Attachment J-2 KEY PERSONNEL EXPERIENCE.pdf

PDF 73 KB Posted

Attached to
San Jose (SJC) Remote Transmitter/Receiver tower (RTR) and the Air Traffic Control Tower (ATCT) and Base Building
Solicitation number
697DCK-24-R-00024
Issued by

About this file

This document contains an attachment requesting experience information for key personnel proposed to work on a federal contract solicitation. The solicitation is number 697DCK-24-R-00024 from the Department of Transportation Federal Aviation Administration Southwestern Region to provide services for the San Jose (SJC) Remote Transmitter/Receiver tower (RTR) and the Air Traffic Control Tower (ATCT) and Base Building. The attachment requests a minimum of one and maximum of three similar projects completed in the last ten years by each key personnel, including names and contact information for references that can be verified. Relevant details on work performed, contract costs, and completion dates should be provided.

View the file

Other files

File Type Posted
697DCK-24-R-00024 Amendment 0002.pdf PDF
Attachment J-1l Phase II ESA SJC Airport.pdf PDF
Attachment J-1n Whole Building Commissioning Requirements.pdf PDF
Attachment J-1e SJC RTR Existing Plans.pdf PDF
Attachment J-1b FAA BIM Guide V5 Final.pdf PDF
Attachment J-1d Terminal Facilities Standard Design 11000 SF.pdf PDF
Attachment J-1p - Executive Order 14057 of December 8 2021.pdf PDF
Attachment J-1a TFDS_V2.1.pdf PDF
Attachment J-1g Requirments Document (RD) Workbook Excerpts.pdf PDF
Attachment J-1h - GSO Division 1 Specifications.pdf PDF
Attachment J-1f 211129 SJC AFTIL 2 No Hazards Initial Draft Ver.01 (Siting Report).pdf PDF
Attachment J-1o Palm Springs ATCT PPD Sample.pdf PDF
Attachment J-1j - GSA PBS P100 2022.pdf PDF
Attachment J-1k - Draft Generic RTR Design Reference Guide.pdf PDF
Attachment J-1q - SJC_AOA Fence Standard Drawings.pdf PDF
Attachment J-1c GSO ATCT Plans.pdf PDF
Attachment J-1i - EO 14057 Implementing Instructions.pdf PDF
Attachment J-1m- CPDS Standard Design Type Radial Electrical One-Line Diagram 3-7-2023.pdf PDF
Attachment J-1 Scope of Work ATCT Base Building RTR_Amend 0001.pdf PDF
Attachment J-2 KEY PERSONNEL EXPERIENCE_Amend 0001.pdf PDF
697DCK-24-R-00024 Amendment 0001.pdf PDF
QUESTIONS and Responses_Jan 9 2024.pdf PDF
SIR_697DCK-24-R-00024.pdf PDF
QUESTIONS and Responses_Dec 28 2023.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
Attachment J-3 Price Proposal.xlsx XLSX spreadsheet
Attachment J-1 Scope of Work ATCT Base Building RTR.pdf PDF
SIR_697DCK-24-R-00024.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-2 KEY PERSONNEL EXPERIENCE

List a minimum of one (1), but no more than three (4) projects similar to the Statement of Work, in the last five (10) years from the date of the solicitation for each of the key personnel proposed in response to the solicitation. If the work was performed at a different firm other than your current employer, please indicate below.

Names and references must be current and verifiable. (Copy for additional sheets)

Key Personnel Name: _______________________________________________

Project Ref. Number (1, 2, or 3): ______________________________________

Project Name/Location:

POC Name and Telephone Number:

Description of Work Performed:

Contract Cost:

Completion Date:

Firm (if applicable): _________________________________________________

ATTACHMENT J-2 KEY PERSONNEL EXPERIENCE

File details come from the government source that posted it. Updated .