.04 $97,433.86
Gunner Contracting, LLC 3.900 $23,000.00 $89,700.00
McKenzie Construction & Site Development, LLC
3.900 $18,605.88 $72,562.93
Central Southern Construction Corp. 3.900 $15,000.00 $58,500.00
AVENTUS NV, Inc. 3.900 $14,946.47 $58,291.23 Black River Asphalt, LLC 3.900 $13,453.22 $52,467.56
Cutting Edge Contractors, Inc. 3.900 $9,433.98 $36,792.52
Jud CO LLC 3.900 $7,300.00 $28,470.00 TNT General Contractors 3.900 $6,425.00 $25,057.50
TIMS 8AJV 3.900 $3,415.00 $13,318.50
Engineer's Estimate 3.900 ACRE $16,000.00 $62,400.00
A0260 20301-1900 REMOVAL OF PIPE
CULVERT
Black River Asphalt, LLC 3.000 $9,205.97 $27,617.91
McKenzie Construction & Site Development, LLC
3.000 $8,594.29 $25,782.87
Central Southern Construction Corp. 3.000 $5,000.00 $15,000.00
TNT General Contractors 3.000 $4,850.00 $14,550.00
TIMS 8AJV 3.000 $4,200.00 $12,600.00
Whelcon Contractors
LLC. 3.000 $4,017.76 $12,053.28
AVENTUS NV, Inc. 3.000 $3,461.29 $10,383.87 Cutting Edge Contractors, Inc. 3.000 $2,102.98 $6,308.94
Jud CO LLC 3.000 $2,100.00 $6,300.00 Gunner Contracting, LLC 3.000 $1,000.00 $3,000.00
Engineer's Estimate 3.000 EACH $4,500.00 $13,500.00 A0280 20301-2400 REMOVAL OF SIGN AVENTUS NV, Inc. 12.000 $707.99 $8,495.88
Black River Asphalt, LLC 12.000 $630.35 $7,564.20
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0280 20301-2400 REMOVAL OF SIGN McKenzie Construction & Site Development, LLC
12.000 $579.58 $6,954.96
Central Southern Construction Corp. 12.000 $500.00 $6,000.00
TNT General Contractors 12.000 $350.00 $4,200.00
Gunner Contracting, LLC 12.000 $200.00 $2,400.00
Cutting Edge Contractors, Inc. 12.000 $152.22 $1,826.64
Jud CO LLC 12.000 $140.00 $1,680.00
TIMS 8AJV 12.000 $140.00 $1,680.00
Whelcon Contractors
LLC. 12.000 $78.22 $938.64
Engineer's Estimate 12.000 EACH $200.00 $2,400.00
A0300 20302-0400 REMOVAL OF
CURB, ASPHALT
Black River Asphalt, LLC 275.000 $54.41 $14,962.75
Central Southern Construction Corp. 275.000 $50.00 $13,750.00
McKenzie Construction & Site Development, LLC
275.000 $41.01 $11,277.75
AVENTUS NV, Inc. 275.000 $23.60 $6,490.00 TNT General Contractors 275.000 $12.75 $3,506.25
Jud CO LLC 275.000 $9.20 $2,530.00 Whelcon Contractors
LLC. 275.000 $7.47 $2,054.25
Gunner Contracting, LLC 275.000 $7.00 $1,925.00
Cutting Edge Contractors, Inc. 275.000 $6.76 $1,859.00
TIMS 8AJV 275.000 $2.00 $550.00
Engineer's Estimate 275.000 LNFT $40.00 $11,000.00
A0320 20303-1600 REMOVAL OF
PAVEMENT,
ASPHALT
AVENTUS NV, Inc. 1,965.000 $55.07 $108,212.55 Central Southern Construction Corp. 1,965.000 $30.00 $58,950.00
McKenzie Construction & Site Development, LLC
1,965.000 $26.53 $52,131.45
Whelcon Contractors
LLC. 1,965.000 $17.65 $34,682.25
Black River Asphalt, LLC 1,965.000 $9.53 $18,726.45
TNT General Contractors 1,965.000 $9.50 $18,667.50
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0320 20303-1600 REMOVAL OF
PAVEMENT,
ASPHALT
Gunner Contracting, LLC 1,965.000 $9.00 $17,685.00
Jud CO LLC 1,965.000 $9.00 $17,685.00 Cutting Edge Contractors, Inc. 1,965.000 $6.28 $12,340.20
TIMS 8AJV 1,965.000 $1.30 $2,554.50
Engineer's Estimate 1,965.000 SQYD $22.00 $43,230.00
A0340 20402-0000 SUBEXCAVATION TIMS 8AJV 200.000 $300.00 $60,000.00
Black River Asphalt, LLC 200.000 $259.68 $51,936.00
Whelcon Contractors
LLC. 200.000 $240.45 $48,090.00
Central Southern Construction Corp. 200.000 $200.00 $40,000.00
Gunner Contracting, LLC 200.000 $195.00 $39,000.00
AVENTUS NV, Inc. 200.000 $180.93 $36,186.00 Jud CO LLC 200.000 $178.00 $35,600.00 Cutting Edge Contractors, Inc. 200.000 $95.38 $19,076.00
McKenzie Construction & Site Development, LLC
200.000 $82.50 $16,500.00
TNT General Contractors 200.000 $68.00 $13,600.00
Engineer's Estimate 200.000 CUYD $140.00 $28,000.00
A0360 20420-0000 EMBANKMENT
CONSTRUCTION
Whelcon Contractors
LLC. 315.000 $270.12 $85,087.80
Cutting Edge Contractors, Inc. 315.000 $183.26 $57,726.90
Central Southern Construction Corp. 315.000 $175.00 $55,125.00
AVENTUS NV, Inc. 315.000 $165.20 $52,038.00
TIMS 8AJV 315.000 $160.00 $50,400.00
Black River Asphalt, LLC 315.000 $133.82 $42,153.30
Gunner Contracting, LLC 315.000 $100.00 $31,500.00
McKenzie Construction & Site Development, LLC
315.000 $89.26 $28,116.90
TNT General Contractors 315.000 $73.80 $23,247.00
Jud CO LLC 315.000 $73.00 $22,995.00 Engineer's Estimate 315.000 CUYD $120.00 $37,800.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0380 20425-1000 DITCH,
EXCAVATION
McKenzie Construction & Site Development, LLC
3,100.000 $45.47 $140,957.00
Central Southern Construction Corp. 3,100.000 $30.00 $93,000.00
TIMS 8AJV 3,100.000 $25.00 $77,500.00
AVENTUS NV, Inc. 3,100.000 $23.60 $73,160.00 Jud CO LLC 3,100.000 $23.05 $71,455.00 Black River Asphalt, LLC 3,100.000 $15.68 $48,608.00
Cutting Edge Contractors, Inc. 3,100.000 $10.22 $31,682.00
TNT General Contractors 3,100.000 $8.25 $25,575.00
Gunner Contracting, LLC 3,100.000 $8.00 $24,800.00
Whelcon Contractors
LLC. 3,100.000 $5.49 $17,019.00
Engineer's Estimate 3,100.000 LNFT $45.00 $139,500.00
A0400 25101-0200 PLACED RIPRAP,
CLASS 2
McKenzie Construction & Site Development, LLC
40.000 $652.78 $26,111.20
Central Southern Construction Corp. 40.000 $500.00 $20,000.00
AVENTUS NV, Inc. 40.000 $448.39 $17,935.60 Jud CO LLC 40.000 $355.00 $14,200.00 Whelcon Contractors
LLC. 40.000 $329.45 $13,178.00
TNT General Contractors 40.000 $325.00 $13,000.00
Gunner Contracting, LLC 40.000 $275.00 $11,000.00
Black River Asphalt, LLC 40.000 $211.81 $8,472.40
Cutting Edge Contractors, Inc. 40.000 $173.95 $6,958.00
TIMS 8AJV 40.000 $170.00 $6,800.00
Engineer's Estimate 40.000 CUYD $300.00 $12,000.00
A0420 25101-0300 PLACED RIPRAP,
CLASS 3
Central Southern Construction Corp. 20.000 $750.00 $15,000.00
McKenzie Construction & Site Development, LLC
20.000 $652.78 $13,055.60
AVENTUS NV, Inc. 20.000 $511.33 $10,226.60 Black River Asphalt, LLC 20.000 $439.70 $8,794.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0420 25101-0300 PLACED RIPRAP,
CLASS 3
Whelcon Contractors
LLC. 20.000 $384.70 $7,694.00
Jud CO LLC 20.000 $334.00 $6,680.00 TNT General Contractors 20.000 $325.00 $6,500.00
Gunner Contracting, LLC 20.000 $300.00 $6,000.00
TIMS 8AJV 20.000 $265.00 $5,300.00
Cutting Edge Contractors, Inc. 20.000 $225.24 $4,504.80
Engineer's Estimate 20.000 CUYD $330.00 $6,600.00 A0440 26201-0000 SLOPE SCALING Whelcon Contractors
LLC. 40.000 $1,080.48 $43,219.20
Jud CO LLC 40.000 $950.00 $38,000.00 TNT General Contractors 40.000 $785.00 $31,400.00
Black River Asphalt, LLC 40.000 $759.57 $30,382.80
McKenzie Construction & Site Development, LLC
40.000 $603.10 $24,124.00
AVENTUS NV, Inc. 40.000 $511.33 $20,453.20 Central Southern Construction Corp. 40.000 $500.00 $20,000.00
Gunner Contracting, LLC 40.000 $312.00 $12,480.00
Cutting Edge Contractors, Inc. 40.000 $277.12 $11,084.80
TIMS 8AJV 40.000 $260.00 $10,400.00
Engineer's Estimate 40.000 HOUR $480.00 $19,200.00
A0460 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
AVENTUS NV, Inc. 1,600.000 $145.54 $232,864.00 Whelcon Contractors
LLC. 1,600.000 $137.80 $220,480.00
TIMS 8AJV 1,600.000 $105.00 $168,000.00
McKenzie Construction & Site Development, LLC
1,600.000 $102.52 $164,032.00
Cutting Edge Contractors, Inc. 1,600.000 $91.13 $145,808.00
Central Southern Construction Corp. 1,600.000 $90.00 $144,000.00
Gunner Contracting, LLC 1,600.000 $85.00 $136,000.00
Jud CO LLC 1,600.000 $74.25 $118,800.00 TNT General Contractors 1,600.000 $65.00 $104,000.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0460 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
Black River Asphalt, LLC 1,600.000 $55.95 $89,520.00
Engineer's Estimate 1,600.000 TON $90.00 $144,000.00
A0480 30302-1000 DITCH
RECONDITIONING
Central Southern Construction Corp. 170.000 $150.00 $25,500.00
Black River Asphalt, LLC 170.000 $71.49 $12,153.30
AVENTUS NV, Inc. 170.000 $55.07 $9,361.90 McKenzie Construction & Site Development, LLC
170.000 $53.55 $9,103.50
TNT General Contractors 170.000 $45.00 $7,650.00
Gunner Contracting, LLC 170.000 $35.00 $5,950.00
Jud CO LLC 170.000 $13.00 $2,210.00 Cutting Edge Contractors, Inc. 170.000 $9.66 $1,642.20
TIMS 8AJV 170.000 $6.50 $1,105.00
Whelcon Contractors
LLC. 170.000 $5.49 $933.30
Engineer's Estimate 170.000 LNFT $45.00 $7,650.00
A0500 30401-5200 FULL DEPTH
RECLAMATION,
METHOD 2, 4-INCH
DEPTH
Cutting Edge Contractors, Inc. 1.300 $158,849.11 $206,503.84
Gunner Contracting, LLC 1.300 $150,000.00 $195,000.00
McKenzie Construction & Site Development, LLC
1.300 $142,479.46 $185,223.30
TIMS 8AJV 1.300 $129,225.00 $167,992.50
Jud CO LLC 1.300 $106,500.00 $138,450.00 AVENTUS NV, Inc. 1.300 $102,265.29 $132,944.88 Central Southern Construction Corp. 1.300 $100,000.00 $130,000.00
Black River Asphalt, LLC 1.300 $88,902.91 $115,573.78
Whelcon Contractors
LLC. 1.300 $84,664.74 $110,064.16
TNT General Contractors 1.300 $57,846.96 $75,201.05
Engineer's Estimate 1.300 MILE $65,000.00 $84,500.00
A0520 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
AVENTUS NV, Inc. 3,600.000 $589.99 $2,123,964.00 TNT General Contractors 3,600.000 $310.00 $1,116,000.00
TIMS 8AJV 3,600.000 $292.15 $1,051,740.00
Jud CO LLC 3,600.000 $216.25 $778,500.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0520 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
McKenzie Construction & Site Development, LLC
3,600.000 $214.70 $772,920.00
Central Southern Construction Corp. 3,600.000 $213.60 $768,960.00
Gunner Contracting, LLC 3,600.000 $197.25 $710,100.00
Cutting Edge Contractors, Inc. 3,600.000 $181.38 $652,968.00
Black River Asphalt, LLC 3,600.000 $170.01 $612,036.00
Whelcon Contractors
LLC. 3,600.000 $168.87 $607,932.00
Engineer's Estimate 3,600.000 TON $220.00 $792,000.00 A0540 40601-0000 FOG SEAL Black River Asphalt, LLC 9.000 $7,082.49 $63,742.41
AVENTUS NV, Inc. 9.000 $2,831.96 $25,487.64 TNT General Contractors 9.000 $1,875.00 $16,875.00
TIMS 8AJV 9.000 $1,100.00 $9,900.00
McKenzie Construction & Site Development, LLC
9.000 $960.38 $8,643.42
Central Southern Construction Corp. 9.000 $960.00 $8,640.00
Jud CO LLC 9.000 $910.00 $8,190.00 Cutting Edge Contractors, Inc. 9.000 $829.01 $7,461.09
Gunner Contracting, LLC 9.000 $810.00 $7,290.00
Whelcon Contractors
LLC. 9.000 $804.74 $7,242.66
Engineer's Estimate 9.000 TON $1,665.00 $14,985.00
A0560 41102-1000 PRIME COAT,
METHOD 1
TNT General Contractors 18,700.000 $6.25 $116,875.00
AVENTUS NV, Inc. 18,700.000 $4.72 $88,264.00 Black River Asphalt, LLC 18,700.000 $4.54 $84,898.00
Gunner Contracting, LLC 18,700.000 $4.30 $80,410.00
Whelcon Contractors
LLC. 18,700.000 $4.30 $80,410.00
Cutting Edge Contractors, Inc. 18,700.000 $3.97 $74,239.00
Central Southern Construction Corp. 18,700.000 $1.20 $22,440.00
Jud CO LLC 18,700.000 $1.20 $22,440.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0560 41102-1000 PRIME COAT,
METHOD 1
McKenzie Construction & Site Development, LLC
18,700.000 $1.20 $22,440.00
TIMS 8AJV 18,700.000 $0.95 $17,765.00
Engineer's Estimate 18,700.000 SQYD $3.25 $60,775.00
A0580 41105-0000 BLOTTER McKenzie Construction & Site Development, LLC
30.000 $604.31 $18,129.30
Central Southern Construction Corp. 30.000 $601.20 $18,036.00
TNT General Contractors 30.000 $485.00 $14,550.00
AVENTUS NV, Inc. 30.000 $212.40 $6,372.00 Black River Asphalt, LLC 30.000 $149.45 $4,483.50
Cutting Edge Contractors, Inc. 30.000 $136.02 $4,080.60
Jud CO LLC 30.000 $120.00 $3,600.00 Gunner Contracting, LLC 30.000 $107.00 $3,210.00
Whelcon Contractors
LLC. 30.000 $106.34 $3,190.20
TIMS 8AJV 30.000 $25.00 $750.00
Engineer's Estimate 30.000 TON $200.00 $6,000.00
A0600 41201-0000 TACK COAT Black River Asphalt, LLC 10.000 $6,216.63 $62,166.30
AVENTUS NV, Inc. 10.000 $3,461.29 $34,612.90 TNT General Contractors 10.000 $1,875.00 $18,750.00
Jud CO LLC 10.000 $1,450.00 $14,500.00 Cutting Edge Contractors, Inc. 10.000 $1,275.42 $12,754.20
Gunner Contracting, LLC 10.000 $1,275.00 $12,750.00
Whelcon Contractors
LLC. 10.000 $1,268.78 $12,687.80
McKenzie Construction & Site Development, LLC
10.000 $1,253.25 $12,532.50
Central Southern Construction Corp. 10.000 $1,248.00 $12,480.00
TIMS 8AJV 10.000 $425.00 $4,250.00
Engineer's Estimate 10.000 TON $1,750.00 $17,500.00
A0620 55401-1000 REINFORCING
STEEL
TNT General Contractors 130.000 $225.00 $29,250.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0620 55401-1000 REINFORCING
STEEL
McKenzie Construction & Site Development, LLC
130.000 $120.62 $15,680.60
Central Southern Construction Corp. 130.000 $100.00 $13,000.00
Cutting Edge Contractors, Inc. 130.000 $54.34 $7,064.20
Black River Asphalt, LLC 130.000 $52.25 $6,792.50
AVENTUS NV, Inc. 130.000 $47.20 $6,136.00 Whelcon Contractors
LLC. 130.000 $11.33 $1,472.90
Jud CO LLC 130.000 $6.90 $897.00 Gunner Contracting, LLC 130.000 $6.50 $845.00
TIMS 8AJV 130.000 $1.25 $162.50
Engineer's Estimate 130.000 LB $5.25 $682.50
A0640 60101-0000 CONCRETE (L
HEADWALL)
TNT General Contractors 4.000 $11,250.00 $45,000.00
Cutting Edge Contractors, Inc. 4.000 $8,782.45 $35,129.80
McKenzie Construction & Site Development, LLC
4.000 $6,031.08 $24,124.32
AVENTUS NV, Inc. 4.000 $5,034.60 $20,138.40 Central Southern Construction Corp. 4.000 $5,000.00 $20,000.00
Gunner Contracting, LLC 4.000 $3,800.00 $15,200.00
Whelcon Contractors
LLC. 4.000 $3,588.86 $14,355.44
Jud CO LLC 4.000 $2,750.00 $11,000.00
TIMS 8AJV 4.000 $1,950.00 $7,800.00
Black River Asphalt, LLC 4.000 $1,926.74 $7,706.96
Engineer's Estimate 4.000 CUYD $3,000.00 $12,000.00
A0660 60101-0000 CONCRETE
(SPILLWAY)
McKenzie Construction & Site Development, LLC
5.000 $6,031.08 $30,155.40
AVENTUS NV, Inc. 5.000 $5,034.60 $25,173.00 Central Southern Construction Corp. 5.000 $5,000.00 $25,000.00
Cutting Edge Contractors, Inc. 5.000 $4,514.16 $22,570.80
TIMS 8AJV 5.000 $4,350.00 $21,750.00
Gunner Contracting, LLC 5.000 $2,850.00 $14,250.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0660 60101-0000 CONCRETE
(SPILLWAY)
Jud CO LLC 5.000 $2,060.00 $10,300.00 Whelcon Contractors
LLC. 5.000 $1,816.88 $9,084.40
TNT General Contractors 5.000 $1,811.00 $9,055.00
Black River Asphalt, LLC 5.000 $1,622.90 $8,114.50
Engineer's Estimate 5.000 CUYD $3,000.00 $15,000.00
A0680 60201-0600 18-INCH PIPE
CULVERT
Black River Asphalt, LLC 55.000 $516.04 $28,382.20
McKenzie Construction & Site Development, LLC
55.000 $453.53 $24,944.15
Central Southern Construction Corp. 55.000 $450.00 $24,750.00
Whelcon Contractors
LLC. 55.000 $340.26 $18,714.30
TIMS 8AJV 55.000 $300.00 $16,500.00
AVENTUS NV, Inc. 55.000 $275.33 $15,143.15 Jud CO LLC 55.000 $216.00 $11,880.00 Cutting Edge Contractors, Inc. 55.000 $187.51 $10,313.05
Gunner Contracting, LLC 55.000 $185.00 $10,175.00
TNT General Contractors 55.000 $165.00 $9,075.00
Engineer's Estimate 55.000 LNFT $245.00 $13,475.00
A0700 60201-0800 24-INCH PIPE
CULVERT
Central Southern Construction Corp. 135.000 $600.00 $81,000.00
Whelcon Contractors
LLC. 135.000 $477.95 $64,523.25
McKenzie Construction & Site Development, LLC
135.000 $466.80 $63,018.00
Black River Asphalt, LLC 135.000 $354.60 $47,871.00
AVENTUS NV, Inc. 135.000 $338.26 $45,665.10
TIMS 8AJV 135.000 $325.00 $43,875.00
Jud CO LLC 135.000 $255.00 $34,425.00 Gunner Contracting, LLC 135.000 $205.00 $27,675.00
TNT General Contractors 135.000 $205.00 $27,675.00
Cutting Edge Contractors, Inc. 135.000 $187.14 $25,263.90
Engineer's Estimate 135.000 LNFT $280.00 $37,800.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0720 60201-1000 36-INCH PIPE
CULVERT
Central Southern Construction Corp. 65.000 $750.00 $48,750.00
Whelcon Contractors
LLC. 65.000 $629.92 $40,944.80
Black River Asphalt, LLC 65.000 $541.16 $35,175.40
AVENTUS NV, Inc. 65.000 $487.73 $31,702.45 McKenzie Construction & Site Development, LLC
65.000 $476.45 $30,969.25
TIMS 8AJV 65.000 $420.00 $27,300.00
Jud CO LLC 65.000 $350.00 $22,750.00 Gunner Contracting, LLC 65.000 $300.00 $19,500.00
Cutting Edge Contractors, Inc. 65.000 $278.79 $18,121.35
TNT General Contractors 65.000 $250.00 $16,250.00
Engineer's Estimate 65.000 LNFT $400.00 $26,000.00
A0740 60210-0600 END SECTION FOR
18-INCH PIPE
CULVERT
Central Southern Construction Corp. 2.000 $3,500.00 $7,000.00
AVENTUS NV, Inc. 2.000 $2,123.97 $4,247.94 McKenzie Construction & Site Development, LLC
2.000 $1,349.75 $2,699.50
TNT General Contractors 2.000 $1,145.00 $2,290.00
Jud CO LLC 2.000 $1,050.00 $2,100.00
TIMS 8AJV 2.000 $1,035.00 $2,070.00
Whelcon Contractors
LLC. 2.000 $703.99 $1,407.98
Black River Asphalt, LLC 2.000 $679.31 $1,358.62
Gunner Contracting, LLC 2.000 $495.00 $990.00
Cutting Edge Contractors, Inc. 2.000 $407.37 $814.74
Engineer's Estimate 2.000 EACH $2,150.00 $4,300.00
A0760 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
Central Southern Construction Corp. 3.000 $5,000.00 $15,000.00
AVENTUS NV, Inc. 3.000 $2,595.97 $7,787.91 McKenzie Construction & Site Development, LLC
3.000 $1,735.74 $5,207.22
TNT General Contractors 3.000 $1,525.00 $4,575.00
Jud CO LLC 3.000 $1,260.00 $3,780.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0760 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
TIMS 8AJV 3.000 $1,160.00 $3,480.00
Black River Asphalt, LLC 3.000 $1,018.99 $3,056.97
Whelcon Contractors
LLC. 3.000 $834.64 $2,503.92
Gunner Contracting, LLC 3.000 $600.00 $1,800.00
Cutting Edge Contractors, Inc. 3.000 $551.55 $1,654.65
Engineer's Estimate 3.000 EACH $2,700.00 $8,100.00
A0780 60210-1000 END SECTION FOR
36-INCH PIPE
CULVERT
Central Southern Construction Corp. 2.000 $7,500.00 $15,000.00
AVENTUS NV, Inc. 2.000 $4,090.61 $8,181.22 McKenzie Construction & Site Development, LLC
2.000 $2,917.83 $5,835.66
Whelcon Contractors
LLC. 2.000 $2,337.12 $4,674.24
Jud CO LLC 2.000 $2,230.00 $4,460.00
TIMS 8AJV 2.000 $2,000.00 $4,000.00
TNT General Contractors 2.000 $1,885.00 $3,770.00
Black River Asphalt, LLC 2.000 $1,358.65 $2,717.30
Cutting Edge Contractors, Inc. 2.000 $1,216.75 $2,433.50
Gunner Contracting, LLC 2.000 $1,150.00 $2,300.00
Engineer's Estimate 2.000 EACH $2,600.00 $5,200.00
A0800 60901-2100 CURB, ASPHALT, 4-
INCH DEPTH
Central Southern Construction Corp. 340.000 $100.00 $34,000.00
TNT General Contractors 340.000 $88.00 $29,920.00
Black River Asphalt, LLC 340.000 $63.69 $21,654.60
McKenzie Construction & Site Development, LLC
340.000 $60.31 $20,505.40
Whelcon Contractors
LLC. 340.000 $58.25 $19,805.00
AVENTUS NV, Inc. 340.000 $55.07 $18,723.80 Cutting Edge Contractors, Inc. 340.000 $52.15 $17,731.00
Jud CO LLC 340.000 $25.50 $8,670.00 Gunner Contracting, LLC 340.000 $25.00 $8,500.00
TIMS 8AJV 340.000 $23.50 $7,990.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0800 60901-2100 CURB, ASPHALT, 4-
INCH DEPTH Engineer's Estimate 340.000 LNFT $35.00 $11,900.00
A0820 61921-1000 REMOVE AND
RESET FENCE
Cutting Edge Contractors, Inc. 170.000 $190.69 $32,417.30
AVENTUS NV, Inc. 170.000 $102.27 $17,385.90 Central Southern Construction Corp. 170.000 $100.00 $17,000.00
Black River Asphalt, LLC 170.000 $95.42 $16,221.40
TNT General Contractors 170.000 $75.00 $12,750.00
Whelcon Contractors
LLC. 170.000 $66.09 $11,235.30
McKenzie Construction & Site Development, LLC
170.000 $54.27 $9,225.90
Jud CO LLC 170.000 $35.00 $5,950.00 Gunner Contracting, LLC 170.000 $20.00 $3,400.00
TIMS 8AJV 170.000 $15.00 $2,550.00
Engineer's Estimate 170.000 LNFT $40.00 $6,800.00
A0840 62201-0200 DUMP TRUCK, 8
CUBIC YARD
MINIMUM
CAPACITY
McKenzie Construction & Site Development, LLC
40.000 $366.68 $14,667.20
AVENTUS NV, Inc. 40.000 $338.26 $13,530.40 Central Southern Construction Corp. 40.000 $300.00 $12,000.00
Black River Asphalt, LLC 40.000 $271.39 $10,855.60
TIMS 8AJV 40.000 $230.00 $9,200.00
Jud CO LLC 40.000 $212.00 $8,480.00 TNT General Contractors 40.000 $210.60 $8,424.00
Cutting Edge Contractors, Inc. 40.000 $145.64 $5,825.60
Whelcon Contractors
LLC. 40.000 $142.00 $5,680.00
Gunner Contracting, LLC 40.000 $135.00 $5,400.00
Engineer's Estimate 40.000 HOUR $220.00 $8,800.00
A0860 62201-0550 BACKHOE LOADER,
6 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
24-INCH WIDTH
McKenzie Construction & Site Development, LLC
40.000 $445.09 $17,803.60
AVENTUS NV, Inc. 40.000 $322.53 $12,901.20 Central Southern Construction Corp. 40.000 $300.00 $12,000.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0860 62201-0550 BACKHOE LOADER,
6 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
24-INCH WIDTH
TNT General Contractors 40.000 $243.00 $9,720.00
Black River Asphalt, LLC 40.000 $226.62 $9,064.80
Jud CO LLC 40.000 $196.00 $7,840.00 Cutting Edge Contractors, Inc. 40.000 $157.72 $6,308.80
TIMS 8AJV 40.000 $155.00 $6,200.00
Whelcon Contractors
LLC. 40.000 $134.15 $5,366.00
Gunner Contracting, LLC 40.000 $115.00 $4,600.00
Engineer's Estimate 40.000 HOUR $185.00 $7,400.00
A0880 62201-0950 WHEEL LOADER, 3
CUBIC YARD
MINIMUM RATED
CAPACITY
McKenzie Construction & Site Development, LLC
40.000 $392.02 $15,680.80
Black River Asphalt, LLC 40.000 $384.50 $15,380.00
AVENTUS NV, Inc. 40.000 $369.73 $14,789.20 Central Southern Construction Corp. 40.000 $300.00 $12,000.00
TNT General Contractors 40.000 $243.00 $9,720.00
Cutting Edge Contractors, Inc. 40.000 $184.56 $7,382.40
TIMS 8AJV 40.000 $175.00 $7,000.00
Whelcon Contractors
LLC. 40.000 $158.25 $6,330.00
Jud CO LLC 40.000 $150.00 $6,000.00 Gunner Contracting, LLC 40.000 $119.00 $4,760.00
Engineer's Estimate 40.000 HOUR $205.00 $8,200.00
A0900 62201-1300 BULLDOZER, 160HP
MINIMUM
FLYWHEEL POWER
McKenzie Construction & Site Development, LLC
40.000 $991.50 $39,660.00
AVENTUS NV, Inc. 40.000 $542.79 $21,711.60 Central Southern Construction Corp. 40.000 $350.00 $14,000.00
Black River Asphalt, LLC 40.000 $337.62 $13,504.80
Jud CO LLC 40.000 $282.00 $11,280.00 TNT General Contractors 40.000 $280.00 $11,200.00
TIMS 8AJV 40.000 $250.00 $10,000.00
Whelcon Contractors
LLC. 40.000 $234.75 $9,390.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0900 62201-1300 BULLDOZER, 160HP
MINIMUM
FLYWHEEL POWER
Cutting Edge Contractors, Inc. 40.000 $216.39 $8,655.60
Gunner Contracting, LLC 40.000 $164.00 $6,560.00
Engineer's Estimate 40.000 HOUR $290.00 $11,600.00
A0920 62201-2850 MOTOR GRADER,
12 FOOT
MINIMUM BLADE
McKenzie Construction & Site Development, LLC
40.000 $1,075.94 $43,037.60
AVENTUS NV, Inc. 40.000 $511.33 $20,453.20 Central Southern Construction Corp. 40.000 $300.00 $12,000.00
TNT General Contractors 40.000 $280.00 $11,200.00
Cutting Edge Contractors, Inc. 40.000 $240.87 $9,634.80
TIMS 8AJV 40.000 $235.00 $9,400.00
Jud CO LLC 40.000 $216.00 $8,640.00 Whelcon Contractors
LLC. 40.000 $201.20 $8,048.00
Black River Asphalt, LLC 40.000 $184.77 $7,390.80
Gunner Contracting, LLC 40.000 $165.00 $6,600.00
Engineer's Estimate 40.000 HOUR $325.00 $13,000.00
A0940 62201-3150 HYDRAULIC
EXCAVATOR, 1.0
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
McKenzie Construction & Site Development, LLC
40.000 $512.64 $20,505.60
AVENTUS NV, Inc. 40.000 $432.66 $17,306.40 Central Southern Construction Corp. 40.000 $350.00 $14,000.00
TNT General Contractors 40.000 $286.20 $11,448.00
Cutting Edge Contractors, Inc. 40.000 $200.47 $8,018.80
Whelcon Contractors
LLC. 40.000 $198.90 $7,956.00
TIMS 8AJV 40.000 $190.00 $7,600.00
Jud CO LLC 40.000 $178.00 $7,120.00 Black River Asphalt, LLC 40.000 $159.64 $6,385.60
Gunner Contracting, LLC 40.000 $150.00 $6,000.00
Engineer's Estimate 40.000 HOUR $300.00 $12,000.00 A0960 62301-0000 GENERAL LABOR AVENTUS NV, Inc. 80.000 $228.13 $18,250.40
Whelcon Contractors
LLC. 80.000 $191.10 $15,288.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0960 62301-0000 GENERAL LABOR McKenzie Construction & Site Development, LLC
80.000 $182.13 $14,570.40
Central Southern Construction Corp. 80.000 $100.00 $8,000.00
Cutting Edge Contractors, Inc. 80.000 $82.54 $6,603.20
Black River Asphalt, LLC 80.000 $79.61 $6,368.80
TNT General Contractors 80.000 $65.25 $5,220.00
Jud CO LLC 80.000 $59.00 $4,720.00
TIMS 8AJV 80.000 $55.00 $4,400.00
Gunner Contracting, LLC 80.000 $35.00 $2,800.00
Engineer's Estimate 80.000 HOUR $90.00 $7,200.00
A0980 62303-1010 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
BIOLOGICAL
SERVICES
McKenzie Construction & Site Development, LLC
$179,774.47
TNT General Contractors $44,000.00
AVENTUS NV, Inc. $43,779.12 Black River Asphalt, LLC $40,759.40
Whelcon Contractors
LLC. $33,046.34
Central Southern Construction Corp. $30,000.00
Jud CO LLC $25,600.00
TIMS 8AJV $20,000.00
Cutting Edge Contractors, Inc. $17,688.71
Gunner Contracting, LLC $14,500.00
Engineer's Estimate ALL LPSM LPSM $16,000.00
A1000 62303-1020 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
TNT General Contractors $44,000.00
AVENTUS NV, Inc. $43,779.12 Black River Asphalt, LLC $40,759.40
Central Southern Construction Corp. $30,000.00
Gunner Contracting, LLC $24,500.00
Whelcon Contractors
LLC. $15,862.25
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1000 62303-1020 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
Cutting Edge Contractors, Inc. $14,150.96
McKenzie Construction & Site Development, LLC
$13,578.37
TIMS 8AJV $10,000.00
Jud CO LLC $5,870.00 Engineer's Estimate ALL LPSM LPSM $16,000.00
A1020 62510-2000 SEEDING,
HYDRAULIC
METHOD
Central Southern Construction Corp. 7.200 $10,000.00 $72,000.00
AVENTUS NV, Inc. 7.200 $8,653.22 $62,303.18 Jud CO LLC 7.200 $6,600.00 $47,520.00 Cutting Edge Contractors, Inc. 7.200 $5,681.03 $40,903.42
McKenzie Construction & Site Development, LLC
7.200 $5,427.97 $39,081.38
TNT General Contractors 7.200 $4,825.00 $34,740.00
Whelcon Contractors
LLC. 7.200 $4,576.73 $32,952.46
Gunner Contracting, LLC 7.200 $3,600.00 $25,920.00
Black River Asphalt, LLC 7.200 $2,347.09 $16,899.05
TIMS 8AJV 7.200 $1,900.00 $13,680.00
Engineer's Estimate 7.200 ACRE $3,235.00 $23,292.00
A1040 62515-3000 MULCHING,
HYDRAULIC
METHOD, BONDED
FIBER MATRIX
AVENTUS NV, Inc. 7.200 $12,271.83 $88,357.18 Central Southern Construction Corp. 7.200 $10,000.00 $72,000.00
Jud CO LLC 7.200 $7,440.00 $53,568.00 Black River Asphalt, LLC 7.200 $7,041.26 $50,697.07
Whelcon Contractors
LLC. 7.200 $6,850.59 $49,324.25
Gunner Contracting, LLC 7.200 $6,800.00 $48,960.00
McKenzie Construction & Site Development, LLC
7.200 $6,644.74 $47,842.13
TNT General Contractors 7.200 $6,200.00 $44,640.00
TIMS 8AJV 7.200 $5,700.00 $41,040.00
Cutting Edge Contractors, Inc. 7.200 $928.66 $6,686.35
Engineer's Estimate 7.200 ACRE $6,520.00 $46,944.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1060 62901-1300 ROLLED EROSION
CONTROL
PRODUCT, TYPE 5.B
McKenzie Construction & Site Development, LLC
330.000 $62.24 $20,539.20
Black River Asphalt, LLC 330.000 $56.59 $18,674.70
Whelcon Contractors
LLC. 330.000 $52.33 $17,268.90
AVENTUS NV, Inc. 330.000 $36.19 $11,942.70 Gunner Contracting, LLC 330.000 $35.00 $11,550.00
TIMS 8AJV 330.000 $19.25 $6,352.50
Central Southern Construction Corp. 330.000 $15.00 $4,950.00
TNT General Contractors 330.000 $14.50 $4,785.00
Jud CO LLC 330.000 $12.00 $3,960.00 Cutting Edge Contractors, Inc. 330.000 $8.63 $2,847.90
Engineer's Estimate 330.000 SQYD $20.00 $6,600.00 A1080 63301-0000 SIGN SYSTEM Central Southern
Construction Corp. 3.000 $5,000.00 $15,000.00
Cutting Edge Contractors, Inc. 3.000 $2,252.36 $6,757.08
Black River Asphalt, LLC 3.000 $2,037.96 $6,113.88
AVENTUS NV, Inc. 3.000 $1,494.65 $4,483.95
TIMS 8AJV 3.000 $1,100.00 $3,300.00
Jud CO LLC 3.000 $940.00 $2,820.00 TNT General Contractors 3.000 $875.00 $2,625.00
Gunner Contracting, LLC 3.000 $850.00 $2,550.00
Whelcon Contractors
LLC. 3.000 $793.11 $2,379.33
McKenzie Construction & Site Development, LLC
3.000 $717.69 $2,153.07
Engineer's Estimate 3.000 EACH $875.00 $2,625.00 A1100 63308-0000 OBJECT MARKER Central Southern
Construction Corp. 10.000 $850.00 $8,500.00
TIMS 8AJV 10.000 $800.00 $8,000.00
Jud CO LLC 10.000 $657.00 $6,570.00 Gunner Contracting, LLC 10.000 $650.00 $6,500.00
Black River Asphalt, LLC 10.000 $611.39 $6,113.90
AVENTUS NV, Inc. 10.000 $550.66 $5,506.60
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1100 63308-0000 OBJECT MARKER McKenzie Construction & Site Development, LLC
10.000 $470.42 $4,704.20
Whelcon Contractors
LLC. 10.000 $297.42 $2,974.20
Cutting Edge Contractors, Inc. 10.000 $219.34 $2,193.40
TNT General Contractors 10.000 $75.00 $750.00
Engineer's Estimate 10.000 EACH $150.00 $1,500.00
A1120 63316-1000 REMOVE AND
RESET SIGN
SYSTEM
Black River Asphalt, LLC 1.000 $15,502.16 $15,502.16
Cutting Edge Contractors, Inc. 1.000 $2,948.12 $2,948.12
TNT General Contractors 1.000 $2,500.00 $2,500.00
Gunner Contracting, LLC 1.000 $1,235.00 $1,235.00
TIMS 8AJV 1.000 $1,100.00 $1,100.00
Central Southern Construction Corp. 1.000 $1,000.00 $1,000.00
AVENTUS NV, Inc. 1.000 $707.99 $707.99 Jud CO LLC 1.000 $460.00 $460.00 Whelcon Contractors
LLC. 1.000 $297.42 $297.42
McKenzie Construction & Site Development, LLC
1.000 $283.46 $283.46
Engineer's Estimate 1.000 EACH $1,000.00 $1,000.00
A1140 63402-1500 PAVEMENT
MARKINGS, TYPE H,
SOLID
Black River Asphalt, LLC 5.300 $30,569.56 $162,018.67
AVENTUS NV, Inc. 5.300 $13,373.15 $70,877.70 Cutting Edge Contractors, Inc. 5.300 $8,586.26 $45,507.18
Jud CO LLC 5.300 $5,090.00 $26,977.00 Central Southern Construction Corp. 5.300 $4,200.00 $22,260.00
Whelcon Contractors
LLC. 5.300 $3,965.56 $21,017.47
McKenzie Construction & Site Development, LLC
5.300 $3,566.78 $18,903.93
TIMS 8AJV 5.300 $3,300.00 $17,490.00
Gunner Contracting, LLC 5.300 $3,055.15 $16,192.30
TNT General Contractors 5.300 $1,855.00 $9,831.50
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1140 63402-1500 PAVEMENT
MARKINGS, TYPE H,
SOLID
Engineer's Estimate 5.300 MILE $4,700.00 $24,910.00
A1160 63501-0000 TEMPORARY
TRAFFIC CONTROL
TNT General Contractors $360,000.00
McKenzie Construction & Site Development, LLC
$310,480.06
Gunner Contracting, LLC $245,000.00
Whelcon Contractors
LLC. $198,278.07
AVENTUS NV, Inc. $173,064.33 Central Southern Construction Corp. $150,000.00
TIMS 8AJV $125,000.00
Jud CO LLC $96,500.00 Black River Asphalt, LLC $57,742.49
Cutting Edge Contractors, Inc. $37,594.39
Engineer's Estimate ALL LPSM LPSM $120,000.00
A1180 63701-0000 FIELD OFFICE TIMS 8AJV 1.000 $125,000.00 $125,000.00
Black River Asphalt, LLC 1.000 $67,932.35 $67,932.35
McKenzie Construction & Site Development, LLC
1.000 $66,107.27 $66,107.27
AVENTUS NV, Inc. 1.000 $55,065.92 $55,065.92 Jud CO LLC 1.000 $48,000.00 $48,000.00 Cutting Edge Contractors, Inc. 1.000 $38,915.15 $38,915.15
TNT General Contractors 1.000 $35,432.45 $35,432.45
Whelcon Contractors
LLC. 1.000 $31,724.49 $31,724.49
Central Southern Construction Corp. 1.000 $21,000.00 $21,000.00
Gunner Contracting, LLC 1.000 $20,000.00 $20,000.00
Engineer's Estimate 1.000 EACH $35,000.00 $35,000.00
Report Generated on 11/20/2026 7:26 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]