Amendment 0002_signed.pdf
PDF 622 KB Posted
- Attached to
- MSP District Janitorial Services, Various Locations Federal contract opportunity
- Solicitation number
- 697DCK-23-R-00006
About this file
This document is an amendment to a solicitation for janitorial services at various locations for the Department of Transportation Federal Aviation Administration Southwestern Region. The solicitation seeks offers for MSP District Janitorial Services at multiple sites to be performed over a one year base period and four one-year options. Offerors must submit pricing for the base period and all option periods by the closing date of July 15, 2023. The estimated annual value is $500,000 to $1,000,000. The NAICS code is 561720 and the small business size standard is $38.5 million in average annual receipts. The solicitation is unrestricted and available through beta.SAM.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003_signed.pdf | ||
| Amendment 0001_signed.pdf | ||
| Attachment 4 - Section B Pricing Spreadsheet-Minneapolis District Janitorial.xlsx | XLSX spreadsheet | |
| Attachment 2 - MSP District ATCTs Site Specific SOWs.pdf | ||
| Attachment 3 - MSP District Administrative Facilities Site Specific SOWs.pdf | ||
| 697DCK-23-R-00006.pdf | ||
| Attachment 1 - ZMP ARTCC and CCF Site Specific SOW.pdf | ||
| Attachment 5 - Service Contract Act Combined Wage Determination.pdf | ||
| Attachment 6 - Customer Satisfaction Survey.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| ������������ | � |
| ������� | � |
� �������������������� ����������������� �!""#$%!&#'()���*���*���+*���,������������� -���,,����.������ /����01�2�����+�1��3�2����0���� ��4�����,����4�25���221���67 ����� 8����*���2������67��� �9:;'<�:;!=��:'>�?(
@����*�����������22��,�������������A9BC�D:<'':C�%9E=:FC�G:!:'�!=H�I�J�K9H'(
L����*���*�����,�2�M�������������L6���������GNN��ONP�QQ(�R���*���,���������,���������+����������R6���������GNN��ONP�QS(����� ,���M��7������TTU��V�
���������W��XX���
�YZ�[\]̂Z�_̀a\ZbZc�d]efgfh[hf]_�fd�[aZ_cZc�[d�dZh�i]bhY�f_��hZa��/����YZ�Y]̀b�[_c�c[hZ�djZgfifZc�i]b�bZgZfjh�]i��iiZbd�iiZbd�à dh�[gk_]leZcmZ�bZgZfjh�]i�hYfd�[aZ_caZ_h�jbf]b�h]�hYZ�Y]̀b�[_c�c[hZ�djZgfifZc�f_�hYZ�d]efgfh[hf]_�]b�[d�[aZ_cZcn�\o�]_Z�]i�hYZ�i]ee]lf_m�aZhY]cdp�q[r�6o�g]ajeZhf_m�hZad�@�[_c���n�[_c�bZh̀b_f_m fd�ZshZ_cZcn� fd�_]h�ZshZ_cZc�
�)������1����4�������������������������� �<'tE$<'HB(TuU��V�
�������XX���
����W�������� � U���������� �� ��V�� ����������U��
��v�����������TwUqsr ����3�2��3��4���������2��221����1�21������p��G"'%$ F�!E:;9<$:F(���3���3��4�2�2���,���3�������*��/�����*��������3����������6���3���6�.���1*6�������������+�������2�*���,���������,M�����3����*���2�����.���3��4�2��DE%;�!D�%;!=x'D�$=�"!F$=x�9 $%'C�����3�2�21��M�*����M��4���*�����2���������������1�21��������3���1�3����7��,p�����3����G"'%$ F�:F"'�9 �>9H$ $%!:$9=�!=H�!E:;9<$:F(!""<9"<$!:$9=�H!:'C�':%B(��2���,���3�������*��/�� �U���X������y �]_hb[gh]b� fd�_]hn� fd�bZz̀fbZc�h]�dfm_�hYfd�c]g̀aZ_h�[_c�bZh̀b_
����������������*��R��
�/����2����������,��*���*���+*���,����������<x!=$�'H�&F��K��D'%:$9=�;'!H$=xDC�$=%#EH$=x�D9#$%$:!:$9=�%9=:<!%:�DE&�'%:�>!::'<��;'<'� '!D$&#'Br dZj[b[hZ�eZhhZb�]b�hZeZmb[a�lYfgY�f_gècZd�[�bZiZbZ_gZ�h]�hYZ�d]efgfh[hf]_�[_c�[aZ_caZ_h�_̀a\Zb���,��M1����,�7�1��������M��4�*�������6�������.�������3���M������2�4������,����3�����������,��,,��2�����������3��3�1�����������2����,����*�7���21M����������������,�7�1���,,������i�\o�f̂bh̀Z�]i�hYfd�[aZ_caZ_h�o]̀�cZdfbZ�h]�gY[_mZ�[_�]iiZb�[ebZ[co�d̀\afhhZcn�d̀gY�gY[_mZ�a[o�\Z�a[cZ�\o�hZeZmb[a�]b�eZhhZbn�jb]̂fcZc�Z[gY�hZeZmb[a�]b�eZhhZb�a[kZd�bZiZbZ_gZ�h]�hYZ�d]efgfh[hf]_�[_c�hYfd�[aZ_caZ_hn�[_c�fd�bZgZf̂Zc�jbf]b�h]�hYZ�]jZ_f_m�Y]̀b�[_c�c[hZ�djZgfifZc�g]jfZd�]i�hYZ�[aZ_caZ_h �q\r�6o�[gk_]leZcmf_m�bZgZfjh�]i�hYfd�[aZ_caZ_h�]_�Z[gY�g]jo�]i�hYZ�]iiZb�d̀\afhhZc �]b�qgr�6o��¡¡¡¡¡¡¡¡¡¡¡�{�
�{ g]jfZd�h]�hYZ�fdd̀f_m�]iifgZ�
}£�|£�|}|�qsr
����������¥}}}|�����������������������¦�������§���̈{©������������������§����ª«¬¬�®®̄°¬±²|©���������������³®¬��́ ¬̄³µ³̄���§�ª«¬¬�®®̄°¬±²�¦��¶��¶��������������¦�������������·������©�¶��¶��������������~�{~�|}|������̈}}¶����©��¤��§����������������������ª«²�}}}{�̧±�}}}|������������������§��¦�¹����¶��¶����©¶¬º³»±�»µ�¶¬ºµ»º¼̧ ¬̄̈�{}�}{�|}|��®»�}¢��}�|}|½ �5�����*����������M���,�����������4��,,������OF"'�9<�"<$=:(�������*���������M���,�2�4�����OF"'�9<�"<$=:( ����������2�4��� �56������������1�3����7���6������������+�,,���� �5��������2�4����G$x=!:E<'�9 �"'<D9=�!E:;9<$�'H�:9�D$x=( �G$x=!:E<'�9 �K9=:<!%:$=x�� $%'<(�¬̧¬��¬±±³«°�sgZjh�[d�jb]̂fcZc�YZbZf_n�[ee�hZbad�[_c�g]_cfhf]_d�]i�hYZ�c]g̀aZ_h�bZiZbZ_gZc�f_��hZa�L��]b��R�n�[d�YZbZh]i]bZ�gY[_mZcn�bZa[f_d�̀_gY[_mZc�[_c�f_�ìee�i]bgZ�[_c�ZiiZgh�
%&'�()*+,-./0�1���234�546�7�68�6�+�96:45�;�4<�68��342:9:6�6:45�3�=3�68�>���>��?@�249�6:453A�B8:98�74�3�C�698�68��+.1'�,8��D>:9:5��38��6A�84B�E�>A�8�3�?&�3:6�3A�B:68�68���77:6:45�4<�FGHI�G+J.K�H/+1*I0�,8��GHI�G+J.�+.1�B�3�:5�7E�>6�562=�2�<6�4<�68��D436:5�'�-6�8�3�L��5��77�7�E:��M47:<:9�6:45�@@@��'�()*+,-./0��G4>�68��?@�3:6�30��>4E:7��3NO�>��<446���A�<244>�6=D�3A��57�3�>E:9��<>�NO�59:�3�<4>���98�249�6:45'H/+1*I0�H22�:5<4>C�6:45�>���>7:5��3NO�>��<446���A�<>�NO�59=A�<244>�6=D���69'A�:3�D>4E:7�7�:5�68��+:6�P+D�9:<:9�+.13�D436�7�45�+HM'Q.R�7�6�7�ST�UT�@�?'��2��3��>�<�>�64�H66�98C�563�&P?�<4>�<O>68�>�:5<4>C�6:45'
STATEMENT OF WORK
Custodial Services
Warning:
The Statement of Work (SOW) paragraphs, Contract Data Requirements List (CDRL) items, and Data Item Descriptions (DIDs) identified for your type of acquisition are recommendations only. You are expected to modify or add SOW paragraphs, CDRLs, or DIDs to address the specific requirements of your program.
Table of Contents
1.0 PURPOSE
1.1 GENERAL REQUIREMENTS
2.0 RESERVED
3.0 REQUIREMENTS
3.1 MANAGEMENT
3.1.1 Work Control
3.1.2 Work Schedule
3.1.3 Interference with Government Business
3.1.4 Protection of Government Property
3.1.5 Environmental Management
3.2 CUSTODIAL SERVICES REQUIREMENTS
3.2.1 Basic Services
3.2.2 Service Call Work
3.2.3 Project (Indefinite Quantity) Work
4.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES
4.1 CONTRACTOR FURNISHED ITEMS
5.0 DEFINITIONS
1.0 Purpose
The intention of this solicitation is to obtain custodial services for FAA Buildings and Offices in 1 location by means of a combination firm fixed-price and indefinite quantity contract:
FAR FSDO
4620 Amber Valley Parkway S Fargo, ND 58104
1.1 General Requirements
The Contractor must provide all labor, supplies, supervision, tools, materials, equipment, and transportation necessary to provide custodial services in accordance with this specification. Custodial service applies to all designated spaces including, but not limited to, halls, restrooms, offices, work areas, entrance ways, lobbies, storage areas, elevators, and stairways. Publications applicable to this specification are listed in Attachment
2.0 Reserved
3.0 Requirements
Period of Performance: The period of performance must be for one (1) Base Year and four 12-month option years. The Period of Performance reads as follows:
Base Year: 10/01/2023 to 09/302024 Option Year 1: 10/01/2024 to 09/30/2025 Option Year 2: 10/01/2025 to 09/30/2026 Option Year 3: 10/01/2026 to 09/30/2027 Option Year 4: 10/01/2027 to 09/30/2028
3.1 Management
The Contractor must manage the total work effort associated with the custodial services required herein to assure fully adequate and timely completion of these services. Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, and quality control. The Contractor must provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with sound and efficient management practices. The Contractor must maintain an adequate workforce and be trained in the proper use and handling of contract specified and approved supplies and equipment, to complete work in accordance with the time and quality standards specified herein.
3.1.1 Work Control
The Contractor must implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. The Contractor must plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and reports on the status of service call and indefinite quantity work items must be provided when requested by the Contracting Officer.
REDUCTION IN PAYMENT:
A. Upon receipt of written notification by the Contracting Officer, regarding nonconformance of contractual services, as provided in the incorporated schedule, which specifies the allowable deviations and maximum deductions for deviations, the Contractor will be given 24 hours to provide the required corrective action. If such nonconformance is not corrected within this allowable period, the Contracting Officer may have such work done by others, with the cost(s) deducted from the monthly payment.
B. Repeated failures to perform work, as required by the specifications and contract documents, may result in termination of the contract.
C. The following schedule outlines the Government’s plan for ensuring contract performance; including maximum deductions which may be taken should deficiencies be found for the noted services. The Government will, at its option, require corrective action or take a deduction from the monthly invoice. The contractor will be notified of any discrepancies found and will have an opportunity respond to the deficiencies. The Government has the right to inspect services at any time. Any random inspection will take into consideration the normally scheduled times and frequencies required for service performance. The contractor is entitled to a joint monthly inspection each month. The contractor is to coordinate with the Contracting Officer’s Representative (COR) when a joint inspection is needed. The COR may also initiate a joint inspection, which will be coordinated with the Contractor Quality Control Representative or his designee.
D. Upon request, the COR is entitled to review the results of the contractor’s quality control program and internal inspections.
Required Service
Performance Standard
Allowable Deviation
Method of Surveillance
Maximum Deduction for Deviation
Annual Tasks
Accomplish per specs &
Frequency schedule None
Random Sampling
30% of monthly charges
Semi-annual Tasks
Accomplish per specs &
Frequency schedule None
Random Sampling
15% of monthly charges
Quarterly Tasks
Accomplish per specs &
Frequency schedule None
Random Sampling
10% of monthly charges
Monthly Tasks
Accomplish per specs &
Frequency schedule None
Random Sampling 5% of monthly charges
3.1.2 Work Schedule
The Contractor's initial work schedule must indicate the hours of the day that twice weekly or more frequent services will be performed and the day of the week that weekly or less frequent services will be performed. The schedule must list the type of work to be performed, the areas to be worked, and the estimated time to complete the work in each area. When scheduled services performed twice weekly or less frequently fall on a holiday, alternate dates must be specified. The initial work schedule must be submitted to the Contracting Officer for approval within 15 days after award. Once approved, all work must be performed in strict compliance with the work schedule to facilitate the Government's inspection of the work. Changes to the work schedule must be submitted for the Contracting Officer's approval at least three working days prior to performance. In preparing the work schedule, the Contractor must comply with the following general requirements:
(1) Except as may otherwise be specified, all firm fixed-price work must be performed during the Government's regular working hours. If the Contractor desires to carry on work after regular working hours, or on Saturdays, Sundays, or holidays, prior approval must be obtained from the Contracting Officer.
(2) Project (indefinite quantity) work items must be performed during the days and times specified below. If the Contractor desires to perform this work other than during the days and times shown, or on Saturdays, Sundays, or holidays, prior approval must be obtained from the Contracting Officer.
Stripping and Re-waxing First week of April and October after 4pm Shampooing Carpets and Rugs First week of April after 4pm Cleaning Light Fixtures First week of April after 4pm High Dusting/Cleaning Monday- Friday after 4pm Cleaning Exterior Glass First week of April/July/October/ January anytime Cleaning Interior Glass First week of April/July/October/ January after 4pm Cleaning Venetian Blinds First week of April after 4pm
3.1.3 Interference with Government Business
The Contractor must schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and mission. In those cases where some interference may be essentially unavoidable, the Contractor must be responsible to make every effort to minimize the impact of the interference, inconvenience, customer discomfort, etc.
3.1.4 Protection of Government Property
During execution of the work, the Contractor must take special care to protect Government property including furniture, walls, baseboards, and other surfaces from materials not intended. Accidental splashes must be removed immediately. The Contractor must return areas damaged as a result of work under this contract to their original condition, to include painting, refinishing, or replacement, if necessary.
3.1.5 Environmental Management
In order to comply with Executive Order 13834, and the FAA Green Procurement Plan (GPP), the Contractor must use environmentally preferable products and services. These program elements include, but are not limited to: products and services that are energy-efficient, water-efficient, biobased, non-ozone depleting, contain recycled-content, and non-toxic or less-toxic alternatives. The Contractor must also ensure the use of integrated pest management principles; responsible chemical use/storage practices;
and diversion of non-hazardous waste from landfills. These program elements are described on the Office of Federal Sustainability website (http://www.sustainability.gov).
3.1.5.1 Products and Materials
Custodial cleaning products required in the performance of this SOW must carry the Environmental Protection Agency Design for the Environment (DFE) label, Green Seal certification, or must meet/exceed South Coast Air Quality Management District (SCAQMD) specifications and/or DFE and Green Seal specifications. Cleaning products must minimize exposure to potentially harmful chemicals (e.g., corrosives, skin irritants, human carcinogens, etc.) and contain biobased solvents, reduced flammability, and low or no volatile organic compounds. Green cleaning program guidance can be found in more detail on the Office of Federal Sustainability website (http://www.sustainability.gov) If it is determined that such certified products do not meet Government performance requirements, the Contractor must submit a proposed alternative that would meet the performance requirements with the lowest environmental impact for evaluation and acceptance. Products that fall under the Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines (CPG) (http://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program) must meet the minimum recovered (recycled) content levels. Bio-based products must be used in accordance with the U.S.
Department of United States Department of Agriculture’s BioPreferred program (http://www.biopreferred.gov). The contractor must purchase and use Energy Star or other energy-efficient items listed on the Department of Energy’s Federal Energy Management Program (FEMP) Product Energy Efficiency Recommendations product list.
3.2 Custodial Services Requirements
The Contractor must provide the custodial services described herein. Custodial services requirements are divided into three groups: basic services, service calls, and project (indefinite quantity) work requirements. An inventory and description of the areas to receive custodial services is included in Attachment 1.
3.2.1 Basic Services
Basic services must be performed at the locations and frequencies shown in Attachment 1 and must consist of the services listed for the specified spaces. Furniture or other equipment (including waste and recycling containers) moved while performing basic services must be returned to their original position.
All basic services will be paid for under the firm fixed-price portion of the contract. Performance requirements for these services include the following:
3.2.1.1 Space Cleaning
Space cleaning must consist of the following services each time a space is cleaned.
(a) Sweeping/Dust Mopping. Concrete/quarry tile, terrazzo, wood, and resilient flooring must be swept or dust mopped so as to remove all loose dirt, dust, and debris.
(b) Vacuuming Carpets and Rugs. Carpeted areas and rugs must be vacuumed free of all loose soil and debris.
(c) Emptying Waste and Recycling Containers. All waste and recycling containers must be emptied and plastic liners replaced. Any plastic liner with food wastes or that is soiled or leaking must be replaced with a new plastic liner. Waste and recycling containers must be washed monthly inside and outside utilizing a disinfectant and must be free of odors. After washing, containers must be wiped dry and new plastic liners installed. All ash trays and ash receptacles must be emptied and cleaned free of tobacco residue. Boxes, cans, bottles, and other items placed adjacent to waste containers and marked "TRASH" must also be removed and disposed of. All waste collected must be disposed of in the nearest outside trash collection point. Waste that falls on the floor and outside grounds during the waste removal must be picked up and disposed of by the Contractor.
http://www.sustainability.gov/ http://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program http://www.biopreferred.gov/
(d) Low Dusting/Cleaning. All furniture, partitions, radiators, equipment, hand railings in stairways, grills, horizontal ledges, and sills must be dusted. Walls, doors, and partitions must be wiped clean (including glass in partitions and doors) to a height of 7*- 0" above the floor level. If present, chalk boards, chalk trays, and erasers must be cleaned. Corridor, lobby, and entrance walls and doors must be cleaned. Miscellaneous hardware and bright metal work must be wiped clean. Drinking fountains must be cleaned and disinfected. All surfaces of drinking fountains must be free of stains, smudges, and scale.
(e) Cleaning Walk-off Mats. Each time floors are swept/dust mopped or vacuumed, walk-off mats in that area must be cleaned. Soil and moisture underneath mats must be removed and the floor must be cleaned as appropriate along with the rest of the floor. The mats must be returned to their original locations afterwards. The Contractor must report, in writing to the Contracting Officer, all walk-off mats that are worn out to the point of being ineffective.
3.2.1.2 Floor Care
Floor care must be performed in the spaces as shown on the "Schedule of Services" in Attachment 1, and must consist of the following services.
(a) Damp Mopping. Prior to damp mopping, floors must be swept/dust mopped. Floors must be damp mopped with an approved cleaning solution to remove dirt, streaks, smears, and stains.
(b) Spray Cleaning and Buffing. Prior to spray cleaning and buffing, floors must be damp mopped as specified above. Floors must be spray cleaned and buffed to remove traffic marks, heavy soil, etc. The material used for spray cleaning and buffing must contain a blend of detergents and polymers to emulsify surface soil and repair traffic areas. If loose residue is produced by buffing, it must be removed in a manner that will leave the floor clean without destroying the high gloss produced by buffing. When completed, a spray cleaned and buffed floor must have a uniform, high-gloss finish, free of scuff and heel marks. The floor finish must be uniform from wall to wall, including corners.
(c) Waxing and Buffing. In the event that spray cleaning and buffing is not sufficient to maintain a uniform high-gloss finish, floors must be completely waxed and buffed. The Contractor must use a liquid wax system containing not less than 18% solids. The floors must be damp mopped as specified above immediately prior to application of wax. Floors must be buffed, if required, to a uniform gloss finish free from dirt, traffic marks, and stains.
3.2.1.3 Restroom Services
Restroom services must consist of the following each time services are performed.
(a) Cleaning Restrooms. Restroom fixtures, including water closets, urinals, lavatories, and sinks must be washed inside and outside utilizing a disinfectant, and must be free of stains and odors.
Pumice sticks and an approved toilet bowl cleaner must be used to remove stains from urinals and water closets. Brushes, sponges, and cloths that have been used to clean any other part of the restroom (including water closets, urinals, walls, floors, and partitions) must not be used to clean lavatories or sinks. Floors must be swept/dust mopped free of dirt and mopped with a disinfectant. Floor drains must be cleaned and flushed with a disinfectant. Wainscoting, partitions, walls, and doors must be cleaned free of dirt, stains, and graffiti. Mirrors must be cleaned and polished. All metal fixtures and hardware must be cleaned. Waste and recycling containers must be emptied, disinfected, and plastic liners replaced. If present, shower stall rooms and locker/dressing rooms must be considered part of the restrooms, and cleaned accordingly.
(b) Servicing Restrooms. Servicing restrooms must include inspecting, replenishing, and cleaning supply dispensers. Restroom supplies must include, but are not limited to, paper towels, toilet tissue, and soap. The Contractor must stock restrooms with sufficient supplies to insure that the supplies will last until the next scheduled service. If dispensers become empty before the next scheduled servicing, the Contractor must replenish them at no additional cost to the Government.
3.2.1.4 Other Services
(a) Waste Management. In accordance with EO 13834, FAA is required to divert from landfill or incineration facility disposal a minimum of 50% of the non-hazardous waste generated as a result of its operations. In support of meeting this requirement, the Contractor must divert from landfill or incineration facility disposal a minimum of 50% of the non-hazardous waste generated as a result of the Contractor’s work, to the maximum extent feasible. In doing so, the Contractor must appropriately utilize the facility’s existing waste and recycling program. If no such program exists, the Contractor must develop, operate and track, at its own expense, a comprehensive waste, recycling and reuse program. The Contractor must report non-hazardous waste diversion rates on a regular basis [insert time frame].
3.2.2 Service Call Work
Service call work for the buildings/spaces listed in Attachment 1 must consist of providing labor and material to perform unscheduled custodial services that are brief in scope. The Government will receive service call requests from building monitors and notify the Contractor of the work required. The Contractor must provide adequate procedures for receiving and responding to service calls during regular working hours. All services specified in this paragraph will be paid for under the firm fixed-price portion of the contract.
3.2.2.1 Service Calls for Cleaning
Service calls for cleaning must consist of providing miscellaneous minor cleaning tasks beyond the scope of basic services. Historically, the activity has experienced approximately 1 such calls per year.
(a) The Contractor must respond to service call requests for cleaning within 2 hours during regular working hours. Once begun, the cleaning effort must continue until completed.
(b) These calls include, but are not limited to, such items as:
Clean up of overflowed restroom fixtures.
Clean up of spills.
Cleaning muddy or wet entrances.
Clean up of broken glass.
3.2.2.2 Service Calls for Lighting
N/A
3.2.3 Project (Indefinite Quantity) Work
N/A
3.2.3.1 Stripping and Rewaxing Floors
Resilient flooring must be swept/dust mopped and stripped to remove all built-up wax and imbedded dirt prior to rewaxing. After application of wax, areas must be buffed (if required) sufficiently for maximum gloss and uniform sheen from wall to wall, including corners. The rewaxed floor must present a clean appearance free from scuff marks or dirt smears. Furniture or other equipment moved during floor stripping and rewaxing must be returned to their original positions.
3.2.3.2 Shampooing Carpets and Rugs
Prior to shampooing, carpets and rugs must be vacuumed free of all loose soil and debris. Carpets and rugs must be shampooed free of streaks, stains, and spots, and must have a bright uniform color.
Shampooing must be done by the water extraction method. After drying, furniture or other equipment moved for the shampooing must be returned to their original positions.
3.2.3.3 Cleaning Light Fixtures
Globes, reflectors, covers, diffusers, and plastic side panels must be removed and washed. After cleaning and reassembling, light fixtures must be free of bugs, dirt, dust, grease, and other foreign matter.
3.2.3.4 High Dusting/Cleaning
High cleaning includes cleaning horizontal and vertical surfaces above 7* - 0" from floor level including all overhead piping and ceiling areas. All dust, lint, litter, and soil must be removed from all surfaces.
Walls must be free of dirt, smudges, and markings. Ceilings are to be free of cobwebs and loose dirt.
3.2.3.5 Cleaning Exterior Glass
The Contractor must thoroughly clean all exterior glass surfaces, window frames, sills, and sashes, from the ground line up to and including the second floor. All glass surfaces must be cleaned and left free of streaks and stains, and must be wiped dry. All paint, putty, film, and foreign matter found on glass surfaces must be removed. Where storm windows exist, exterior window cleaning must include both sides of the storm window and the outside of the inner glass, and must be counted as three separate surfaces for reimbursement purposes.
3.2.3.6 Cleaning Interior Glass
The Contractor must thoroughly clean all interior glass surfaces and associated window frames, sills, and sashes. All glass surfaces must be cleaned and left free of streaks and stains, and all adjacent surfaces wiped dry. All paint, putty, film, and foreign matter found on glass surfaces must be removed.
3.2.3.7 Cleaning Venetian Blinds
Venetian blinds, including mini-blinds, must be removed and cleaned free of all dust and embedded dirt and re-hung in working order. Once removed for cleaning, the blinds must be re-hung by the Contractor within 1 working day.
4.0 Government Furnished Property and Services
The Government will provide the Contractor the option of using certain Government owned facilities, equipment, materials, and utilities for use only in connection with this contract. The use of Government furnished property and services for other purposes is prohibited. All such facilities, equipment, and materials will be provided in "as is" condition.
a. Government Furnished Facilities. The Government will not provide office space and operational facilities to the Contractor. The Contractor must secure and maintain the necessary office space and other facilities required for the performance of this contract at his/her own expense.
b. Government Furnished Equipment. The Contractor must furnish all tools and equipment required for the performance of this contract unless otherwise specified. The Government will not provide tools or equipment to the Contractor.
c. Government Furnished Material. The Government will not provide any materials to the Contractor.
d. Availability of Utilities. The Government will furnish the following utility services at existing outlets, for use in those facilities provided by the Government and as may be required for the work to be performed under the contract: electricity, steam, natural gas, fresh water, sewage service, and refuse collection (from existing collection points). Information concerning the location of existing outlets may be obtained from the Contracting Officer. The Contractor must provide and maintain, at his/her expense, the necessary service lines from existing Government outlets to the site of work.
(1) Utilities specified above will be furnished at no cost to the Contractor.
(2) The Contractor must be responsible for instructing employees in utilities conservation practices. The Contractor must be responsible for conserving utilities, which must include, but not necessarily be limited to:
* Lights must be used only in areas where and at the time when work is actually being performed unless otherwise directed by the COTR.
* Mechanical equipment controls for heating, ventilation and air conditioning systems will not be adjusted by contract employees.
* Water faucets or valves must be turned off after the required usage has been accomplished. To conserve water, only the minimum quantity of water needed for the required usage must be expended.
4.1 Contractor Furnished Items
Except for items listed in Government Furnished Property and Services paragraph, the Contractor must provide all facilities, equipment, materials, supplies, and services to perform the requirements of this contract. Material, equipment, and supplies provided must adhere to the requirements set forth in Section
3.1.5 and be of acceptable commercial grade and quality.
5.0 Definitions
As used throughout this contract, the following terms must have the meaning set forth below.
a. Where "as shown", "as indicated", "as detailed", or words of similar import are used, it must be understood that reference is made to this specification and the drawings accompanying this specification unless stated otherwise.
b. Where "as directed", "as required", "as permitted", "approval", "acceptance", or words of similar import are used, it must be understood that direction, requirement, permission, approval, or acceptance of the Contracting Officer is intended unless stated otherwise.
c. Clean. "Clean" must be defined as free of dirt, dust, spots, streaks, stains, smudges, litter, debris, and other residue.
d. Contracting Officer. The Contracting Officer is a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
e. Contractor. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor must ensure that his/her subcontractors comply with the provisions of this contract.
f. Contractor Representative. A foreman or superintendent assigned by the contractor.
g. Disinfect. Cleaning in order to destroy any harmful microorganisms by application of an approved chemical agent.
h. Engineered Performance Standards (EPS). A job estimating system developed for the Department of Defense. EPS is the average time necessary for a qualified craftsman working at a normal pace, following acceptable trade methods, receiving capable supervision, and experiencing normal delays to perform defined amounts of work of a specified quality. EPS manuals are published under the following numbers by each military branch:
Navy: NAVFAC P 700 Series Army: TB 420 Series Air Force: AFM 85 Series
i. Facility. An establishment, structure, or assembly of units of equipment designated for a specific function.
j. Frequency of Service.
(1) Annual (A). Services performed once during each 12 month period of the contract at intervals of 345 to 385 days.
(2) Semi-Annual (SA). Services performed twice during each 12 month period of the contract at intervals of 160 to 200 calendar days.
(3) Quarterly (Q). Services performed 4 times during each 12 month period of the contract at intervals of 80 to 100 calendar days.
(4) Monthly (M). Services performed 12 times during each 12 month period of the contract at intervals of 28 to 31 calendar days.
(5) Semi-Monthly (SM). Services performed 24 times during each 12 month period of the contract at intervals of 14 to 16 calendar days.
(6) Weekly (W). Services performed 52 times during each 12 month period of the contract at intervals of six to eight calendar days.
(7) Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.
(8) Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday and Friday.
(9) Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
(10) Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
k. Quality Assurance (QA). A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
l. Quality Assurance Evaluator (QAE). The Government employee designated by the Contracting Officer to be responsible for monitoring of Contractor performance.
m. Quality Control (QC). A method used by the Contractor to control the quality of goods and services produced.
n. Regular Working Hours. The Government's regular (normal) working hours are from 7AM-4PM Mondays through Fridays except (a) Federal Holidays and (b) other days specifically designated by the Contracting Officer.
o. Relamping. A procedure by which the Contractor periodically inspects each building included in this contract in order to systematically replace burned out and/or blinking fluorescent tubes and incandescent bulbs.
p. Response Time. Response time is defined as the time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site, with appropriate tools, equipment, and materials, ready to perform the work required.
q. Space. A space is an area to receive custodial services which may or may not be considered a room by common definition. Examples of spaces are definable sections of hallways, stairwells, lobbies, offices, entrances, and elevators.
r. Waste and Recycling Containers. Waste containers are defined as trash receptacles, waste baskets, trash cans, wastepaper baskets, ash trays, or any container holding trash, paper, or other recyclables and refuse of any type.
ATTACHMENT 1
Janitorial Service to be Performed: Facility to be cleaned consists of approximately 6100 square feet.
Hours Service is to be Performed: All services must be conducted as follows.
Contractor personnel need to be aware of times when Air Traffic is particularly heavy and therefore, adjustment of hours may be required to perform the necessary work. The contractor shall ensure that the janitor on-site is aware of and understands these requirements.
All service shall be performed between the hours of 4:00 PM. and 6:00AM.
Service schedule shall be Five (5) days per week, M-F (excluding National Holidays). All window washing shall be performed during daylight hours.
All services must be conducted during the following days/hours:
Daily (D5):
• Break Room o Remove debris and wipe up obvious spills o Clean and disinfect sink o Wipe vinyl chairs and brush off upholstered chairs o Empty waste and recycle containers. Replace liners as necessary.
In case of leakage, damp wipe receptacle and clean to remove all residue
• Restrooms o Wet mop all tile and disinfect all porcelain surfaces o Fill all paper towel holders and toilet paper holders o Empty waste and recycle containers. Replace liners as necessary.
In case of leakage, damp wipe receptacle and clean to remove all residue o Clean mirrors
• All other locations o Remove obvious debris from carpeted areas, vacuum common entry areas using industrial vacuum o Empty waste and recycle containers. Replace liners as necessary.
In case of leakage, damp wipe receptacle and clean to remove all residue o Sweep or mop all uncarpeted floors using chemically treated absorbent dusting tools or sweeping compounds. Remove obvious debris and wipe up any spills o Wash and wipe down counter tops, coffee bar, and conference room
Weekly (W):
• Break Room o Vacuum using an industrial vacuum o Clean countertops and table tops o Clean and dry refrigerator exteriors o Clean all dry marking boards
• All other locations o Sweep and wet mop all uncarpeted floors using a detergent solution o Removal all oil, tar, and stubborn dirt o Buff, spot wax, all uncarpeted floor space to prevent finish from wearing through to tile surface o Vacuum all carpeted offices using an industrial vacuum o Dust surface of all desks, tables, file cabinets, and shelves up to
70” height o Wash glass entrance doors and any glass corridor doors and sidelights Monthly (M):
• Spot clean all wall surfaces up to 70” as needed to remove smudges, marks, and fingerprints
• Sweep all storage areas (does not include garage area)
• Wash all waste receptacles
Quarterly (Q)
• Wash all interior windows. Methods and materials used must not leave a film, streak, or stain surfaces. Wipe all spillage and dripping. Drip cloths will be used to protect floors and equipment.
Semi-Annually (SA):
• Strip all tiled floors, re-wax, and buff
Annually (A):
• Shampoo all carpeting, making sure carpets are dry by the next working day
• Clean blinds so there are no visible streaks
As Required:
• Spot cleaning of carpeting as pointed out by COR or as noticed as needed by contractor
The contractor is responsible for all government furnished keys and access cards.
Should keys and/or access cards become lost or destroyed, the contractor shall bear the cost of replacement keys and re-coring of all applicable locks.
| 697DCK-23-R-00006_0002.pdf |
| Custodial Services SOW FAR FSDO.pdf |
| 1.0 Purpose |
| 1.1 General Requirements |
| 2.0 Reserved |
| 3.0 Requirements |
| 3.1 Management |
| 3.1.1 Work Control |
| 3.1.2 Work Schedule |
| 3.1.3 Interference with Government Business |
| 3.1.4 Protection of Government Property |
| 3.1.5 Environmental Management |
| 3.1.5.1 Products and Materials |
| 3.2 Custodial Services Requirements |
| 3.2.1 Basic Services |
| 3.2.1.1 Space Cleaning |
| 3.2.1.2 Floor Care |
| 3.2.1.3 Restroom Services |
| 3.2.1.4 Other Services |
| 3.2.2 Service Call Work |
| 3.2.2.1 Service Calls for Cleaning |
| 3.2.2.2 Service Calls for Lighting |
| 3.2.3 Project (Indefinite Quantity) Work |
| 3.2.3.1 Stripping and Rewaxing Floors |
| 3.2.3.2 Shampooing Carpets and Rugs |
| 3.2.3.3 Cleaning Light Fixtures |
| 3.2.3.4 High Dusting/Cleaning |
| 3.2.3.5 Cleaning Exterior Glass |
| 3.2.3.6 Cleaning Interior Glass |
| 3.2.3.7 Cleaning Venetian Blinds |
| 4.0 Government Furnished Property and Services |
| 4.1 Contractor Furnished Items |
5.0 Definitions
| 2023-08-16T09:23:07-0400 | |
| RENEA O REDDISH |
File details come from the government source that posted it. Updated .