J-4 MSP Past Performance Questionnaire.pdf

PDF 692 KB Posted

Attached to
MSP Boilers Hot Water Pumps and PCS Room HVAC Replacement Project Minneapolis Air Traffic Control Tower (ATCT)
Solicitation number
697DCK-20-R-00070
Issued by

About this file

This document includes a past performance questionnaire and details of a federal contract opportunity for replacement of boilers, hot water pumps, and HVAC at the Minneapolis Air Traffic Control Tower facility. The past performance questionnaire requests information about a contractor's previous contracts including contract number, value, type, description, and performance ratings in areas such as quality, schedule, cost control and customer satisfaction. The federal contract opportunity is a solicitation to replace boilers, hot water pumps and HVAC at the Minneapolis ATCT. Offerors must register in SAM, submit proposals by March 27, 2020 responding to sections L and M, and may participate in an optional site visit on March 11, 2020 by registering by March 9. The solicitation is issued by the DOT Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
Q_R 5 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amend 04.pdf PDF
697DCK-20-R-00070 Amend 0003.pdf PDF
J-2 MSP Boiler-Pumps - SECTION 235216 CONDENSING BOILERS 042220.pdf PDF
J-11 Q_A 4 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amendment 0002.pdf PDF
J-1a Drawings - MSP ATCT Boilers PCS RM HVAC Replacement 3_24_2020.pdf PDF
Q_R 3 - MSP Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amend 0002.pdf PDF
J-6 MSP - Addendum 1 Items Rev 1.pdf PDF
J-9 IMG_6226.JPG JPG image
J-7 IMG_6217.JPG JPG image
J-8 IMG_6221.JPG JPG image
J-10 Q_R 2 - MSP Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 0001.pdf PDF
J-5 Q_R 1 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
SIR_697DCK-20-R-00070.pdf PDF
J-2 Specifications - MSP - Boilers Pumps and HVAC Replacement.pdf PDF
J-5 Q_R 1 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
J-3 MSP Wage Determination.pdf PDF
J-1 SOW - MSP ATCT Boilers PCS RM HVAC Replacement Project.pdf PDF
697DCK-20-R-00070 FINAL.pdf PDF
J-4 SIR_Past Performance Questionnaire.pdf PDF
J-1a Drawings - MSP ATCT HVAC.pdf PDF
J-2 Specifications - MSP-Boiler-Pumps and PCS Rm HVAC Replacement (2).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE QUESTIONNAIRE

Your assistance is requested in support of a source selection Please complete this Questionnaire and email or send by facsimile to Thuylinh Trannguyen, Federal Aviation Administration Contracting Officer at:

Thuylinh.T.Trannguyen@faa.gov

TO BE COMPLETED BY OFFEROR

1. CONTRACTOR NAME & ADDRESS: 2. CONTRACT NO:

3. CONTRACT INITIATION DATE:

4. COMPLETION DATE:

5. TOTAL CONTRACT VALUE:

6. TYPE OF CONTRACT:

(Fixed Price, GMP, FPI, etc.)

7. DESCRIPTION OF CONTRACT REQUIREMENTS:

TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE

8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:

b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:

Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.

EX = Exceptional S = Satisfactory US = Unsatisfactory VG = Very Good MG = Marginal N/O = Not Observed A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).

EX VG S MG US N/O

B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.

EX VG S MG US N/O

C. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.

EX VG S MG US N/O

D. Schedule – Assess the timeliness of contractor against the schedule of activities.

EX VG S MG US N/O

E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.

EX VG S MG US N/O

F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”

EX VG S MG US N/O

G. Overall Assessment.

EX VG S MG US N/O

Comments:

mailto:Robert.Higgins@faa.gov

1 CONTRACTOR NAME ADDRESS:
2 CONTRACT NO:
3 CONTRACT INITIATION DATE:
4 COMPLETION DATE:
5 TOTAL CONTRACT VALUE:
6 TYPE OF CONTRACT Fixed Price GMP FPI etc:
7 DESCRIPTION OF CONTRACT REQUIREMENTS:
If an Award Fee contract what was the average Award Fee:
Evaluator:
Text5:
Text6:
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off

File details come from the government source that posted it. Updated .