This is a mechanical drawing showing HVAC installation details for the Norwood Memorial Airport Air Traffic Control Tower facility. The drawing includes specifications for a PTAC (Packaged Terminal Air Conditioner) installation and an electric unit heater schedule.
The drawing details requirements for a complete PTAC installation with DC inverter heat pump unit, including manufacturer's wall sleeve installation, wall-mounted thermostat, and condensate drain kit. Key specifications include a NEMA 6-15R power connection, MERV 8 fresh air filters to be replaced every 3 months, and reusable front panel air filters requiring monthly cleaning. Physical dimensions for the unit heater are specified as 16" x 14" x 7.5". The drawing includes detailed installation notes, mechanical PTAC schedules, and electrical specifications. All work is part of an HVAC replacement and roof rehabilitation project for the FAA's Technical Operations Eastern Service Area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6973GH-25-R-00007_Amd_0001.pdf | ||
| QandA Sheet 6973GH-25-R-00007.pdf | ||
| owd-23000102-m002.pdf | ||
| owd-23000102-g001.pdf | ||
| owd-23000102-c001.pdf | ||
| owd-23000102-e001.pdf | ||
| owd-23000102-e002.pdf | ||
| owd-23000102-m001.pdf | ||
| Contractors Release Form DOT F 4220.4.doc | DOC document | |
| Offeror Organizational Experience Form.pdf | ||
| 6973GH-25-R-00007.pdf | ||
| SF-25_PerformanceBond.pdf | ||
| SF-24_BidBond.pdf | ||
| Uniform Bipartisan Infrastructure Law Report.xlsx | XLSX spreadsheet | |
| SF-25A_PaymentBond.pdf | ||
| Wage Determination_MA20240001_Norfold County.pdf | ||
| SOW - OWD ATCT HVAC.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:3
:4
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
o w d -2
-m
.d w g
8 234567
H
G
F
E
D
C
A
B
PTAC-1
MARK SERVICE TYPE
UNIT IDENTIFICATION
TOTAL
HEATING
970 WATTS
REFRIGERANT
VOLTS PHASE HZ
208/230 1 60
DESCRIPTION
HEAT PUMP
FILTER DATA ELECTRICAL DATACOOLING
FREDRIECH
PVH12K
HEATING
PACKAGE TERMINAL AIR CONDITIONER SCHEDULE
MOP
(AMPS)
MCA
(AMPS)
4.1
FAN MOTOR
MOISTURE
TONNAGE
COOLING
TOTAL
1-1.5 12000 BTU
ELECTRIC UNIT HEATER SCHEDULE
MARK MANUFACTURER MODEL
AIR DELIVERY DATA FAN MOTOR DATA ELECTRICAL DATA
TYPE
EUH-1 QMARK MUH05-21 800 3.7
KWCFM FPM RPM
1600 1/100350
ELECTRIC HEAT
SS FIN
TUBULAR
AMPS
AWG 10 18/21
VOLTS PHASE
HZ
1-3 PHASE208/240
SIZE
WIRE
DELTA T °F
45°
HP
PHYSICAL
DIMENSIONS
H X W X D
COMMENTS
16" X 14" X 7.5" PROVIDE AND INSTALL UNIT HEATER IN FIRST FLOOR EQUIPMENT ROOM.
CONTRACTOR MUST SUBMIT ON UNIT HEATER FOR ACCEPTANCE. APPROVED EQUAL IS ALLOWED.·
OPERATE AS 3.7 KW DUE TO POWER BEING PROVIDE IS ONLY 208 VOLT/ SINGLE PHASE.
CONDUIT FOR CONTROL AND POWER. POWER MUST BE PROVIDED FROM PANEL A, REUSE EXISTING DOUBLE POLE 2O AMP BREAKER. UNIT HEATER WILL
HEATER. CONTRACTOR TO PROVIDE AND INSTALL MANUFACTURER'S LINE VOLTAGE THERMOSTAT WITH RECOMMENDED CONDUCTORS. REUSE EXISTING
FOR EUH-1, CONTRACTOR MUST PROVIDE AND INSTALL MUH05-21 IN FIRST FLOOR EQUIPMENT ROOM TO REPLACE THE EXISTING CEILING MOUNTED UNIT ·
CONTRACTOR MUST PROVIDE MANUFACTURER'S CEILING MOUNT AND REQUIRED INSTALLATION ACCESSORIES FOR EUH-1·
NOTES:
CONTRACTOR MUST SUBMIT EQUIPMENT FOR APPROVAL.·
SLEEVE TO MAKE SURE IT IS WEATHER TIGHT.
INSTRUCTION. CONTRACTOR MUST CREATE A NEW WALL PENETRATION FOR THE WALL SLEEVE, AND CAULK ALL SIDES OF THE WALL
CONTRACTOR MUST PROVIDE AND INSTALL A COMPATIBLE INSULATED WALL SLEEVE FOLLOWING MANUFACTURER'S INSTALLATION ·
CONTRACTOR MUST PROVIDE AND INSTALL FREDRIECH PVH12K FOLLOWING MANUFACTURER'S INSTALLATION INSTRUCTIONS.·
NOTES:
M003 NOT TO SCALE
SECOND FLOOR SPLIT SYSTEM DEMOLITION1
REQUIREMENTS.
DISPOSE OF THE REFRIGERANT ACCORDING TO LOCAL, STATE, AND FEDERAL
THE EXISTING REFRIGERANT PIPING AND CONDENSATION PIPING IS TO BE DEMOLISHED; ·
GROUND LEVEL ON THE NORTH SIDE OF THE CONTROL TOWER.
LOCATED ON THE SECOND FLOOR EQUIPMENT ROOM, AND THE OUTDOOR UNIT IS AT
THE CONTRACTOR MUST DEMOLISH THE EXISTING SPLIT SYSTEM. THE INDOOR UNIT IS ·
NOTES:
M003 NOT TO SCALE
SECOND FLOOR PTAC INSTALLATION2
PRIOR TO INSTALLATION.
CONTRACTOR MUST SUBMIT SLEEVE, THERMOSTAT, AND PTAC UNIT FOR APPROVAL ·
COMPLETED. PROVIDE ADDITIONAL FILTERS TO LOCAL FAA PERSONNEL.
CONTRACTOR TO INSTALL A NEW FILTER AFTER ALL CONSTRUCTION ACTIVITIES ARE ·
REMOVE EXCESS CONDENSATE.
CONTRACTOR TO PROVIDE AND INSTALL MANUFACTURER'S CONDENSATE DRAIN KIT, TO ·
MANUFACTURER INSTALLATION INSTRUCTIONS.
COMPLETE INSTALLATION MUST INCLUDING CONDUIT AND CONDUCTORS ACCORDING
CONTRACTOR MUST PROVIDE AND INSTALL A WIRED, WALL MOUNTED THERMOSTAT. ·
THAT IS A NEMA 6-15R.
THE POWER WILL BE PROVIDED BY PANEL A WHICH IS CURRENTLY FEEDING AN OUTLET ·
AND BE WEATHER-RESISTANT.
MANUFACTURER INSTRUCTIONS. THE PENETRATION MUST BE CAULKED ON ALL SIDES
CONTRACTOR TO CREATE PENETRATION AND INSTALLING SLEEVE ACCORDING TO
CONTRACTOR MUST PROVIDE AND INSTALL THE PTAC'S MANUFACTURER'S WALL SLEEVE. ·
DC INVERTER (HEAT PUMP UNIT).
THE CONTRACTOR MUST PROVIDE AND INSTALL A COMPLETE PTAC INSTALLATION WITH ·
NOTES:
I-BEAM PART OF ATCT STRUCTURE
EXISTING CONDUIT
CARRIER
PTAC UNIT
SUPPLY
RETURN
REMOVAL
1.9
PTS./HR
R-410A
DC INVERTER
MOTOR
H.P.
INDOOR
CFM
1/12 470
NEMA
PLUG
6-15R
FRONT PANEL AIR FILTER - REUSABLE FILTER (TOO BE CLEANED MONTHLY)
FRESH AIR FILTER - FILTERS TO BE REPLACED EVERY 3 MONTHS (MERV 8)
INSULATED PTAC SLEEVE
BE COMPATIBLE WITH THE PTAC UNIT
INSTALLATION INSTRUCTIONS. THE SLEEVE MUST
TO FOLLOW THE SLEEVE MANUFACTURER'S
TO EXTERIOR. PENETRATION MUST BE CREATED
PENETRATION THROUGH INTERIOR FINISHED WALL
CONTRACTOR TO MAKE A NEW WALL
IS
S
U E
D F
O R
E D
M
08/22/2023
MGR: ENGINEERING CENTER
NORWOOD
OWD-23000102-M003
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
MECHANICAL PTAC SCHEDULE
o w d -2
-m
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
NORWOOD MEMORIAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
23000102
08/22/2023 CONSTRUCTION 23000102
MA
owd-23000102-m003
| 2023-08-22T18:50:16-0400 | |
| HENRY B NEWCOMB |
| 2023-08-22T15:58:09-0400 | |
| SHREY B PATEL |