This document provides details for a federal contract solicitation for roadway resurfacing and rehabilitation work at Yosemite National Park in California. The solicitation seeks bids for work including asphalt paving, concrete curbing, aggregate base installation, culvert installation, excavation, borrow material, sidewalk construction, and rockery wall installation along 12 miles of Tioga Pass Road and at parking areas in Tuolumne Meadows and Tenaya Lake. The estimated price range for the contract is between $25-35 million and the work is anticipated to be conducted between August 2020 and October 2022. Questions from bidders were addressed relating to material availability and the economic price adjustment index to be used. The solicitation will be full and open competition conducted by the Federal Highway Administration for the National Park Service.

View the file

Other files

File Type Posted
Bid Tabs - CA FTNP NPS YOSE 17(4) 941(1).pdf PDF
Bid Opening Summary .pdf PDF
Amendment A005 .pdf PDF
Interested Vendor List 8 26 2020 Rev 1.pdf PDF
Interested Vendor List 8 26 2020.pdf PDF
Amendment A004.pdf PDF
QnA - August 25 2020.pdf PDF
Amendment A003 .pdf PDF
QnA - August 21 2020.pdf PDF
Amendment A002 - Wage Decision.pdf PDF
Interested Vendor List 8 19 2020.pdf PDF
QnA - August 19 2020 .pdf PDF
QnA - August 18 2020 Rev1.pdf PDF
Amendment A001 .pdf PDF
QnA - August 18 2020 .pdf PDF
QnA 8 12 2020 Tioga.pdf PDF
Interested Vendors List 8 12 2020.pdf PDF
QnA 8 3 2020 Tioga.pdf PDF
CA YOSE 17(4) 941(1) Plans.pdf PDF
Tioga Plans Part 2 of 3 - E through U Sections.pdf PDF
Plans Part 3 of 3 - V and W Sections.pdf PDF
CA PRA YOSE 17(3) Yosemite National Park Pavements Report.pdf PDF
Tuolumne Meadows Parking - FINAL Geotech Report_20200710.pdf PDF
6982AF20B000013 IFB.pdf PDF
Plans - Part 1 of 3 A through D sections.pdf PDF
Plans Part 3 of 3 - V and W Sections.pdf PDF
YOSE17(4)-Justification for Other than Full and Open Competition_Redacted.pdf PDF
CA FTBR FSTR(2) Final Hydrology and Hydraulics Recommendations Report.pdf PDF
Plans Part 2 of 3 - E through U Sections.pdf PDF
CA FTBR FSTR(2) Final Geotech Report.pdf PDF
fp14.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for CA FTNP NPS YOSE 17(4) 941(1), Tioga Road & Tuolumne Meadows

August 27, 2020

Questions Answers 23 Cement suppliers are currently not quoting cement powder because of a cement shortage.

Is there any thoughts on replacing the concrete curbs with asphalt curbs?

No

24 What region will the FHWA use to determine the Price Adjustment Index?

West Coast/Northwest

25 Please provide pay item for Traffic Control Supervisor.

As per FP-14 Subsection 109.05(b), work for which direct payment is not provided is a subsidiary obligation of the Contractor. Payment for such work is indirectly included under other pay items listed in the bid schedule