This is a technical drawing showing roof rehabilitation and HVAC replacement plans for the Norwood Memorial Airport Air Traffic Control Tower (ATCT) facility. The drawing includes detailed roof plans, elevations, and cross-sections with specifications for elastomeric coating application and HVAC unit installation.
The drawing contains specific requirements for roof work including: cleaning existing roof drains, applying elastomeric coating to vertical flashing of HVAC curbs and hatches, replacing 2" insulation within vibration isolation stands, repairing damaged EPDM layers, and installing new 14-gauge aluminum closures. Key measurements and specifications are provided, such as 3'-6" walkway pads and 3" gaps between HVAC units and walkway pads. The drawing also includes detailed notes regarding manufacturer inspections, coordination requirements, warranty specifications, and proper sealing of vapor barriers. The work involves both the upper and lower roof sections, with particular attention to coating railings, parapet walls, mullions, and column treatments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6973GH-25-R-00007_Amd_0001.pdf | ||
| QandA Sheet 6973GH-25-R-00007.pdf | ||
| owd-23000102-m002.pdf | ||
| owd-23000102-g001.pdf | ||
| owd-23000102-e001.pdf | ||
| owd-23000102-e002.pdf | ||
| owd-23000102-m003.pdf | ||
| owd-23000102-m001.pdf | ||
| Contractors Release Form DOT F 4220.4.doc | DOC document | |
| Offeror Organizational Experience Form.pdf | ||
| 6973GH-25-R-00007.pdf | ||
| SF-25_PerformanceBond.pdf | ||
| SF-24_BidBond.pdf | ||
| Uniform Bipartisan Infrastructure Law Report.xlsx | XLSX spreadsheet | |
| SF-25A_PaymentBond.pdf | ||
| Wage Determination_MA20240001_Norfold County.pdf | ||
| SOW - OWD ATCT HVAC.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/2
/2
:3
:5
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
o w d -2
-c
.d w g
8 234567
H
G
F
E
D
C
A
B
3.3" ISOCYANURATE INSULATION
ROOF
HATCH
ROOF HATCH TO
COUNTERPOISE
ROOF TOP
HVAC UNIT & CURB
(SEE NOTE 3)
RETURN
SUPPLY
3" GAP BETWEEN
HVAC UNIT AND
WALKWAY PAD
(TYP)
ALL WALKWAY
PADS ARE 3'-6"
(TYP)
NOTES:
COATING APPLICATION.
HAVE ELASTOMERIC COATING MANUFACTURER'S REPRESENTATIVE COME TO THE SITE TO INSPECT ROOF 10.
APPLICATION OF ELASTOMERIC COATING.
THE EPDM HAS BECOME UNADHERED AND WILL NEED TO REPAIRED OR REPLACED PRIOR TO THE
BELOW THE STEEL BALCONY, THERE ARE AREAS A ROOF DECK THAT IS COVERED IN AN EPDM. SOME OF 9.
COVERS THAT WERE REMOVED.
APPROVED EQUAL OF A LIQUID MEMBRANE). INSTALL NEW 14 GA ALUMINUM CLOSURES TO REPLACE THE
REMOVE THE STEEL PORTION OF THE COLUMN CLOSURES. APPLY A COAT OF SIKALASTIC 641 (OR AN 8.
PROVIDE COORDINATION DRAWINGS PRIOR TO WORK START
FLASHING MUST BE COVERED IN ELASTOMERIC TOPCOAT TO OBTAIN MANUFACTURER'S ROOF WARRANTY. 7.
REPLACE THE 2" INSULATION WITHIN THE VIBRATION ISOLATION STAND WITH LIKE INSULATION6.
STAND AS WELL AS THE HATCH ACCORDING TO MANUFACTURER'S INSTALLATION REQUIREMENTS
ELASTOMERIC COATINGS SHALL BE APPLIED UP THE VERTICAL FLASHING OF THE HVAC CURB/SEISMIC 5.
TO CONFIRM COMPLETE COVERAGE OF THE ROOF
AFTER EACH APPLICATION OF TOP COAT OF ELASTOMERIC ROOFING SYSTEM SHALL BE INSPECTED BY COR 4.
VAPOR BARRIER IS SEALED AT ALL EDGES3.
CONTRACTOR TO CLEAN EXISTING ROOF DRAINS, AND REMOVE ANY DEBRIS FROM THE AREA.2.
CONTRACTOR TO SUBMIT ALL MATERIALS FOR APPROVAL FOR THE NEW ROOFING SYSTEM1.
LOCATION. (EXISTING)
COATED WALKWAY IN SELECT
60 MIL PVC MEMBRANE WITH SAND
MANUFACTURER'S SPECIFICATIONS
COATING ACCORDING TO
APPLY TOP LAYER OF ELASTOMERIC
FASTENED TO ROOF DECK (EXISTING)
1/2" DENSDECK MECHANICALLY
GROUND LEVEL
C-2 LEVEL CHIEF'S ROOM
C-3 LEVEL JUNCTION ROOM
CONTROL CAB LEVEL
ROOF DECK
PARAPET
1'-7 1/2"
2'-9 1/2"
2'-7"
LIGHTNING PROTECTION
CAB FALSE CEILING
OBSTRUCTION LIGHT (TYP)
LIGHTNING ROD (TYP)
C001
NORTH ELEVATION
NOT TO SCALE
HVAC UNIT (TYP)
ROOF EDGE
COATING RAILINGS
ROOFING SYSTEM, INCLUDING
UPPER ROOF OVER EXISTING
APPLY ELASTOMERIC COATING TO
THE FACADE
MULLIONS, AND CONTINUE DOWN
PARAPET ROOF WALL, RAILINGS,
APPLY COATING OVER UPPER
(SEE NOTE 8)
COAT COLUMNS IN RESIN COAT.
REMOVE COLUMN CAPS AND
(SEE NOTE 9)
CORNERS OF THE ROOF DECK
TOP EDGES OF THE EXPOSED
APPLY ELASTOMERIC COATING TO
HVAC UNIT AND HATCH FLASHING
UP THE VERTICAL SIDES OF THE
APPLY ELASTOMERIC COATING 8"
C001
ROOF PARTIAL ELEVATION
NOT TO SCALE
C001
ROOFING CROSS SECTION
NOT TO SCALE
METAL DECKING (EXISTING)
S-PATTERN CORRUGATED
PAD (TYP)
AND EXISTING WALKWAY
3" GAP BETWEEN PARAPET
(TYP. OF 4 PLACES)
TO ELASTOMERIC COATING
NEED TO REPAIRED, PRIOR
DAMAGED EPDM LAYER WILL
LOWER EXPOSED ROOF WITH
WALKWAY MATS.
EXISTING DAMAGED
HATCHING INDICATES
A TRAFFIC SURFACE.
SURFACE TO CREATE
ENTIRE ROOF
WILL BE APPLIED TO
MATERIAL COATING
APPLICATION OF GRIT
(OR APPROVED EQUAL).
FLEECE, AND 641.
SIKALASTIC ROOFPRO PRIMER,
SYSTEM. ONCE DRY, APPLY
AND DEBRIS FROM EXISTING ROOF
PRESSURE WASH LOOSE SAND
ALONG THE ROOF LINE
THE NEAREST ROOF DRAIN
CONDENSATE DRAIN PIPED TO
C001
ROOF PLAN
NOT TO SCALE
BILCO ROOF HATCH
CAULK JOINTS
WINDOWS. APPLY SIKAFLEX 1A TO
TO EXPOSE BARE METAL AROUND
REMOVE EXISTING SURFACE RUST
(SEE NOTE 2)
ROOF DRAIN (TYP)
DUCTLESS MINI-SPLIT
FOR SECOND FLOOR
EXISTING CONDENSER UNIT
DUCTLESS MINI-SPLIT
UNIT FOR SECOND FLOOR
EXISTING EVAPORATOR
IS
S
U E
D F
O R
E D
M
08/22/2023
MGR: ENGINEERING CENTER
NORWOOD
OWD-23000102-C001
SP
SP
ATCT
HVAC REPLACEMENT AND ROOF REHAB PROJECT
ROOF WORK
o w d -2
-c
.d w g
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
NORWOOD MEMORIAL AIRPORT
THIS DRAWING PRODUCED ON NEW ENGLAND REGION CAD SYSTEM
PROJECT ENGINEER
23000102
08/22/2023 CONSTRUCTION 23000102
MA
owd-23000102-c001
| 2023-08-22T18:49:07-0400 | |
| HENRY B NEWCOMB |
| 2023-08-22T15:57:33-0400 | |
| SHREY B PATEL |
File details come from the government source that posted it. Updated .