About this file

This document includes a statement of work and federal contract opportunity notice. The statement of work requires the contractor to provide design, excavation, erection, installation, and removal services to replace two 100-foot high self-supporting steel antenna towers at the Teterboro RTR site. Services include tower and foundation design, permitting, excavation and installation of new tower foundations, erecting towers with associated platforms and equipment, installing overhead ice bridges and cabling between towers and the RTR shelter, and removing the existing towers and foundations. The federal contract opportunity is seeking proposals for these replacement services, with a site visit scheduled for August 14th. Proposals must be received by September 5th, 2019. The contracting agency is the Department of Transportation Federal Aviation Administration Aeronautical Center.

TEB Statement of Work (pdf)

View the file

Other files for this federal contract opportunity

Other files attached to SCREENING INFORMATION REQUEST/REQUEST FOR OFFER RTR Tower Replacement in Teterboro, NJ, newest first.
File Type Posted
Geotech Report_Teterboro Airport1.pdf PDF
ACM and LBP inspection.pdf PDF
Experience Information Form.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
Solicitation Amendment 6973GH-19-R-00230 0002.pdf PDF
WAGE DETERMINATION NJ20180026.pdf PDF
Performance Bond.pdf PDF
site visit QA.pdf PDF
TEB tower replacement spec final.pdf PDF
Solicitation Amendment 6973GH-19-R-00230 0001.pdf PDF
TEB Statement of Work.pdf PDF
TEB RTR Tower Project Drawings.pdf PDF
6973GH-19-R-00230.pdf PDF
Payment Bond.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
Performance Bond.pdf PDF
Solicitation Amendment 6973GH-19-R-00230 0001.pdf PDF
TEB RTR Tower Project Drawings.pdf PDF
WAGE DETERMINATION NJ20180026.pdf PDF
site visit QA.pdf PDF
Experience Information Form.pdf PDF
Payment Bond.pdf PDF
6973GH-19-R-00230.pdf PDF
Geotech Report_Teterboro Airport1.pdf PDF
TEB tower replacement spec final.pdf PDF
TEB RTR Tower Project Drawings.pdf PDF
TEB tower replacement spec final.pdf PDF
6973GH-19-R-00230.pdf PDF
Payment Bond.pdf PDF
Experience Information Form.pdf PDF
Geotech Report_Teterboro Airport1.pdf PDF
WAGE DETERMINATION NJ20180026.pdf PDF
Performance Bond.pdf PDF
TEB Statement of Work.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PR # ES-19-01110

Teterboro RTR Tower Replacement Teterboro, NJ

The Contractor shall provide the necessary labor, materials, supplies, and equipment to:

Provide design for tower and foundations for two 100 ft. high self-supporting steel antenna towers using provided soil boring data. NOTE: Design must include all items necessary to meet Port Authority of NY and NJ (PANYNJ) Tenant Construction and Alteration Process (TCAP)

Prepare all forms and documents necessary for compliance with the PANYNJ TCAP to the FAA for signature. Submit and obtain a permit to build from PANYNJ. Pay all fee necessary for this process. See PANYNJ website for Tenant Construction Review Manual for design and process requirements.

Excavate and install concrete foundations for the two antenna towers, Provide and erect the antenna towers along with all associated items including: platform, railings, climbing ladder, wave-guide ladder, LMR-900 cables, antenna mounts, grounding and lightning protection, obstruction lighting, etc.

Provide and install overhead ice bridge from each tower to the RTR shelter.

Install LMR-900 coax cables (GFM) from the RTR shelter to the new towers;

Provide and install 2 ground bars and 24 polyphasers inside the RTR shelter.

Perform site work as required.

Remove the existing two existing steel 100-ft high-guyed towers and all associated guys and concrete foundations (to 1ft below grade). Communications towers tested positive for Lead Base Paint use proper methods for removal and recycle tower per all Federal, State, and Local regulations. Remove all communication cables and antennas from the existing towers.

File details come from the government source that posted it. Updated .