About this file

This is a mechanical drawing showing HVAC installation details for the Norwood Memorial Airport Air Traffic Control Tower facility. The drawing includes specifications for a PTAC (Packaged Terminal Air Conditioner) installation and an electric unit heater schedule.

The drawing details requirements for a complete PTAC installation with DC inverter heat pump unit, including manufacturer's wall sleeve installation, wall-mounted thermostat, and condensate drain kit. Key specifications include a NEMA 6-15R power connection, MERV 8 fresh air filters to be replaced every 3 months, and reusable front panel air filters requiring monthly cleaning. Physical dimensions for the unit heater are specified as 16" x 14" x 7.5". The drawing includes detailed installation notes, mechanical PTAC schedules, and electrical specifications. All work is part of an HVAC replacement and roof rehabilitation project for the FAA's Technical Operations Eastern Service Area.

View the file

Other files

File Type Posted
6973GH-25-R-00007_Amd_0001.pdf PDF
QandA Sheet 6973GH-25-R-00007.pdf PDF
owd-23000102-m002.pdf PDF
owd-23000102-g001.pdf PDF
owd-23000102-c001.pdf PDF
owd-23000102-e001.pdf PDF
owd-23000102-e002.pdf PDF
owd-23000102-m001.pdf PDF
Contractors Release Form DOT F 4220.4.doc DOC document
Offeror Organizational Experience Form.pdf PDF
6973GH-25-R-00007.pdf PDF
SF-25_PerformanceBond.pdf PDF
SF-24_BidBond.pdf PDF
Uniform Bipartisan Infrastructure Law Report.xlsx XLSX spreadsheet
SF-25A_PaymentBond.pdf PDF
Wage Determination_MA20240001_Norfold County.pdf PDF
SOW - OWD ATCT HVAC.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN

DATE

REDLINE

APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

8 1234567

DATE

DRAWING NO

DESIGNED

REVIEWED BY

/2

/2

:3

:4

P

M P lo tt e d b y S

R V

C -C

A E

G -E

D M

S -C

O O

R D

DATE

APPROVED

o w d -2

-m

.d w g

8 234567

H

G

F

E

D

C

A

B

PTAC-1

MARK SERVICE TYPE

UNIT IDENTIFICATION

TOTAL

HEATING

970 WATTS

REFRIGERANT

VOLTS PHASE HZ

208/230 1 60

DESCRIPTION

HEAT PUMP

FILTER DATA ELECTRICAL DATACOOLING

FREDRIECH

PVH12K

HEATING

PACKAGE TERMINAL AIR CONDITIONER SCHEDULE

MOP

(AMPS)

MCA

(AMPS)

4.1

FAN MOTOR

MOISTURE

TONNAGE

COOLING

TOTAL

1-1.5 12000 BTU

ELECTRIC UNIT HEATER SCHEDULE

MARK MANUFACTURER MODEL

AIR DELIVERY DATA FAN MOTOR DATA ELECTRICAL DATA

TYPE

EUH-1 QMARK MUH05-21 800 3.7

KWCFM FPM RPM

1600 1/100350

ELECTRIC HEAT

SS FIN

TUBULAR

AMPS

AWG 10 18/21

VOLTS PHASE

HZ

1-3 PHASE208/240

SIZE

WIRE

DELTA T °F

45°

HP

PHYSICAL

DIMENSIONS

H X W X D

COMMENTS

16" X 14" X 7.5" PROVIDE AND INSTALL UNIT HEATER IN FIRST FLOOR EQUIPMENT ROOM.

CONTRACTOR MUST SUBMIT ON UNIT HEATER FOR ACCEPTANCE. APPROVED EQUAL IS ALLOWED.·

OPERATE AS 3.7 KW DUE TO POWER BEING PROVIDE IS ONLY 208 VOLT/ SINGLE PHASE.

CONDUIT FOR CONTROL AND POWER. POWER MUST BE PROVIDED FROM PANEL A, REUSE EXISTING DOUBLE POLE 2O AMP BREAKER. UNIT HEATER WILL

HEATER. CONTRACTOR TO PROVIDE AND INSTALL MANUFACTURER'S LINE VOLTAGE THERMOSTAT WITH RECOMMENDED CONDUCTORS. REUSE EXISTING

FOR EUH-1, CONTRACTOR MUST PROVIDE AND INSTALL MUH05-21 IN FIRST FLOOR EQUIPMENT ROOM TO REPLACE THE EXISTING CEILING MOUNTED UNIT ·

CONTRACTOR MUST PROVIDE MANUFACTURER'S CEILING MOUNT AND REQUIRED INSTALLATION ACCESSORIES FOR EUH-1·

NOTES:

CONTRACTOR MUST SUBMIT EQUIPMENT FOR APPROVAL.·

SLEEVE TO MAKE SURE IT IS WEATHER TIGHT.

INSTRUCTION. CONTRACTOR MUST CREATE A NEW WALL PENETRATION FOR THE WALL SLEEVE, AND CAULK ALL SIDES OF THE WALL

CONTRACTOR MUST PROVIDE AND INSTALL A COMPATIBLE INSULATED WALL SLEEVE FOLLOWING MANUFACTURER'S INSTALLATION ·

CONTRACTOR MUST PROVIDE AND INSTALL FREDRIECH PVH12K FOLLOWING MANUFACTURER'S INSTALLATION INSTRUCTIONS.·

NOTES:

M003 NOT TO SCALE

SECOND FLOOR SPLIT SYSTEM DEMOLITION1

REQUIREMENTS.

DISPOSE OF THE REFRIGERANT ACCORDING TO LOCAL, STATE, AND FEDERAL

THE EXISTING REFRIGERANT PIPING AND CONDENSATION PIPING IS TO BE DEMOLISHED; ·

GROUND LEVEL ON THE NORTH SIDE OF THE CONTROL TOWER.

LOCATED ON THE SECOND FLOOR EQUIPMENT ROOM, AND THE OUTDOOR UNIT IS AT

THE CONTRACTOR MUST DEMOLISH THE EXISTING SPLIT SYSTEM. THE INDOOR UNIT IS ·

NOTES:

M003 NOT TO SCALE

SECOND FLOOR PTAC INSTALLATION2

PRIOR TO INSTALLATION.

CONTRACTOR MUST SUBMIT SLEEVE, THERMOSTAT, AND PTAC UNIT FOR APPROVAL ·

COMPLETED. PROVIDE ADDITIONAL FILTERS TO LOCAL FAA PERSONNEL.

CONTRACTOR TO INSTALL A NEW FILTER AFTER ALL CONSTRUCTION ACTIVITIES ARE ·

REMOVE EXCESS CONDENSATE.

CONTRACTOR TO PROVIDE AND INSTALL MANUFACTURER'S CONDENSATE DRAIN KIT, TO ·

MANUFACTURER INSTALLATION INSTRUCTIONS.

COMPLETE INSTALLATION MUST INCLUDING CONDUIT AND CONDUCTORS ACCORDING

CONTRACTOR MUST PROVIDE AND INSTALL A WIRED, WALL MOUNTED THERMOSTAT. ·

THAT IS A NEMA 6-15R.

THE POWER WILL BE PROVIDED BY PANEL A WHICH IS CURRENTLY FEEDING AN OUTLET ·

AND BE WEATHER-RESISTANT.

MANUFACTURER INSTRUCTIONS. THE PENETRATION MUST BE CAULKED ON ALL SIDES

CONTRACTOR TO CREATE PENETRATION AND INSTALLING SLEEVE ACCORDING TO

CONTRACTOR MUST PROVIDE AND INSTALL THE PTAC'S MANUFACTURER'S WALL SLEEVE. ·

DC INVERTER (HEAT PUMP UNIT).

THE CONTRACTOR MUST PROVIDE AND INSTALL A COMPLETE PTAC INSTALLATION WITH ·

NOTES:

I-BEAM PART OF ATCT STRUCTURE

EXISTING CONDUIT

CARRIER

PTAC UNIT

SUPPLY

RETURN

REMOVAL

1.9

PTS./HR

R-410A

DC INVERTER

MOTOR

H.P.

INDOOR

CFM

1/12 470

NEMA

PLUG

6-15R

FRONT PANEL AIR FILTER - REUSABLE FILTER (TOO BE CLEANED MONTHLY)

FRESH AIR FILTER - FILTERS TO BE REPLACED EVERY 3 MONTHS (MERV 8)

INSULATED PTAC SLEEVE

BE COMPATIBLE WITH THE PTAC UNIT

INSTALLATION INSTRUCTIONS. THE SLEEVE MUST

TO FOLLOW THE SLEEVE MANUFACTURER'S

TO EXTERIOR. PENETRATION MUST BE CREATED

PENETRATION THROUGH INTERIOR FINISHED WALL

CONTRACTOR TO MAKE A NEW WALL

IS

S

U E

D F

O R

E D

M

08/22/2023

MGR: ENGINEERING CENTER

NORWOOD

OWD-23000102-M003

SP

SP

ATCT

HVAC REPLACEMENT AND ROOF REHAB PROJECT

MECHANICAL PTAC SCHEDULE

o w d -2

-m

.d w g

OPS INFRASTRUCTURE

ENGINEERING SERVICES

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

NORWOOD MEMORIAL AIRPORT

THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM

PROJECT ENGINEER

23000102

08/22/2023 CONSTRUCTION 23000102

MA

owd-23000102-m003

2023-08-22T18:50:16-0400
HENRY B NEWCOMB
2023-08-22T15:58:09-0400
SHREY B PATEL

File details come from the government source that posted it. Updated .