Attachment J-1f 211129 SJC AFTIL 2 No Hazards Initial Draft Ver.01 (Siting Report).pdf
PDF 2 MB Posted
- Solicitation number
- 697DCK-24-R-00024
About this file
This solicitation is seeking proposals from architectural and engineering firms to design and prepare bid documents for a new Remote Transmitter/Receiver tower and Air Traffic Control Tower including base building at Norman Y. Mineta San Jose International Airport. The Federal Aviation Administration requires these services to replace aging facilities. Proposals are due by January 22, 2024 at 3:00 PM Pacific Time and should be submitted electronically to the Contracting Officer. The solicitation includes attachments with additional details for offerors to review prior to submitting proposals. Questions are due by December 15, 2023 and must be submitted in writing to the Contracting Officer.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Norman Y. Mineta San Jose International Airport (SJC) Replacement Airport Traffic Control Tower AFTIL-2 – No Hazards
Comparative Safety Analysis
Version .01
November 29, 2021
Norman Y. Mineta San Jose International Airport (SJC) Replacement Airport Traffic Control Tower AFTIL-2 – No Hazards
SRM Document Change Page
Date Change Summary Version Number
11/29/2021 Initial Draft .01
Contents
EXECUTIVE SUMMARY
SRM DOCUMENT SIGNATURES
SECTION 1. CURRENT SYSTEM
SECTION 2. DESCRIPTION OF CHANGE
SECTION 3. RATIONALE FOR A SAFETY FINDING WITHOUT HAZARDS
SECTION 4. DISSENTION
SECTION 5. SJC AFTIL-2 SRM PANEL ATTENDEES
ABBREVIATIONS
Tables
Table 1.1: 5M Model
Table 3.1: Preliminary Hazard List: SJC Site 1 AFTIL-2 (No Hazard)
Table 3.2: Preliminary Hazard List: SJC Site 4 AFTIL-2 (No Hazard)
Figures
Figure 1. SJC existing ATCT Tower Visibility Analysis Key Point RWY 30L
Figure 2. SJC existing ATCT Tower Visibility Analysis Key Point RWY 30R
Figure 3. Tower Visibility Analysis Diagram
Figure 4. SJC overhead with Preferred Sites
Figure 5. SJC close up overhead with Preferred Sites
Figure 6. SJC Future Airport Layout Plan Update (October 2018)
Figure 7. SJC Airport Diagram (November 2021)
Figure 8. SJC ATCT Site 1 Cab Orientation
Figure 9. SJC Site 1 view of Approach Ends RWYs 30R/30L
Figure 10. SJC ATCT Site 1 view of Approach Ends RWYs 12L/12R
Figure 11. SJC existing ATCT view of Site1
Figure 12. SJC Site 1 view of existing ATCT
Figure 13. SJC Site 1 Tower Height Chart
Figure 14. SJC Site 1 Tower Visibility Analysis
Figure 15. SJC Site 1 Tower Visibility Analysis Diagram
Figure 16. SJC ATCT Site 4 Cab Orientation
Figure 17. SJC Site 4 view of Approach Ends RWYs 30R/30L
Figure 18. SJC Site 4 view of Approach Ends RWYs 12L/12R
Figure 19. SJC view of Site 4 from existing ATCT
Figure 20. SJC Site 4 view of existing ATCT
Figure 21. SJC Site 4 Tower Height Chart
Figure 22. SJC Site 4 Tower Visibility Analysis
Figure 23. SJC Site 4 Tower Visibility Analysis Diagram
EXECUTIVE SUMMARY
Title: Norman Y. Mineta San Jose International (SJC) Airport Replacement Airport Traffic Control Tower AFTIL-2 – No Hazards
Initiating Organization: SJC/AJW-244
Safety Analysis Type: Operations (OPS)
Norman Y. Mineta San Jose International Airport (SJC) is located in Silicon Valley, about two miles northwest of San Jose, CA. San Jose International Airport is a self-supporting enterprise owned and operated by the city of San Jose. SJC has two parallel runways, 12L/30R and 12R/30L (11000 x 150 ft.). The SJC ATCT is a Level 7, Non- Standard type design, Federal Aviation Administration (FAA) owned, operated, and maintained Tower with Radar facility commissioned in 1994. The ATCT cab area is approximately 365 sq. ft. and the facility operates from 0600Z -2400Z local. SJC proposes to assess two viable sites and determine physical characteristics for a potential replacement ATCT.
An Airway Facilities Tower Integration Laboratory (AFTIL) 1 meeting was held July 9 and 10, 2019 in Atlantic City, NJ. Meeting attendees participated in siting activities for the proposed replacement SJC ATCT and conducted an SRM Panel to generate a Comparative Safety Assessment (CSA) of two viable ATCT sites (Site 1, Site 4).
An AFTIL-2 meeting was held, October 19 and October 20, 2021, to assess the two viable sites, Site 1 and Site 4, to determine physical characteristics for a potential replacement SJC ATCT. Panel member representatives from the FAA SJC ATCT and AFTIL personnel attended the meeting on-site at the William J Hughes Technical Center (WJHTC) Building 170 lab. Remaining members attended the meeting virtually via Zoom (Section 5). During the meeting, cab orientation (direction of view), stairwell location, column/mullion placement, and control position location for each site were determined. An Air Traffic Organization (ATO) Safety Risk Management Panel (SRM) Panel was convened to conduct a safety analysis for each site generating an AFTIL-2 Comparative Safety Assessment.
The Safety Risk Management (SRM) Panel met to conduct a viable sites safety analysis as a proposed National Airspace System (NAS) change based on the Air Traffic Organization (ATO) SRM process as defined by the ATO Safety Management System (SMS) Manual, dated April 2019. The SRM Panel, comprised of stakeholders in the change, were organized by the AFTIL with support from the Western Service Area (WSA) and Quality Control Group (QCG). Stakeholders, which included representatives of FAA WSA, SJC ATCT and San Jose Airport Administration, participated in the ATCT siting activities.
No Hazards were found in either of the two viable sites.
SRM DOCUMENT SIGNATURES
Title: Norman Y. Mineta San Jose International (SJC) Airport Replacement Airport Traffic Control Tower AFTIL-2 – No Hazards
Concurrence by:
Date
Concurrence by:
Approved By:
Accepted By:
SECTION 1. CURRENT SYSTEM
Norman Y. Mineta San Jose International Airport (SJC) is located in Silicon Valley, about two miles northwest of San Jose, CA. San Jose International Airport is a self-supporting enterprise owned and operated by the city of San Jose. SJC is the San
Francisco Bay Area's second-busiest airport by passenger boardings, behind San
Francisco International Airport. The Airport Master Plan projects demand of 22.5 million annual passengers and 184,000 commercial airline operations by the year 20371 necessitating improvements in taxiway system improvements capable of serving wide-body commercial aircraft, new and remodeled terminal buildings to adequately serve projected demand and new or expanded cargo and general aviation facilities. The airport is also an official U.S. Customs and Border Protection international port of entry.
SJC has two parallel runways, 12L/30R and 12R/30L (11000 x 150 ft.) with five partial to almost full length taxiways. Centerline separation between the parallel runways is approximately 700 ft. The current parallel TWY V is planned to be converted to ramp area with TWY W1 renamed TWY V. The SJC ATCT is a Level 7, Non-
Standard type design, Federal Aviation Administration (FAA) owned, operated, and maintained Tower with Radar facility commissioned in 1994. The ATCT cab area is approximately 365 sq. ft. and the facility operates from 0600Z -2400Z local. SJC ATCT airport operations, during 2019, totaled over 205,000 with over 72% attributed to Air
Carrier. Due to the Covid pandemic (2020), total airport operations dropped to a little over 115,000 with air carrier reduced to a little over 62% of these operations. During the first eight months of 2021, SJC has shown an increase in airport operations moving towards 2019 numbers.
The existing ATCT cab is equipped for the following positions:
Local Control (LC)
Local Assist (LA) (acts as a second pair of eyes)
Ground Control (GC)
Ground Control West (GCW) (optional on a southeast flow)
Clearance Delivery/Flight Data (CD/FD)
Front Line Manager/ Controller-In-Charge (FLM/CIC)
Need for an SRM Panel The need for a Safety Risk Management (SRM) panel is necessary to relocate the existing SJC ATCT. When the existing ATCT was commissioned, the longest runway was 8,000 ft. In a Comparative Safety Assessment, held July 9 and 10, 2019, SJC ATC found line of sight (LOS) issues: at night and even during some daylight conditions that it is hard to see the approach ends of the runways with the extension of a set of parallel runways to 11,000 ft. At the existing eye level height and location of the ATCT, a
Airport Master Plan for Norman Y. Mineta San Jose International Airport As Amended Through April 2020
Visibility Siting Requirements Human Factors Analyses found the SJC ATCT failed the LOS Angle of Incidence requirement, minimum .8 degrees, with a value of .74 degrees for key point2 RWY 30L (Tower to Key Point Distance: 5282 ft.) (Figure 1) and .72 degrees for key point RWY 30R (Tower to Key Point Distance: 5471 ft.) (Figure 2).
Lookdown issues with the ramp adjacent to the ATCT and TWY V were also found.
Airport expansion and restructuring may introduce new, or enhance existing, LOS issues.
Scope of SRM Panel An Airway Facilities Tower Integration Laboratory (AFTIL) 1 meeting was held July 9 and 10, 2019 in Atlantic City, NJ. Meeting attendees participated in siting activities for the proposed replacement SJC ATCT and conducted an SRM Panel to generate a Comparative Safety Assessment (CSA). Two sites were initially assessed as viable and preferred, Site 1 and Site 4).
An AFTIL-2 meeting was held, October 19 and October 20, 2021, to assess the two preferred sites, Site 1 and Site 4, to determine physical characteristics for a potential replacement SJC ATCT. Panel member representatives from the FAA SJC ATCT and AFTIL personnel attended the meeting on-site at the William J Hughes Technical Center (WJHTC) Building 170 lab. Remaining members attended the meeting virtually via Zoom (Section 5). During the meeting, cab orientation (direction of view), stairwell location, column/mullion placement, and control position location for each site were determined. An Air Traffic Organization (ATO) Safety Risk Management Panel (SRM) Panel was convened to conduct a safety analysis for each site generating an AFTIL-2 Comparative Safety Assessment. Meeting attendees applied the Air Traffic Organization (ATO) SRM process as defined by the ATO Safety Management System (SMS) Manual, dated April 2019.
Table 1.1: 5M Model
Mission: The clearly defined and detailed purpose of the NAS change proposal or system/operation being assessed
Safely conduct ATC operations in a replacement SJC ATCT
(hu)Man: Operators, maintainers, and affected stakeholders
Includes the following human elements: All operational personnel at SJC: ATCS, tech ops, management, etc.
Machine: Equipment used in the system Radar, Radio and Communication Equipment
Management: Procedures and policies that govern the system’s behavior
FAA Order 6480.4B, FAA Order 7110.65, Air Traffic Control, and local Standard Operating Procedures (SOPs) bound the Management element, which describes how operational personnel conduct/apply required procedures in the Tower
In AFTIL Quick Look Reports, the Key Point is normally the furthest RWY threshold from the existing ATCT.
environment.
Media: The environment in which the system is operated/maintained
SJC ATCT
SECTION 2. DESCRIPTION OF CHANGE
Existing LOS issues with portions of key movement areas of the airport and future airport expansion/restructuring present a possible safety risk to the ATC environment.
An AFTIL-2 meeting was held, October 19 and October 20, 2021 to determine a potential replacement SJC ATCT.
Two sites were assessed as preferred: Site 1 and Site 4
Site 1: Latitude: 37 21’ 35.09" North, Longitude: 121 55' 58.20" West;
Eye Level AGL 153 feet.
Site 4: Latitude: 37 21' 34.23" North, Longitude: 121 55' 58.85" West;
Eye Level AGL 155 feet.
Figures 4 & 5 represent an overhead depiction of the two SJC preferred sites that were determined as viable locations. The SJC Future Airport Layout Plan Update dated
October 2018 (Figure 6), depicts the existing and future airport layouts.
The SRM Panel attendees agreed that operations in any of the replacement ATCTs will not introduce risk into the NAS.
Figure 1. SJC existing ATCT Tower Visibility Analysis Key Point RWY 30L3
Information derived from SJC QL Final Signed 8.31.17
Figure 2. SJC existing ATCT Tower Visibility Analysis Key Point RWY 30R4
Information derived from Copy SJC QL Final Signed 8.31.17
Figure 3. Tower Visibility Analysis Diagram
Figure 4. SJC overhead with Preferred Sites
Figure 5. SJC close up overhead with Preferred Sites
Norman Y. Mineta San Jose International Airport (SJC) Replacement Airport Traffic Control Tower AFTIL-2 – No Hazards
Figure 6. SJC Future Airport Layout Plan Update (October 2018)
Figure 7. SJC Airport Diagram (November 2021)
SECTION 3. RATIONALE FOR A SAFETY FINDING WITHOUT HAZARDS
SRM Panel attendees conducted a safety analysis on the SJC replacement ATCT Site 1 and Site 4, based on the PHL designated for use during AFTIL-2 SRM Panel assessments, which reviews Interior and exterior physical barriers. The AFTIL 2 Safety Assessment encompasses analysis and assessment of orientation of ATCT cab to field, control positions, equipment, mullions and stairwell location for overall optimal visibility of the field. The following tables list SRM Panel attendee comments, observations, and findings for each preferred site according to PHL section topics. SRM Panel attendees agreed that operations in any of the replacement ATCTs will not introduce risk into the NAS for both existing and proposed structures depicted in the SJC Future Airport Layout Plan Update dated October 2018. SJC ATC selected Site 4 as their recommended site.
Table 3.1: Preliminary Hazard List: SJC Site 1 AFTIL-2 (No Hazard)
Norman Y. Mineta San Jose International Airport (SJC)
AFTIL-2
October 19, 2021
ATCT SITING CRITERIA
AFTIL Trip #2 SJC Site 1 Lat: 37 21 35.09N Long: 121 55 58.20W
Eye Height: 153 ft. AGL 202 ft. AMSL Cab Size: 550 sq.ft. (Existing: 83 ft and (525 or 365) sq.ft.)
Tower to Key Point (12L) Distance: 5948 ft.
SJC ATC: David Zakaski ATM Andrew Van Hoe (NATCA Rep)
Site 1 is located on the southwest side of the field, approximately 130 ft. west of the existing ATCT and approximately 240 ft. southwest of the edge of
TWY V.
16. Interior physical barriers
16 a. Position of ATC in Tower Cab:
Facing (Priority) North---East-- -West---South
SJC ATC oriented the cab (12 sided structure supported by mullions) north east (Figure 8), similar to the existing ATCT (8 sided structure). LC position is located to the left of a mullion facing north east with a line drawn perpendicular to the parallel runways. LA position is located to the right of this mullion. GC and CD/FD positions are located to the right of LA, each separated by one pane of glass respectively. GCW position is located to the left of LC separated by one pane of glass. The FLM/CIC position was relocated from left of GCW to a cab center console desk, facing LC position. The stairwell is located on the south side of the cab with the entrance just to the right and rear of the FLM/CIC desk. Cab orientation and control position locations were examined and determined for optimal visibility of the airport by SJC ATCT personnel. Sunstreams, for different times of the year, were displayed to depict possible effects of the sun. To mitigate the hazards determined in the AFTIL 1 Safety Assessment (Controller loss of situational awareness associated with sun angle), SJC ATC requested "Double Shades" be made available as a requirement. SJC ATC found no major issues with mullion placement and determined any issues would be easily resolved by moving to look around the mullion.
Findings: No Hazards
From LC (LA)
LC position faces northeast towards the main Air Carrier terminal across the field, with the approach ends of RWYs 30L/30R to the right of view and the approach ends of RWYs 12R/12L to the left of view.
LA position is just to the right of LC position and acts as an "extra pair of eyes" and coordinator for LC. At the proposed location and height (eye level 153 ft.), SJC ATC had an unobstructed view of all runways, their exit/entrance points, approach ends, arrival and departure paths. SJC handles Medevac helicopter traffic from the Valley Medical Center (located a few miles south of the field) and the Regional Medical Center (a few miles northeast of the field). Good views were found for each. SJC ATC, positioned the mullions so as to provide overall optimal visibility for each control position.
From LC position, SJC ATC personnel were concerned with a mullion positioning just to the left of CD/FD which interfered with an open view of the approach end to RWY 30R and line up and wait spots for RWY 30L at TWY D and C. SJC ATC acknowledged mullions are not considered an obstruction. The cab model was rotated 15 degrees counter clockwise to diminish this issue. Control positions remained in their original locations relative to cab orientation. SJC ATC found this mullion positioning depicted a clear view of these concerned areas. SJC ATC found no major issues with the remaining mullion placements and determined any issues would be easily resolved by moving to look around the mullion.
Findings: No Hazards
From GC (GCW)
GC position faces east southeast to the right of LA position separated by one pane of glass. GC is the primary control position with the option to open a same equipped GCW position located on the northwest side of the cab. GC primarily faces the approach ends RWYs 30R/30L. Site 1 provides a more distinctive and clearer view of TWYs Z and Y, which are located across the field, than from their existing ATCT. Site 1 also provides a view of gates 1-3 of Terminal 1 across the field. The location of Site 1 created lookdown issues with a portion of TWY V, in front of Site 1, Signature ramp, to the northwest of Site 1, and Atlantic ramp, to the southeast of Site 1. Although ramp areas are considered non-movement and not under control of ATC, SJC ATC found a concern with whether aircraft, from these areas, were actually holding short of TWY V when they called for taxi. Airport restructuring plans include converting TWY V to a ramp area, renaming TWY W1 (just to northeast and parallel to TWY V) as TWY V prior to commissioning of a new ATCT. This would resolve the LOS issue with TWY V and help in alleviating any concern with the ramp areas. SJC ATC found a clear view of all other taxiways and most ramp areas.
Findings: No Hazards
16 b. Position of Tower Cab equipment
A physical layout of the 550 square foot ATCT cab with typical equipment was provided.SJC ATC reviewed and realigned equipment for overall optimal locations. Future upgraded equipment was discussed. The design and size of the cab would allow for any additional or upgraded equipment.
Findings: No Hazards
16 c. Position of Tower Cab mullions
Reviewed in Section 16a.
Findings: No Hazards
17. Exterior physical barriers 17a. Construction equipment ( Vehicles, Cranes, scaffolding etc.)
for both proposed Site and airport expansion 17 b. Proposed new structures and Airport expansion (ALP)
SJC ATC found no LOS issues with proposed airport expansion, construction or equipment associated, as depicted on the SJC Future Airport Layout Plan Update dated October 2018. Any impact to Air Traffic operations would be coordinated well prior with SJC ATC.
17c. Existing ATCT
Working in Existing ATCT with Construction of Site1 in progress
Construction of Site 1 was examined for LOS issues while working in the current ATCT (Figure 11). Site 1 is located approximately 130 ft. (center to center of cab) west of the current ATCT. The eye level height of the existing ATCT is 83 ft. AGL. The top of tower (TOT) height of Site 1 is projected to be 183
ft. AGL.SJC ATC found a LOS issue with construction of Site 1 from the perspective of the existing ATCT. A portion of the downwind to RWY 12R/30L was blocked. A major portion of their traffic is straight in. A very small portion of small VFR traffic would be affected by this blockage. Due to the amount of time of blockage (a few seconds), the amount of traffic affected and additional procedures to mitigate this blockage, they considered this a minor issue of concern. SJC ATC determined controller awareness and pre duty familiarization would further resolve this to an area of low concern. No other issues were determined.
Findings: No Hazards
Working in Site 1 with existing ATCT still in place
Working from Site 1 with the existing ATCT in view was examined (Figure 12). Only the very top of the existing cab is in view, with blockage of a small portion of TWY W1 and the existing TWY V. Due to the small portion and time of blockage, SJC ATC found no LOS issues.
18. Other No other issues were found with Site 1
Figure 8. SJC ATCT Site 1 Cab Orientation
Figure 9. SJC Site 1 view of Approach Ends RWYs 30R/30L
Figure 10. SJC Site 1 view of Approach Ends RWYs 12L/12R
Figure 11. SJC existing ATCT view of Site1
Figure 12. SJC Site 1 view of existing ATCT
Figure 13. SJC Site 1 Tower Height Chart
Figure 14. SJC Site 1 Tower Visibility Analysis
Figure 15. SJC Site 1 Tower Visibility Analysis Diagram
Table 3.2: Preliminary Hazard List: SJC Site 4 AFTIL-2 (No Hazard)
Norman Y. Mineta San Jose International Airport (SJC)
AFTIL-2
October 19, 2021
ATCT SITING CRITERIA
AFTIL Trip #2 SJC Site 4 Lat:37 21 34.23N Long: 121 55 58.85W
Eye Height: 155 ft. AGL 205 ft. AMSL Cab Size: 550 sq.ft. (Existing: 83 ft and (525 or 365) sq.ft.)
Tower to Key Point (12L) Distance: 6010 ft.
David Zakaski ATM Andrew Van Hoe (NATCA Rep)
Site 4 is located on the southwest side of the field, approximately 400 ft. west of the existing ATCT and approximately 500 ft. southwest of the edge of
TWY V.
16. Interior physical barriers
16 a. Position of ATC in Tower Cab:
Facing (Priority) (North---East-- -West---South) Northeast
SJC ATC oriented the cab (12 sided structure supported by mullions) north east (Figure 16), similar to the existing ATCT (8 sided structure). LC position is located to the left of a mullion facing north east with a line drawn perpendicular to the parallel runways. LA position is located to the right of this mullion. GC and CD/FD positions are located to the right of LA, each separated by one pane of glass respectively. GCW position is located to the left of LC separated by one pane of glass. The FLM/CIC position was relocated from left of GCW to a cab center console desk, facing LC position. The stairwell is located on the south side of the cab with the entrance just to the right and rear of the FLM/CIC desk. Cab orientation and control position locations were examined and determined for optimal visibility of the airport by SJC ATCT personnel. Sunstreams, for different times of the year, were displayed to depict possible effects of the sun. To mitigate the hazards determined in the AFTIL 1 Safety Assessment (Controller loss of situational awareness associated with sun angle), SJC ATC requested "Double Shades" be made available as a requirement. SJC ATC found no major issues with mullion placement and determined any issues would be easily resolved by moving to look around the mullion.
From LC (LA)
LC position faces northeast towards the main Air Carrier terminal across the field, with the approach ends of RWYs 30L/30R to the right of view and the approach ends of RWYs 12R/12L to the left of view.
LA position is just to the right of LC position and acts as an "extra pair of eyes" and coordinator for LC. At the proposed location and height (eye level 155 ft.), SJC ATC had an unobstructed view of all runways, their exit/entrance points, approach ends, arrival and departure paths. SJC handles Medevac helicopter traffic from the Valley Medical Center (located a few miles south of the field) and the Regional Medical Center (a few miles northeast of the field). Good views were found for each. SJC ATC, positioned the mullions so as to provide overall optimal visibility for each control position.
From LC position, SJC ATC personnel were concerned with a mullion positioning just to the left of CD/FD which interfered with an open view of the approach end to RWY 30R and line up and wait spots for RWY 30L at TWY D and C. SJC ATC acknowledged mullions are not considered an obstruction. The cab model was rotated 15 degrees counter clockwise to diminish this issue. Control positions remained in their original locations relative to cab orientation. SJC ATC found this mullion positioning depicted a clear view of these concerned areas. SJC ATC found no major issues with the remaining mullion placements and determined any issues would be easily resolved by moving to look around the mullion. SJC ATC preferred Site 4 as the recommended site. Location, further southwest from the movement and ramp area, and height of Site 4 provided a wider peripheral view of the approach ends of the runways, approach and departure paths with less rotation and movement within the tower cab.Findings: No Hazards
From GC (GCW)
GC position faces east southeast to the right of LA position separated by one pane of glass. GC is the primary control position with the option to open a same equipped GCW position located on the northwest side of the cab. GC primarily faces the approach ends RWYs 30R/30L. Site 4 provides a an even more distinctive and clearer view, than Site 1, of TWYs Z and Y, which are located across the field. Site 4 also provides a better view of the backside of Terminal 1, across the field, of gates 1-
3. Site 4 provides a very good view of the entry/exit point to the movement area of the newly constructed ARFF station and the soon to be phased in run up pad for RWY 30L. The lookdown issues, created by Site 1, with a portion of TWY V and their concerns with whether aircraft, from these areas, were actually holding short of TWY V when they called for taxi were resolved. In addition, airport restructuring plans include converting TWY V to a ramp area, renaming TWY W1 (just to northeast and parallel to TWY V) as TWY V prior to commissioning of a new ATCT. All entry/exit points were visible. A majority of the Signature and Atlantic ramps were also visible. As with LC position, SJC ATC preferred Site 4 as the recommended site for GC position. Location, further southwest from the movement and ramp area, and height of Site 4 provided a wider peripheral view of the taxiways and ramp areas with less rotation and movement within the tower cab.
Findings: No Hazards
16 b. Position of Tower Cab equipment
A physical layout of the 550 square foot ATCT cab with typical equipment was provided.SJC ATC reviewed and realigned equipment for overall optimal locations. Future upgraded equipment was discussed. The design and size of the cab would allow for any additional or upgraded equipment.
Findings: No Hazards
16 c. Position of Tower Cab mullions
Reviewed in Section 16a.
17. Exterior physical barriers 17a. Construction equipment ( Vehicles, Cranes, scaffolding etc.)
for both proposed Site and airport expansion 17 b. Proposed new structures and Airport expansion (ALP)
SJC ATC found no LOS issues with proposed airport expansion, construction or equipment associated, as depicted on the SJC Future Airport Layout Plan Update dated October 2018. Any impact to Air Traffic operations would be coordinated well prior with SJC ATC.
Findings: No Hazards
17c. Existing ATCT
Working in Existing ATCT with Construction of Site 4 in progress
Construction of Site 4 was examined for LOS issues while working in the current ATCT (Figure 19). Site 4 is located approximately 400 ft. (center to center of cab) west of the current ATCT. The eye level height of the existing ATCT is 83 ft. AGL. The top of tower (TOT) height of Site 4 is projected to be 185
ft. AGL. SJC ATC found a LOS issue with construction of Site 4 from the perspective of the existing ATCT. A portion of the downwind to RWY 12R/30L was blocked. A major portion of their traffic is straight in. A very small portion of small VFR traffic would be affected by this blockage. Due to the amount of time of blockage (a few seconds), the amount of traffic affected and additional procedures to mitigate this blockage, they considered this a minor issue of concern. SJC ATC determined controller awareness and pre duty familiarization would further resolve this to an area of low concern. No other issues were determined.
Findings: No Hazards
Working in Site 4 with existing ATCT still in place
Working from Site 4 with the existing ATCT in view was examined (Figure 20). A portion of the existing cab is in view, with blockage of a small portion of TWY W1 and the existing TWY V. Due to the small portion and time of blockage, SJC ATC found no LOS issues.
Findings: No Hazards
18. Other No other issues were found with Site 4. SJC ATC selected Site4 as their recommended site.
Figure 16. SJC ATCT Site 4 Cab Orientation
Figure 17. SJC Site 4 view of Approach Ends RWYs 30R/30L
Figure 18. SJC Site 4 view of Approach Ends RWYs 12L/12R
Figure 19. SJC view of Site 4 from existing ATCT
Figure 20. SJC Site 4 view of existing ATCT
Figure 21. SJC Site 4 Tower Height Chart
Figure 22. SJC Site 4 Tower Visibility Analysis
Figure 23. SJC Site 4 Tower Visibility Analysis Diagram
SECTION 4. DISSENTION
Not Applicable.
SECTION 5. SJC AFTIL-2 SRM PANEL ATTENDEES
Name Organization Email Phone
On- Site
(OS)
Zoom (Z)
Change Proponent
David C Zakaski
TWOA1-SJC
ATM
david.c.zakaski@faa.gov (408) 235-5413 OS
Panel Members
David C Zakaski
TWOA1-SJC
ATM
david.c.zakaski@faa.gov (408) 235-5413 OS
Andrew Van- Hoe
TWOA1-SJC
NATCA
andrew.van-hoe@faa.gov (651) 463-5500 OS
Subject Matter Experts
Aaron Holden ANG E18 Aaron.K-CTR.Holden@faa.gov (856) 374-3274 OS
Ben Gottlieb ANG E18 benjamin.gottlieb@faa.gov (609) 485-4382 OS
Bill West ANG E18 William.A-CTR.West@faa.gov (609) 485-4335 OS
Bob Niszczak ANG-E18 robert.s-ctr.niszczak@faa.gov (609) 485-5710 OS
Jim Seitzinger ANG E18 James.Seitzinger@faa.gov (609) 485-5551 OS
John Pallante ANG E18 John.CTR.Pallante@faa.gov (609) 485-8452 OS
Alvin Nepomuceno
AJW-2444 alvin.ctr.nepomuceno@faa.org (301) 346-2825 Z
Andres Niemeyer
SJC Airport Org.
aniemeyer@sjc.org (669) 282-0382 Z
Ankit Patel AJW-2443 Ankit.Patel@faa.gov (202) 267-6095 Z
Chanh Huynh AJO chanh.huynh@faa.gov (310) 270-6972 Z
Charles Kolb AJW-2444 charles.ctr.kolb@faa.gov (206) 231-2944 Z
Ed Chapleski FAA AFTIL edward.c.chapleski@faa.gov (609) 485-8086 Z
Ian Hogg SJC Airport
Org.
ihogg@sjc.org (408) 582-4242 Z
Jordan Flores AJV PRG jordan.flores@faa.gov (206) 231-2563 Z
Joseph Peterson
AJW-2W16A joe.peterson@faa.gov (206) 231-2701 Z
Matthew Clark AJW matthew.ctr.clark@faa.gov (571) 334-4940 Z
Mimi Tran (Khanh N Tran)
AJV-W37 khanh.n.tran@faa.gov (206) 231-2898 Z
Perry Oleck AJV-W24 perry.j.oleck@faa.gov (206) 231-2276 Z
Rollo L Devore AJO rollo.l-ctr.devore@faa.gov (206) 231-2943 Z
Rudi Harmon AJW-2444 rudi.f.harmon@faa.gov (847) 420-4269 Z
Ryan Sheelen SJC Airport
Org.
rsheelen@sjc.org (408) 392-1193 Z
Steve Mares AJV-W steve.mares@faa.gov (206) 231-2892 Z
Terence Moore ANG E18 terence.d.moore@faa.gov (69) 485-6379 Z
Vance Whitesel AJW-2W11C vance.whitesel@faa.gov (562) 441-1505 Z
Facilitation Team
Dave Ailes ANG E18 david.l-ctr.ailes@faa.gov (609) 839-1232 OS
Terence Moore ANG E18 terence.d.moore@faa.gov (609) 485-6379 Z
Observers
Jamie Finley ANG E18 jamie.ctr.finley@faa.gov (609) 485-7387 Z
Nolan Foy FAA nolan.d.foy@faa.gov (609) 271-3255 Z
Ryan Drexel ANG E18 ryan.ctr.drexel@faa.gov (609) 485-5531 Z
ABBREVIATIONS
AFTIL – Airport Facilities Terminal Integration Laboratory
AGL – Above Ground Level
ARFF – Airport Rescue and Fire Fighting
ALP – Airport Layout Plan
AMSL – Above Mean Sea Level
AOI – Angle of Incidence
ATC – Air Traffic Control
ATCS – Air Traffic Control Specialist
ATCT – Airport Traffic Control Tower
ATM – Air Traffic Manager
ATO – Air Traffic Organization
CIC – Controller-In-Charge
CD – Clearance Delivery
CSA – Comparative Safety Assessment
FAA – Federal Aviation Administration
FBO – Fixed Base Operator
FD – Flight data
FLM – Front Line Manager
GC – Ground Control
GCW – Ground Control West
LA – Local Assist
LC – Local Control
LOS – Line-of-Sight
NAS – National Airspace System
NASWATCH - Airway Facilities Radio Frequency Screening Tool
NATCA – National Air Traffic Controllers Association
OPS – Operations
PHL – Preliminary Hazard List
QCG – Quality Control Group
RWY – Runway
SJC – Norman Y. Mineta San Jose International Airport
SME – Subject Matter Expert
SMS – Safety Management System
SOP – Standard Operating Procedure
SRM – Safety Risk Management
TERPS – United States Standard for Terminal Instrument Procedures
TRACON – Terminal Radar Approach Control
TWY – Taxiway
WSA – Western Service Area
WJHTC – William J. Hughes Technical Center
File details come from the government source that posted it. Updated .