TEB Statement of Work.pdf
PDF 25 KB Posted
- Attached to
- SCREENING INFORMATION REQUEST/REQUEST FOR OFFER RTR Tower Replacement in Teterboro, NJ Federal contract opportunity
- Solicitation number
- 6973GH-19-R-00230
About this file
This document contains a statement of work and related federal contract opportunity notice. The statement of work requires the contractor to provide design, permitting, construction, and installation services to replace two 100-foot self-supporting steel antenna towers at the Teterboro RTR site in New Jersey. Services include tower and foundation design, permitting assistance, excavation and concrete foundation installation, tower erection, installation of associated equipment and cabling, site work, and removal of existing towers and foundations. The related federal contract opportunity is a pre-solicitation notice seeking offers for these replacement tower services. The solicitation number is 6973GH-19-R-00230. A mandatory site visit will be held on August 14th, and all questions must be submitted by August 26th. Offers are due by September 5th, 2019 and must be submitted electronically to the contracting officer and specialist listed. The award will be a firm-fixed-price construction contract from the Department of Transportation Federal Aviation Administration Aeronautical Center.
TEB Statement of Work (pdf)
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PR # ES-19-01110
Teterboro RTR Tower Replacement Teterboro, NJ
The Contractor shall provide the necessary labor, materials, supplies, and equipment to:
Provide design for tower and foundations for two 100 ft. high self-supporting steel antenna towers using provided soil boring data. NOTE: Design must include all items necessary to meet Port Authority of NY and NJ (PANYNJ) Tenant Construction and Alteration Process (TCAP)
Prepare all forms and documents necessary for compliance with the PANYNJ TCAP to the FAA for signature. Submit and obtain a permit to build from PANYNJ. Pay all fee necessary for this process. See PANYNJ website for Tenant Construction Review Manual for design and process requirements.
Excavate and install concrete foundations for the two antenna towers, Provide and erect the antenna towers along with all associated items including: platform, railings, climbing ladder, wave-guide ladder, LMR-900 cables, antenna mounts, grounding and lightning protection, obstruction lighting, etc.
Provide and install overhead ice bridge from each tower to the RTR shelter.
Install LMR-900 coax cables (GFM) from the RTR shelter to the new towers;
Provide and install 2 ground bars and 24 polyphasers inside the RTR shelter.
Perform site work as required.
Remove the existing two existing steel 100-ft high-guyed towers and all associated guys and concrete foundations (to 1ft below grade). Communications towers tested positive for Lead Base Paint use proper methods for removal and recycle tower per all Federal, State, and Local regulations. Remove all communication cables and antennas from the existing towers.