This document is a requirements document outlining the need to replace the San Jose Air Traffic Control Tower and associated facilities. Key details include:
-
The project involves replacing the existing 6,120 square foot ATCT facility and 4,370 square foot base building located at Norman Y. Mineta San Jose International Airport due to line of sight deficiencies and facility condition issues. The new ATCT cab will be 550 square feet with 12 sides supported by mullions. The replacement base building will be based on the 11,000 square foot TRACON standard design.
-
Functional requirements include maintaining the current seven operational positions and 12 technical operations staff. Special considerations include seismic design requirements, communication diversity, and meeting high performance sustainable standards. The project cost is estimated at $M redacted and includes design, construction, equipment, and disposition.
-
The solicitation number 697DCK-24-R-00024 issued by the Federal Aviation Administration seeks an A/E firm to design the replacement Remote Transmitter/Receiver Tower and ATCT/Base Building. Proposals are due by January 22, 2024. The document provides relevant details for responding to the solicitation.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Norman Y. Mineta San Jose International Airport (SJC)
San Jose, California
Airport Traffic Control Tower (ATCT)
REQUIREMENTS DOCUMENT
Prepared By:
Air Traffic Organization
Technical Operations
Facilities & Engineering Services (AJW-2)
Terminal Facilities Planning (AJW-2444)
October 2022
Federal Aviation Administration
800 Independence Avenue SW
Washington, D.C. 20591
Norman Y. Mineta San Jose International Airport (SJC), CA, ATCT, Requirements Document October 2022
Federal Aviation Administration – Air Traffic Organization
For Internal Use Only – Not for Distribution
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
Background:
This document defines the facility requirements for the Norman Y. Mineta San Jose International Airport (SJC), CA, ATCT replacement project. These requirements are the baseline for subsequent design and implementation and as such, these requirements will not be changed without prior approval. The cost and schedule will be updated as the design is completed. This document indicates that Terminal Facilities Planning has deemed the program ready for execution responsibilities. Terminal Facilities Execution agrees to accept the program and begin implementation.
Recommendation: Approve Requirements Document for Alternative 3 (Replace the existing SJC ATCT)
Submitted By: ______________________________________________________________________________
Manager, Terminal Facilities Planning (AJW-2444) Date
Signed by Date Decision
Approved
Disapproved
Group Manager, Facilities and Security Services Group (AJW-24)
Approved
Disapproved
Group Manager, Planning and Requirements Group, Western Service Center (AJV-W3)
Approved
Disapproved
Director, Technical Operations, Western Service Area (AJW-W)
Approved
Disapproved
Director, Air Traffic Operations, Western Service Area (AJT-W)
Approved
Disapproved
Director, Financial Services (AJG-R)
Approved
Disapproved
Director, Air Traffic Operations, Headquarters (AJT-2)
Approved
Disapproved
Vice President, Air Traffic Services (AJT-0)
Approved
Disapproved
Director, Facilities & Engineering Services (AJW-2)
Approved
Disapproved
Vice President, Technical Operations (AJW-0)
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
1.0 Executive Summary
The SJC ATCT is located across the airfield from the airport terminal buildings. The ATCT is a Tier 2, ATC
Level 7 facility that operates 18 hours per day, 7 days a week. The SJC ATCT Cab is approximately 525 square feet with a Cab eye level of 83 feet above ground level (AGL).
Figure 1. SJC ATCT and Base Building
The 6,120-square-foot ATCT is a site adaptation of the Leo Daly/HNTB standard design, with a 560-square-foot Cab and a slightly larger shaft. The SJC ATCT is slightly modified from the Low Activity
Level (LAL) standard upon which it is based. The ATCT has eight levels plus the Cab. The 4,370-square-foot base building is a single-story standard design intermediate-level base building without a TRACON, and was constructed at the same time as the ATCT. A 320-sq. ft., stand-alone, prefabricated wood storage trailer is located at the east corner of the site along with two additional smaller storage buildings (144 sq.
ft. and 60 sq. ft.).
The 2017 Quick Look evaluation found several Line-of-Sight (LOS) issues from the Cab as well as interior issues of the volume of equipment adding congestion to the Cab. Due to the significant number of LOS deficiencies, the project was recommended to enter into the Terminal Facilities Planning (TFP)
Investment Analysis Process (IAP).
Condition Assessment (CA) items being addressed pertain to life safety or non-compliance with
Americans with Disabilities Act (ADA) and Architectural Barriers Act (ABA) accessibility guidelines, as well as deferred maintenance and architectural, mechanical, and electrical deficiencies.
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
A summary of the major deficiencies identified in the 2015 Condition Assessment are listed below:
The ATCT’s exterior door at the Ground Level sticks and is a keyed door rather than a door controlled by a card reader.
There are loose handrails along the height of the ATCT Stair. Some stair treads are cracked and these can create a tripping hazard.
Jet fumes can be smelled in the Cab on occasion.
The roofing membrane appears to be worn, has some cracking at the membrane joints and appears to be original to the buildings (20 years), beyond its life expectancy.
Many of the raised access flooring floor tiles are delaminating. Many of the floor tiles have had screws installed to reattach the laminate finish to the floor tiles.
The asphalt parking lot also needs to be resurfaced.
The metal guardrails at the Catwalk are in poor condition and in need of painting. There is occasionally some insect infestation (wasps) on the Catwalk.
Air Traffic has sufficient storage at the facility, but the SSC (Tech Ops) does not have enough storage. Additionally, Tech Ops indicated the base building’s Equipment Room is running out of space. There is no room for new equipment racks without moving or eliminating work areas at the perimeter of the room.
The masonry control joint sealant at the Base Building is cracked, dried out and separating from the adjacent surfaces. The sealant is beyond its life expectancy.
A Surge Protective Device (SPD) is missing for many panel boards serving exterior and/or NAS equipment. For those panel boards that do have an SPD, the conduits feeding the SPD are not properly sealed to prevent soot from entering the panel board enclosure.
2.0 Operational and Functional Requirements
Facility Specifications for SJC ATCT
Facility Type: ATCT
Current Facility Status: (owned or leased) Owned
Planned Collocations/Consolidations: None
Attached functions: None
ATC Level: Level 7
Hours of operation: Ops Hours 0600-2359LCL
Current positions: 6
Airspace/Procedure Changes: None
*FY Operations for 2020: 140,923
Current FY +20 years Operations (2040): 323,097
Automation: STARS
Siting: AFTIL
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
Method of Implementation: FAA Construction
Airspace/Procedure Changes (Planning) None
Overlying ARTCC: Oakland Center (ZOA)
Controlling TRACON: Northern California TRACON (NCT)
* Last complete full year count http://aspm.faa.gov/main/taf.asp
2.1 Airspace Changes
No changes are anticipated that would be associated with the SJC replacement project.
2.2 Facility Siting Requirements
The AFTIL 2, October 20, 2021 siting Memo of Record identified Site 4 as the recommended site depicted in Figure 2. A Safety Management System (SMS) Comparative Safety Analysis (CSA) panel was conducted at the AFTIL to identify, analyze, review, and mitigate hazards associated with siting the new SJC ATCT. The February 3, 2022 CSA identified no hazards.
http://aspm.faa.gov/main/taf.asp
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
Figure 2. SJC Viable Site 4 Location
2.3 AJT Operational Positions
OPERATIONAL POSITIONS Existing Future
San Jose, Santa Clara, CA ATCT (SJC), Type 7, Ops Hours 0600-2400LCL, Technical Requirements Analysis Team, AJG-P24, 8/24/2021
Current
Facility Replace ATCT
Existing
Operational
Positions
Estimated
Operational
Positions SJC
ATCT
Tower Control Positions
LOCAL CONTROL 1 1 1
GROUND CONTROL 1 1
GROUND CONTROL WEST (new 1/1/2016) 1 1
Total Control Positions 3 3
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
Tower Support Positions
CLEARANCE DELIVERY 1 1
FLIGHT DATA 1 1
LOCAL ASSIST 1 1
OPERATIONAL SUPERVIOSR/CONTROLLER-IN-
CHARGE
Total Support Positions 4 4
Total Facility Positions 7 7
2.4 AJT Staffing
Terminal Staffing Current Future
San Jose, Santa Clara, CA ATCT (SJC), Type 7, Ops Hours 0600-2400LCL, Technical Requirements Analysis Team, AJG-P24, 8/24/2021
Current
Facility Replace Facility
Existing FY19
ATCT Staffing
Target -
Authorization
Estimated ATCT
Staffing Target -
Authorization
AIR TRAFFIC PERSONNEL
Air Traffic Manager 1 1
Staff Manager
Support Manager
Operations Manager
Operational Supervisor 3 3
Support Specialist
Air Traffic Control Specialist 15 15
ATCS Staffing Range (Min/Max) 14/17 14/17
Administrative Officer
Personnel Specialist
Technical Support 1 1
Administrative Support 1 1
Traffic Management Officer
Supervisory Traffic Management Coordinator
Traffic Management Coordinator
Traffic Management Analyst
Traffic Management Specialist
Total Air Traffic Personnel 21 21
CONTRACT PERSONNEL
Contract Weather Observers
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
US Customs Staff
Contractor Training manager
Contractors for Training
Contractor Administrative
Total Contract Personnel 0 0
Total Facility Personnel 21 21
2.5 AJR Staffing
Currently there is no Traffic Management staff at SJC.
2.6 AJW Staffing
Currently, the SJC SSC Technical Operations staff are located in an off airport location. The SSC
Technical Operations staff will be moved to the new ATCT base building location.
TECHNICAL OPERATIONS PERSONNEL STAFFING
SJC ATCT Staffing Final
Verified
Verified by CSA Administrative
Services Group, AJV-C51, 03/25/2021 Current Staff
Hours of Ops =
Monday - Friday
6:00AM-4:30PM
New Proposed Hrs.
of Ops Hours of Ops
= Monday - Friday
6:00AM-4:30PM
Max
Shift
Count
Staffing
FUNCTION
District Manager 0 0 0 0
Technical Operations Manager* 0 0 0 0
Facility Manager 0 0 0 0
SSC Manager** 1 1 1 1
SSC Coordinator** 1 1 1 1
Support Specialist 0 0 0 0
Air Traffic System Specialist (ATSS) 9 9 9 9
General Maintenance Mechanic (GMM) 0 0 0 0
Engineering Technician 0 0 0 0
Electronics Technician 0 0 0 0
Management & Program Assistant 1 1 1 1
Administrative Support Personnel 0 0 0 0
Security Guards 0 0 0 0
Tech Ops Total 12 12 12 12
*Formerly the GNAS Manager
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
**SSC is System Support Center
2.7 System Functional Requirements
For a complete listing of all facility equipment functionality, refer to the equipment list tab of the SJC
Requirements Document Workbook (RDWB). There is no difference in equipment functionality between the existing facility and the new facility.
2.8 Facility Requirements
2.8.1 Space Allocation
ROOM FUNCTION
Allow. Space per Staff
Final
Validated
Allowable
Space
Max Shift
Count
New
Staffing
TERMINAL PERSONNEL
Air Traffic Manager 150 1 0 150
Operations Manager 150 3 0 450
Automation Specialist 96 1 96
Admin Assistant 64 1 0 64
Air Traffic Workspace 100 1 100
Subtotal 860
TECHNICAL OPERATIONS PERSONNEL
Tech Ops SSC Manager 150 1 0 150
SSC Coordinator 150 1 150
On Site ATSS 32 9 0 288
Admin Assistant 64 1 0 64
Subtotal 652
OTHER PERSONNEL ADMIN. SPACE
CBI Training Room 200 1 200
Subtotal 200
AIR TRAFFIC SPACES
Debriefing Room 100 1 0 100
Drug Testing Room 70 1 0 70
Quiet Room 100 1 0 100
Tape Play-Back 80 1 0 80
Subtotal 350
TECHNICAL OPERATIONS REQUIREMENTS
Electronics Equipment Rooms 1,154 1 0 1,154
TELCO 100 1 0 100
LAN Room 100 1 100
Subtotal 1,354
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
2.8.2 Special Considerations
2.8.2.1 Special Design Considerations
ENVIRONMENTAL SUPPORT - MECH/ELEC SPACE
Battery Room 250 1 250
Battery Storage 140 1 1 140
Electrical Switchgear Room 450 1 450
Engine Generator Equipment Room 150 1 150
Electrical Room - Administrative Space 170 1 170
NAS Electronic Workshop 275 1 275
Environmental Shop 400 1 400
Fire Control Room 150 1 150
Fire Pump Room 200 1 200
Fire Life Safety Electrical Room 200 1 200
HAZMAT Storage Room 150 1 150
Mechanical Equipment Room 1,444 1 1,444
PPE Storage - Technician 4 12 45
PPE Storage Group 100 1 100
Supply / Parts Storage 400 1 400
Secure Storage Area 300 1 300
Security Equipment Room 50 1 50
Shipping / Receiving 100 1 100
UPS Room 150 1 150
Subtotal 5,124
JOINT USE & MISC. SUPPORT AREAS
Wellness Room 225 1 225
Mail Room / File Copier 100 1 100
Project Office / RE space 100 1 100
Lactation Room (with sink) 100 1 100
Smoking Room 100 1 100
Large Conference Room 300 1 300
Small Conference Room 150 1 150
Janitor Closet 30 1 30
Locker Room - See Note 4 150 1 150
Administrative Storage 200 1 200
NAS Documentation Area / Tech Library 200 1 200
Break Room / Seating Area 15 30 450
Loading Dock / Shipping / Receiving 500 1 500
Subtotal 2,605
15% Planning Factor (restrooms / corridors, etc.) 1,672
TOTAL ATCT/ BASE BUILDING SPACE 12,817
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
The Terminal Facilities Design Standard (TFDS) establishes design standardization where possible/practical to facilities and facility systems for new buildings and modernizations within FAA
Terminal Facilities. The TFDS is a mandatory document containing policy and technical criteria to be used in the programming, design, construction, measurement and verification, and documentation of
FAA ATCT Facilities.
Elevators are required in all ATCT facilities and in all base buildings with two or more stories high. Dual elevators are required in all ATCT facilities where the cab floor height is greater than 120 feet above the lowest level, allowing fire department vehicle access.
The latest version of the Terminal Facilities Design Standard (TFDS) must be followed for the design of this project. Please contact Zane Edwards or Ryan Cummings of Design Engineering and
Innovation (DEI), prior to the commencement of design for the most recent TFDS and Standard Design
Drawings.
Email: Zane.Edwards@FAA.GOV. Cell Phone: 202-374-5570
Email: Ryan.Cummings@FAA.GOV. Cell Phone: 617-968-5583
2.8.2.2 Vertical Conveyance
Dual machine room fire service access elevators (FSAE) must be provided in the ATCT shaft. Follow the alternative approach for code compliance of FSAE, dated February 2021.
2.8.2.3 Whole Building Commissioning
A third party commissioning authority will be retained to perform enhanced whole building commissioning. This effort starts prior to the commencement of design.
2.8.2.4 Special Performance-Based Seismic Design
This project will include a performance based seismic design and a peer review of the seismic design conducted by a separate contractor funded by the FAA under a separate contract. For estimating purposes, both the performance-based seismic design and the peer review are captured.
2.8.2.5 Special Siting Considerations
The AFTIL 2, October 20, 2021 siting Memo of Record identified Site 4 as the recommended site. The
February 3, 2022 CSA identified no hazards.
AFTIL – SJC Site 4
Cab Floor Elevation-153 ft. AGL
Cab Eye Level – 155 ft. AGL
LAT – 37°21′34.23″N
LONG – 121 55 58.85″W
The Tower Cab will be 12-sided and 550 sq. ft. with 12 sides supported by mullions. Total size of site is 3.71 acres comprised of the four segments of initial proposal and secondary proposals. The four combined segmented site was agreed to and signed by airport authority via Letter of Concurrence on
06/02/2022
See image below for Site Latitude and Longitude coordinates:
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
2.8.2.6 Special Space Considerations
The base building will be based upon the 11,000 sq. ft. TRACON Standard Design. Modify the room sizes per the RDWB space tab. Regarding ATCT space allocation, the design engineer should contact
Design Engineering and Innovation, AJW-244 (DEI), for the most recent standards.
2.8.2.7 Special Parking
Provide the following parking spaces:
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
35 Employee and Visitors
10 GOVs
3 Accessible
2.8.2.8 Special Electric Vehicle Considerations
The FAA Fleet Management Program at this time has no plans to provide electric powered vehicles to
SJC. However, during the early design phase the need for charging stations for government vehicles will be addressed as part of the 10 percent design submission. Please contact the FAA Fleet Program Manager prior to the 10 percent design submission to verify that this has not changed. The FAA EV Fleet Manager
POC is Tim Morris (tim.morris@faa.gov). Conduit infrastructure for charging stations from building electrical system to planned parking lot station location will be provided as part of the base design.
2.8.2.9 Special Power System Considerations
Power requirements for this project are a Radial with E/G and UPS. The space allocation tab provides an estimate of the amount of electrical equipment space required. The actual room sizes are to be determined once the power system is sized.
The design engineer must utilize the new Electrical System Load Calculator. The tool can be found on the Terminal Facilities Standard design KSN site at the following link:
https://ksn2.faa.gov/ajt/programops/facilities/dei/standard_designs/Key%20FAA%20Standards%20and %20Orders/Forms/AllItems.aspx
The Engine Generator will be installed outdoors consistent with the April 2017 memorandum from the
Acquisition and Integration Team, Power Services Group, AJW-222, Subject: Outdoor Engine Generator
Policy.
2.8.2.10 Special Fire Life Safety Bus Considerations
Design shall comply with requirements of National Electrical Code (NEC), Life Safety Code (LSC), and
International Building Code (IBC). These requirements are shown as outlined in the July 2021 Fire Life
Safety (FLS)/ Electrical Workgroup Final Submission Report. It is the responsibility of the designer to adapt these requirements into the design of the facility and provide a functional code-compliant design.
In the event that load shedding is necessary, the designer is responsible to design a code-compliant design utilizing the general principles shown in the electrical drawings.
2.8.2.11 Special Security Considerations
Standard security requirements apply for a Security Level 2 (SL2) facility in accordance with FAA
Order 1600.69C, FAA Facility Security Management Program. The final security level determination and associated requirements will need to be coordinated with the Service Area SSE.
2.8.2.12 Special Communications Considerations
The RTR will need to be relocated.
2.8.2.13 Special Communication Diversity
mailto:tim.morris@faa.gov https://ksn2.faa.gov/ajt/programops/facilities/dei/standard_designs/Key%20FAA%20Standards%20and%20Orders/Forms/AllItems.aspx https://ksn2.faa.gov/ajt/programops/facilities/dei/standard_designs/Key%20FAA%20Standards%20and%20Orders/Forms/AllItems.aspx
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
In accordance with the FAA memo dated December 17, 2009, “Communication Diversity for Critical
ATO-T Systems” at Section C, all new TRACON installations shall comply with Order 6000.36A, Communications Diversity.
2.8.2.14 Special Fiber Loop Considerations
The current fiber optic transmission system (FOTS) will be incorporated into the new facility.
2.8.2.15 Special Slat Wall Considerations
Slat wall consoles will be utilized in the Cab. Slat wall consoles must be provided by an ATC Facilities
Design Engineering and Innovation-vetted vendor.
2.8.2.16 Special Contract Weather Observer Considerations
The Contract Weather Observer (CWO) space must be designed to the following requirements:
Window access to enable visibility of weather conditions, with visibility of runway complex.
Walking time to and from points of observation must not exceed 10 minutes.
Observer must be able to view primary instrument runway, including final approach area.
Observer must have an unobstructed view of at least one half of each quadrant (East, West, North, South) of the natural horizon.
If the horizon is obstructed, the Observer will move to as many locations as necessary.
Natural obstructions such as trees and hills are not obstructions to the horizon; they define the horizon.
The point of observation may be from a ramp or rooftop. It must be safe, easily accessible, and meet OSHA standards.
ASOS and ATIS information need to be readily available to CWO staff.
Building Telco and LAN access are required.
2.8.2.17 Special Smoking Considerations
A smoking room will be included as part of the design for this building. The room may be removed by official mutual agreement between management and both NATCA and PASS labor unions.
2.8.2.18 Special Lactation Room Considerations
One lactation room shall be included in the design. The room shall adhere to the AIA Best Practices for lactation rooms and include the following at a minimum:
100 sq. ft. in size
User-operated lockable door
A chair
A minimum work surface of 18” by 32”
A sink and mini refrigerator
2.8.2.19 Special Secure Fence Area Considerations
The Air Traffic Organization Technical Space Guidelines requires a minimum of 1500 sq. ft. of secured fence area for “materials, equipment, vehicles, storage, and/ or staging etc.” The guidelines do not require environmental/element protection.
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
2.8.2.20 Special High Performance Sustainable Requirement Considerations
All new ATO design projects are required to meet the High Performance and Sustainable Building
(HPSB) Guiding Principles, in accordance with the 2012 A&E Project Manual and the Federal
Leadership in High Performance and Sustainable Buildings Memorandum of Understanding (January
2006).
Deliverable requirements shall include a Sustainability Report prepared by the A&E to document their strategy to meet or exceed minimum sustainability requirements on the project as outlined in Appendix
F of the 2012 A&E Project Manual. The Sustainability Report must be submitted along with the architectural submittal during every formal submission and updated as frequently as needed. The
Sustainability Report shall describe the incremental costs with payback analysis anticipated to meet various HPSB guidelines. The report must also include documentation, including tables and checklists, to demonstrate compliance with the sustainability requirements. In the event the project lead anticipates failure to meet specific sustainability requirements, the Sustainability Report shall include justification for why each requirement cannot be met. If the requirement can be met partially, the report must quantify the extent to which the project meets the requirement. Contact Mr. Gabriel Velicu, Terminal Facilities
Design Engineering and Innovation Sustainability Lead, with any questions.
Email: Gabriel.Velicu@faa.gov.
Office Phone: 202-267-8722.
2.8.2.21 Special Disposition Considerations
The project includes the disposition of FAA equipment and the demolition of the existing facility.
2.8.2.22 Special Fuel Piping Considerations
The memorandum titled, “ATO Fuel Storage Tank, Piping Identification,” dated October 3, 2019, requires all visible/exposed piping carrying flammable or combustible fluid to be painted yellow and marked in accordance with ANSI/ASME A13-1.
2.8.2.23 Special Funding Considerations
SJC funding profile as of September 2022 includes $M Redacted, anticipated as follows:
$M funds for Design
$M funds for Construction
$M funds Electronics Equipment
$M funds for Disposition
This funding profile is subject to change. Any change to the funding profile above or the Program
Operations Execution hand-off date identified on the schedule tab will require the project schedule to be updated.
2.8.2.24 ATCT Cab Mullion and Orientation Considerations
Cab Mullions: A 550 sq. ft. cab with twelve mullions was approved within the February 3, 2022 CSA.
Per the CSA, the cab orientation is defined as follows:
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
2.8.2.25 Special Integrated Logistics Support Plan (ILSP) Considerations
An Integrated Logistic Support Plan (ILSP) is required to provide a disciplined, unified, and iterative approach to the management and support of NAS operational requirements through the maintenance planning, supply support, support equipment, technical data, direct work maintenance staffing, maintenance support facilities, computer resources support, training, and packaging handling storage and transportation, where applicable.
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
3.0 Program Requirements
3.1 Project Cost
Costs are represented in millions of dollars.
Redacted
3.2 Integrated Program Schedule
The following table (next page) represents notional dates and activity durations associated with prior
FAA projects of similar size and complexity.
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
3.3 Risk Management
Terminal Facilities Execution shall implement a risk management program that includes risk identification, risk classification (severity of consequences and likelihood of occurrence), measures to
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
mitigate or reduce risk to an acceptable level, verification that mitigation measures are incorporated and implemented, and assessment of residual risk during the execution of this project.
4.0 Implementation Planning
Terminal Facilities Execution shall develop and document a plan(s) for achieving the technical, cost, and schedule requirements specified in this document. The plan(s) shall address the following elements:
a) Management Team
Roles and responsibilities of key individuals and organizations that will implement this program shall be documented. Identify all relevant functions and disciplines.
b) Program Control
Program schedule and cost performance will be managed, measured, evaluated, and reported for all resources supporting the program and shall be documented. Additionally, an explanation of how program activity will be coordinated and reported (e.g., monthly status reviews, quarterly regional reviews, annual service area reviews) shall be documented.
c) Implementation Strategy
The strategy for bringing the transfer of function/consolidation or collocation into operational use for the new facility shall be documented. This typically involves deployment planning; personnel transition, training, and relocation; implementation contract(s) award and administration; site engineering, environmental assessment, lease/procurement, and physical integration; facility design and construction; systems and equipment acquisition/refurbishment and delivery; installation and checkout; system shakedown; dual operations; joint acceptance and inspection; commissioning; the removal and disposal of replaced systems, equipment, land and facilities; and In Service
Management.
The training strategy for obtaining the processes, procedures, course materials, and skills necessary to train personnel shall be defined. Also, an explanation of how service will be maintained during transition from the current capability to the new capability shall be documented. An integrated program schedule of activities to achieve the above Implementation Strategy shall be developed, showing major program milestones and critical interrelationships between work activities.
As part of the requirements development process, Terminal Facilities Planning, in conjunction with the AJV-W, Western Service Center, has developed a preliminary Transition Management Plan and schedule that addresses many of the implementation planning elements above. The draft plan and schedule are identified as references to this document; the final plan shall be completed for presentation at Decision Point 4. The schedule is also incorporated into the RD as Section 3.2, Integrated Program Schedule.
5.0 References
Approved Alternatives Analysis and Business Case
Safety Risk Management Document
SJC Requirements Document Work Book
Procurement Sensitive
DRAFT DELIBERATIVE DOCUMENT FOR DISCUSSION PURPOSES ONLY
Public availability to be determined under 5 USC 552.
Comparative Safety Analysis
6.0 Attachments
SJC Requirements Document Work Book