This document contains questions and responses pertaining to a federal solicitation for architectural and engineering services. The solicitation seeks proposals to design both a new Remote Transmitter/Receiver tower and an Air Traffic Control Tower and base building at the San Jose International Airport. Key details include that structural engineering for the tower glass system does not need to be identified in proposals but will be required as part of the contract, and that the relevant experience timeframe for key personnel is four projects in the last ten years. The proposal due date was extended to January 29, 2024 to allow proposers time to incorporate amendments. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
697DCK-24-R-00024 Amendment 0002.pdf PDF
Attachment J-1l Phase II ESA SJC Airport.pdf PDF
Attachment J-1n Whole Building Commissioning Requirements.pdf PDF
Attachment J-1e SJC RTR Existing Plans.pdf PDF
Attachment J-1b FAA BIM Guide V5 Final.pdf PDF
Attachment J-1d Terminal Facilities Standard Design 11000 SF.pdf PDF
Attachment J-1p - Executive Order 14057 of December 8 2021.pdf PDF
Attachment J-1a TFDS_V2.1.pdf PDF
Attachment J-1g Requirments Document (RD) Workbook Excerpts.pdf PDF
Attachment J-1h - GSO Division 1 Specifications.pdf PDF
Attachment J-1f 211129 SJC AFTIL 2 No Hazards Initial Draft Ver.01 (Siting Report).pdf PDF
Attachment J-1o Palm Springs ATCT PPD Sample.pdf PDF
Attachment J-1j - GSA PBS P100 2022.pdf PDF
Attachment J-1k - Draft Generic RTR Design Reference Guide.pdf PDF
Attachment J-1q - SJC_AOA Fence Standard Drawings.pdf PDF
Attachment J-1c GSO ATCT Plans.pdf PDF
Attachment J-1i - EO 14057 Implementing Instructions.pdf PDF
Attachment J-1m- CPDS Standard Design Type Radial Electrical One-Line Diagram 3-7-2023.pdf PDF
Attachment J-1 Scope of Work ATCT Base Building RTR_Amend 0001.pdf PDF
Attachment J-2 KEY PERSONNEL EXPERIENCE_Amend 0001.pdf PDF
697DCK-24-R-00024 Amendment 0001.pdf PDF
SIR_697DCK-24-R-00024.pdf PDF
QUESTIONS and Responses_Dec 28 2023.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
Attachment J-2 KEY PERSONNEL EXPERIENCE.pdf PDF
Attachment J-3 Price Proposal.xlsx XLSX spreadsheet
Attachment J-1 Scope of Work ATCT Base Building RTR.pdf PDF
SIR_697DCK-24-R-00024.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & RESPONSES

697DCK-24-R-00024

January 9, 2024

1. Question: In Reference to Attachment J-1, Scope of Work ATCT Base Building RTR, PDF page 10 of 54, Section 1.4 Design Team, we require more clarity to the response to the previous question #4 as it pertains to facade and glazing engineering. Please clarify whether we are to provide a licensed structural engineer to perform the facade and glazing engineering with our submission, as it has been our experience that this is typically provided by the general contractor because it allows the greatest flexibility during the bidding phase.

Response: Structural engineer for this project must be identified per the evaluation criteria document. A specific structural engineer for the cab glazing system does not need to be identified with this solicitation, but design of the cab glass system is required as part of this contract and specific glazing/façade experience is required at that point per the scope of work.

2. Question: Referencing the SIR_697DCK-24-R-00024 solicitation document, please provide additional clarification on the anticipated role of the designer of record in question #8. Is it the intent for the designer of record to be a SME in the design of ATCTs? What is the difference between the Architect of Record / Engineers of Record and the Designer of Record? Having this clarity better helps the contractor understand the requirement which could result in a better value to the customer.

Response: No designer of record required. See updated SOW and Evaluation documents

3. Question: On Attachment J-2, Key Personnel Experience, the bold text notes, “List a minimum of one (1), but no more than three (4) projects similar to the Statement of Work, in the last five (10) years from the date of the solicitation for each of the key personnel proposed in response to the solicitation.” As this direction in the solicitation is not clear, and to ensure we are meeting the requirements in time for a compliant submission, we request that the customer confirm that the number of projects range is one (1), but no more than (4) four and the timeframe is the last ten

(10) years, which aligns with the Factor 1 – Past Performance timeframe.

Response: Corrections have been made to read four (4) and ten (10) years. Please see the revisions to Amendment 0001.

4. Question: In order to (1) incorporate previous Q&A , (2) incorporate any new Q&A, (3) allow PPQ respondents appropriate time to respond (4) submit compliantly, and ensure we best meet the customers requirements, we respectfully request an extension to 1/29/2024.

Response: The proposal due date has been revised to 1/29/2024 in Amendment 0001.