J-1a Drawings - MSP ATCT Boilers PCS RM HVAC Replacement 3_24_2020.pdf
PDF 5 MB Posted
- Solicitation number
- 697DCK-20-R-00070
About this file
This solicitation package outlines requirements for replacing boilers, hot water pumps, and HVAC equipment at the Minneapolis-St. Paul International Airport Air Traffic Control Tower facility. The Federal Aviation Administration seeks proposals to replace existing boilers and pumps supplying hot water to the tower, as well as replace HVAC units serving the boiler plant control room. An optional pre-bid site visit is scheduled for March 11, 2020. Questions are due by March 20, 2020 and proposals are due by March 27, 2020. Offerors must be registered in the System for Award Management to be eligible for award. The selected contractor will be responsible for removing and replacing boilers, pumps and HVAC units to maintain environmental conditions in the control room.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
COMPUTER AIR CONDITIONER SCHEDULE * (CRAC-3 AND CRAC-4)
MARK LOCATION SERVICE CFM
EXT SP BLOWER
(IN WGl HP
COOLING CAPACITY
ENT TEMP MBH & SCOP 50/50 GLYCOL WATER
MAX PD
1---�--t----�---�--+----�---�------, (FT WC)
DB(° F) WB(° F) SENS TOT AL SCOP GPM ENT(° F) L VG(° F)
CRAC-3 ROOM 144 PCS 1800 0.8
CRAC-4 ROOM 144 PCS 1800 0.8
2 75 52
2 75 52
38.8 41.3
38.8 41.3
2.45
2.45
* FURNISH CRAC-3 & 4 WITH VARIABLE FREQUENCY DRIVE FAN (VFD) LOCKOUT OF ELECT HEAT.
BUil T-IN PREWIRED CONDENSATE PUMP WITH 20' HEAD.
SCHEDULE NOTES:
CD
KNOWN ACCEPT ABLE SOURCE: LIEBERT MODEL PX011 PDX,
Upflow, Glycol-cooled and GLYCOOL (with Econ-O-Coil)DX .
INTEGRATE CRAC-3 & CRAC-4 COMMUNICATION WITH EXISTING
BUILDING MANAGEMENT JOHNSON CONTROL NETWORK.
G) FURNISH NEW LEAK DETECTION SYSTEM FOR CRAC-3 AND
CRAC-4 AND INTERFACE WITH DOC SYSTEM.
C±) INTEGRATE CRAC-3 & 4 VFD'S WITH THE DIGITAL CONTROL
SYSTEM AT THE FRONT END.
SPECIAL NOTE:
CD THE GENERAL CONTRACTOR, FAA RESIDENT ENGINEER, HVAC
CONTROL AND TEST/BALANCE SUB-CONTRACTORS SHALL BE
ON SITE DURING TESTING AND CHECK OUT OF CRAC-3
AND CRAC-4.
7 6
11.1 44 52
11.1 44 52
11.3
GLYCOL
i'. WEIGHT
CONTROL
VALVE
2-WAY
2-WAY
REHEAT CAP
KW STEPS
12 2
12 2
FILTER DATA
ASHRAE
52-76 EFF MIN
30i'.
30i'.
TYPE FLA
DISPOSABLE 39.8
DISPOSABLE 39.8
ELECTRICAL DAT A
VOLT AGE PHASE
460 3
460 3
HZ
WEIGHT
<LBS)
REMARKS
ACCEPTABLE
KNOWN SOURCE
LIEBERT PX011
PDX Upflow Econ-O-Coil
LIEBERT PX011
PDX Upflow Econ-O-Coil
F
E
* CRAC-3 & 4 SHALL MEET (ASHRAE ST AND ARD - 127). ALSO MEET THE SENSIBLE
COEFFICIENT OF PERFORMANCE (SCOPl SHOWN ON THIS EQUIPMENT SCHEDULE.
B 12/0412019 ADDENDUM
A 09/25/2019 PCS ROOM HVAC & BOILERS & PUMPS PROJECT
REV
APPROVED
DATE DESCRIPTION
1605216 1605216
JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMIN1STRATION
D
C
MO
REDLINE
APVD
DATE
ATO- TECHNICAL OPERATIONS CENTRAL SERVICE AREA =>
ATCT
EQUIPMENT SCHEDULE
MINNEAPOLIS MINNEAPOLIS-ST PAUL INTERNATIONAL AIRPORT
REVIEWED BY SUBMITTED BY APPROVED BY
MORRIS OGUNLEYE DOUGLAS E WEA VER
PROJECT ENGINEER MGR: ENGINEERING
MN
DESIGNED ISSUED BY DATE
06/18/2018 I
JCN
1600012 i---i----t-:::DRA
=w=N c---------1 ENGINEERING SERVICES r.coRA=w,=NG:-:cN-::-o ����---�r=-R=-iEv l----f------------1-----=LK�N TERMINAL
CHECKED
MSP-D-ATCT-M028 B
z
CJ
w
CJ)
SQ
11.3
| J-1a Drawings - MSP ATCT Boilers PCS RM HVAC Replacement |
| DEST0189 |
| DEST0190 |
| DEST0191 |
| DEST0192 |
| DEST0193 |
| DEST0194 |
| DEST0195 |
| Drawing_M028_MSP_ATCT_HVAC |
| DEST0196 |
| J-1a Drawings - MSP ATCT Boilers PCS RM HVAC Replacement |
| DEST0197 |
| DEST0198 |
| DEST0199 |
| DEST0200 |
| DEST0201 |
| DEST0202 |
| DEST0203 |
File details come from the government source that posted it. Updated .