This federal contract opportunity solicitation seeks construction services for roadway resurfacing, restoration, and rehabilitation work within Yosemite National Park in California. The scope of work includes resurfacing 12 miles of Tioga Pass Road, eliminating off-road parking and expanding parking areas in Tuolumne Meadows and near Tenaya Lake to improve safety. Additional work involves repairs to the Tuolumne River Bridge and reconfiguring four parking lots near Tenaya Lake. The estimated price range is between $25-35 million. Principal work items consist of asphalt paving, aggregate work, drainage structures, excavation, sidewalk and parking lot construction. The anticipated advertisement date is July 2020 with construction from August 2020 through October 2022. The soliciting agency is the Department of Transportation Federal Highway Administration. Responses are due through a full and open competition.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A - 10
A0430 30201-2000 ROADWAY AGGREGATE, METHOD 2 (RECYCLED ASPHALT)
310 CUYD $____________ $____________
A0440 30202-2000 ROADWAY AGGREGATE, METHOD 2
19,250.0 TON $____________ $____________
A0450 30202-2100 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE
560.0 TON $____________ $____________
A0460 30301-3000 SHOULDER AND DITCH RECONDITIONING
7.440 MILE $____________ $____________
A0470 30301-6000 ROADWAY RECONDITIONING
0.284 MILE $____________ $____________
A004 A0471 30303-1000 ROADBED RECONDITIONING
1,950 SQYD $____________ $____________
A0480 30401-1300 FULL DEPTH RECLAMATION, METHOD 1, 6-INCH DEPTH
11.600 MILE $____________ $____________
A0490 30402-1300 FULL DEPTH RECLAMATION, METHOD 1, 6-INCH DEPTH
17,000 SQYD $____________ $____________
A004 A0500 30701-0000 CEMENT TREATED AGGREGATE COURSE
1,950 SQYD $____________ $____________
A0520 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
35,500.0 TON $____________ $____________
A0530 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
354.5 TON $____________ $____________
A0550 40601-0000 FOG SEAL
125.0 TON $____________ $____________
A0560 41102-1000 PRIME COAT, METHOD 1
184,000 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA NPS YOSE 17(4) & 941(1)
Project Name:Tuolumne Meadows Parking
A004 08/26/2020
A - 11
A0570 41105-0000 BLOTTER
1,380.0 TON $____________ $____________
A0580 41201-0000 TACK COAT
125.0 TON $____________ $____________
A0590 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
405 SQYD $____________ $____________
A0600 50101-0800 MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTH
2,160 SQYD $____________ $____________
A0610 55222-0000 REPAIR CONCRETE (BRIDGE DECK AND JOINTS)
ALL LPSM $___LPSM_____ $____________
A0620 60101-0000 CONCRETE (HEADWALL/WINGWALLS)
30 CUYD $____________ $____________
A0630 60101-0000 CONCRETE (STAIRS)
1.0 CUYD $____________ $____________
A0640 60110-0000 CONCRETE COLORING AGENT
58,400 LB $____________ $____________
A0650 60201-0600 18-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)
920 LNFT $____________ $____________
A0660 60201-0800 24-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)
300 LNFT $____________ $____________
A0670 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
(CORRUGATED METAL PIPE, POLYMERIC COATED)
460 LNFT $____________ $____________
A0680 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
(CORRUGATED METAL PIPE, POLYMERIC COATED)
42 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA NPS YOSE 17(4) & 941(1)
Project Name:Tuolumne Meadows Parking
A - 12
A0690 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT (POLYMERIC COATED)
40 EACH $____________ $____________
A0700 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (POLYMERIC COATED)
5 EACH $____________ $____________
A0710 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT (POLYMERIC COATED)
18 EACH $____________ $____________
A0720 60211-1000 END SECTION FOR 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT (POLYMERIC COATED)
4 EACH $____________ $____________
A0730 60220-0290 4 FEET SPAN, 2 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
74 LNFT $____________ $____________
A0740 60220-3000 10 FEET SPAN, 5 FEET RISE PRECAST REINFORCED CONCRETE BOX
CULVERT
74 LNFT $____________ $____________
A0750 60403-1900 INLET, FLH TYPE 6B
3 EACH $____________ $____________
A0760 60404-1000 CATCH BASIN, FLH TYPE 1
3 EACH $____________ $____________
A0770 60405-0000 MANHOLE ADJUSTMENT
40 EACH $____________ $____________
A0780 60406-0000 INLET ADJUSTMENT
4 EACH $____________ $____________
A0790 60409-0100 INLET TOP, METAL FRAME AND GRATE, FLH TYPE A
6 EACH $____________ $____________
A0800 60409-0800 INLET TOP, METAL FRAME AND GRATE , FLH TYPE 6B
3 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA NPS YOSE 17(4) & 941(1)
Project Name:Tuolumne Meadows Parking
A - 13
A0810 60409-1000 INLET TOP, CONCRETE (SPECIAL)
12 EACH $____________ $____________
A0820 60501-0000 STANDARD UNDERDRAIN SYSTEM
550 LNFT $____________ $____________
A0830 60526-0000 DRAINAGE CHASE
140 LNFT $____________ $____________
A0840 60704-0000 CLEANING CULVERT IN PLACE
30 EACH $____________ $____________
A0850 60901-0600 CURB, CONCRETE, 8-INCH DEPTH
15 LNFT $____________ $____________
A0860 60901-1200 CURB, CONCRETE, 14-INCH DEPTH
77,225 LNFT $____________ $____________
A0870 60906-1000 GUTTER, CONCRETE (5-INCH DEPTH)
490 SQYD $____________ $____________
A0880 60908-1000 PAVED DITCH, ASPHALT
9,580 SQYD $____________ $____________
A0890 60920-0000 RESET WHEELSTOP (WOODEN)
24 EACH $____________ $____________
A0900 61102-2100 3-INCH WATERLINE, COPPER (HDPE)
220 LNFT $____________ $____________
A0910 61104-0400 VALVE, GATE (3-INCH)
1 EACH $____________ $____________
A0920 61105-0000 VALVE BOX
1 EACH $____________ $____________
A0930 61202-0400 6-INCH SEWER LINE, PLASTIC (SDR 11 HDPE)
195 LNFT $____________ $____________
A0940 61203-0000 MANHOLE, SANITARY SEWER
3 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA NPS YOSE 17(4) & 941(1)
Project Name:Tuolumne Meadows Parking
A - 14
A0950 61207-0000 CLEANOUT (END OF PIPE)
1 EACH $____________ $____________
A0960 61501-0100 SIDEWALK, CONCRETE (5-INCH DEPTH w/ THICKENED EDGE)
860 SQYD $____________ $____________
A0970 61501-0100 SIDEWALK, CONCRETE (5-INCH DEPTH)
600 SQYD $____________ $____________
A0980 61501-0100 SIDEWALK, CONCRETE (5-INCH DEPTH w/ THICKENED EDGE, EXPOSED
AGGREGATE FINISH)
2,900 SQYD $____________ $____________
A0990 61504-1000 ACCESSIBILITY RAMP, CONCRETE
75.0 SQYD $____________ $____________
A1000 61509-0000 DETECTABLE WARNING PANELS (CAST IRON)
21.0 SQYD $____________ $____________
A1010 61902-1800 GATE, METAL, 24 FEET WIDTH
2 EACH $____________ $____________
A1020 62002-0000 STONE MASONRY
10 SQYD $____________ $____________
A1030 62002-0800 CLASS B MASONRY, COURSE POINTED FINISH
46 SQYD $____________ $____________
A1040 62002-1000 CLASS B MASONRY, ROCK FACE FINISH
85 SQYD $____________ $____________
A1050 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT
7 EACH $____________ $____________
A1060 62028-1000 REMOVE AND RESET STONE MASONRY HEADWALL
27 EACH $____________ $____________
A1070 62031-0000 REPOINT STONE MASONRY
75 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA NPS YOSE 17(4) & 941(1)
Project Name:Tuolumne Meadows Parking
A - 15
A1080 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A1090 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
40 HOUR $____________ $____________
A1100 62201-0800 WHEEL LOADER, 0.7 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
A1110 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
40 HOUR $____________ $____________
A1120 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT
40 HOUR $____________ $____________
A1130 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
A1140 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
40 HOUR $____________ $____________
A1150 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
40 HOUR $____________ $____________
A1160 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
650 SQYD $____________ $____________
A1170 62510-2000 SEEDING, HYDRAULIC METHOD
30.5 ACRE $____________ $____________
A1180 62515-2000 MULCHING, HYDRAULIC METHOD
30.5 ACRE $____________ $____________
A1190 63301-0000 SIGN SYSTEM
84 EACH $____________ $____________
A1200 63308-0000 OBJECT MARKER
380 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA NPS YOSE 17(4) & 941(1)
Project Name:Tuolumne Meadows Parking
A - 16
A1210 63309-1000 DELINEATOR, TYPE SNOW POLE
500 EACH $____________ $____________
A1220 63314-0000 RUMBLE STRIP (CENTERLINE)
6.750 MILE $____________ $____________
A1230 63315-0000 RUMBLE STRIP (TRANSVERSE)
23.5 SQYD $____________ $____________
A1240 63317-1000 REMOVE AND RESET SIGN
4 SQYD $____________ $____________
A1250 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
5,200 LNFT $____________ $____________
A1260 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
102.000 MILE $____________ $____________
A1270 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
3.000 MILE $____________ $____________
A1280 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B, WORD MESSAGE)
45 EACH $____________ $____________
A1290 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
10 EACH $____________ $____________
A1300 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
10 EACH $____________ $____________
A1310 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
28 EACH $____________ $____________
A1320 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
500 EACH $____________ $____________
A1330 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
500 EACH $____________ $____________
A1340 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
100 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA NPS YOSE 17(4) & 941(1)
Project Name:Tuolumne Meadows Parking
A - 17
A1350 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
40 EACH $____________ $____________
A1360 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
40 EACH $____________ $____________
A1370 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
6 EACH $____________ $____________
A1380 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (BLACK)
12,000 LNFT $____________ $____________
A1390 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
1,500.00 SQFT $____________ $____________
A1400 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
24.046 MILE $____________ $____________
A004 A1410 63507-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
5,400.0 DAY $____________ $____________
A004 A1411 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
5,400 HOUR $____________ $____________
A004 A1420 63507-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
1,350.0 DAY $____________ $____________
A004 A1421 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
1,350 HOUR $____________ $____________
A1430 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
4 EACH $____________ $____________
A1440 63610-1600 CONDUIT, 2-INCH, PVC
850 LNFT $____________ $____________
A1450 63610-2800 CONDUIT, 4-INCH, PVC
370 LNFT $____________ $____________
A1460 63621-5000 UTILITY BOX, CONCRETE (3x5x6 VAULT)
2 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA NPS YOSE 17(4) & 941(1)
Project Name:Tuolumne Meadows Parking
A - 18
A1470 63621-5000 UTILITY BOX, CONCRETE (2x3x3 VAULT)
4 EACH $____________ $____________
A1480 63622-0000 UTILITY TRENCH (POWER AND COMMUNICATIONS)
670 LNFT $____________ $____________
A1490 64620-0000 REMOVE AND RESET (BEAR BOX)
7 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA NPS YOSE 17(4) & 941(1)
Project Name:Tuolumne Meadows Parking
A004 08/26/2020
A0110 15401-0000 CONTRACTOR TESTING (GOVERNMENT FURNISHED LAB)
BID ALTERNATE ITEM - SEE PAGE A-4 ALL LPSM $__________ $___________
E-64 08/26/2020
CA PRA YOSE 17(4) & 941(1)
Tioga Road & Tuolumne Meadows Parking PMIS No. 174171 & 235881
Section 302. — MINOR CRUSHED AGGREGATE
Construction Requirements
302.04 Placing Crushed Aggregate.
(a) Roadway Aggregate. Add the following before the first sentence:
Use pulverized and/or crushed existing asphalt material meeting the requirements of Subsection 304.05 before importing any roadway aggregate material.
Measurement
302.07 Add the following:
Measure pulverized and crushed asphalt incorporated as roadway aggregate outside the limits of full depth reclamation, under pay item 30201-2000, Roadway Aggregate, Method 2 (Recycled Asphalt).
Section 303. — ROAD RECONDITIONING
Construction Requirements
303.03 Ditch Reconditioning. Add the following:
Also perform work as shown on the plans.
303.04 Shoulder Reconditioning. Add the following:
Also perform work as shown on the plans.
303.05 Roadbed Reconditioning. Delete the text and substitute the following:
Scarify existing pavement and base course to a depth of 8 inches and remove rocks larger than 3 inches. Perform Full Depth Reclamation in accordance with Section 304. Expose subgrade below pulverized material. Scarify surface (subgrade) to a depth of 8 inches. Remove rocks larger than 3 inches from scarified subgrade. Remove other irregularities and shape to a uniform surface. Compact according to Subsection 204.11. Replace pulverized material.
Section 304. — FULL DEPTH RECLAMATION
Construction Requirements
304.03 General. Add the following:
E-65 08/26/2020
CA PRA YOSE 17(4) & 941(1)
A “Job-Mix Formula” meeting the requirements of Section 401, must be approved prior to the start of pulverizing on Tioga Road.
Shape the road to cross slopes as shown on the plans and as approved by the CO. Construct smooth transitions into and out of curves. Remove localized irregularities in cross-slope and roadway width by utilizing excess pulverized material from within the project limits or imported Roadway Aggregate when directed by the CO. Removal, loading, hauling, stockpiling and placement of pulverized material may be required.
Do not leave any portion of the pulverized roadway(s) unpaved for more than 14 consecutive days. Place the first lift of Asphalt Concrete Pavement (ACP) within 14 days of pulverizing unless a longer period is approved by the CO. If the ACP cannot be placed on a section of pulverized roadway due to temperature or seasonal restrictions, do not pulverize that section until after the paving restriction is past. Only pulverize what can be paved within 14 days.
Submit a paving sequencing plan for pulverizing for review and approval 7 days prior to start of pulverizing. The schedule must indicate pulverizing and paving sequence such that the pulverized sections are paved within 14 days after pulverizing.
If the roadway is pulverized and not paved within 14 days for any reason, place a 2-inch thick lift of temporary asphalt concrete as per Section 404, to protect the roadway. When work resumes, remove the temporary pavement, and restore the subgrade. Complete this work at no additional cost to the Government.
Contractor is hereby advised that there are numerous steel snow poles that have been installed in the shoulders over the years to identify the edge of the roadway during the winter snow periods.
See Subsection 107.08 for additional information.
304.05 Pulverizing. Delete the last paragraph and substitute the following:
Use the reclaimer to pulverize the existing roadway material, in-place until 100 percent passes the 1 ½-inch (38-millimeter) sieve. Reprocess or remove larger particles and dispose of them according to Subsection 203.05.
Measurement
304.11 Add the following:
Pulverization of existing asphalt paved ditches and curb are incidental to the mainline full depth reclamation pay item.
E-66 08/26/2020
CA PRA YOSE 17(4) & 941(1)
Section 307. — RESERVED Delete the section and replace with the following:
Section 307. — CEMENT TREATED AGGREGATE COURSE
Description
307.01 This work consists of furnishing and placing cement treated aggregate course on a prepared surface to the lines, grades and cross sections shown on the project plans. This work also includes:
Scarifying the existing pavement
Removing protruding rocks larger than 3 inches in diameter
After pulverizing (measured and paid for under Section 305), removing the existing pulverized material
Removing the existing subgrade to a depth of 6” and incorporating the subgrade material into the work
Replacing the pulverized material
Provide a mixture attaining a minimum compressive strength of 750 pounds per square inch at seven days, plus an additional two percent cement for erosion resistance. Furnish at least 275 pounds of hydraulic cement per cubic yard, however, the amount of cement in the mix may be reduced when fly ash is added as hereinafter specified.
Material
307.02 Conform to the following Section and Subsections
Cement 701.01 Aggregate 703.18 Flyash 725.04(a)
Construction
307.03 Mix Design: Determine the mix proportions of the aggregate, cement, flyash and moisture. Submit the job mix design with the supporting test results to the CO for approval, prior to incorporating any of the material into the work. Determine the "base" amount of cement by laboratory testing and continue to monitor throughout the duration of the project with modifications as required to meet existing field conditions.
Calculate the percent of cement in the mix by the weight of cement divided by the total weight of the dry compacted cement treated aggregate course.
E-67 08/26/2020
CA PRA YOSE 17(4) & 941(1)
Include in the job mix design data the grade of cement, brand of flyash, and the source of aggregate. Submit a new mix design for approval any time a change in materials, or proportioning of the materials, from that given in the approved mix designs are submitted.
307.04 Production Start-Up Procedures. Conduct a preparatory phase meeting at least seven days prior to the start of placement according to Subsection 153.04(a). In addition, be prepared to discuss the following:
(a) Hauling logistics
(b) Placement operations
(c) Control of lift alignment, thickness and compaction processes
(d) Moistening of lifts prior to subsequent lift placement
(e) Curing operations
(f) Cold weather curing procedures, if necessary
307.05 Preparation: Prepare the subgrade and shape the foundation area to lines and grades as shown on the project plans or as directed by the CO in accordance with Section 204.
Immediately prior to placement of the cement treated aggregate course mixture, moisten the subgrade if necessary.
307.06 Mixing: Proportion and mix aggregate, cement and flyash for the mixture in a central mixing plant. Use a plant that either incorporates a batch mixing type using revolving blade, rotary drum mixers, or of the continuous mixing type. Proportion the aggregate, cement and flyash by weight.
Fly ash may be used at the option of the contractor. A maximum of 20 percent of the total weight of cement may be replaced with fly ash.
Proportion the water by weight or volume and by a means where the CO may readily verify the amount of water required per batch or the rate of water flow required for continuous mixing.
Obtain CO approval for modifying the time of adding water, or the points at which it is introduced into the mixer from the approved mix design.
Produce a moisture content of the completed mixture that is uniform and within two percentage points of optimum at the point of delivery to the placement site. Determine the optimum moisture content in accordance with the requirements of AASHTO T134. Add the cement and flyash in such a manner that it is uniformly distributed throughout the aggregate during the mixing operation.
Provide safe, convenient facilities for sampling the cement and flyash in the supply line to the weight hopper or pugmill. Do not exceed the charge in the batch mixer or the rate of feed to the continuous mixer that will permit complete mixing of all of the mix material.
307.07 Batch Mixing: Provide a mixer equipped with a sufficient number of paddles of a type and arrangement to produce a uniformly mixed batch. Provide a mixer equipped with a timing device which will indicate, by a definite audible or visual signal, the expiration of the mixing period, accurate to within two seconds.
E-68 08/26/2020
CA PRA YOSE 17(4) & 941(1)
Begin the time of mixing a batch after all ingredients are in the mixer and end the mixing when the mixer is half emptied. Continue mixing until a homogeneous mixture of unchanging appearance is produced, which should not be less than 30 seconds.
Provide batch mixing sampling facilities at the plant which are satisfactory to the CO and which will allow representative samples of the soil cement mixture to be obtained easily and safely.
307.08 Continuous Mixing: Draw aggregate from the storage facility by a feeder or feeders which will continuously supply the correct amount of aggregate in proportion to the cement.
Provide a control system that will automatically close down the plant when the material in any storage facility approaches the strike off capacity of the feed gate. The plant will not be permitted to operate unless this automatic control system is in good working condition.
Provide a feeder for the aggregate that is mechanically or electrically driven.
Provide sampling facilities for continuous mix plants which are satisfactory to the CO, and which will allow representative samples of the aggregate and the soil cement mixture to be obtained easily and safely.
Equip the cement feeder and the aggregate feeders with devices by which the rate of feed can be accurately determined while the plant is in full operation.
307.09 Spreading: Transport mixed materials from the plant to the placement site in approved vehicles and spread the material on a the moistened foundation, or previously completed cement treated aggregate course lift with spreading equipment that will produce layers of the widths and thicknesses that are necessary for compaction to the required dimensions of the completed soil cement lifts. Accomplish spreading by the use of approved spreader boxes or finishing machines. Place each successive lift as soon as practicable after the preceding lift is completed.
Keep all cement treated aggregate course surfaces that will be in contact with succeeding layers of soil cement continuously moist by fog spraying until placement of the subsequent lift. Do not mix and place cement treated aggregate course when the area on which the cement treated aggregate course is to be placed is frozen. Do not mix or place frozen cement treated aggregate course mixture. Mix or place the cement treated aggregate course only when the air temperature is at least 40 degrees F and rising, and not when the temperature is expected to drop below 40 degrees F in the next 24 hours.
307.10 Compaction: Uniformly compact cement treated aggregate course to a minimum of 95 percent of the maximum density. Wheel rolling with only hauling equipment is not an acceptable method of compaction.
At the start of compaction, provide a mixture that is uniform and in loose condition throughout its full depth and has a moisture content as previously specified herein. Do not leave any section undisturbed for longer than 30 minutes during compaction operations. Accomplish compaction of each layer in such a manner as to produce a dense surface free of compaction planes.
Complete compaction within two hours from the time water is added to the mixture. Whenever the contractor's operation is interrupted for more than two hours, scarify the top surface of the
E-69 08/26/2020
CA PRA YOSE 17(4) & 941(1)
completed layer to a depth of at least one inch with a spike tooth instrument prior to placement of the next lift. Sweep the surface, after scarifying using a power broom or other method approved by the CO, to completely free the surface of all loose material prior to actual placement of the soil cement mixture for the next lift.
307.11 Finishing: After compaction, shape the cement treated aggregate course, if necessary, to the required lines, grades, and cross sections and rolled to a reasonably smooth surface.
307.12 Curing: Keep permanently exposed surfaces in a continuously moist condition for seven days.
When necessary, protect the cement treated aggregate course from freezing for seven days after its construction.
307.13 Maintenance: Maintain the cement treated aggregate course in good condition until all work is completed and accepted. Maintenance includes immediate repairs of any defects that may occur. Repeat maintenance work as often as necessary. Replace faulty work full depth at no expense to the Government.
307.14 Acceptance: See Table 307-1 for sampling, testing, and acceptance requirements.
Material for cement treated aggregate course will be evaluated under Subsections 106.03 and
106.04. Submit a production certification with each shipment of hydraulic cement. Placement operations will be evaluated under 106.02 and 106.04.
Compressive strength will be evaluated on the following scale. See Table 307-1 for strength requirements. Remove and replace all rejected materials.
Compressive Strength Compressive Strength Pay Factor
750 psi + 1.00
700 psi to 750 psi 0.85
600 psi to 700 psi 0.75
500 psi to 600 psi 0.50
Less than 500 psi Reject / Replace
Measurement
307.15 Measure the Section 307 pay items listed in the bid schedule according to Subsection
109.02. Measure cement treated aggregate course by the square yard of the neat line quantity in the plans.
E-70 08/26/2020
CA PRA YOSE 17(4) & 941(1)
Payment
307.16 The accepted quantities will be paid at the contract price per unit of measurement for the Section 307 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Removal and replacement of the pulverized material and earthwork is subsidiary to the Section 307 pay items.
Performance of the work required to pulverize the existing asphalt, and shape and compact the pulverized material will be performed, accepted, measured and paid for under Section 305.
Payment for cement treated aggregate course will be made at a price determined by multiplying the contract price by the compressive strength pay factor.
E-71
08/26/2020
CA PRA YOSE 17(4) & 941(1)
Tioga Road & Tuolumne Meadows Parking PMIS No. 174171 & 235881
Table 307-1, Sampling, Testing and Acceptance Requirements Material or product
Type of Acceptance
Characteristic Category Test Method Specification
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Remarks
Source Aggregate Measured and tested for conformance
Process control
Aggregate quality
Gradation
Subsection 703.03
AASHTO
T-27 & T-11
1 per mix design or change in material
2 per day during production
Stockpile
Production stream or stockpile
Yes
Yes
Before production
24 hours
Mix Design Mixture composition
Measured and tested for conformance
All Subsection 307.03
1 per mix design
Stockpile Yes Before production
Production Production of aggregates
Measured and tested for conformance
Gradation
Liquid Limit
Plant scale batching & documentation
AASHTO T-
27 & T-11
AASHTO
R58 & T-89 Method A
Subsections 307.06,
307.07 & 307.08
1 per day or change in material
Every Load
Flowing aggregate stream at batching
Yes During batching
Complete batch ticket for every load
E-72
08/26/2020
CA PRA YOSE 17(4) & 941(1)
Tioga Road & Tuolumne Meadows Parking PMIS No. 174171 & 235881
Table 307-1, Sampling, Testing and Acceptance Requirements Material or product
Type of Acceptance
Characteristic Category Test Method Specification
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Remarks
Cement Treated Aggregate
Measured and tested for conformance
Process control
Moisture content
Density of compacted soil cement
Compressive Strength
Moisture Content Gradation
AASHTO
T-134
AASHTO T-
ASTM
D1633, Method A
AASHTO T-
AASHTO T-
27 & T-11
1 per load, reduce to every 3rd load after 3 successive passing tests
1 per 500 square yards, but not less than min. 1 per lift
1 per 30 CY but not less than 1 per day and not less than 4 total
2 per day
Point of delivery
In place material after compaction
Discharge stream at point of delivery Production belt or stockpile
No
No
Yes
Yes
Upon completion of test
Upon completion of test
7 days
Upon completion of test
Measured and tested for conformance
Surface tolerance and grade
Directed by the CO
Section 307 Directed by the CO
In place material after compaction
Upon completion
Q)
A M E N D
SUMMARY OF QUANTITIES - Schedule A
Sheet and Description
Line BS - B10 Bll B12 B13 - B16 B17 - B28
Item Pay Item
Pay Item Description Unit No.
Number Drainage Grading Surfacing Pullout Misc.
Summary Summary Summary Summary Tabulations
AOOlO 15101-0000 MOBILIZATION LPSM
A0020 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE MILE 0.809
A0030 15210-3000 CENTERLINE, VERIFICATION AND STAKING MILE 11.508
A0040 15214-2000 SURVEY AND STAKING, RETAINING WALL LPSM All
A0050 15214-3000 SURVEY AND STAKING, PARKING AREA LPSM All
A0060 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 37
A0070 15215-5000 SURVEY AND STAKING, BOX CULVERT EACH 2
A0080 15216-1000 SURVEY AND STAKING, ROADWAY CROSS-SECTIONS MILE 0.809
A0090 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES MILE 1.620
AOlOO 15301-0000 CONTRACTOR QUALITY CONTROL LPSM
A0110 15401-0000 CONTRACTOR TESTING LPSM
A0120 15501-0000 CONSTRUCTION SCHEDULE LPSM
A0130 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 400
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 2,580
A0150 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 15
A0160 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A EACH 38
A0170 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 2
A0180 15802-0000 WATERING FOR DUST CONTROL LPSM
A0190 20203-0000 SELECTIVE CLEARING (FLUSH CUT AND PRUNING) MILE 11.214
A0200 20205-0000 SELECTIVE CLEARING AND GRUBBING ACRE 3.030
A0210 20207-0000 SELECTIVE CLEARING AND GRUBBING MILE 0.809
A0220 20301-2400 REMOVAL OF SIGN EACH
A0230 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 2,452
A0240 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 5,132
A0250 20303-3000 REMOVAL OF SIDEWALK, ASPHALT SQYD 1,110
A0260 20303-3200 REMOVAL OF SIDEWALK, CONCRETE SQYD 313
A0270 20401-0000 ROADWAY EXCAVATION CUYD 3,404
A0280 20402-0000 SUBEXCAVATION (SHOULDER STABILIZATION) CUYD 44
A0290 20402-0000 SUBEXCAVATION CUYD 1,466
A0300 20435-3000 BACKFILL, CURB CUYD 1,078
A0310 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 22,674
A0320 21101-2000 ROADWAY OBLITERATION, METHOD 2 SQYD 908
A0330 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 350.0
A0340 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 123.6 155.1
A0350 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 53.4
A0360 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 68.8
A0370 25125-0000 BOULDER (RANDOM PLACEMENT) EACH 175
A0380 25125-0000 BOULDER (GRADE CONTROL STRUCTURE) EACH 16
A0390 25126-0000 REMOVE AND RESET BOULDER EACH 928
A0400 25205-1000 ROCK BUTTRESS, MECHANICALLY-PLACED CUYD 61
Milestone: Amendment A004 Amendment Review Date: 08/25/20 Reoort Date: 08/25/20
Estimated
B29 - B38 Quantities
Signing and Bid
Striping Allowance Schedule
Tabulations
ALL
0.809
11.508
ALL
ALL
3 40
0.809
1.620
ALL
ALL
ALL
40 440
252 2,832
5 20
7 45
1 3
ALL
11.214
0.170 3.200
0.809
42 8 50
148 2,600
378 5,510
90 1,200
18 331
171 3,575
16 60
84 1,550
198 3,800
1,126 23,800
42 950
10.0 360.0
14.6 390.0
1.6 55.0
4.2 73.0
5 180
2 18
22 950
9 70
STATE PROJECT
SHEET
NUMBER
CA
CA FTNP/NPS YOSE
B1 17(4) & 941(1)
Remarks and/or Determination of Estimated Quantity
/4' fi12�20
� oFESS/o� I � � TI Ira�<'�
�(!)� �� C,;, � I No. 050864 ) � 1(
Exp. 9/30/21 * o'� li
C/V\\. ��� � OF Cfl..\.\<;;C5
NPS DWG. ND.: 104/168426 NPS PMIS NO. 174171 & 235881
SUMMARY OF QUANTITIES - Schedule A
A Sheet and Description
B8 - B10 B11 B12 B13 - B16 B17 - B28 B29 - B38 Estimated Quantities
STATE
CA
PROJECT
CA FTNP/NPS YOSE
17(4) & 941(1)
SHEET
NUMBER
B2
M Line Pay Item E Item Pay Item Description Unit 1-------+-----+------+-----+------+------+------------t Remarks and/or Determination of Estimated
N No. Number Drainage Grading Surfacing D Summary Summary Summary
A0410 25210-0000 ROCKERY SQFT
A0420 26001-0000 ROCK BOLT LNFT
A0430 30201-2000 ROADWAY AGGREGATE, METHOD 2 (RECYCLED ASPHALT) CUYD 295
A0440 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 14,639.7
A0450 30202-2100 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE TON
A0460 30301-3000 SHOULDER AND DITCH RECONDITIONING MILE 7.231
A0470 30301-6000 ROADWAY RECONDITIONING MILE 0.284
Signing and Pullout Misc. Striping Summary Tabulations Tabulations
4,021
1,965.1 1,043.6
253.6 276.4
Allowance
937.4 30.0
0.209
Bid Schedule
4,200
19,250.0
560.0
7.440 0.284
Quantity
If required at Dog Lake TH
A004 A0471 30303-1000 ROADBED RECONDITIONING )6 SQYD 1,891 59 1,950
A0480 30401-1300 FULL DEPTH RECLAMATION, METHOD 1, 6-INCH DEPTH
A0490 30402-1300 FULL DEPTH RECLAMATION, METHOD 1, 6-INCH DEPTH
A004 '-MWO 307010000 -- _:._:--::--� -�
=• __ :�¥.,c-r::_;6
A0520 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION
ESAL
A0530 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
A0550 40601-0000 FOG SEAL
A0560 41102-1000 PRIME COAT, METHOD 1
A0570 41105-0000 BLOTTER
A0580 41201-0000 TACK COAT
A0590 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
A0600 50101-0800 MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTH
A0610 55222-0000 REPAIR CONCRETE (BRIDGE DECK AND JOINTS)
A0620 60101-0000 CONCRETE (HEADWALL/WINGWALLS)
A0630 60101-0000 CONCRETE (STAIRS)
A0640 60110-0000 CONCRETE COLORING AGENT
A0650 60201-0600 18-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC
COATED)
A0660 60201-0800 24-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC
COATED)
A0670 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
(CORRUGATED METAL PIPE, POLYMERIC COATED)
A0680 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
MILE
SQYD
5Q¥9
TON
TON
TON
SQYD
TON
TON
SQYD
SQYD
LPSM
CUYD
CUYD
LB
LNFT
LNFT
LNFT
11.534 11,647 4,886
31,843.4 2,333.6
318.5 23.5
113.9 6.6
182,339 1,367.0
113.9 6.6
0.066 11.600 467 17,000
1,323.0 35,500.0
12.5 354.5
4.5 125.0
1,661 184,000
13.0 1,380.0
4.5 125.0
396 9 405 2,121 39 2,160
ALL
1 30
0.7 0.3 1.0 40,672 1,170 58,400
30 920
8 300
14 460
40 (CORRUGATED METAL PIPE, POLYMERIC COATED) LNFT 2 42
A0690 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT (POLYMERIC COATED) EACH 37
See Sheet C13
See Sheet 54
4 END SECTION FOR 24-INCH PIPE CULVERT (POLYMERIC COATED) EACH 1 5
./Jo, A l 00/25/20
END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR
16 ELLIPTICAL PIPE CULVERT (POLYMERIC COATED) EACH 2 18
QfESS/OAI� -----------------------------+-----+--------------------+--------------------------- � � - :"Y( END SECTION FOR 36-INCH EQUIVALENT DIAMETER ARCH OR I ,.-, � A. FfrQ 0.
I I:::!(:)� ��-'Q 2 ELLIPTICAL PIPE CULVERT (POLYMERIC COATED) EACH 2 4 & �
� I No. 050864 ) �
Milestone: Amendment A004 Amendment Review Date: 08/25/20 Reoort Date: 08/25/20 c� Revise Pay .ltem 3070l-OOOO to 30303-lOOO, Amendment A004
-f( Exp. 9/30/21 )t cP�li £lfil ��� OF CA\.\'(CS co-----------------------------------------------------------------------------------------,N""'P"'"s ""Dw"'G'"'.N"'D,....: ..,.10"""4;.,.,.1""'68""42""6 .....,.,N""'Ps"""p"'MI""s ""'No"'".""17""'41""7""'1&'"'2""3""'5s,,.,..s1
A M E N D
A001
SUMMARY OF QUANTITIES - Schedule A
Sheet and Description
Line BS - B10 Bll B12 B13 - B16 B17 - B28 B29 - B38
Item Pay Item
Pay Item Description Unit No.
Number Drainage Grading Surfacing Pullout Misc.
Signing and
Summary Summary Summary Summary Tabulations Striping
Tabulations
A0730 60220-0290 4 FEET SPAN, 2 FEET RISE PRECAST REINFORCED CONCRETE BOX
CULVERT LNFT 70
A0740 60220-3000 10 FEET SPAN, 5 FEET RISE PRECAST REINFORCED CONCRETE BOX
CULVERT LNFT 70
A0750 60403-1900 INLET, FLH TYPE 6B EACH 2
A0760 60404-1000 CATCH BASIN, FLH TYPE 1 EACH 2
A0770 60405-0000 MANHOLE ADJUSTMENT EACH 36
A0780 60406-0000 INLET ADJUSTMENT EACH 2
A0790 60409-0100 INLET TOP, METAL FRAME AND GRATE, FLH TYPE A EACH 4
A0800 60409-0800 INLET TOP, METAL FRAME AND GRATE, FLH TYPE 6B EACH 2
A0810 60409-1000 INLET TOP, CONCRETE (SPECIAL) EACH 8
A0820 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 480
A0830 60526-0000 DRAINAGE CHASE LNFT 128
A0840 60704-0000 CLEANING CULVERT IN PLACE EACH 27
A0850 60901-0600 CURB, CONCRETE, 8-INCH DEPTH LNFT 10
A0860 60901-1200 CURB, CONCRETE, 14-INCH DEPTH LNFT �\_56-;-tt6 76,634)
A0870 60906-1000 GUTTER, CONCRETE (5-INCH DEPTH) SQYD 476
A0880 60908-1000 PAVED DITCH, ASPHALT SQYD 9,125
A0890 60920-0000 RESET WHEELSTOP (WOODEN) EACH 24
A0900 61102-2100 3-INCH WATERLINE, COPPER (HDPE) LNFT 200
A0910 61104-0400 VALVE, GATE (3-INCH) EACH 1
A0920 61105-0000 VALVE BOX EACH 1
A0930 61202-0400 6-INCH SEWER LINE, PLASTIC (SDR 11 HDPE) LNFT 187
A0940 61203-0000 MANHOLE, SANITARY SEWER EACH 2
A0950 61207-0000 CLEANOUT (END OF PIPE) EACH 1
A0960 61501-0100 SIDEWALK, CONCRETE (5-INCH DEPTH w/ THICKENED EDGE) SQYD 843
A0970 61501-0100 SIDEWALK, CONCRETE (5-INCH DEPTH) SQYD 580
A0980 61501-0100 SIDEWALK, CONCRETE (5-INCH DEPTH w/ THICKENED EDGE, EXPOSED
AGGREGATE FINISH) SQYD 2,839
A0990 61504-1000 ACCESSIBILITY RAMP, CONCRETE SQYD 73.0
AlOOO 61509-0000 DETECTABLE WARNING PANELS (CAST IRON) SQYD 19.8
A1010 61902-1800 GATE, METAL, 24 FEET WIDTH EACH 2
A1020 62002-0000 STONE MASONRY SQYD 7
A1030 62002-0800 CLASS B MASONRY, COURSE POINTED FINISH SQYD 43
A1040 62002-1000 CLASS B MASONRY, ROCK FACE FINISH SQYD 82
A1050 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT EACH 6
A1060 62028-1000 REMOVE AND RESET STONE MASONRY HEADWALL EACH 23
A1070 62031-0000 REPOINT STONE MASONRY SQFT 70
A1080 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR
Milestone: Amendment A004 Amendment Review Date: 08/25/20 (£'Plan sheet clarification, Amendment A001 ) Reoort Date: 08/25/20
Estimated Quantities
Bid Allowance
Schedule
4 74
4 74
1 3
1 3
4 40
2 4
2 6
1 3
4 12
70 550
12 140
3 30
5 15
591 77,225
14 490
455 9,580
20 220
8 195
1 3
17 860
20 600
61 2,900
2.0 75.0
1.2 21.0
3 10
3 46
3 85
1 7
4 27
5 75
STATE PROJECT
SHEET
NUMBER
CA
CA FTNP/NPS YOSE
B2A 17(4) & 941(1)
Remarks and/or Determination of Estimated Quantity
See C Sheets for locations f fi/2512-0 �ofESS!O,t
-4
; �:{ A. Ffo� � 1/;; C, � 0-c3 � � I No. 050864 ) 'sg
Exp. 9/30/21 )f-c.J"� li
C/V\\. ��"'?:-c OF CA\.\,;/J
NPS DWG. ND.: 104/168426 NPS PMIS NO. 174171 & 235881
A
M E N D
A004
A004
A004
A004
SUMMARY OF QUANTITIES - Schedule A
Sheet and Description
Line B8 - B10 Bll B12 B13 - B16 B17 - B28
Item Pay Item
Pay Item Description Unit No.
Number Drainage Grading Surfacing Pullout Misc.
Summary Summary Summary Summary Tabulations
A1090 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH HOUR
AllOO 62201-0800 WHEEL LOADER, 0.7 CUBIC YARD MINIMUM RATED CAPACITY HOUR
A1110 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR
A1120 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT HOUR
A1130 62301-0000 GENERAL LABOR HOUR
A1140 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR
A1150 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR
A1160 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH SQYD 615
A1170 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 30.1
A1180 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 30.1
A1190 63301-0000 SIGN SYSTEM EACH
A1200 63308-0000 OBJECT MARKER EACH
A1210 63309-1000 DELINEATOR, TYPE SNOW POLE EACH
A1220 63314-0000 RUMBLE STRIP (CENTERLINE) MILE
A1230 63315-0000 RUMBLE STRIP (TRANSVERSE) SQYD
A1240 63317-1000 REMOVE AND RESET SIGN SQYD
A1250 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT
A1260 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE
A1270 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN MILE
A1280 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B, WORD MESSAGE) EACH
A1290 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH
A1300 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH
A1310 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 28
A1320 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 500
A1330 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER EACH 500
A1340 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 100
A1350 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A EACH 40
A1360 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 40
A1370 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 6
A1380 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (BLACK) LNFT 12,000
A1390 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 1,500.00
A1400 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS MILE 24.046
-M4M 63597 9599 +EMPGRAR¥ +RAFFIG GGN+RGb, FbAGGER 9A¥ & �
A1411 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 5,400
Af42G 63597 9699 +EMPGRAR¥ +RAFFIG GGN=i=RGb, PibG:i= GAR 9A¥ �
�1421 635Q6-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUJ� 1,350
A1430 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP EACH 4
A1440 63610-1600 CONDUIT, 2-INCH, PVC LNFT 820
Milestone: Amendment A004 Amendment Review Date: 08/25/20 (£ Change Flagger and Pilot Car Pay .Items from Day to Hour unit of measurement, Amendment A004 _J Reoort Date: 08/25/20
B29 - B38
Signing and Striping Allowance
Tabulations
0.4
0.4
72 12
6.553 0.197
23.2 0.3
1 3
5,130 70
101.418 0.582
2.892 0.108
41 4
8 2
9 1
Estimated Quantities
Bid Schedule
30.5
30.5
6.750
23.5
5,200
102.000
3.000
12,000
1,500.00
24.046
5,400
1,350
STATE PROJECT
SHEET
NUMBER
CA
CA FTNP/NPS YOSE
B3 17(4) & 941(1)
Remarks and/or Determination of Estimated Quantity
4 fi12�20
� ofESS/0,t � - '11 I� A.Ffra <%
1/;; (:)� �� 0c c3 � � I No. 050864 ) i 1( Exp. 9/30/21 *
<.P� li
C/V\\. ��""t-
£ OF CA\.\'{C5
NPS DWG. ND.: 104/168426 NPS PMIS NO. 174171 & 235881
A
M
E
N
D
Line
Item Pay Item
Pay Item Description
No.
Number
A1450 63610-2800 CONDUIT, 4-INCH, PVC
A1460 63621-5000 UTILITY BOX, CONCRETE (3x5x6 VAULT)
A1470 63621-5000 UTILITY BOX, CONCRETE (2x3x3 VAULT)
A1480 63622-0000 UTILITY TRENCH (POWER AND COMMUNICATIONS)
A1490 64620-0000 REMOVE AND RESET (BEAR BOX)
Milestone: Amendment A004
Amendment Review Date: 08/25/20
Reoort Date: 08/25/20
SUMMARY OF QUANTITIES - Schedule A
Sheet and Description
B10 B11 B12 - B17 - B28
Unit Drainage Grading Surfacing Pullout Misc.
Summary Summary Summary Summary Tabulations
LNFT 360
EACH 2
EACH 4
LNFT 640
EACH 5
Estimated
B38 Quantities
Signing and Bid
Striping Allowance Schedule
Tabulations
10 370
30 670
2 7
STATE PROJECT
SHEET
NUMBER
CA
CA FTNP/NPS YOSE
B4 17(4) & 941(1)
Remarks and/or Determination of Estimated
Quantity fi/25120
��lo,,v4< I <i; �� A. FRo� <% 1/:i (j � 0-c3 � � I No. 050864 ) 'sg 1( Exp. 9/30/21 lf-
J''1'l) C/V\\.. ��"?:-loF CA\..\'f:G
NPS DWG. ND.: 104/168426 NPS PMIS NO. 174171 & 235881
Pay Item 30202-2000 30301-3000
ROADWAY SHOULDER AND
AGGREGATE, DITCH
Schedule Station to Station Length
METHOD 2 RECONDITIONING
(Note 1) (Note 2)
TON MILE
Tioga Road
A 1564+00 to 1630+00 6,600 906.2 0.932
A 1630+00 to 1675+00 4,500 605.1 0.390
A 1675+00 to 1715+00 4,000 554.3 0.706
A 1715+00 to 1770+00 5,500 755.1 0.716
A 1770+00 to 1820+00 5,000 690.7 0.809
A 1820+00 to 1885+00 6,500 890.6 1.248
A 1885+00 to 1965+00 8,000 1,097.5 1.478
A 1902+25 to 1909+25 700
A 1965+00 to 2010+00 4,500 577.8 0.131
A 2010+00 to 2070+00 6,000 759.1 0.111
A 2070+00 to 2105+00 3,500 443.1 0.092
A 2105+00 to 2173+00 6,800 922.0 0.618
Soda Springs & Tuolumne Stables Roads
A 10+00.00 to 26+28.08 1,628 852.1
A 30+00.00 to 39+57.22 957 1,027.4
30301-6000
ROADWAY
RECONDITIONING
MILE
30303-1000
IA
RECONDITIONING
SQYD
1,891
SURFACING SUMMARY
30401-5300 30402-5300 30201-2000
FULL DEPTH FULL DEPTH ROADWAY
RECLAMATION, RECLAMATION, AGGREGATIE,
METHOD 2, 6- METHOD 2, 6- METHOD 2
INCH DEPTH INCH DEPTH (RECYCLED
(Note 3) (Note 3) ASPHALT)
MILE SQYD CUYD
1.250
0.852
0.758
1.042
0.947
1.231
1.515
0.852
1.136
0.663
1.288
Visitor Center, Visitor Contact Station, Gas Station, Store, Campground Registration, Lem be rt Dome, Dog Lake Trallhead & Gaylor Pit Road
A Visitor Center 917.4 3,718
A Visitor Contact Station 1,445.3
A Gas Station 169.4
A Store (See Note 8) 83.1 2,548 215
A CG Registration (See Note8) 2,584 80
A Lembert Dome 1,228
A Dog LakeTrailhead 843.1 43
A Gaylor Pit Road 1, 100.4 0.284
Schedule A Totals 14,639.7 7.231 0.284 1,891 11.534 10,121 295
Pothole Dome, Pothole East & Wilderness Center
X Pothole Dome 55.2 2,615
X Pothole Dome East 464.0
X Wilderness Center 180.7 3,413
Option X Tota Is 699.9 6,028
Sunrise Lakes Trail head, Old Campgrond, Murphy Creek Picnic Area, Murphy Creek Picnic Area & East Beach y Sunrise Lakes TH 620.3 92 y Old Campground 166.2 1,200 100 y Murphy Creek 734.5 142 101 y Murphy Creek TH (See Note 9) 9 y East Beach 107.6 201
Option Y Totals 1,628.6 1,342 503
Project Totals 16,968.2 7.231 0.284 1,891 11.534 17,491 798
NOTES:
40101-5600
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
1/2-INCH OR 3/4-
INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
(Note 4)
TON
2,746.6
1,900.2
1,653.7
2,289.1
2,071.7
2,709.2
3,331.3
1,959.3
2,636.7
1,537.4
2,855.0
874.0
486.5
1,299.7
871.4
535.5
543.6
206.1
259.8
591.8
484.8
31,843.4
157.0
310.3
878.1
1,345.4
401.7
236.4
549.5
392.3
1,579.9
34,768.7
(1) Tioga Shouldering material. Soda Springs and Tuolumne Stables Base and Shouldering material. Parking Area Base and Shouldering material. Roadway Aggregate unit weight= 139 lbs/cuft.
(2) Do not measure Roadway Shoulder and Ditch Reconditioning where curb, paved ditch or obliteration are proposed on both sides of the roadway
(3) See Typical Sections Tioga Road limits. See Series D Removal Sheets for Parking Area limits.
(4) Asphalt Concrete Pa\ement unit weight= 150 lbs/cufl
(5) Fog Seal application rate at 0.15 gal/sqyd, 8.33 lbs/gal
(6) Blotter application rate at 15 lbs/sqyd
(7) Tack coat application rate at 0.15 gal/sqyd, 8.33 lbs/gal
(8) Assumes material worn pulverizing (Recycled Aggregate Base) is hauled to Soda Springs Road and placed as Roadway Aggregate
(9) Assumes material worn pulverizing (Recycled Aggregate Base) is hauled to Murphy Creek and placed as Roadway Aggregate
(10) Cap all pul-..,rized material (Recyled Aggregate Base) with ACP or Roadway Aggregate. Do not shoulder up with pulverized material.
40105-3000 40601-0000
ANTISTRIP
FOG SEAL
ADDITIVE,
(Note 5)
TYPE 3
TON TON
27.5 10.2
19.0 7.0
16.5 6.1
22.9 8.5
20.7 7.7
27.1 10.0
33.3 12.3
19.6 7.3
26.4 9.8
15.4 5.7
28.6 10.6
8.7 3.2
4.9 1.8
13.0 3.6
8.7 2.4
5.4 1.5
5.4 1.5
2.1 0.6
2.6 0.7
5.9 1.6
4.8 1.8
318.5 113.9
1.6 0.4
3.1 0.9
8.8 2.4
13.5 3.7
4.0 1.5
2.4 0.9
5.5 2.0
3.9 1.5
15.8 5.9
347.8 123.5
'/JS. Add Roadbed Reconditioning Pay Item, Amendment A004
41102-1000 41105-0000
PRIME COAT, BLOTTER
METHOD 1 (Note 6)
SQYD TON
16,276 122.0
11,261 84.0
9,800 73.0
13,565 102.0
12,277 92.0
16,054 120.0
19,741 148.0
11,611 87.0
15,625 117.0
9,110 68.0
16,918 127.0
5,179 39.0
2,883 22.0
5,782 43.0
3,877 29.0
2,383 18.0
2,418 18.0
917 7.0
1,156 9.0
2,633 20.0
2,873 22.0
182,339 1,367.0
698 5.0
1,380 10.0
3,906 29.0
5,984 44.0
2,381 18.0
1,401 11.0
3,256 24.0
2,325 17.0
9,363 70.0
197,686 1,481.0
41201-0000
TACK COAT
(Note 7)
TON
10.2
7.0
6.1
8.5
7.7
10.0
12.3
7.3
9.8
5.7
10.6
3.2
1.8
3.6
2.4
1.5
1.5
0.6
0.7
1.6
1.8
113.9
0.4
0.9
2.4
3.7
1.5
0.9
2.0
1.5
5.9
123.5
Remarks
STATE PROJECT
CA
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
SURFACING
SUMMARY
SHEET
NUMBER
B12
�L __________________________________________________________________________________________________________ ::::::::::::::::::::.... ___ L ______ ,,,,,,,..,.,.,.,.,,..,,.,,....,.,,.,..,.,.,.,.,.,.,......,.,,,.,,.,,,,.,,,.,,.,.,.,,...,.,,,.,.,,,.,..,..,,=,.,,.,J
NPS DWG. NO.: 104/168426 NPS PMIS NO. 174171 & 235881
h h
50'
N
1902+15 Remove & Reset SMH, 1 EA (Outlet)
I 1902+25 to 1909+25
/cement Treated A9f}re-g-ate Caarse, Roadbed Reconditioning, 1,891 SQYD
100'
Tioga Road(i;.
LO
1906+3 18-Inch Pipe Culvert, 38 LF Remove & Reset SMH, 2 EA
Placed Riprap, CL 2, 2.2 CUYD
Scale in Feet
1909+30 18-Inch Pipe Culvert, 14 LF
Remove & Reset Stone Masonry Headwall, 1 EA
·.· 4
N a, ID + "
0 a,..., .-t C'I .-t ti:
1907+15 to 1910+37, RT See Pullout Summary
1910+79 to 1913+79, RT See Pullout Summary
1910+78 to 1913+81, RT Curb, Concrete, 14-Inch Depth
Paved Ditch, Asphalt
STATE
CA
PROJECT
CA FTNP/NPS YOSE
17(4) & 941(1)
1914+89 Repaint Stone
Masonry (Outlet), 15 SQFT
SHEET
NUMBER
C13
Ln .-t C'I .-t
"L---------------------------------------------------------------::-------------------, s!
l i?;
c:, 3;
G c:, h c:, c:, I c:, 0::, c:, c:, L!)
ti:
50' 0 100'
Scale in Feet
1918+38 Remove & Reset SMH, 2 EA Placed Riprap, CL 2, 2.2 CUYD
C) C)
-I-
Tioga Road q;_
"""f
1924+66 to 1927+13, LT Curb, Concrete, 14-Inch Depth
1925+97 Cleaning Culvert In Place, 1 EA
1924+66, LT
R;p,ap Rundown, Type 2
1921+75 to 1924+75 Subexcavation, 533 CUYD
1926+29 to 1927+09, RT Curb, Concrete, 14-Jnch Depth Paved Ditch, Asphalt
1926+07 to 1927+07, RT See Pullout Summary
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
TIOGA ROAD
1900+00 TO 1930+00
(4: Revise Pay Item, Amendment AOO�j
� L _______ f:.�---------------------------�-------------------------------....:;;;-:;:;;;;;;;;:;;;;;;:;;:;:;;;;;;;;:;;;;;;:;;;;;;:;;;;:;:;;;;:;:;;;;:;:;;;_ _____ L.. ____ Nrs'i5wuo.':"'io4Jram""""NirsrMISN1i.'rnmTT:isSEit ~
NPS DWG. NO.: 104/168426 NPS PMIS NO. 174171 & 235881
| CA_YOSE_17(4)&941(1)_Plans._A004-revised.pdf |
| B01 |
| B02 |
| B02A |
| B03 |
| B04 |
| B05 |
| B06 |
| B07 |
| B12 |
| C13-PLN(TTT)13 |
File details come from the government source that posted it. Updated .