J-5_Guidance_Design.pdf

PDF 140 KB Posted

Attached to
MARAD NSMV Vessel Construction Management (VCM)
Solicitation number
693JF718R000029
Issued by

About this file

This document provides the list of guidance design documents and technical information use restrictions agreement for the National Security Multi-Mission Vessel (NSMV) program. The Maritime Administration intends to procure vessel construction management services through a request for proposal to be issued on or about October 11, 2018. The list of guidance design documents includes over 50 documents covering areas such as general arrangement, capabilities and requirements, rules and regulations, stability analysis, machinery specifications, electrical diagrams, and structural designs. Interested parties must sign the technical information use restrictions agreement limiting use of the guidance design documents to questions, offers, or responses related to the design, construction, delivery, operation or maintenance of the NSMV.

Attachment J-5 - Guidance Design

View the file

Other files

File Type Posted
NSMV_Contract_693JF719D000002.pdf PDF
RFP_693JF718R000029_for_Amendment_0005_04-04-19_Pg_91.pdf PDF
693JF718R000029_Amendment_0005_SF30.pdf PDF
Body_of_RFP_693JF718R000029_for_Amendment_0004_11-16-18.pdf PDF
693JF718R000029_Amendment_0004.pdf PDF
J-4_List_of_Deliverables_11-16-18.xlsx XLSX spreadsheet
J-7_Certificate_of_Completion_and_Delivery_11-08-18.pdf PDF
J-6_Delivery_and_Acceptance_Certificate_11-08-18.pdf PDF
693JF718R000029_Amendment_0003.pdf PDF
693JF718R000029_-_Amendment_0003_-_QAs_2___11-08-18.pdf PDF
J-4_List_of_Deliverables_11-08-18.xlsx XLSX spreadsheet
Body_of_RFP_693JF718R000029_for_Amendment_0003_11-08-18.pdf PDF
693JF718R000029_-_Amendment_0002_-_Q&As_1_-_10232018.pdf PDF
693JF718R000029_-_Amendment_0001_-_Extension.pdf PDF
J-3_Stage_Completion_Certificate_Template.pdf PDF
J-2_Payment_Bond_Template.pdf PDF
J-4_List_of_Deliverables.pdf PDF
J-6_Delivery_and_Acceptance_Certificate.pdf PDF
J-9_Past_Performance_Questionnaire.pdf PDF
J-1_Performance_Bond_Template.pdf PDF
J-7_Certificate_of_Completion_and_Delivery.pdf PDF
J-8_Critical_Equipment_List.pdf PDF
693JF718R000029_-_NSMV_Vessel_Construction_Manager_(VCM).pdf PDF
J-10_Training_Space_Equipment_and_Material.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-5 Guidance Design –

The Guidance Design consists of the documents listed in the NSMV List of Guidance Design Documents

(listed below) and the ABS Approval Letters and Drawings. Access to the Maritime Administration, NSMV Guidance Design Documents SharePoint Site can be requested by email with submission of a signed NSMV's Technical Information Use Restrictions Agreement, provided below.

1) NSMV List of Guidance Design Documents and ABS Approval Letters and Drawings

2) NSMV's Technical Information Use Restrictions Agreement

1) NSMV Guidance Design List of Guidance Design Documents - June 26, 2018

Document No. Title Revision

2015‐017‐03‐01 NSMV ‐General Arrangement 1

2015‐017‐03‐02 NSMV Capabilities & Requirements ‐ 2015‐017‐03‐04 NSMV Phase 3 Basis of Design 1

2015‐017‐03‐05A Report on Model Testing, Stock Propeller ‐ 2015‐017‐03‐05B Report on Model Testing, Design Propeller ‐ 2015‐017‐03‐06 Lightship Weight Report Phase 3 ‐ 2015‐017‐03‐07 Rules and Regulations Applicable to the NSMV ‐ 2015‐017‐03‐09 NSMV Stability Analysis ‐ 2015‐017‐03‐10 Gap Analysis ‐ 2015‐017‐03‐11 Midship Section 0

2015‐017‐03‐12 Hull Structure Calculations 1

2015‐017‐03‐13 Electric Load Analysis ‐ 2015‐017‐03‐14 List of Machinery ‐ 2015‐017‐03‐15 HVAC System Design & Calculations ‐ 2015‐017‐03‐16 Evacuation Analysis ‐ 2015‐017‐03‐17 Machinery Reference Calculations ‐ 2015‐017‐03‐18 Propeller Design ‐ 2015‐017‐03‐19 Rudder Design ‐ 2015‐017‐03‐20 Outline Specification 2

2015‐017‐03‐21 Main Machinery Space Arrangement ‐ 2015‐017‐03‐22 Aux. Machinery Space Arrangement ‐ 2015‐017‐03‐23 Structural Fire Protection ‐ 2015‐017‐03‐24 Helideck Arrangement ‐ 2015‐017‐03‐25 Report on Hull Lines Optimization ‐ 2015‐017‐03‐26 Safe Return to Port Analysis ‐ 2015‐017‐03‐28 Assessment of Trailer Maneuvers ‐ 2015‐017‐03‐29 Galley & Mess Arrangement ‐ 2015‐017‐03‐30 Electrical One Line Diagram ‐ 2015‐017‐03‐31 Electrical Design Basis ‐ 2015‐017‐03‐32 Seakeeping Analysis ‐ 2015‐017‐03‐33 Ship Network Diagram ‐ 2015‐017‐03‐34 Electrical Functional and Operating Philosophy ‐ 2015‐017‐03‐35 Ship Network Specification ‐ 2015‐017‐03‐36 High Voltage Main Switchboard Specification ‐ 2015‐017‐03‐37 High Voltage Substation Switchboard Specification ‐

Document No. Title Revision

2015‐017‐03‐38 Transformer Specification ‐ 2015‐017‐03‐39 Navigation Lights Arrangement ‐ 2015‐017‐03‐40 NSMV Doors, Stairs and Landings 0

2015‐017‐03‐41 Simplified Shell Expansion Drawing 0

2015‐017‐03‐42 Primary Structure Scantling Plan 0

2015‐017‐03‐43 Primary Deckhouse Structure 0

2015‐017‐03‐44 Typical Transverse Bulkhead 0

2015‐017‐03‐45 Structural Analysis: Assumptions and Loads 1

2015‐017‐03‐46 Structural Analysis: Results 1

2015‐017‐03‐47 Vibration Analysis Report 1

2015‐017‐03‐50 Ballast System Diagram ‐ 2015‐017‐03‐51 Clean Bilge System Diagram ‐ 2015‐017‐03‐52 Oily Bilge & Waste Oil System Diagram ‐ 2015‐017‐03‐53 Fire Main System Diagram ‐ 2015‐017‐03‐54 Cooling Water System Diagram ‐ 2015‐017‐03‐55 Potable Water System Diagram ‐ 2015‐017‐03‐56 Fuel Systems Diagram ‐ 2015‐017‐03‐57 Lube Oil System Diagram ‐ 2015‐017‐03‐58 Black Water System Diagram ‐ 2015‐017‐03‐59 Gray Water System Diagram ‐ 2015‐017‐03‐60 HVAC Treated Water System Diagram ‐ 2015‐017‐03‐61 HVAC Layout Diagram 1

ABS Approval Letters and Drawings

2) NSMV's Technical Information Use Restrictions Agreement – (provided below)

Print, sign and return.

MARITIME ADMINISTRATION

U.S. Department of Transportation

1200 New Jersey Ave., S.E.

Washington, D.C. 20590

Use Restrictions Agreement

In consideration of being granted access to the documents on the List of Guidance Design Documents relating to the design and construction of the National Security Multi-Mission Vessel (“NSMV”), which is being designed and constructed for the Maritime Administration (“Agency”), the undersigned certifies that it will not use, in any manner or to any extent, in whole or in part, the content of any such documents except as necessary to:

(a) prepare a question, offer, proposal, or any other type of response, in response to any draft solicitation, market research, pre-solicitation synopsis, solicitation, modified solicitation, or request for information issued by the Agency in connection with the design, construction delivery, operation and maintenance of the NSMV;

(b) prepare a question or response to request for information from other Government agencies or regulatory authorities in connection with the design, construction delivery, operation and maintenance of the NSMV; and

(c) solicit bids or offers, enter into discussions, or negotiate a contract relating to the construction of the NSMV.

The undersigned acknowledges that this Agreement is made and intended for the benefit of the United

States Government and may be enforced by the United States Government. By granting the undersigned conditional access to information in this context, the United States Government may seek any remedy available to it to enforce this Agreement including, but not limited to, application for a court order prohibiting certain actions.

The undersigned understands that if it violates the terms and conditions of this Agreement, it could be subjected to administrative, disciplinary, civil, or criminal action, as appropriate, under the laws, regulations, or directives applicable to the category of information involved and the United States

Government has not waived any statutory or common law evidentiary privileges or protections that it may assert in any administrative or court proceeding to protect any information to which the undersigned has been given conditional access under the terms of this Agreement.

Each provision of this Agreement is severable. If a court should find any provision of this Agreement to be unenforceable, all other provisions shall remain in full force and effect. Signing this Agreement does not bar disclosures to Congress or to an authorized official of an executive agency or the Department of

Justice that are essential to reporting a substantial violation of law.

Company (Print):

Signature: _________________________________________________

Name and Title: _________________________________________________

Date: _________________________________________________

Individually:

Signature: _________________________________________________

Name (Print): _________________________________________________

Date: _________________________________________________

File details come from the government source that posted it. Updated .