This solicitation requests proposals from architecture and engineering firms to design a new Remote Transmitter/Receiver tower, Air Traffic Control Tower, and associated base building for the San Jose International Airport. Interested vendors must submit all questions to the contracting officer by December 15, 2023. Proposals are due by January 22, 2024 at 3:00 PM Pacific Time and must be emailed to the contracting officer at the provided address. The selected firm will be responsible for designing the new RTR tower, ATCT, and base building to support air traffic operations at the airport. The Federal Aviation Administration's Southwestern Region is issuing this solicitation.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WASD-D-11ATBM-G001
11,000 SF ADMIN BASE BUILDING
BASIS OF DESIGN
BASIS OF DESIGN
III. USE & OCCUPANCY CLASSIFICATION
V. GENERAL BUILDING HEIGHT AND AREA
VII. FIRE RESISTANCE RATED CONSTRUCTION
VIII. INTERIOR FINISHES
II. CODES OF RECORD
I. FACILITY DEFINITION
VI. TYPE OF CONSTRUCTION
IX. FIRE PROTECTION SYSTEM
X. MEANS OF EGRESS
XI. ACCESSIBILITY
IV. SPECIAL DETAILED REQUIREMENTS BASED ON USE AND
OCCUPANCY
XIII. MECHANICAL ROOM LEGEND NOTES
1 4 CHILLED WATER (CHW) PUMPS (2 FOR BASE BUILDING LOOP AND 2 FOR
TOWER LOOP)
2 CHW EXPANSION TANK AND CHEMICAL SHOT FEEDER (BASE BUILDING LOOP)
3 CHW EXPANSION TANK AND CHEMICAL SHOT FEEDER (TOWER LOOP)
4 CHW PLATE/FRAME HEAT EXCHANGER
5 WATER FILTRATION SYSTEM (IF REQUIRED)
6 DOMESTIC WATER BOOSTER PUMP SYSTEM (TOWER)
7 WATER HEATER
8 4 HEATING HOT WATER (HHW) PUMPS (2 FOR BASE BUILDING LOOP AND 2 FOR
TOWER LOOP)
9 HHW EXPANSION TANK AND CHEMICAL SHOT FEEDER (BASE BUILDING LOOP)
HHW EXPANSION TANK AND CHEMICAL SHOT FEEDER (TOWER LOOP)
HHW PLATE/FRAME HEAT EXCHANGER
BASE BUILDINGS ARE IDENTIFIED AS ADMINISTRATIVE (NON-TRACON) BASE BUILDINGS
AND TRACON BASE BUILDINGS AND ARE CLASSIFIED INTO SIZES BASED ON THE NUMBER OF
PERSONNEL THE FACILITY IS EXPECTED TO ACCOMMODATE AS WELL AS THE FOOTPRINT
AND CLEARANCES REQUIRED BY THE EQUIPMENT.
AREAS WITHIN THE BASE BUILDINGS ARE GROUPED BASED ON ACTIVITY AND CLASSIFIED
BY ACTIVITY MODULE. THE ACTIVITY MODULE GROUPS ARE AS FOLLOWS:
-AIR TRAFFIC (INCLUDING OPERATIONAL AND GENERAL ADMINISTRATION OFFICES)
-AIRWAY FACILITIES (INCLUDING OPERATIONAL AND GENERAL ADMINISTRATION
OFFICES)
-MECHANICAL/ELECTRICAL SUPPORT
-EQUIPMENT AREAS WITH SHOP AND STORAGE
SQUARE FOOT SPACE REQUIREMENTS FOR ROOMS WITHIN EACH ACTIVITY MODULE WERE
ESTABLISHED BY THE FEDERAL AVIATION ADMINISTRATION ATO ON APRIL 27, 2004.
THE DESIGN AND CONSTRUCTION OF THE 11,000 SQUARE FOOT ADMINISTRATIVE BASE
BUILDING SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BUILDING
CODE (IBC), 2006 EDITION AND NFPA 101, THE LIFE SAFETY CODE (LSC), 2006
EDITION. WHERE THE IBC AND NFPA 101 HAVE CONFLICTING REQUIREMENTS, THE MORE
RESTRICTIVE CODE SHALL TAKE PRECEDENCE.
THE FOLLOWING DOCUMENTS WILL PROVIDE THE CRITERIA WHICH WILL GOVERN THE FIRE
PROTECTION AND LIFE SAFETY DESIGN OF THE FACILITY.
A. INTERNATIONAL BUILDING CODE (IBC), 2006 EDITION.
B. INTERNATIONAL FIRE CODE (IFC), 2006 EDITION.
C. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 10 (NFPA 10), STANDARD
FOR PORTABLE FIRE EXTINGUISHERS, 2007 EDITION.
D. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 13 (NFPA 13), STANDARD
FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2007 EDITION.
E. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 20 (NFPA 20), STANDARD
FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, 2007
EDITION.
F. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 24 (NFPA 24), STANDARD
FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR
APPURTENANCES, 2007 EDITION.
G. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 70 (NFPA 70), NATIONAL
ELECTRICAL CODE, 2008 EDITION.
H. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 72 (NFPA 72), NATIONAL
FIRE ALARM CODE, 2007 EDITION.
I. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 75 (NFPA 75), STANDARD
FOR THE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT, 2003 EDITION.
J. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 76 (NFPA 76), STANDARD
FOR THE PROTECTION OF TELECOMMUNICATIONS FACILITIES, 2005 EDITION.
K. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 90A (NFPA 90A), STANDARD
FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2002
EDITION.
L. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 92A (NFPA 92A),
RECOMMENDED PRACTICE FOR SMOKE CONTROL SYSTEMS, 2006 EDITION.
M. NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 101 (NFPA 101), THE LIFE
SAFETY CODE, 2006 EDITION.
N. FAA ORDER 6480.7E.
A. BUSINESS (IBC SECTION 304)
B. NEW BUSINESS (NFPA 101, SECTION 38.1.1.1)
INTERNATIONAL BUILDING CODE (IBC SECTION 304) - THIS BASE BUILDING IS
CLASSIFIED AS A BUSINESS OCCUPANCY IN ACCORDANCE WITH THE REQUIREMENTS
OF THE IBC. THE BASE BUILDING IS DESIGNED TO SERVE AN OCCUPANT LOAD OF
100 SQUARE FEET PER PERSON IN ACCORDANCE WITH IBC TABLE 1004.1.2.
LIFE SAFETY CODE (NFPA 101 SECTION 38.1.1.1) - THIS BASE BUILDING IS
CLASSIFIED AS A BUSINESS OCCUPANCY IN ACCORDANCE WITH THE REQUIREMENTS
OF THE LSC. THE BASE BUILDING IS DESIGNED TO SERVE AN OCCUPANT LOAD OF
100 SQUARE FEET PER PERSON PER NFPA 101 TABLE 7.3.1.2.
A. ALLOWABLE HEIGHT (IBC SECTION 504.1)
MAXIMUM PERMITTED: 4 STORIES
PROVIDED: 1 STORY
B. ALLOWABLE AREA (IBC TABLE 503)
MAXIMUM PERMITTED: 23.000 SQUARE FEET (BASE ALLOWABLE AREA)
MAXIMUM PROVIDED: 10,990 SQUARE FEET
A. CONSTRUCTION TYPE (IBC TABLE 601)
MINIMUM REQUIRED: V
PROVIDED: IIB
A. SUPPRESSION - THE FACILITY WILL BE PROTECTED THROUGHOUT BY AN
ELECTRONICALLY SUPERVISED FULLY AUTOMATIC FIRE SPRINKLER SYSTEM
B. FIRE PUMP - THE FACILITY WILL BE EQUIPPED WITH A FIRE PUMP AS
REQUIRED TO SUPPLY THE AUTOMATIC FIRE SPRINKLER SYSTEM. THE FIRE
PUMP SHOULD BE SIZED BASED ON SPRINKLER/STANDPIPE DEMAND FOR THE
ADJACENT TOWER.
C. ALARM & DETECTION - THE FACILITY WILL BE PROTECTED BY SMOKE
DETECTION AS REQUIRED (ELECTRONIC EQUIPMENT ROOMS).
D. ALARM NOTIFICATION AND COMMUNICATION - NOTIFICATION SHALL BE
AS REQUIRED BY NFPA 72.
MEANS OF EGRESS SHALL BE IN ACCORDANCE WITH NFPA 101.
A. OCCUPANT LOAD (NFPA 101 SECTION 38.1.7)
BUILDING TOTAL: 111 PEOPLE (10,990 SQUARE FEET, 100 SQUARE FEET PER
PERSON)
B. NUMBER OF EXITS (NFPA 101 SECTION 38.2.4.1(2) ERRATA 101-03-1)
REQUIRED: 2
PROVIDED: 4
A MINIMUM OF TWO EXITS ARE REQUIRED BY BOTH THE IBC AND THE LSC.
EXITS MUST BE SEPARATED BY A MINIMUM OF 1/3 OF THE LENGTH OF THE
MAXIMUM OVERALL DIAGONAL DIMENSION OF THE BUILDING OR AREA TO BE
SERVED MEASURED IN A STRAIGHT LINE BETWEEN EXIT DOORS OR EXIT
ACCESS DOORWAYS.
C. CORRIDOR CAPACITY (NFPA 101 SECTION 38.2.3.1)
REQUIRED: 44 INCHES
PROVIDED: 60 INCHES
D. EXIT DOORS
MINIMUM WIDTH: 32 INCHES (PER DOOR)
PROVIDED: 34 INCHES (CLEAR WIDTH)
E. TRAVEL DISTANCE (NFPA 101 SECTION 38.2.6)
PERMITTED: 300 FEET (MAXIMUM)
PROVIDED: 98 FEET
F. COMMON PATH (NFPA 101 SECTION 38.2.5.3.2)
PERMITTED: 100 FEET (MAXIMUM)
PROVIDED: 45 FEET
G. DEAD-END CORRIDOR (NFPA 101 SECTION 38.2.5.2)
PERMITTED: 50 FEET (MAXIMUM)
PROVIDED: NONE
H. EXIT SIGNS: EXIT SIGNS WILL BE INTERNALLY-ILLUMINATED, LED TYPE.
EXIT SIGNS WILL HAVE INTEGRAL BATTERY BACKUP AND BE CONNECTED TO
THE EMERGENCY CIRCUIT. SIGNS WILL BE LOCATED AT ALL BUILDING EXIT
DOORS AND WHENEVER THE DIRECTION TO THE EXIT IS NOT READILY OBVIOUS.
I. EMERGENCY LIGHTING: ALL MEANS OF EGRESS, INCLUDING EXIT ACCESS
CORRIDORS AND EXIT DISCHARGE WILL BE PROVIDED WITH EMERGENCY
LIGHTING. EMERGENCY LIGHTING WILL BE PROVIDED VIA STANDARD FIXTURES
ON THE EMERGENCY POWER SYSTEM WITH INTEGRAL BATTERY PACK UNITS.
EMERGENCY LIGHTING WILL BE PROVIDED FOR A MINIMUM OF 1 1/2 HOURS IN
THE EVENT OF INTERNAL POWER FAILURE. BACKUP POWER IS PROVIDED BY
BOTH THE ENGINE GENERATOR AND BATTERY BACKUP. AVERAGE ILLUMINATION
WILL NOT BE LESS THAN 10 LUX (1-FOOT CANDLE) WITH A MINIMUM OF 1 LUX
(0.1-FOOT CANDLE) AT ANY POINT.
XII. SECURITY REQUIREMENTS
GLAZING DESIGN (INCLUDING BACK-UP SUPPORT) FOR BLAST EFFECTS IS
REQUIRED.
ACCESSIBILITY SHALL BE AS PER THE ARCHITECTURAL BARRIERS PORTION OF THE
AMERICANS WITH DISABILITIES ACT AND ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY GUIDELINE, AS PUBLISHED BY THE UNITED STATES ACCESS BOARD,
DATED JULY 23, 2004. THIS DOCUMENT IS AVAILABLE AT WWW.ACCESS-BOARD.GOV.
THE A/E IS RESPONSIBLE FOR CHECKING WHETHER THERE ARE LOCAL ACCESSIBILITY
REQUIREMENTS. IF THEY EXIST, THE MOST STRINGENT WILL PREVAIL BETWEEN LOCAL
CODES AND ABA. THE CRITERIA OF THESE STANDARDS SHOULD BE CONSIDERED A
MINIMUM IN PROVIDING ACCESS TO THE PHYSICALLY DISABLED. WHERE DIMENSIONS
FOR CLEARANCES ARE STATED, ALLOWANCE SHOULD BE MADE IN THE DESIGN FOR
CONSTRUCTION TOLERANCES TO ENSURE THAT THE FINISHED CONSTRUCTION IS IN
FULL COMPLIANCE.
NEW FACILITY CONSTRUCTION SHALL COMPLY WITH BLAST PROTECTION REQUIREMENTS
OF THE MOST CURRENT ISSUE OF FAA ORDER 1600.69, FAA FACILITY SECURITY
MANAGEMENT PROGRAM.
CONSTRUCTION - CONSTRUCTION IS INTENDED TO BE UNPROTECTED, NON-COMBUSTIBLE.
A. SEPARATION FROM OTHER BUILDINGS (IBC TABLE 602)
B. EXPOSURE PROTECTION (IBC TABLE 602)
C. STRUCTURAL FRAME, INCLUDING COLUMNS, GIRDERS AND TRUSSES (IBC TABLE
601).
REQUIRED: NONE
D. FLOORS, INCLUDING SUPPORTING BEAMS AND JOISTS (IBC TABLE 601)
REQUIRED: NONE
E. ROOF, INCLUDING SUPPORTING BEAMS AND JOISTS (IBC TABLE 601)
REQUIRED: NONE
PROVIDED: NONE
INTERIOR FIRE RESISTANCE RATED SEPARATIONS SHALL BE IN ACCORDANCE WITH THE
IBC.
A. TOWER TO BASE BUILDING (IBC SECTION 705.4)
REQUIRED: 3-HOUR FIRE RESISTANCE RATED SEPARATION
PROVIDED: 3-HOUR FIRE RESISTANCE RATED SEPARATION
B. STAIR AND SHAFT ENCLOSURES (IBC SECTION 707.4)
REQUIRED: 1-HOUR FIRE RESISTANCE RATED SEPARATION
PROVIDED: NONE - THERE ARE NO SHAFTS OR STAIRS
C. MECHANICAL ROOM (NFPA 101 SECTION 38.3.2.1)
REQUIRED: SMOKE PARTITION
PROVIDED: SMOKE PARTITION
D. TRACON, RADAR EQUIPMENT, NAV/COM EQUIPMENT, RADAR EXPANSION, TRACON
EXPANSION AND NAV/COM EXPANSION TO CORRIDOR (NFPA 75, SECTION 5.1.3)
REQUIRED: 1-HOUR FIRE RESISTANCE RATED SEPARATION
PROVIDED: 1-HOUR FIRE RESISTANCE RATED SEPARATION
E. FIRE CONTROL ROOM (IBC SECTION 911)
REQUIRED: 1-HOUR FIRE RESISTANCE RATED SEPARATION
PROVIDED: 1-HOUR FIRE RESISTANCE RATED SEPARATION
F. FIRE PUMP ROOM (NFPA 20, SECTION 5.12.1.1)
REQUIRED: 1-HOUR FIRE RESISTANCE RATED SEPARATION
PROVIDED: 1-HOUR FIRE RESISTANCE RATED SEPARATION
G. OPENING PROTECTION IN 1-HOUR WALLS EXCLUDING SHAFT, EXIT ENCLOSURE AND
EXIT PASSAGEWAY WALLS (IBC TABLE 714.2)
REQUIRED: 45-MINUTE DOORS
PROVIDED: 45-MINUTE DOORS
H. OPENING PROTECTION IN 3-HOUR WALLS (IBC TABLE 714.2)
REQUIRED: 3-HOUR DOORS
PROVIDED: 3-HOUR DOORS
I. CORRIDORS: CORRIDORS ARE NOT REQUIRED TO BE FIRE RESISTANCE RATED PER
NFPA 101 SECTION 38.3.6.1 (3) IN NEW BUSINESS OCCUPANCIES PROTECTED
THROUGHOUT BY A SUPERVISED AUTOMATIC SPRINKLER SYSTEM.
J. STORAGE ROOMS ARE REQUIRED TO BE SEPARATED BY SMOKE RATED CONSTRUCTION
IN ACCORDANCE WITH IBC TABLE 508.2.
INTERIOR FINISH WILL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 101
CHAPTER 10 AND IBC CHAPTER 8.
A. A MINIMUM OF CLASS A OR B INTERIOR WALL FINISH WILL BE PROVIDED IN
EXITS AND EXIT ACCESS CORRIDORS (NFPA 101 SECTION 38.3.3.2.1).
B. ALL OTHER AREAS, INTERIOR WALL AND CEILING FINISHES ARE REQUIRED TO
BE A MINIMUM OF CLASS C (NFPA 101 SECTIONS 38.3.3.2.2).
C. TYPICALLY, INTERIOR WALL FINISH WILL BE PAINT. INTERIOR FLOOR FINISH
WILL BE A MINIMUM OF CLASS II FINISH (NFPA 101 SECTION 38.3.3.3.2).
D. TYPICALLY, INTERIOR FLOOR FINISH WILL CONSIST OF CARPET, VINYL TILE, CERAMIC
TILE AND SEALED CONCRETE AND COMPLY WITH THE REQUIREMENTS OF NFPA 101
SECTION 10.2.7.
E. SPECIFIC WALL AND FLOOR FINISHES ARE SHOWN ON THE BUILDING’S INTERIOR
FINISH SCHEDULE.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
p f w
\0 u p d a te m a in ta in s td d e s ig n \7 c a d d \7 a r c h \e a d m in b b \E
S
F \W
A S
D D
A
T B
M G
.d g n
/1
/2
:5
:5
P
M
N A
M E
APPROVED
DATE
NOTE:
THIS DRAWING HAS BEEN REDUCED
TO 1/2 SIZE
YYYPAGE OF XXX
TERMINAL FACILITIES STANDARD DESIGNS
FAA STD 002f COMPLIANT
7/27/09
3’-0"
2’-6"
1’-0"
MIN.
ROOM NAME SQ FT ROOM NAME SQ FT
08’ 8’ 16’
1/8" = 1’-0"
2’-6"
GAS BOILER WITH
FLUE THROUGH ROOF
AHU
FRONT
CLEAR
FRONT
CLEAR
WASD-D-11ATBM-A001
SCALE: 1/8" = 1’ - 0"
140’-0"
138’-0"
" CORRIDOR
JA
N
IT
O
R
A001
ROOM
ROOM
141 AT MANAGER
ROOM SCHEDULE
170 LOCKER ROOM
171 MEN
172 WOMEN
173 JANITOR
5’-0"
181 192
TELCO EQUIPMENT
EQUIPMENT
EXPANSION
145 SF
298 SF
267 SF
435 SF
27 SF
A H
U A
H U
51 SF
130 SF
166 SF
40 SF
622 SF
40 SF
94 SF
5’-0" 5’-0"
5’-0"
151 ELECTRICAL ROOM
AT MANAGER
V E
S T
IB
U
L E
CORRIDOR
CONFERENCE
ROOM
C O
R R
ID
O
R
LINK TO TOWER
OR EMERGENCY
EXIT
V E
S T
IB
U
L E
100 VESTIBULE
101 CORRIDOR
102 CORRIDOR
104 CORRIDOR
105 VESTIBULE
106 CORRIDOR
107 VESTIBULE
111 AF MANAGER
123 CONFERENCE ROOM
124 SMOKING ROOM
180 MECHANICAL ROOM
181 ENV. SHOP
194 EQUIPMENT EXPANSION
554 SF
934 SF
196 SF
1444 SF
350 SF
220 SF
314 SF
COIL
PULL
CLEAR
C O
R R
ID
O
R
SMOKING ROOM
OPEN AREA
152 TAPE PLAYBACK
RAISED FLOOR
MAIL SLOTS
5’-6"5’-6"
STORAGE
AT
TAPE PLAYBACK
CBI
DRUG
TEST
ROOM
3/4" PLYWOOD WITH
GRADE A ON EXPOSED
FACE W/RECESSED
FASTENERS
LINK TO TOWER
OR EMERGENCY
EXIT
VESTIBULE
DAY
TANK
E/G
EG ROOM
MDPE
MDPN
ATS
UPS
MBP
BATTERIES
BATTERY ROOM
EYE WASH
11,000 SF ADMIN BASE BUILDING
121 STORAGE
122 DRUG TEST ROOM
125 BREAKROOM/KITCHEN
142 AT
155 DEBRIEF ROOM
DEBRIEF
ROOM
191 EQUIPMENT
376 SF
223 SF
180 SF
180 SF
406 SF
183 ENGINE GENERATOR ROOM
M
IN
M
IN
INTAKE
LOUVER
8" CMU WITH SOUND
ATTENUATION WALL
11,000 SF ADMIN BASE BUILDING
FLOOR PLAN
144 OPEN AREA
112 AF
113 TECH LIBRARY
154 CBI
182 TECH STORAGE/WORKSPACE
192 LAN ROOM
193 TELCO
MEN
WOMEN
LOCKERS
4’-0"
MIN.
4’-6"
MIN.
SEE WASD-D-11ATBM-G002
FOR EQUIPMENT LAYOUT
232 SF
AF MANAGER
AF
TECH
LIBRARY
OP SUPS
NOTES
SEE NOTE 4
SEE NOTE 4
143 OP SUPS
TOTAL SF 11015
ACCESSIBLE
DRINKING
FOUNTAIN
78 SF
SUSPENDED
REDUNDANT
FAN COIL FOR
UPS/BATTERY
ROOMS
M
IN
184 SWITCH GEAR ROOM
185 UPS ROOM
186 BATTERY ROOM
187 FIRE CONTROL ROOM
188 FIRE PUMP ROOM
UPS ROOM
FIRE CONTROL
ROOM
FIRE PUMP
ROOM
MECHANICAL
ROOM
TECH STORAGE/
WORKSPACE
ENV.
SHOP
LAN
ROOM
SWITCH
GEAR ROOM
LOCKER
ROOM
BREAKROOM
KITCHEN
1. THE ADMIN AREA FLOOR PLAN SHOWN IS AN EXAMPLE OF SPACE USAGE.
ACTUAL LAYOUT WILL REQUIRE SITE ADAPTATION BASED ON THE FAA
PLANNING REQUIREMENTS DOCUMENT.
2. THE ELECTRICAL EQUIPMENT ROOMS SHOWN ARE PRESENTED FOR INITIAL SPACE
PLANNING. ACTUAL ELECTRICAL SYSTEM SHALL BE BASED ON THE FAA PLANNING
REQUIREMENTS DOCUMENT.
3. SEE BASIS OF DESIGN FOR MECHANICAL ROOM LEGEND NOTES.
4. VESTIBULES 105 AND 107 ARE ABA COMPATIBLE. VESTIBULES ARE NOT
NEEDED BETWEEN LINK AND BASE BUILDING.
TEAM
AREA
FILE/COPIER
114 FILE/COPIER
ELECT
ROOM
206 SF
88 SF
132 SF
93 SF
119 SF
928 SF
172 SF
76 SF
116 SF
98 SF
88 SF
135 SF
94 SF
112 SF
85 SF
160 SF
314 SFAF
ADMIN
AT
ADMIN
110 AF ADMIN
140 AT ADMIN
NOTE:
TOTAL AREA INDICATED IS WITHIN EXTERIOR WALLS
INTERNET
WORK
STATIONS
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
1234567
1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
p f w
\0 u p d a te m a in ta in s td d e s ig n \7 c a d d \7 a r c h \e a d m in b
S
F \W
A S
D D
A
T B
M A
.d g n
/1
/2
:5
:5
P
M
N A
M E
APPROVED
DATE
NOTE:
THIS DRAWING HAS BEEN REDUCED
TO 1/2 SIZE
YYYPAGE OF XXX
TERMINAL FACILITIES STANDARD DESIGNS
FAA STD 002f COMPLIANT
7/27/09
.7
08’ 8’ 16’
1/8" = 1’-0"
WASD-D-11ATBM-G002
SCALE: 1/8" = 1’ - 0"G002
11,000 SF ADMIN BASE BUILDING
11,000 SF ADMIN BASE BUILDING
LIFE SAFETY PLAN
97’-2"
STUB UP FROM
UNDERGROUND
FOR FIRE PROTECTION
FIRE PUMP
FIRE PUMP CONTROLLER
JOCKEY PUMP CONTROLLER
1-HR RATED WALL
PATH OF TRAVEL
(X’ X" = TRAVEL DISTANCE)
SMOKE PARTITION
LEGEND
EXIT SIGN
CODE REQUIRED EXIT/EGRESS
EMERGENCY LIGHTING
CODE REQUIRED EXIT/EGRESS OR
STANDBY EMERGENCY LIGHTING
REQUIRED FOR FAA OPERATION.
NOTES
1.IBC TABLE 302.1.1 AND NFPA 101 SECTION 38.3.2.1 IDENTIFY THE
SEPARATION REQUIREMENTS FOR THE BOILER ROOM. ROOMS WITH
ANY BOILER OVER 15 PSI AND 10 BOILER HORSEPOWER (335 MHZ
INPUT) SHALL BE SEPARATED FROM THE MAIN OCCUPANCY OF THE
BUILDING BY CONSTRUCTION CAPABLE OF RESISTING THE PASSAGE
OF SMOKE (I.E. PARTITIONS SHALL EXTEND FROM THE FLOOR TO THE
UNDERSIDE OF THE FLOOR ABOVE; DOORS SHALL BE AUTOMATIC-
CLOSING UPON DETECTION OF SMOKE; DOORS SHALL NOT HAVE AIR
TRANSFER OPENINGS OR BE UNDERCUT IN EXCESS OF THAT PERMITTED
BY NFPA 80).
2. LIGHTING LAYOUT IS DIAGRAMMATIC INDICATING GENERAL
SPACES/ROOMS THAT REQUIRE EMERGENCY LIGHTING. DESIGNER
SHALL PROVIDE LIGHTING DESIGN AND CALCULATIONS FOR
COMPLIANCE WITH FAA LIGHTING CRITERIA AND LIFE SAFETY
CODE. EXIT LIGHTING SHALL EXTEND FOR ALL DESIGNATED
EGRESS PATHWAYS LEADING TO A PUBLIC WAY IN ACCORDANCE
WITH NFPA 101.
.7
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
1234567
1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
p f w
\0 u p d a te m a in ta in s td d e s ig n \7 c a d d \7 a r c h \e a d m in b
S
F \W
A S
D D
A
T B
M G
.d g n
/1
/2
:5
:5
P
M
N A
M E
APPROVED
DATE
NOTE:
THIS DRAWING HAS BEEN REDUCED
TO 1/2 SIZE
YYYPAGE OF XXX
TERMINAL FACILITIES STANDARD DESIGNS
FAA STD 002f COMPLIANT
7/27/09
181 192
ROOM NAME SQ FT ROOM NAME SQ FT
ROOM
ROOM
141 AT MANAGER
ROOM SCHEDULE
170 LOCKER ROOM
171 MEN
172 WOMEN
173 JANITOR
145 SF
298 SF
267 SF
435 SF
27 SF
51 SF
130 SF
166 SF
40 SF
622 SF
40 SF
94 SF
151 ELECTRICAL ROOM100 VESTIBULE
101 CORRIDOR
102 CORRIDOR
104 CORRIDOR
105 VESTIBULE
106 CORRIDOR
107 VESTIBULE
111 AF MANAGER
123 CONFERENCE ROOM
124 SMOKING ROOM
180 MECHANICAL ROOM
181 ENV. SHOP
194 EQUIPMENT EXPANSION
554 SF
934 SF
196 SF
1444 SF
350 SF
220 SF
314 SF
152 TAPE PLAYBACK
121 STORAGE
122 DRUG TEST ROOM
125 BREAKROOM/KITCHEN
142 AT
155 DEBRIEF ROOM
191 EQUIPMENT
376 SF
223 SF
180 SF
180 SF
406 SF
183 ENGINE GENERATOR ROOM
144 OPEN AREA
112 AF
113 TECH LIBRARY
154 CBI
182 TECH STORAGE/WORKSPACE
192 LAN ROOM
193 TELCO
232 SF
143 OP SUPS
TOTAL SF 11015
78 SF
184 SWITCH GEAR ROOM
185 UPS ROOM
186 BATTERY ROOM
187 FIRE CONTROL ROOM
188 FIRE PUMP ROOM
114 FILE/COPIER
206 SF
88 SF
132 SF
93 SF
119 SF
928 SF
172 SF
76 SF
116 SF
98 SF
88 SF
135 SF
94 SF
112 SF
85 SF
160 SF
314 SF
110 AF ADMIN
140 AT ADMIN
NOTE:
TOTAL AREA INDICATED IS WITHIN EXTERIOR WALLS
| WASD-D-11ATBM-G001_Basis of Design |
| WASD-D-11ATBM-A001_Floor Plan |
| WASD-D-11ATBM-G002_Life Safety Plan |
File details come from the government source that posted it. Updated .