This document provides a list of deliverables required under a contract for Vessel Construction Management services and the National Security Multi-Mission Vessel program. The contractor will be responsible for various reporting and planning documents including a preventative maintenance plan, NS-E database updates, recommended design deviations, manufacturers recommended spare parts lists, production plans, regulatory reports, test and inspection reports, operating manuals and more. Many of the deliverables are required upon vessel delivery or prior to key milestones and must be submitted via certified mail, email or electronic media in formats like PDF, AutoCAD or MS Project. The Maritime Administration will issue a Request for Proposal on or about October 11, 2018 for these VCM and NSMV services under solicitation number 693JF718R000029.

Attachment J-4 - List of Deliverables

View the file

Other files

File Type Posted
NSMV_Contract_693JF719D000002.pdf PDF
RFP_693JF718R000029_for_Amendment_0005_04-04-19_Pg_91.pdf PDF
693JF718R000029_Amendment_0005_SF30.pdf PDF
Body_of_RFP_693JF718R000029_for_Amendment_0004_11-16-18.pdf PDF
693JF718R000029_Amendment_0004.pdf PDF
J-4_List_of_Deliverables_11-16-18.xlsx XLSX spreadsheet
J-7_Certificate_of_Completion_and_Delivery_11-08-18.pdf PDF
J-6_Delivery_and_Acceptance_Certificate_11-08-18.pdf PDF
693JF718R000029_Amendment_0003.pdf PDF
693JF718R000029_-_Amendment_0003_-_QAs_2___11-08-18.pdf PDF
J-4_List_of_Deliverables_11-08-18.xlsx XLSX spreadsheet
Body_of_RFP_693JF718R000029_for_Amendment_0003_11-08-18.pdf PDF
693JF718R000029_-_Amendment_0002_-_Q&As_1_-_10232018.pdf PDF
693JF718R000029_-_Amendment_0001_-_Extension.pdf PDF
J-3_Stage_Completion_Certificate_Template.pdf PDF
J-2_Payment_Bond_Template.pdf PDF
J-6_Delivery_and_Acceptance_Certificate.pdf PDF
J-5_Guidance_Design.pdf PDF
J-9_Past_Performance_Questionnaire.pdf PDF
J-1_Performance_Bond_Template.pdf PDF
J-7_Certificate_of_Completion_and_Delivery.pdf PDF
J-8_Critical_Equipment_List.pdf PDF
693JF718R000029_-_NSMV_Vessel_Construction_Manager_(VCM).pdf PDF
J-10_Training_Space_Equipment_and_Material.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

List of Deliverables (Attachment J-4)

Deliverable Reference Required by Delivery Method Format Frequency Distribution National Security Multi- Mission Vessel

Per Offeror's SOW See Section B of the RFP Physical Supporting documentation Per NSMV CO

Preventive Maintenance Plan Per Offeror's SOW With the delivery of each vessel

Electronic transfer NS-E Datatbase Per NSMV COR

Update the List of Deliverables, to include all certificates

Per outline specification and SOW

With delivery of each vessel Physical/electronic Hardcopy/PDF Per NSMV COR

NS-E Database (populated) Per Offeror's SOW With delivery of each Vessel Electronic transfer NS-E Datatbase Per NSMV COR

Recommended Deviations to the Guidance Design

Per Offeror's SOW As provided but not less than 30 days prior to Contract Design approval required

Certified Mail / Email PDF Per NSMV CO/COR

Contract Design Per Offeror's SOW Final Draft 30 days prior to approval required and a minimum of 14 Days prior to final design review

Certified Mail / Electronic Media

Hardcopy / PDF / Autocad Per NSMV CO/COR

Manufacturers' Recommended Spare Parts List

Per Offeror's SOW 9 months after shipyard contract signing

Physical Location as directed Per NSMV COR

Recommended Critical Equipment Spare Parts and Special Tools List

Per Offeror's SOW 9 months after shipyard contract signing

Certified Mail / Email Hardcopy / PDF Per NSMV/as updated CO/COR

Recommended spare parts and outfitting stowage plan

Per Offeror's SOW Per VCM schedule Certified Mail / Electronic Media

Hardcopy / PDF / Autocad 1 x per NSMV CO/COR

Functional Design Per Offeror's SOW Per VCM schedule Certified Mail / Electronic Media

Hardcopy / PDF / Autocad 1 x per NSMV CO/COR

As-built Plans Per Offeror's SOW Upon Delivery Certified Mail / Electronic Media

Hardcopy / PDF / Autocad 1 x per NSMV CO/COR

Shipyard Selection Report Per Offeror's SOW NLT 3 days after shipyard selection

Certified Mail / Email Hardcopy / PDF Once, pending no change CO/COR

Shipyard Selection Abstract Per Offeror's SOW NLT 3 days after shipyard selection

Certified Mail / Email Hardcopy / PDF Once, pending no change CO/COR

Shipyard Contract (Proposed) Per Offeror's SOW 14 days prior to contract signing

Certified Mail / Email Hardcopy / PDF As proposed CO/COR

Shipyard Contract (Executed) Per Offeror's SOW 14 days after shipayrd contract signing

Certified Mail / Email Hardcopy / PDF As incurred CO/COR

Production Plan / Gantt Chart/ progress reports

Per Offeror's SOW As proposed Certified Mail / Email Hardcopy / PDF / MS Project (or equal)

Per NSMV/as updated CO/COR

Makers List Per Offeror's SOW NLT 14 days prior to finalizing the negotiation of shipyard contract / as updated

Email PDF Per NSMV CO/COR

Regulatory/Non-regulatory Agency Report

Per Offeror's SOW bi-monthly Email PDF As incurred CO/COR

Production Reports Per Offeror's SOW As issued Email PDF As required CO/COR Change Requests/orders (Shipyard to VCM)

Per Offeror's SOW As issued Email PDF As incurred CO/COR

Delivery Orders (VCM to Shipyard)

Per Offeror's SOW As issued Email PDF As incurred CO/COR

Schedule of Testing and Inspections

Per Offeror's SOW As available Email PDF Per NSMV CO/COR

Test and Trial Plans Per Offeror's SOW As proposed Email PDF Per NSMV CO/COR USCG Periodic Safety Test Procedures

Per Offeror's SOW As proposed/NLT 30 days prior to delivery

Email PDF Per NSMV CO / COR

Test and Inspection reports Per Offeror's SOW Upon completion of action Email PDF Per NSMV CO / COR Weight and Moment Report Per Offeror's SOW Upon completion of action Certified Mail / Email Hardcopy /PDF Per NSMV CO / COR

Trim and Stability Booklet Per Offeror's SOW Upon completion of action Certified Mail / Email Hardcopy /PDF Per NSMV CO / COR Cargomax Per Offeror's SOW Upon Delivery Configured System Cargomax Per NSMV CO/COR Dock Trial Schedule Per Offeror's SOW As proposed, NLT 3 weeks before trials Email MS office Per NSMV COR

Dock Trial Report Per Offeror's SOW Upon completion of action Email Ms office Per NSMV COR Sea Trial Schedule Per Offeror's SOW As proposed NLT 14 days prior to Sea Trials Email PDF Per NSMV CO / COR

Sea Trial Report Per Offeror's SOW Upon completion of action Certified Mail / Email Hardcopy /PDF Per NSMV CO / COR Environmental Management Plan, VCM

Per Offeror's SOW Upon NSMV Delivery Certified Mail / Email Hardcopy / PDF Per NSMV COR

Ship Oil Pollution Emergency Plan (SOPEP), VCM

Per Offeror's SOW Upon NSMV Delivery Certified Mail / Email Hardcopy / PDF Per NSMV COR

Safety Management System, VCM

Per Offeror's SOW Upon NSMV Delivery Certified Mail / Email Hardcopy / PDF Per NSMV COR

Vessel Security Plan, VCM Per Offeror's SOW Upon NSMV Delivery Certified Mail / Email Hardcopy / PDF Per NSMV COR EPA Generator ID Number Per Offeror's SOW Upon NSMV Delivery Certified Mail / Email Hardcopy / PDF Per NSMV COR Heavy Weather Mooring Plan (home port(s)), VCM

Per Offeror's SOW Upon NSMV Delivery Certified Mail / Email Hardcopy / PDF Per NSMV COR

2 sets of operating manuals, technical manuals, and drawings per ship delivered

Per Offeror's SOW Upon NSMV Delivery With the vessel Hardcopy Per NSMV COR

All recommended logistics support documentation

Per Offeror's SOW Upon NSMV Delivery Proposed Proposed Per NSMV COR

All deliverables required to receive ATO

Per Offeror's SOW 60 days prior to NSMV delivery Certified Mail/Email Hard copy/editable format Per NSMV COR

Hazardous Material Inventory Per Offeror's SOW Upon NSMV Delivery Proposed Proposed Per NSMV COR