Copy of Mapping of deliverables to CLINs6.1.2022.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Job Analysis/Ability to Upgrade Tool
- Solicitation number
- 6973GH-22-R-00047
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule B-Mapping Deliverables.xlsx | XLSX spreadsheet | |
| Questions_Response FAA JA Solicitation 6973GH-22-R-00047_6.29.2022FInal.docx | DOCX document | |
| PWS Job Analysis 6.29.2022 (002).pdf | ||
| 6973GH-22-R-00047 Mod P00003.pdf | ||
| 6973GH-22-R-00047 Mod P00002.pdf | ||
| SIR 6973GH-22-R-00047-.pdf | ||
| 6973GH-22-R-00047 Mod P00001.pdf | ||
| Questions and Answers.pdf | ||
| SIR 6973GH-22-R-00047-.pdf | ||
| Table 1. Technical Evaluation.pdf | ||
| Past Performance Experience Form.docx | DOCX document | |
| PWS Job Analysis 4.4.22 (002).pdf | ||
| Past Performance Survey.docx | DOCX document | |
| Table 2. Previous Experience Technical Criteria.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Title | Description | Schedule | Acceptance Criteria | BASE Year CLIN | Year 1 | Year 2 | Year 3 | Year 4 |
| Technical Project Kickoff Meeting & Meeting Minutes | The vendor must participate in a project kickoff meeting with FAA Personnel associated with this PWS. | TBD | The Kick-Off Meeting Minutes must be accurate, complete, and submitted on time in the COR approved format. | 00001 | ||||
| Milestone schedule | The vendor must provide a milestone schedule outlining anticipated dates of completion for all requirements listed in this PWS. | TBD | Milestone schedule is reviewed and approved by the FAA prior to work starting on the contract. | 00001 | ||||
| Draft Management Plan (PMP) and Integrated Master Schedule (IMS) | The vendor must provide a draft Project Management Plan (PMP) and Integrated Master Schedule (IMS). | TBD | To be reviewed and approved by the FAA prior to start of additional work. | 00001 | ||||
| Monthly Status & Financial Reports | The vendor must provide a monthly status report including finance details submitted to the COR | TBD | The Monthly Status Reports are accurate, complete, and submitted on time in the COR approved format | 00001 | 00003 | 00005 | 00007 | 00009 |
| Job Analysis Methodology | Vendor must provide a detailed job analysis methodology as specified in the PWS | TBD | Methodologies are accurate, complete, submitted on time in the COR approved format. | 00001 | ||||
| Develop written processes for data collection and data analysis methods | Vendor must provide written processes for conducting the job analysis and supporting data collection as specified in the PWS | TBD | Written processes are accurate, complete, and submitted on time in the COR approved format. | 00001 | ||||
| Develop all materials used to conduct the job analysis | Vendor must develop and provide all materials needed to conduct the job analysis as specified in the PWS | TBD | Materials are accurate, complete, and submitted on time in the COR approved format. | 00001 | ||||
| Conduct a Job Analysis | Vendor must apply their job analysis methodology as specified in the PWS for 2 Ea Positions | TBD | Methodologies are accurate, complete, submitted on time in the COR approved format. | 00001 | ||||
| Conduct a Job Analysis | Vendor must apply their job analysis methodology as specified in the PWS for up to 50 positions. | TBD | Methodologies are accurate, complete, submitted on time in the COR approved format. | 00002 | 00003 | 00005 | 00007 | 00009 |
| Develop written processes for reviewing existing CPT database | Vendor must develop and provide written processes and materials for reviewing and verifying the accuracy/currency of existing position documentation and career paths as specified in the PWS | TBD | Written processes are accurate, complete, and submitted on time in the COR approved format. | 00002 | ||||
| Conduct a Review of Existing CPT database | Vendor must conduct a review of existing position profiles and career paths, and update them as needed as specified in the PWS | TBD | Methodologies are accurate, complete, submitted on time in the COR approved format. | 00002 | 00004 | 00006 | 00008 | 0010 |
| Position Profile Development | Vendor must develop detailed position profiles for each position utilizing the proposed job analysis methodology as specified in the PWS | TBD | The Position Profiles are accurate, complete, submitted on time in the COR approved format. | 0001 | 00003 | 00005 | 00007 | 00009 |
| Career Path Linkages | Vendor must update linkages in the CPT database as specified in the PWS | TBD | Linkages in the CPT database are accurate, complete, submitted on time in the COR approved format. | 00002 | 00004 | 00006 | 00008 | 0010 |
| Career Maps | Vendor must update career maps as specified in the PWS | TBD | The Career Maps are accurate, complete, submitted on time in the COR approved format and is prepared in accordance with PWS | 00002 | 00004 | 00006 | 00008 | 0010 |
| Software Code | Vendor must update software code as specified in the PWS | TBD | Software Code is accurate, complete, submitted on time in the COR approved format and is prepared in accordance with PWS | 00002 | 00004 | 00006 | 00008 | 0010 |
| System Interfaces | Vendor must update system interfaces as specified in the PWS | TBD | System Interfaces are accurate, complete, submitted on time in the COR approved format and is prepared in accordance with PWS | 00002 | 00004 | 00006 | 00008 | 0010 |
| Databases | Vendor must update the CPT database as specified in the PWS | TBD | Databases are accurate, complete, submitted on time in the COR approved format and is prepared in accordance with PWS | 00002 | 00004 | 00006 | 00008 | 0010 |
File details come from the government source that posted it. Updated .