owd-23000102-m002.pdf
PDF 260 KB Posted
- Solicitation number
- 6973GH-25-R-00007
About this file
This is a mechanical ductwork detail drawing for an HVAC replacement and roof rehabilitation project at the Norwood Memorial Airport Air Traffic Control Tower (ATCT) in Norwood, MA. The drawing includes detailed plans for ductwork installation, ATCT partial elevation views, roof plan, and condensate drain details.
The drawing specifies key technical requirements including: maximum 6-foot flexible ductwork lengths, 2-inch noise isolating duct liner for hard ductwork, insulated flex ductwork, testing/adjusting/balancing (TAB) requirements with specific CFM settings, and installation of a new copper condensate drain system. The contractor must maintain temporary cooling and heating throughout construction, clean all existing ductwork and components per NADCA standards, and ensure compliance with FAA-STD-19F and FAA-C-1H standards. The HVAC unit must fit on the existing vibration isolation curb and reuse existing power conductors and grounding. The work requires protecting roof openings, cleaning roof drains, and installing a new thermostat in an opaque case to protect from direct sunlight.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6973GH-25-R-00007_Amd_0001.pdf | ||
| QandA Sheet 6973GH-25-R-00007.pdf | ||
| owd-23000102-g001.pdf | ||
| owd-23000102-c001.pdf | ||
| owd-23000102-e001.pdf | ||
| owd-23000102-e002.pdf | ||
| owd-23000102-m003.pdf | ||
| owd-23000102-m001.pdf | ||
| Contractors Release Form DOT F 4220.4.doc | DOC document | |
| Offeror Organizational Experience Form.pdf | ||
| 6973GH-25-R-00007.pdf | ||
| SF-25_PerformanceBond.pdf | ||
| SF-24_BidBond.pdf | ||
| Uniform Bipartisan Infrastructure Law Report.xlsx | XLSX spreadsheet | |
| SF-25A_PaymentBond.pdf | ||
| Wage Determination_MA20240001_Norfold County.pdf | ||
| SOW - OWD ATCT HVAC.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:3
:3
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
o w d -2
-m
.d w g
8 234567
H
G
F
E
D
C
A
B
M002 NOT TO SCALE
DROP DOWN
STAIRS
IN CEILING
36"X12'H
GALV DUCT
TURNING
VANES (TYP)
36"X12"H
GALV DUCT
8" FLEX DUCT
(TYP OF 12)
MANUAL
VOLUME DAMPER
(TYP OF 12)
SUPPLY
AIR DROP
36"X12"H
GALV DUCT
DISTRIBUTION
BOX
DUCTWORK PLAN1
RETURN
AIR DUCT/GRILL
M002
ROOF PLAN
NOT TO SCALE
RETURN
SUPPLY
ROOF
HATCH
S E
R V
IC
E
C L E
A R
A N
C E
S
ROOF HATCH
M002
REUSE EXISTING SEISMIC CURB
DISTRIBUTION
BOX
STRIP DIFFUSERS
M001
ATCT PARTIAL ELEVATION
NOT TO SCALE
CONTROL
CAB LEVEL
8" FLEXIBLE
DUCT 8" FLEXIBLE
DUCT
DISTRIBUTION
BOX
HVAC UNIT
RETURN
AIR DUCT
(RA)
AIR SUPPLY
DROP (SA)
INSULATED
DUCTWORK
4' X 2' RETURN
AIR GRILLE
(TYP OF 12)
SEE NOTE 1
POWERED CONVENIENCE OUTLET
THROUGH THE BASE ELECTRICAL WITH
UNIT MOUNTED/ NON-FUSED DISCONNECT
SEE NOTE 1
ROOF
GRADE
CONNECTIONS
STAND AND DUCT
VIBRATION ISOLATION
HVAC CURB AND
PANELS
WITH REMOVABLE
DROPPED CEILING
M002
CONDENSATE DRAIN DETAIL
NOT TO SCALE
.75 INCH NPT
UNIT ENCLOSURE
CLEANOUT PLUG
1.5"
FEMALE CONNECTOR
TO THE BARE METAL ON THE HVAC UNIT
PROTECTION CONDUCTOR AND CONNECT
REUSE THE EXISTING LIGHTNING
SEE DETAIL 4
CONDENSATE DRAIN
CONSTRUCT A NEW COPPER
THERMOSTAT
EXISTING
REPLACE
TEMPORARY PANEL FOR TEMPORARY HVAC EQUIPMENT UPON PRIOR FAA APPROVAL.
SERVICE THROUGHOUT CONSTRUCTION PERIOD TO THE CAN SPACE WITHOUT THE INTERRUPTION TO AIR TRAFFIC SERVICES. INSTALLATION OF A
29, 31 (208 VOLTS, 3P, 100 AMPS). CONTRACTOR MUST SUBMIT PLAN FOR APPROVAL PRIOR TO CONSTRUCTION. PLAN MUST INCLUDE CONTINUOUS
TEMPORARY SOLUTION MUST MEET THE REQUIREMENTS OF THE SCHEDULE ON M001. POWER TO ONLY BE PROVIDED BY MDP, CIRCUIT BREAKERS 27, THROUGHOUT CONSTRUCTION PROVIDE TEMPORARY COOLING AND HEATING TO THE CAB SPACE AS REQUIRED WITH COORDINATION OF COR. 16.
IN 'CONDENSATE DRAIN DETAIL'. FOLLOW INSTALLATION INSTRUCTION FROM HVAC MANUFACTURER.
COULD RESULT IN CONDENSATE BACKUP DOE TO "AIR LOCK". IF UNIT STATIC IS HIGHER, TRAP MUST BE TALLER TO DRAIN APPROPRIATELY THAN
TO ASSURE PROPER CONDENSATE FLOW. DO NOT ALLOW THE HORIZONTAL RUN TO SAG CAUSING A POSSIBLE DOUBLE TRAP CONDITION WHICH
A CONDENSATE DRAIN LINE MUST BE CONNECTED TO THE P-TRAP. PITCH THE DRAIN AT LEAST 1/2 INCH FOR EVERY 10 FEET OF HORIZONTAL RUN 15.
THROUGHOUT CONSTRUCTION, PROTECT ANY OPENINGS MADE IN THE ROOF TO KEEP THE ROOF WATER TIGHT.14.
THERMOSTAT FROM HEAT LOAD CREATED BY DIRECT SUN LIGHT.
REPLACE EXISTING THERMOSTAT WITH A NEW THERMOSTAT IN SAME LOCATION. PLACE THERMOSTAT IN OPAQUE PLASTIC CASE TO PROTECT 13.
CAB. TESTING PRIOR AND AFTER CONSTRUCTION IS REQUIRED TO ENSURE NO INCREASE OF NOISE FLOOR.
ALL HARD DUCT WORK MUST HAVE 2" NOISE ISOLATING DUCT LINER. NOISE DAMPENING IS REQUIRED TO NOT INCREASE THE NOISE FLOOR OF THE 12.
ALL FLEX DUCT WORK MUST BE INSULATED, MATCH INSULATION TO EXISTING11.
BOX TO 200 CFM. UPON COMPLETION OF TAB, A REPORT MUST BE SUBMITTED TO THE COR.
INTAKE WILL BE SET TO 100 CFM. EACH OF THE MANUAL VOLUMETRIC DAMPERS WILL BE AJUSTED TO LIMIT THE CFM OUT OF EACH DISTRIBUTION
TESTING, ADJUSTING, AND BALANCING (TAB) MUST BE COMPLETED UPON INSTALLATION OF THE NEW HVAC SYSTEM. THE MANUAL OUTDOOR AIR 10.
RESOURCES ARE AVAILABLE UPON REQUEST.
ALL ELECTRICAL WORK MUST MEET LOCAL, STATE, AND FEDERAL REQUIREMENTS AS WELL AS FAA-STD-19F, CHG 2 AND FAA-C-H, CHG1. FAA 9.
CONTRACTOR MUST REUSE EXISTING GROUNDING CONDUCTOR. ATTACH TO NEW UNIT USING EXISTING CONNECTOR ONTO BARE METAL.8.
CLEAN ROOF DRAINS, AND REMOVE DEBRIS DURING CONSTRUCTION.7.
INSTALL A NEW COPPER CONDENSATE DRAIN ACCORDING TO MANUFACTURER'S INSTALLATION INSTRUCTIONS. PROVIDE SHOP DRAWINGS.6.
THE NEW HVAC UNIT MUST FIT ON THE EXISTING VIBRATION ISOLATION CURB. NEW UNIT MUST BE SUBMITTED FOR APPROVAL.5.
WHEN INSTALLING NEW UNIT, THE POWER CONDUCTORS WILL BE RE-USED FROM THE EXISTING UNIT.4.
SCOPE OF WORK, MEANS AND METHODS, SCHEDULE, SITE COMMUNICATION PLAN, PRODUCT SUBMITTALS, AND SDS.
A WRITTEN WORK PLAN AND MUST BE SUBMITTED TO THE COR PRIOR TO THE START OF ANY CLEANING WORK. THE WORK PLAN MUST INCLUDE 3.
CERTIFIED CLEANER.
All EXISTING DUCTWORK, GRILLES/REGISTERS, DISTRIBUTION BOXES, AND PLENUMS TO BE REUSED MUST BE CLEANED AND SANITIZED BY A NADCA 2.
THIS, THE LENGTH OF THE HARDLINE DUCT WORK WILL NEED TO BE EXTENDED AS REQUIRED.
ALL FLEX DUCTWORK MUST HAVE A MAXIMUM LENGTH OF 6 FEET. THE MINIMUM LENGTH OF FLEXIBLE DUCT SHOULD BE USED. TO ACCOMPLISH 1.
NOTES:
A
B
DRAIN THAT DRAINS DIRECTLY INTO EXISTING ROOF DRAIN.
FROM THE UNIT. CONTRACTOR MUST PROVIDE SHOP DRAWING OF CONDENSATE
NOTE: DISTANCE A AND B CONTROL THE DISTANCE OF THE DRAIN OUTLET
IS
S
U E
D F
O R
E D
M
08/22/2023
MGR: ENGINEERING CENTER
NORWOOD
OWD-23000102-M002
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
MECHANICAL DUCTWORK DETAIL
o w d -2
-m
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
NORWOOD MEMORIAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
23000102
08/22/2023 CONSTRUCTION 23000102
MA
owd-23000102-m002
| 2023-08-22T18:50:02-0400 | |
| HENRY B NEWCOMB |
| 2023-08-22T15:58:04-0400 | |
| SHREY B PATEL |
File details come from the government source that posted it. Updated .