About this file

This solicitation requests proposals for a MSP Boilers Hot Water Pumps and PCS Room HVAC Replacement Project at the Minneapolis Air Traffic Control Tower. The Federal Aviation Administration requires the replacement of boilers, hot water pumps, and HVAC located at the facility. Offerors must submit proposals in accordance with Sections L and M of the solicitation by March 27, 2020 at 1500 EST. An optional site visit is scheduled for March 11, 2020 at 1300 CST and notice must be provided by March 9. All questions are due by March 20, 2020 at 1500 EST to thuylinh.trannguyen@faa.gov. To be eligible for award, offerors must have a current SAM registration. The solicitation is issued in accordance with FAA acquisition policy and this announcement does not guarantee procurement but is to receive proposals for consideration.

View the file

Other files

File Type Posted
Q_R 5 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amend 04.pdf PDF
697DCK-20-R-00070 Amend 0003.pdf PDF
J-2 MSP Boiler-Pumps - SECTION 235216 CONDENSING BOILERS 042220.pdf PDF
J-11 Q_A 4 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amendment 0002.pdf PDF
J-1a Drawings - MSP ATCT Boilers PCS RM HVAC Replacement 3_24_2020.pdf PDF
Q_R 3 - MSP Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amend 0002.pdf PDF
J-6 MSP - Addendum 1 Items Rev 1.pdf PDF
J-9 IMG_6226.JPG JPG image
J-7 IMG_6217.JPG JPG image
J-10 Q_R 2 - MSP Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 0001.pdf PDF
J-4 MSP Past Performance Questionnaire.pdf PDF
J-5 Q_R 1 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
SIR_697DCK-20-R-00070.pdf PDF
J-2 Specifications - MSP - Boilers Pumps and HVAC Replacement.pdf PDF
J-5 Q_R 1 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
J-3 MSP Wage Determination.pdf PDF
J-1 SOW - MSP ATCT Boilers PCS RM HVAC Replacement Project.pdf PDF
697DCK-20-R-00070 FINAL.pdf PDF
J-4 SIR_Past Performance Questionnaire.pdf PDF
J-1a Drawings - MSP ATCT HVAC.pdf PDF
J-2 Specifications - MSP-Boiler-Pumps and PCS Rm HVAC Replacement (2).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .