J-5 Q_R 1 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf

PDF 81 KB Posted

Attached to
MSP Boilers Hot Water Pumps and PCS Room HVAC Replacement Project Minneapolis Air Traffic Control Tower (ATCT)
Solicitation number
697DCK-20-R-00070
Issued by

About this file

This solicitation requests proposals for the replacement of boilers, hot water pumps, and HVAC located at the FAA Minneapolis Air Traffic Control Tower facility. Offerors must submit proposals by March 27, 2020 to be considered for award of the contract. An optional site visit is scheduled for March 11, 2020, with RSVPs due by March 9, 2020. Questions regarding the solicitation are due by March 20, 2020. The selected contractor will replace boilers, hot water pumps, and HVAC systems to maintain operations at the Air Traffic Control Tower. Offerors must be registered in the System for Award Management to be eligible for award.

View the file

Other files

File Type Posted
Q_R 5 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amend 04.pdf PDF
697DCK-20-R-00070 Amend 0003.pdf PDF
J-2 MSP Boiler-Pumps - SECTION 235216 CONDENSING BOILERS 042220.pdf PDF
J-11 Q_A 4 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amendment 0002.pdf PDF
J-1a Drawings - MSP ATCT Boilers PCS RM HVAC Replacement 3_24_2020.pdf PDF
Q_R 3 - MSP Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amend 0002.pdf PDF
J-6 MSP - Addendum 1 Items Rev 1.pdf PDF
J-9 IMG_6226.JPG JPG image
J-7 IMG_6217.JPG JPG image
J-8 IMG_6221.JPG JPG image
J-10 Q_R 2 - MSP Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 0001.pdf PDF
J-4 MSP Past Performance Questionnaire.pdf PDF
J-5 Q_R 1 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
SIR_697DCK-20-R-00070.pdf PDF
J-2 Specifications - MSP - Boilers Pumps and HVAC Replacement.pdf PDF
J-3 MSP Wage Determination.pdf PDF
J-1 SOW - MSP ATCT Boilers PCS RM HVAC Replacement Project.pdf PDF
697DCK-20-R-00070 FINAL.pdf PDF
J-4 SIR_Past Performance Questionnaire.pdf PDF
J-1a Drawings - MSP ATCT HVAC.pdf PDF
J-2 Specifications - MSP-Boiler-Pumps and PCS Rm HVAC Replacement (2).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSP Boilers Hot Water Pumps and PCS Room HVAC Replacement

697DCK-20-R-00070

SIR Questions and Responses

March 4, 2020

Q1: I am putting this solicitation together and I have a clarification question for you on the SF 1422 form, section 13 B. it states An Offer Guarantee is NOT required, yet in Section L, L.1, Volume I, Line F, it states Completed Standard Form 24 "Bid Bond" with original signatures and seal.

Which is correct?

R1: A bid guarantee is required. Clause 3.4.1-1 Proposal Guarantee is added to the terms and conditions.

Please see the revised SIR 697DCK-20-R-00070.

Q2: I am reading through Section L and right above Volume II, it states "VOLUME-I MUST NOT INCLUDE ANY PRICING INFORMATION". Our Lump Sum Price is supposed to go on Page 2 of the SF 1422 Form. How are we to do this???

R2: On SF 1422 input the total price only. Do not include a cost breakout. Include your cost breakout in Volume II. Please see the revised SIR 697DCK-20-R-00070.

Q3: Section B states to let you know about going to set up an appointment to go to the PreBid Site Visit, in the Statement of work it States we need to get a hold of Ron M Hubrich, Did you want me to send our confirmation to both of you?

R3: Send confirmation to Thuylinh.T.Trannguyen@faa.gov.

mailto:Thuylinh.T.Trannguyen@faa.gov

File details come from the government source that posted it. Updated .