About this file

This solicitation seeks proposals for the replacement of boilers, hot water pumps, and HVAC located at the Minneapolis Air Traffic Control Tower facility. Offerors must provide replacement of existing boilers, hot water pumps serving the tower, and HVAC serving the PCS room. The Federal Aviation Administration is seeking these services. The proposal submission deadline is March 27, 2020. An optional site visit is available on March 11, 2020 for offerors to inspect the facilities. Questions regarding the solicitation are due by March 20, 2020. To be eligible for award, offerors must be registered in the System for Award Management and submit a proposal in accordance with the solicitation instructions.

View the file

Other files

File Type Posted
Q_R 5 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amend 04.pdf PDF
697DCK-20-R-00070 Amend 0003.pdf PDF
J-2 MSP Boiler-Pumps - SECTION 235216 CONDENSING BOILERS 042220.pdf PDF
J-11 Q_A 4 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amendment 0002.pdf PDF
J-1a Drawings - MSP ATCT Boilers PCS RM HVAC Replacement 3_24_2020.pdf PDF
Q_R 3 - MSP Hot Water Pumps and HVAC Replacement.pdf PDF
697DCK-20-R-00070 Amend 0002.pdf PDF
J-6 MSP - Addendum 1 Items Rev 1.pdf PDF
J-9 IMG_6226.JPG JPG image
J-7 IMG_6217.JPG JPG image
J-8 IMG_6221.JPG JPG image
J-10 Q_R 2 - MSP Hot Water Pumps and HVAC Replacement.pdf PDF
J-4 MSP Past Performance Questionnaire.pdf PDF
J-5 Q_R 1 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
SIR_697DCK-20-R-00070.pdf PDF
J-2 Specifications - MSP - Boilers Pumps and HVAC Replacement.pdf PDF
J-5 Q_R 1 -MSP Boilers Hot Water Pumps and HVAC Replacement.pdf PDF
J-3 MSP Wage Determination.pdf PDF
J-1 SOW - MSP ATCT Boilers PCS RM HVAC Replacement Project.pdf PDF
697DCK-20-R-00070 FINAL.pdf PDF
J-4 SIR_Past Performance Questionnaire.pdf PDF
J-1a Drawings - MSP ATCT HVAC.pdf PDF
J-2 Specifications - MSP-Boiler-Pumps and PCS Rm HVAC Replacement (2).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 3

0001 03/02/2020

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

AAQ510ATL-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

697DCK-20-R-00070

1 copies to the issuing office.

03/02/2020

(x)

The solicitation 697DCK-20-R-0007 Amendment 0001 is hereby executed to incorporate the following attachments in Section J - Attachments as follows:

J-6 MSP - Addendum #1 Items Revision 1 dated March 18, 2020

J-7 Image-6217

J-8 Image-6221

J-9 Image-6226

J-10 Questions and Response Number 2 - MSP Hot Water Pumps and HVAC Replacement dated March

18, 2020

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Katherine Fogle

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

x

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

697DCK-20-R-00070/0001

The proposal submission date remains unchanged as a result of this amendment. Proposals must be submitted no later than March 27, 2020 at 1500

EST. All other terms and conditions in the solicitation remains unchanged.

Section J - List of Documents, Exhibits and Other Attachments Attachment List

ATTACHMENT TITLE DATE NO. OF

PAGES

1 Statement of Work 01/22/2020 4

J-10 Questions and Response Number 2 - MSP Boilers, Hot Water Pumps and HVAC Replacement 03/18/2020 17

J-1a Drawings 09/25/2019 15 J-2 Specifications 10/30/2019 196 J-3 Wage Determination 01/03/2020 7 J-4 Past Performance Questionnaire 03/02/2020 1

J-5 Questions and Response 1 - MSP Boilers Hot Water Pumps and HVAC Replacement 03/04/2020 1

J-6 MSP - Addendum #1 Items Revision 1 03/18/2020 2 J-7 Image - 6217 03/18/2020 1 J-8 Image - 6221 03/18/2020 1 J-9 Image - 6226 03/18/2020 1

The remainder of this page has been intentionally left blank.

697DCK-20-R-00070
697DCK-20-R-00070 (1)

File details come from the government source that posted it. Updated .