Attachment J-1d Terminal Facilities Standard Design 11000 SF.pdf

PDF 1 MB Posted

Attached to
San Jose (SJC) Remote Transmitter/Receiver tower (RTR) and the Air Traffic Control Tower (ATCT) and Base Building
Solicitation number
697DCK-24-R-00024
Issued by

About this file

This solicitation requests proposals from architecture and engineering firms to design a new Remote Transmitter/Receiver tower, Air Traffic Control Tower, and associated base building for the San Jose International Airport. Interested vendors must submit all questions to the contracting officer by December 15, 2023. Proposals are due by January 22, 2024 at 3:00 PM Pacific Time and must be emailed to the contracting officer at the provided address. The selected firm will be responsible for designing the new RTR tower, ATCT, and base building to support air traffic operations at the airport. The Federal Aviation Administration's Southwestern Region is issuing this solicitation.

View the file

Other files

File Type Posted
697DCK-24-R-00024 Amendment 0002.pdf PDF
Attachment J-1l Phase II ESA SJC Airport.pdf PDF
Attachment J-1n Whole Building Commissioning Requirements.pdf PDF
Attachment J-1e SJC RTR Existing Plans.pdf PDF
Attachment J-1b FAA BIM Guide V5 Final.pdf PDF
Attachment J-1p - Executive Order 14057 of December 8 2021.pdf PDF
Attachment J-1a TFDS_V2.1.pdf PDF
Attachment J-1g Requirments Document (RD) Workbook Excerpts.pdf PDF
Attachment J-1h - GSO Division 1 Specifications.pdf PDF
Attachment J-1f 211129 SJC AFTIL 2 No Hazards Initial Draft Ver.01 (Siting Report).pdf PDF
Attachment J-1o Palm Springs ATCT PPD Sample.pdf PDF
Attachment J-1j - GSA PBS P100 2022.pdf PDF
Attachment J-1k - Draft Generic RTR Design Reference Guide.pdf PDF
Attachment J-1q - SJC_AOA Fence Standard Drawings.pdf PDF
Attachment J-1c GSO ATCT Plans.pdf PDF
Attachment J-1i - EO 14057 Implementing Instructions.pdf PDF
Attachment J-1m- CPDS Standard Design Type Radial Electrical One-Line Diagram 3-7-2023.pdf PDF
Attachment J-1 Scope of Work ATCT Base Building RTR_Amend 0001.pdf PDF
Attachment J-2 KEY PERSONNEL EXPERIENCE_Amend 0001.pdf PDF
697DCK-24-R-00024 Amendment 0001.pdf PDF
QUESTIONS and Responses_Jan 9 2024.pdf PDF
SIR_697DCK-24-R-00024.pdf PDF
QUESTIONS and Responses_Dec 28 2023.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
Attachment J-2 KEY PERSONNEL EXPERIENCE.pdf PDF
Attachment J-3 Price Proposal.xlsx XLSX spreadsheet
Attachment J-1 Scope of Work ATCT Base Building RTR.pdf PDF
SIR_697DCK-24-R-00024.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WASD-D-11ATBM-G001

11,000 SF ADMIN BASE BUILDING

BASIS OF DESIGN

BASIS OF DESIGN

III. USE & OCCUPANCY CLASSIFICATION

V. GENERAL BUILDING HEIGHT AND AREA

VII. FIRE RESISTANCE RATED CONSTRUCTION

VIII. INTERIOR FINISHES

II. CODES OF RECORD

I. FACILITY DEFINITION

VI. TYPE OF CONSTRUCTION

IX. FIRE PROTECTION SYSTEM

X. MEANS OF EGRESS

XI. ACCESSIBILITY

IV. SPECIAL DETAILED REQUIREMENTS BASED ON USE AND

OCCUPANCY

XIII. MECHANICAL ROOM LEGEND NOTES

1 4 CHILLED WATER (CHW) PUMPS (2 FOR BASE BUILDING LOOP AND 2 FOR

TOWER LOOP)

2 CHW EXPANSION TANK AND CHEMICAL SHOT FEEDER (BASE BUILDING LOOP)

3 CHW EXPANSION TANK AND CHEMICAL SHOT FEEDER (TOWER LOOP)

4 CHW PLATE/FRAME HEAT EXCHANGER

5 WATER FILTRATION SYSTEM (IF REQUIRED)

6 DOMESTIC WATER BOOSTER PUMP SYSTEM (TOWER)

7 WATER HEATER

8 4 HEATING HOT WATER (HHW) PUMPS (2 FOR BASE BUILDING LOOP AND 2 FOR

TOWER LOOP)

9 HHW EXPANSION TANK AND CHEMICAL SHOT FEEDER (BASE BUILDING LOOP)

HHW EXPANSION TANK AND CHEMICAL SHOT FEEDER (TOWER LOOP)

HHW PLATE/FRAME HEAT EXCHANGER

BASE BUILDINGS ARE IDENTIFIED AS ADMINISTRATIVE (NON-TRACON) BASE BUILDINGS

AND TRACON BASE BUILDINGS AND ARE CLASSIFIED INTO SIZES BASED ON THE NUMBER OF

PERSONNEL THE FACILITY IS EXPECTED TO ACCOMMODATE AS WELL AS THE FOOTPRINT

AND CLEARANCES REQUIRED BY THE EQUIPMENT.

AREAS WITHIN THE BASE BUILDINGS ARE GROUPED BASED ON ACTIVITY AND CLASSIFIED

BY ACTIVITY MODULE. THE ACTIVITY MODULE GROUPS ARE AS FOLLOWS:

-AIR TRAFFIC (INCLUDING OPERATIONAL AND GENERAL ADMINISTRATION OFFICES)

-AIRWAY FACILITIES (INCLUDING OPERATIONAL AND GENERAL ADMINISTRATION

OFFICES)

-MECHANICAL/ELECTRICAL SUPPORT

-EQUIPMENT AREAS WITH SHOP AND STORAGE

SQUARE FOOT SPACE REQUIREMENTS FOR ROOMS WITHIN EACH ACTIVITY MODULE WERE

ESTABLISHED BY THE FEDERAL AVIATION ADMINISTRATION ATO ON APRIL 27, 2004.

THE DESIGN AND CONSTRUCTION OF THE 11,000 SQUARE FOOT ADMINISTRATIVE BASE

BUILDING SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BUILDING

CODE (IBC), 2006 EDITION AND NFPA 101, THE LIFE SAFETY CODE (LSC), 2006

EDITION. WHERE THE IBC AND NFPA 101 HAVE CONFLICTING REQUIREMENTS, THE MORE

RESTRICTIVE CODE SHALL TAKE PRECEDENCE.

THE FOLLOWING DOCUMENTS WILL PROVIDE THE CRITERIA WHICH WILL GOVERN THE FIRE

PROTECTION AND LIFE SAFETY DESIGN OF THE FACILITY.

A. INTERNATIONAL BUILDING CODE (IBC), 2006 EDITION.

B. INTERNATIONAL FIRE CODE (IFC), 2006 EDITION.

C. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 10 (NFPA 10), STANDARD

FOR PORTABLE FIRE EXTINGUISHERS, 2007 EDITION.

D. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 13 (NFPA 13), STANDARD

FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2007 EDITION.

E. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 20 (NFPA 20), STANDARD

FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, 2007

EDITION.

F. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 24 (NFPA 24), STANDARD

FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR

APPURTENANCES, 2007 EDITION.

G. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 70 (NFPA 70), NATIONAL

ELECTRICAL CODE, 2008 EDITION.

H. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 72 (NFPA 72), NATIONAL

FIRE ALARM CODE, 2007 EDITION.

I. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 75 (NFPA 75), STANDARD

FOR THE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT, 2003 EDITION.

J. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 76 (NFPA 76), STANDARD

FOR THE PROTECTION OF TELECOMMUNICATIONS FACILITIES, 2005 EDITION.

K. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 90A (NFPA 90A), STANDARD

FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2002

EDITION.

L. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 92A (NFPA 92A),

RECOMMENDED PRACTICE FOR SMOKE CONTROL SYSTEMS, 2006 EDITION.

M. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 101 (NFPA 101), THE LIFE

SAFETY CODE, 2006 EDITION.

N. FAA ORDER 6480.7E.

A. BUSINESS (IBC SECTION 304)

B. NEW BUSINESS (NFPA 101, SECTION 38.1.1.1)

INTERNATIONAL BUILDING CODE (IBC SECTION 304) - THIS BASE BUILDING IS

CLASSIFIED AS A BUSINESS OCCUPANCY IN ACCORDANCE WITH THE REQUIREMENTS

OF THE IBC. THE BASE BUILDING IS DESIGNED TO SERVE AN OCCUPANT LOAD OF

100 SQUARE FEET PER PERSON IN ACCORDANCE WITH IBC TABLE 1004.1.2.

LIFE SAFETY CODE (NFPA 101 SECTION 38.1.1.1) - THIS BASE BUILDING IS

CLASSIFIED AS A BUSINESS OCCUPANCY IN ACCORDANCE WITH THE REQUIREMENTS

OF THE LSC. THE BASE BUILDING IS DESIGNED TO SERVE AN OCCUPANT LOAD OF

100 SQUARE FEET PER PERSON PER NFPA 101 TABLE 7.3.1.2.

A. ALLOWABLE HEIGHT (IBC SECTION 504.1)

MAXIMUM PERMITTED: 4 STORIES

PROVIDED: 1 STORY

B. ALLOWABLE AREA (IBC TABLE 503)

MAXIMUM PERMITTED: 23.000 SQUARE FEET (BASE ALLOWABLE AREA)

MAXIMUM PROVIDED: 10,990 SQUARE FEET

A. CONSTRUCTION TYPE (IBC TABLE 601)

MINIMUM REQUIRED: V

PROVIDED: IIB

A. SUPPRESSION - THE FACILITY WILL BE PROTECTED THROUGHOUT BY AN

ELECTRONICALLY SUPERVISED FULLY AUTOMATIC FIRE SPRINKLER SYSTEM

B. FIRE PUMP - THE FACILITY WILL BE EQUIPPED WITH A FIRE PUMP AS

REQUIRED TO SUPPLY THE AUTOMATIC FIRE SPRINKLER SYSTEM. THE FIRE

PUMP SHOULD BE SIZED BASED ON SPRINKLER/STANDPIPE DEMAND FOR THE

ADJACENT TOWER.

C. ALARM & DETECTION - THE FACILITY WILL BE PROTECTED BY SMOKE

DETECTION AS REQUIRED (ELECTRONIC EQUIPMENT ROOMS).

D. ALARM NOTIFICATION AND COMMUNICATION - NOTIFICATION SHALL BE

AS REQUIRED BY NFPA 72.

MEANS OF EGRESS SHALL BE IN ACCORDANCE WITH NFPA 101.

A. OCCUPANT LOAD (NFPA 101 SECTION 38.1.7)

BUILDING TOTAL: 111 PEOPLE (10,990 SQUARE FEET, 100 SQUARE FEET PER

PERSON)

B. NUMBER OF EXITS (NFPA 101 SECTION 38.2.4.1(2) ERRATA 101-03-1)

REQUIRED: 2

PROVIDED: 4

A MINIMUM OF TWO EXITS ARE REQUIRED BY BOTH THE IBC AND THE LSC.

EXITS MUST BE SEPARATED BY A MINIMUM OF 1/3 OF THE LENGTH OF THE

MAXIMUM OVERALL DIAGONAL DIMENSION OF THE BUILDING OR AREA TO BE

SERVED MEASURED IN A STRAIGHT LINE BETWEEN EXIT DOORS OR EXIT

ACCESS DOORWAYS.

C. CORRIDOR CAPACITY (NFPA 101 SECTION 38.2.3.1)

REQUIRED: 44 INCHES

PROVIDED: 60 INCHES

D. EXIT DOORS

MINIMUM WIDTH: 32 INCHES (PER DOOR)

PROVIDED: 34 INCHES (CLEAR WIDTH)

E. TRAVEL DISTANCE (NFPA 101 SECTION 38.2.6)

PERMITTED: 300 FEET (MAXIMUM)

PROVIDED: 98 FEET

F. COMMON PATH (NFPA 101 SECTION 38.2.5.3.2)

PERMITTED: 100 FEET (MAXIMUM)

PROVIDED: 45 FEET

G. DEAD-END CORRIDOR (NFPA 101 SECTION 38.2.5.2)

PERMITTED: 50 FEET (MAXIMUM)

PROVIDED: NONE

H. EXIT SIGNS: EXIT SIGNS WILL BE INTERNALLY-ILLUMINATED, LED TYPE.

EXIT SIGNS WILL HAVE INTEGRAL BATTERY BACKUP AND BE CONNECTED TO

THE EMERGENCY CIRCUIT. SIGNS WILL BE LOCATED AT ALL BUILDING EXIT

DOORS AND WHENEVER THE DIRECTION TO THE EXIT IS NOT READILY OBVIOUS.

I. EMERGENCY LIGHTING: ALL MEANS OF EGRESS, INCLUDING EXIT ACCESS

CORRIDORS AND EXIT DISCHARGE WILL BE PROVIDED WITH EMERGENCY

LIGHTING. EMERGENCY LIGHTING WILL BE PROVIDED VIA STANDARD FIXTURES

ON THE EMERGENCY POWER SYSTEM WITH INTEGRAL BATTERY PACK UNITS.

EMERGENCY LIGHTING WILL BE PROVIDED FOR A MINIMUM OF 1 1/2 HOURS IN

THE EVENT OF INTERNAL POWER FAILURE. BACKUP POWER IS PROVIDED BY

BOTH THE ENGINE GENERATOR AND BATTERY BACKUP. AVERAGE ILLUMINATION

WILL NOT BE LESS THAN 10 LUX (1-FOOT CANDLE) WITH A MINIMUM OF 1 LUX

(0.1-FOOT CANDLE) AT ANY POINT.

XII. SECURITY REQUIREMENTS

GLAZING DESIGN (INCLUDING BACK-UP SUPPORT) FOR BLAST EFFECTS IS

REQUIRED.

ACCESSIBILITY SHALL BE AS PER THE ARCHITECTURAL BARRIERS PORTION OF THE

AMERICANS WITH DISABILITIES ACT AND ARCHITECTURAL BARRIERS ACT

ACCESSIBILITY GUIDELINE, AS PUBLISHED BY THE UNITED STATES ACCESS BOARD,

DATED JULY 23, 2004. THIS DOCUMENT IS AVAILABLE AT WWW.ACCESS-BOARD.GOV.

THE A/E IS RESPONSIBLE FOR CHECKING WHETHER THERE ARE LOCAL ACCESSIBILITY

REQUIREMENTS. IF THEY EXIST, THE MOST STRINGENT WILL PREVAIL BETWEEN LOCAL

CODES AND ABA. THE CRITERIA OF THESE STANDARDS SHOULD BE CONSIDERED A

MINIMUM IN PROVIDING ACCESS TO THE PHYSICALLY DISABLED. WHERE DIMENSIONS

FOR CLEARANCES ARE STATED, ALLOWANCE SHOULD BE MADE IN THE DESIGN FOR

CONSTRUCTION TOLERANCES TO ENSURE THAT THE FINISHED CONSTRUCTION IS IN

FULL COMPLIANCE.

NEW FACILITY CONSTRUCTION SHALL COMPLY WITH BLAST PROTECTION REQUIREMENTS

OF THE MOST CURRENT ISSUE OF FAA ORDER 1600.69, FAA FACILITY SECURITY

MANAGEMENT PROGRAM.

CONSTRUCTION - CONSTRUCTION IS INTENDED TO BE UNPROTECTED, NON-COMBUSTIBLE.

A. SEPARATION FROM OTHER BUILDINGS (IBC TABLE 602)

B. EXPOSURE PROTECTION (IBC TABLE 602)

C. STRUCTURAL FRAME, INCLUDING COLUMNS, GIRDERS AND TRUSSES (IBC TABLE

601).

REQUIRED: NONE

D. FLOORS, INCLUDING SUPPORTING BEAMS AND JOISTS (IBC TABLE 601)

REQUIRED: NONE

E. ROOF, INCLUDING SUPPORTING BEAMS AND JOISTS (IBC TABLE 601)

REQUIRED: NONE

PROVIDED: NONE

INTERIOR FIRE RESISTANCE RATED SEPARATIONS SHALL BE IN ACCORDANCE WITH THE

IBC.

A. TOWER TO BASE BUILDING (IBC SECTION 705.4)

REQUIRED: 3-HOUR FIRE RESISTANCE RATED SEPARATION

PROVIDED: 3-HOUR FIRE RESISTANCE RATED SEPARATION

B. STAIR AND SHAFT ENCLOSURES (IBC SECTION 707.4)

REQUIRED: 1-HOUR FIRE RESISTANCE RATED SEPARATION

PROVIDED: NONE - THERE ARE NO SHAFTS OR STAIRS

C. MECHANICAL ROOM (NFPA 101 SECTION 38.3.2.1)

REQUIRED: SMOKE PARTITION

PROVIDED: SMOKE PARTITION

D. TRACON, RADAR EQUIPMENT, NAV/COM EQUIPMENT, RADAR EXPANSION, TRACON

EXPANSION AND NAV/COM EXPANSION TO CORRIDOR (NFPA 75, SECTION 5.1.3)

REQUIRED: 1-HOUR FIRE RESISTANCE RATED SEPARATION

PROVIDED: 1-HOUR FIRE RESISTANCE RATED SEPARATION

E. FIRE CONTROL ROOM (IBC SECTION 911)

REQUIRED: 1-HOUR FIRE RESISTANCE RATED SEPARATION

PROVIDED: 1-HOUR FIRE RESISTANCE RATED SEPARATION

F. FIRE PUMP ROOM (NFPA 20, SECTION 5.12.1.1)

REQUIRED: 1-HOUR FIRE RESISTANCE RATED SEPARATION

PROVIDED: 1-HOUR FIRE RESISTANCE RATED SEPARATION

G. OPENING PROTECTION IN 1-HOUR WALLS EXCLUDING SHAFT, EXIT ENCLOSURE AND

EXIT PASSAGEWAY WALLS (IBC TABLE 714.2)

REQUIRED: 45-MINUTE DOORS

PROVIDED: 45-MINUTE DOORS

H. OPENING PROTECTION IN 3-HOUR WALLS (IBC TABLE 714.2)

REQUIRED: 3-HOUR DOORS

PROVIDED: 3-HOUR DOORS

I. CORRIDORS: CORRIDORS ARE NOT REQUIRED TO BE FIRE RESISTANCE RATED PER

NFPA 101 SECTION 38.3.6.1 (3) IN NEW BUSINESS OCCUPANCIES PROTECTED

THROUGHOUT BY A SUPERVISED AUTOMATIC SPRINKLER SYSTEM.

J. STORAGE ROOMS ARE REQUIRED TO BE SEPARATED BY SMOKE RATED CONSTRUCTION

IN ACCORDANCE WITH IBC TABLE 508.2.

INTERIOR FINISH WILL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 101

CHAPTER 10 AND IBC CHAPTER 8.

A. A MINIMUM OF CLASS A OR B INTERIOR WALL FINISH WILL BE PROVIDED IN

EXITS AND EXIT ACCESS CORRIDORS (NFPA 101 SECTION 38.3.3.2.1).

B. ALL OTHER AREAS, INTERIOR WALL AND CEILING FINISHES ARE REQUIRED TO

BE A MINIMUM OF CLASS C (NFPA 101 SECTIONS 38.3.3.2.2).

C. TYPICALLY, INTERIOR WALL FINISH WILL BE PAINT. INTERIOR FLOOR FINISH

WILL BE A MINIMUM OF CLASS II FINISH (NFPA 101 SECTION 38.3.3.3.2).

D. TYPICALLY, INTERIOR FLOOR FINISH WILL CONSIST OF CARPET, VINYL TILE, CERAMIC

TILE AND SEALED CONCRETE AND COMPLY WITH THE REQUIREMENTS OF NFPA 101

SECTION 10.2.7.

E. SPECIFIC WALL AND FLOOR FINISHES ARE SHOWN ON THE BUILDING’S INTERIOR

FINISH SCHEDULE.

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN

REDLINE

DATE

APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

DATE

DRAWING NO

DESIGNED

REVIEWED BY

p f w

\0 u p d a te m a in ta in s td d e s ig n \7 c a d d \7 a r c h \e a d m in b b \E

S

F \W

A S

D D

A

T B

M G

.d g n

/1

/2

:5

:5

P

M

N A

M E

APPROVED

DATE

NOTE:

THIS DRAWING HAS BEEN REDUCED

TO 1/2 SIZE

YYYPAGE OF XXX

TERMINAL FACILITIES STANDARD DESIGNS

FAA STD 002f COMPLIANT

7/27/09

3’-0"

2’-6"

1’-0"

MIN.

ROOM NAME SQ FT ROOM NAME SQ FT

08’ 8’ 16’

1/8" = 1’-0"

2’-6"

GAS BOILER WITH

FLUE THROUGH ROOF

AHU

FRONT

CLEAR

FRONT

CLEAR

WASD-D-11ATBM-A001

SCALE: 1/8" = 1’ - 0"

140’-0"

138’-0"

" CORRIDOR

JA

N

IT

O

R

A001

ROOM

ROOM

141 AT MANAGER

ROOM SCHEDULE

170 LOCKER ROOM

171 MEN

172 WOMEN

173 JANITOR

5’-0"

181 192

TELCO EQUIPMENT

EQUIPMENT

EXPANSION

145 SF

298 SF

267 SF

435 SF

27 SF

A H

U A

H U

51 SF

130 SF

166 SF

40 SF

622 SF

40 SF

94 SF

5’-0" 5’-0"

5’-0"

151 ELECTRICAL ROOM

AT MANAGER

V E

S T

IB

U

L E

CORRIDOR

CONFERENCE

ROOM

C O

R R

ID

O

R

LINK TO TOWER

OR EMERGENCY

EXIT

V E

S T

IB

U

L E

100 VESTIBULE

101 CORRIDOR

102 CORRIDOR

104 CORRIDOR

105 VESTIBULE

106 CORRIDOR

107 VESTIBULE

111 AF MANAGER

123 CONFERENCE ROOM

124 SMOKING ROOM

180 MECHANICAL ROOM

181 ENV. SHOP

194 EQUIPMENT EXPANSION

554 SF

934 SF

196 SF

1444 SF

350 SF

220 SF

314 SF

COIL

PULL

CLEAR

C O

R R

ID

O

R

SMOKING ROOM

OPEN AREA

152 TAPE PLAYBACK

RAISED FLOOR

MAIL SLOTS

5’-6"5’-6"

STORAGE

AT

TAPE PLAYBACK

CBI

DRUG

TEST

ROOM

3/4" PLYWOOD WITH

GRADE A ON EXPOSED

FACE W/RECESSED

FASTENERS

LINK TO TOWER

OR EMERGENCY

EXIT

VESTIBULE

DAY

TANK

E/G

EG ROOM

MDPE

MDPN

ATS

UPS

MBP

BATTERIES

BATTERY ROOM

EYE WASH

11,000 SF ADMIN BASE BUILDING

121 STORAGE

122 DRUG TEST ROOM

125 BREAKROOM/KITCHEN

142 AT

155 DEBRIEF ROOM

DEBRIEF

ROOM

191 EQUIPMENT

376 SF

223 SF

180 SF

180 SF

406 SF

183 ENGINE GENERATOR ROOM

M

IN

M

IN

INTAKE

LOUVER

8" CMU WITH SOUND

ATTENUATION WALL

11,000 SF ADMIN BASE BUILDING

FLOOR PLAN

144 OPEN AREA

112 AF

113 TECH LIBRARY

154 CBI

182 TECH STORAGE/WORKSPACE

192 LAN ROOM

193 TELCO

MEN

WOMEN

LOCKERS

4’-0"

MIN.

4’-6"

MIN.

SEE WASD-D-11ATBM-G002

FOR EQUIPMENT LAYOUT

232 SF

AF MANAGER

AF

TECH

LIBRARY

OP SUPS

NOTES

SEE NOTE 4

SEE NOTE 4

143 OP SUPS

TOTAL SF 11015

ACCESSIBLE

DRINKING

FOUNTAIN

78 SF

SUSPENDED

REDUNDANT

FAN COIL FOR

UPS/BATTERY

ROOMS

M

IN

184 SWITCH GEAR ROOM

185 UPS ROOM

186 BATTERY ROOM

187 FIRE CONTROL ROOM

188 FIRE PUMP ROOM

UPS ROOM

FIRE CONTROL

ROOM

FIRE PUMP

ROOM

MECHANICAL

ROOM

TECH STORAGE/

WORKSPACE

ENV.

SHOP

LAN

ROOM

SWITCH

GEAR ROOM

LOCKER

ROOM

BREAKROOM

KITCHEN

1. THE ADMIN AREA FLOOR PLAN SHOWN IS AN EXAMPLE OF SPACE USAGE.

ACTUAL LAYOUT WILL REQUIRE SITE ADAPTATION BASED ON THE FAA

PLANNING REQUIREMENTS DOCUMENT.

2. THE ELECTRICAL EQUIPMENT ROOMS SHOWN ARE PRESENTED FOR INITIAL SPACE

PLANNING. ACTUAL ELECTRICAL SYSTEM SHALL BE BASED ON THE FAA PLANNING

REQUIREMENTS DOCUMENT.

3. SEE BASIS OF DESIGN FOR MECHANICAL ROOM LEGEND NOTES.

4. VESTIBULES 105 AND 107 ARE ABA COMPATIBLE. VESTIBULES ARE NOT

NEEDED BETWEEN LINK AND BASE BUILDING.

TEAM

AREA

FILE/COPIER

114 FILE/COPIER

ELECT

ROOM

206 SF

88 SF

132 SF

93 SF

119 SF

928 SF

172 SF

76 SF

116 SF

98 SF

88 SF

135 SF

94 SF

112 SF

85 SF

160 SF

314 SFAF

ADMIN

AT

ADMIN

110 AF ADMIN

140 AT ADMIN

NOTE:

TOTAL AREA INDICATED IS WITHIN EXTERIOR WALLS

INTERNET

WORK

STATIONS

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN

REDLINE

DATE

APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

1234567

1234567

DATE

DRAWING NO

DESIGNED

REVIEWED BY

p f w

\0 u p d a te m a in ta in s td d e s ig n \7 c a d d \7 a r c h \e a d m in b

S

F \W

A S

D D

A

T B

M A

.d g n

/1

/2

:5

:5

P

M

N A

M E

APPROVED

DATE

NOTE:

THIS DRAWING HAS BEEN REDUCED

TO 1/2 SIZE

YYYPAGE OF XXX

TERMINAL FACILITIES STANDARD DESIGNS

FAA STD 002f COMPLIANT

7/27/09

.7

08’ 8’ 16’

1/8" = 1’-0"

WASD-D-11ATBM-G002

SCALE: 1/8" = 1’ - 0"G002

11,000 SF ADMIN BASE BUILDING

11,000 SF ADMIN BASE BUILDING

LIFE SAFETY PLAN

97’-2"

STUB UP FROM

UNDERGROUND

FOR FIRE PROTECTION

FIRE PUMP

FIRE PUMP CONTROLLER

JOCKEY PUMP CONTROLLER

1-HR RATED WALL

PATH OF TRAVEL

(X’ X" = TRAVEL DISTANCE)

SMOKE PARTITION

LEGEND

EXIT SIGN

CODE REQUIRED EXIT/EGRESS

EMERGENCY LIGHTING

CODE REQUIRED EXIT/EGRESS OR

STANDBY EMERGENCY LIGHTING

REQUIRED FOR FAA OPERATION.

NOTES

1.IBC TABLE 302.1.1 AND NFPA 101 SECTION 38.3.2.1 IDENTIFY THE

SEPARATION REQUIREMENTS FOR THE BOILER ROOM. ROOMS WITH

ANY BOILER OVER 15 PSI AND 10 BOILER HORSEPOWER (335 MHZ

INPUT) SHALL BE SEPARATED FROM THE MAIN OCCUPANCY OF THE

BUILDING BY CONSTRUCTION CAPABLE OF RESISTING THE PASSAGE

OF SMOKE (I.E. PARTITIONS SHALL EXTEND FROM THE FLOOR TO THE

UNDERSIDE OF THE FLOOR ABOVE; DOORS SHALL BE AUTOMATIC-

CLOSING UPON DETECTION OF SMOKE; DOORS SHALL NOT HAVE AIR

TRANSFER OPENINGS OR BE UNDERCUT IN EXCESS OF THAT PERMITTED

BY NFPA 80).

2. LIGHTING LAYOUT IS DIAGRAMMATIC INDICATING GENERAL

SPACES/ROOMS THAT REQUIRE EMERGENCY LIGHTING. DESIGNER

SHALL PROVIDE LIGHTING DESIGN AND CALCULATIONS FOR

COMPLIANCE WITH FAA LIGHTING CRITERIA AND LIFE SAFETY

CODE. EXIT LIGHTING SHALL EXTEND FOR ALL DESIGNATED

EGRESS PATHWAYS LEADING TO A PUBLIC WAY IN ACCORDANCE

WITH NFPA 101.

.7

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN

REDLINE

DATE

APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

1234567

1234567

DATE

DRAWING NO

DESIGNED

REVIEWED BY

p f w

\0 u p d a te m a in ta in s td d e s ig n \7 c a d d \7 a r c h \e a d m in b

S

F \W

A S

D D

A

T B

M G

.d g n

/1

/2

:5

:5

P

M

N A

M E

APPROVED

DATE

NOTE:

THIS DRAWING HAS BEEN REDUCED

TO 1/2 SIZE

YYYPAGE OF XXX

TERMINAL FACILITIES STANDARD DESIGNS

FAA STD 002f COMPLIANT

7/27/09

181 192

ROOM NAME SQ FT ROOM NAME SQ FT

ROOM

ROOM

141 AT MANAGER

ROOM SCHEDULE

170 LOCKER ROOM

171 MEN

172 WOMEN

173 JANITOR

145 SF

298 SF

267 SF

435 SF

27 SF

51 SF

130 SF

166 SF

40 SF

622 SF

40 SF

94 SF

151 ELECTRICAL ROOM100 VESTIBULE

101 CORRIDOR

102 CORRIDOR

104 CORRIDOR

105 VESTIBULE

106 CORRIDOR

107 VESTIBULE

111 AF MANAGER

123 CONFERENCE ROOM

124 SMOKING ROOM

180 MECHANICAL ROOM

181 ENV. SHOP

194 EQUIPMENT EXPANSION

554 SF

934 SF

196 SF

1444 SF

350 SF

220 SF

314 SF

152 TAPE PLAYBACK

121 STORAGE

122 DRUG TEST ROOM

125 BREAKROOM/KITCHEN

142 AT

155 DEBRIEF ROOM

191 EQUIPMENT

376 SF

223 SF

180 SF

180 SF

406 SF

183 ENGINE GENERATOR ROOM

144 OPEN AREA

112 AF

113 TECH LIBRARY

154 CBI

182 TECH STORAGE/WORKSPACE

192 LAN ROOM

193 TELCO

232 SF

143 OP SUPS

TOTAL SF 11015

78 SF

184 SWITCH GEAR ROOM

185 UPS ROOM

186 BATTERY ROOM

187 FIRE CONTROL ROOM

188 FIRE PUMP ROOM

114 FILE/COPIER

206 SF

88 SF

132 SF

93 SF

119 SF

928 SF

172 SF

76 SF

116 SF

98 SF

88 SF

135 SF

94 SF

112 SF

85 SF

160 SF

314 SF

110 AF ADMIN

140 AT ADMIN

NOTE:

TOTAL AREA INDICATED IS WITHIN EXTERIOR WALLS

WASD-D-11ATBM-G001_Basis of Design
WASD-D-11ATBM-A001_Floor Plan
WASD-D-11ATBM-G002_Life Safety Plan

File details come from the government source that posted it. Updated .