DRAFT RFP -NP GWMP MVT(4).pdf

PDF 2 MB Posted

Attached to
George Washington Memorial Parkway Mount Vernon Trail Reconstruction - VA NP GWMP MVT(4)
Solicitation number
693C73-24-R-000018
Issued by

About this file

This document is a Request for Proposal (RFP) issued by the Federal Highway Administration, Eastern Federal Lands Highway Division (EFLHD) to solicit competitive proposals for a two-phase design-build contract to reconstruct 6.5 miles of the Mount Vernon Trail in Arlington County, the City of Alexandria, Virginia, and the District of Columbia.

The project aims to address deferred maintenance, accommodate changes in use, improve accessibility, functionality, longevity, and safety of the trail. The RFP includes a base contract for the trail reconstruction in Virginia and an option for construction in the District of Columbia. The estimated design and construction cost for the base contract and option is $35 million to $45 million. EFLHD will use a best value determination process to award the contract. Proposals are due by December 17, 2024, and the contract is planned to be awarded on June 10, 2025, with a notice to proceed on August 5, 2025. The RFP provides detailed information on the scope of work, procurement process, proposal requirements, and government-furnished information.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

RFP No. 693C73- 24-R-000018

This Contract Cites

STANDARD SPECIFICATIONS (FP-14)

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

VA NP GWMP MVT(4)

George Washington Memorial Parkway

Reconstruction of Mount Vernon Trail from Milepost 11 to Milepost 17.5

Contract No.

NPS PMIS Nos. 317390 and 317394

ADDRESS:

CONTRACTOR:

DRA

REQREQ

RFP RFP

AFT

WW

MP MVT(4)MP MVT(4

ton Memorial Parkon Memor t Vernon Trail fromnon Trail fro

NPS PMIS NosNPS PMIS Nos

STATE District of Columbia

DISTRICT

PARK George Washington Memorial Parkway

TYPE OF IMPROVEMENT

The reconstruction of 6.5 miles of the Mount Vernon Trail. Includes grading, aggregate base, and asphalt pavement. It also includes replacing and rehabilitating existing timber bridges, improving drainage, crosswalks, and railing along the trail, and other miscellaneous work.

Project Length Totals For Parking Areas, Lane Miles is calculated as SQFT/11ft (nominal) lane

8.76 0.00

Schedule Parking Area Roadway / Parking Area / Other Stations / SQFT Linear

Feet Route Miles

Lane Miles

A Mainline Trail - Virginia 50108 To 74897 24,789 4.69 0.00

A Mainline Trail - Virginia 82533 To 84720 2,187 0.41 0.00

A Spur Trails - Virginia To 4,540 0.86 0.00

B Mainline Trail - District of Columbia 75194 To 82401 7,207 1.36 0.00

B Spur Trails - District of Columbia To 3,750 0.71 0.00

B George Washington Memorial Parkway 7413 To 11270 3,857 0.73 0.00

DRAFFTFTTTTTT0 TFTTFT4,5

FTFTTo 82401FT207

AFTFTo FT AFAFFF7413 To 11270F

Table of Contents

Subcontracting Plan…………………………………………………….. ……..………1 through 5

Solicitation/Contract Form (SF-1442)…................................................................... . 1 through 4

Scope of Work.....................................................................................................................1 through 13

PART 1. INSTRUCTIONS TO THE OFFEROR

A. General........................................................................................................... ................ 1-A-1

B. Procurement Process................................................................................................... ... 1-B-1

C. Proposal Requirements............................................................................................... .... 1-C-1

D. Government Furnished Information........................................................................... .... 1-D-1

PART 2. CONTRACT CLAUSES AND CONDITIONS

H. Special Terms and Conditions.................................................................................... .... 2-H-1

I. Contract Clauses......................................................................................................... ......2-I-1

Corporate Certificate

PART 3. WAGE DETERMINATION

J. Minimum Wage Schedule.......................................................................................... ..... 3-J-1

PART 4. REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

K. Representations and Certifications........................................................................... ..... 4-K-1

L. Instructions, Conditions, and Notices to Offerors or Respondents............................ .... 4-L-1

PART 5. SPECIAL CONTRACT REQUIREMENTS

A. Division 100. General Requirements.......................................................................... ... 5-A-1 B. Division 110. Design Criteria..................................................................................... .... 5-B-1

C. Division 120. Submittals and Reviews....................................................................... ... 5-C-1

D. Division 150. Project Requirements........................................................................... .... 5-D-1

E. Divisions 200-700. Work Items and Material Requirements.................................... ..... 5-E-1

Appendix A: Conceptual Plans

Appendix B: Bridge Inspection Reports

Appendix C: Geotechnical Data Report

Appendix D: Preliminary Pavement Recommendations

Appendix E: National Park Service Environmental Assessment

Appendix F: Wetland and Stream Delineation Report

Appendix G: Draft Archaeological Survey Report

Appendix H: Sign Inventory and Safety Report

Appendix I: National Park Service Active Transportation Guidebook

Appendix J: 109.07 Price Proposal Forms

Appendix K: 109.08 Request for Progress Payment Forms

Note: Newly posted documents supersede any previous documents.

APM 025E – Revised 1/17/2024 1

ATTACHMENT 1 – FHWA SUBCONTRACTING PLAN

1. INSTRUCTIONS:

Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid. The statement shall be signed by an official authorized to make decisions on behalf of the firm.

The following information shall be provided in the bidder/offeror subcontracting plan submission and shall be expressed in terms of goal percentages of the total planned subcontracting dollars.

Text lines may be added to this template as needed.

Note to the CS/CO: Per APM 025, where a subcontracting plan is required, the complete solicitation shall be sent to the Small Business Specialist (SBS) for review/approval along with Attachment 3, Combined

Subcontracting Plan Routing Sheet. Prior to award, completed Subcontracting Plan(s) shall be sent to the SBS for review/approval along with the previously signed routing sheet.

*insert and complete additional tables if the contract includes option year(s).

1 Percentage = (subcontracted amount in the category/total planned subcontracted amount) 2 Planned subcontracts to “other than small business” concerns + subcontracts to Small Business concerns = 100% 3 SDVOSB is a subcategory of VOSB. Any dollar amount applied to SDVOSB also applies to VOSB.

4 In this document, the term WOSB includes Economically Disadvantaged WOSB (EDWOSB) concerns.

SUBCONTRACTING GOALS – BASE YEAR

Total prime contract amount – Base Year: $ [insert amount] Total planned subcontracted amount (regardless of firm/entity size status) – Base Year: $ [insert amount]

Total planned subcontracts to “other than small business” concerns (i.e., large, non-profit, university, etc.) $[insert amount] [insert

#]%1 Total planned subcontracts to Small Business concerns: $[insert amount] [insert

#]%2 Total planned subcontracts to Veteran Owned Small Business concerns (VOSB)3: $[insert amount] [insert #]% o Total planned subcontracts to Service-Disabled Veteran Owned Small Business (SDVOSB) concerns: $[insert amount] [insert #]%

Total planned subcontracts to Historically Underutilized Business Zones (HUBZones): $[insert amount] [insert #]%

Total planned subcontracts to Small Disadvantaged Business (SDB) concerns (includes 8(a), Alaska Native Corporations (ANC), and Indian Tribes):

$[insert amount] [insert #]%

Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)4 concerns: $[insert amount] [insert #]%

APM 025E – Revised 1/17/2024 2

1.1 Rationale if establishing a goal lower than 5% for VOSB:

1.2 Rationale if establishing a goal lower than 5% for SDVOSB:

1.3 Rationale if establishing a goal lower than 3% for HUBZone:

1.4 Rationale if establishing a goal lower than 5% for SDB:

1.5 Rationale if establishing a goal lower than 5% for WOSB:

1.6 Rationale if establishing a goal lower than the current DOT subcontracting goal:

2. The following principal types of supplies and/or services are planned to be subcontracted under this contract. [Add additional rows if more space is needed.]

5 List all applicable size standards for each proposed subcontractor.

Type of Supply/Service to be Subcontracted

Company/Firm

Name

Subcontracted

Amount

Subcontractor Size

Standard (Other Than

SB, SB, VOSB, SDVOSB,

HUBZone, SDB, WOSB)5

APM 025E – Revised 1/17/2024 3

3. The following methods were used to develop the subcontract percentage goals:

4. The following methods were used to identify potential subcontract sources for solicitation purposes. (i.e. source lists used and organizations contacted to identify potential SB concerns, such as the System for Award Management (www.SAM.gov), Dynamic Small Business Search (www.DSBS.sba.gov), trade associations, industry conferences/fairs, etc.)

5. [Select appropriate option.] Indirect costs [were/were not] included in establishing the subcontracting goals specified in the table above.

6. If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, VOSB, SDVOSB, HUBZone, SDB and WOSB subcontractors:

7. The following individual will administer the subcontracting program:

Name:

Title:

Address:

Telephone:

E-mail:

This individual's specific duties, as they relate to the subcontracting program, are as follows:

8. The following efforts will be taken to ensure that SB, SDB, VOSB, SDVOSB, HUBZone, and

WOSB subcontractors will have an equitable opportunity to compete for subcontracts:

APM 025E – Revised 1/17/2024 4

[initial] It is agreed that FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts, which offer further subcontracting opportunities. It is further agreed that all subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $700,000 ($1.5M for construction of any public facility with further subcontracting possibilities) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9.

9. The following types of records will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan (i.e., establishment of source lists, guides and other data that identify SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns; a description of the offeror’s efforts to locate SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns and to award subcontracts to them, etc.) and shall be maintained through completion of the contract:

10. In accordance with FAR Subpart 19.704(a)(10) through (15), the Contractor further agrees to:

[Initial each line]

Cooperate in any studies or surveys as may be required;

Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan;

After November 30, 2017, include subcontracting data for each order when reporting subcontracting achievements for indefinite-delivery, indefinite-quantity contracts intended for use by multiple agencies;

Submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov/ within the timeframes identified at FAR Subpart 19.704(a)(10)(iv);

Ensure that other than small business subcontractors with subcontracting plans agree to submit eSRS documents online as required;

Provide its prime contract number and its unique entity identifier, and the e-mail address of the offeror’s official responsible for acknowledging receipt of or rejecting the ISRs to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs;

Require that each subcontractor with a subcontracting plan provide the prime contract number, its own unique entity identifier, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans;

APM 025E – Revised 1/17/2024 5

Make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that the offeror used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal;

Provide the contracting officer with a written explanation if the contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in FAR 19.704(a)(12) of this section. This written explanation will be submitted to the contracting officer within 30 days of contract completion;

Will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor; and

Pay its small business subcontractors on time and in accordance with the terms and conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor (see FAR 52.242-5).

Submitted by:

POC Name:

Title:

Email Address:

Company Name:

DUNS/CAGE:

Mailing Address:

Signature

DRAFT

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

SUITE E2-3-300

693C73

ASHBURN VA 20147

SEE BLOCK 7

a. NAME

Shirley A. Anderson

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) eflhd.contracts@dot.gov

SEE BLOCK 10

06/20/2024

693C7324R000018

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This Request for Proposal (Design Build) for George Washington Memorial Parkway

Mount Vernon Trail Reconstruction, Project No. VA NP GWMP MVT(4) located in

Arlington County and the City of Alexandria, Virginia and the District of Columbia, Washington, D.C., is in strict accordance with the Solicitation/Contract instructions, notices, clauses, provisions, items listed below, and for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.

This project is intended to address deferred maintenance, accommodate changes in use, improve accessibility, functionality, longevity, and safety of the trail along the northern section of the MVT. The approximate limits of construction are from the

City of Alexandria (Milepost 11.0) to the northern terminus at Theodore Roosevelt

Island (Milepost 17.5). The 18-mile Mount Vernon Trail (MVT) is a paved, multi-use trail corridor stretching from George Washington¿s Mount Vernon Estate to Theodore

Roosevelt Island, linking Fairfax County and the City of Alexandria, to Arlington

County and major Potomac River bridge crossings into the District of Columbia. The

MVT is a popular recreation resource and a critical regional transportation connection.

Government Furnished Information (GFI) - SEE SLFTS

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________ _______ TBD calendar days after receiving

CONTINUATION SHEET, BLOCK 11

12/17/2024

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

�����./�0::/303�#73//5�20�9/3:03;�2./�=03D�3/AB83/>�#2�2./�9384/5�59/48:8/>�$/60=�81�523842�#4403>#14/�=82.�2./�2/3;5�0:�2.85�5068482#2801?�8:�2.85�0::/3�85�#44/92/>

$@�2./��0E/31;/12�81�=382817�=82.81�--------------------�4#6/1>#3�>#@5�#:2/3�2./�>#2/�0::/35�#3/�>B/����������

�%(��
�)��
�������
���
����� �������������������
���

�����./�0::/303�#73//5�20�:B3185.�#1@�3/AB83/>�9/3:03;#14/�#1>�9#@;/12�$01>5�

0��#������ ��2�

������������
H������

������� �)4��

3�2���%����

�����"��� � ��������
�������������
��" ��������������
�������������"���

����������3 4��� '5 '6 �--����7��

3�2���%���

�����������������������
H������

������� )4������ �$���� �� �4������

����2�� #��0 ��2�����

�)��������� )�&4'��������������� ������������ &4'���������������

�"������&��*���G��'����, Block 26

Federal Highway Administration Eastern Federal Lands Highway Division ATTN: Construction Branch Quantum Park 22001 Loudoun County Parkway Suite E2-2-200 Ashburn, VA 20147

Federal Highway Administration Eastern Federal Lands Highway Division A/P Branch, AMZ-150 P.O. Box 25710 or E-MAIL

9-AMC-AMZ-EFLINVOICES@FAA.GOV

Oklahoma City, OK 73125

EFLHD-CO

peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693C7324R000018

Schedule A

Schedule B

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Bid Bond (See Instructions on Page 3)

Date Bond Executed (Must Not Be Later Than Bid Opening Date)

OMB Control Number: 9000-0001 Expiration Date: 1/31/2027

Principal (Legal Name And Business Address) Type Of Organization ("X" One)

State Of Incorporation

Surety(ies) (Name And Business Address)

Percent Of Bid Price

Penal Sum Of Bond Amount Not To Exceed Million(s) Thousand(s) Hundred(s) Cents

Bid Identification Bid Date Invitation Number

Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 24 (REV. 10/2023)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

For (Construction, Supplies Or Services)

Obligation:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

Conditions:

The Principal has submitted the bid identified above.

Therefore:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

Other (Specify) Individual Partnership Joint Venture Corporation

2.

(Seal)2.(Seal)

1.

1.

1.

1. 3.2.

Name(s) (Typed)

Signature(s)

Individual Surety(ies)

Name(s) And Title(s) (Typed)

Corporate Seal

(Seal)

3.

(Seal)

2.

(Seal) Signature(s)

Principal

2.

State Of Incorporation Liability Limit ($)

2.

2.

1.Name(s) And Title(s) (Typed)

Signature(s) 1. 2. Corporate Seal

Corporate Seal

Su re ty C

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

Name(s) And Title(s) (Typed)

Su re ty D

Signature(s)

Name And Address

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

Liability Limit ($)State Of Incorporation

1.

1.

Su re ty A

Name And Address

Su re ty B

Name(s) And Title(s) (Typed)

Signature(s)

Name And Address

Corporate Surety(ies)

Witness:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

STANDARD FORM 24 (REV. 10/2023) PAGE 2

STANDARD FORM 24 (REV. 10/2023) PAGE 3

Corporate Seal

Su re ty F

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

1.

1.

State Of Incorporation

2.

2.

Liability Limit ($)

Corporate Seal

Name(s) And Title(s) (Typed)

Su re ty G

Signature(s)

Name And Address

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

State Of Incorporation Liability Limit ($)

2.

2.

1.

1.

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

Su re ty E

Instructions

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability

Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated

"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New

Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and

"offeror."

STANDARD FORM 24 (REV. 10/2023) PAGE 4

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0001. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General

Services Administration, Regulatory Secretariat Division (MVCB), 1800 F Street, NW, Washington, DC

20405.

SCOPE OF WORK

A.1 Description of Project

The 18-mile Mount Vernon Trail (MVT) is a paved, multi-use trail corridor stretching from George Washington’s Mount Vernon Estate to Theodore Roosevelt Island, linking Fairfax County and the City of Alexandria, to Arlington County and major Potomac River bridge crossings into the District of Columbia. The MVT is a popular recreation resource and a critical regional transportation connection. The trail hosts over one million pedestrians and bicyclists annually. During peak periods, the MVT north of Alexandria is one of the most heavily used multi-use trails in the country. The National Park Service originally constructed the MVT in the 1970s and 1980s. The trail is relatively narrow by modern standards and characterized by meandering curves, timber bridges, and in some areas, dense vegetation.

The trail is a critical regional transportation connection and recreational amenity set within the cultural landscape of the planned design of the Mount Vernon Memorial Highway and the George Washington Memorial Parkway (MVMH/GWMP). This project may affect the character of the landscape which is a contributing feature to the National Register of Historic Places significance of the MVMH/GWMP.

Many of the built facilities along the MVT need immediate attention. The bridges, trail tread (condition and width), trail alignment, drainage, signage, and trailhead features (i.e. benches, drinking fountains, bike racks, etc.) are all in need of varying levels of rehabilitation due to their age and deferred maintenance.

This project is intended to address deferred maintenance, accommodate changes in use, improve accessibility, functionality, longevity, and safety of the trail along the northern section of the MVT. The approximate limits of construction are from the City of Alexandria (Milepost 11.0) to the northern terminus at Theodore Roosevelt Island (Milepost 17.5).

The project is located in Arlington County and the City of Alexandria, Virginia and the District of Columbia, Washington, D.C.

The project also includes preparing any required documents for design waivers and exceptions and obtaining all permits required to construct the project.

The work is split into bid schedules as follows:

Base Contract (Schedule A):

The base contract is for the design of the Mount Vernon Trail reconstruction and construction of the Mount Vernon Trail in Arlington County and the City of Alexandria, Virginia.

Option 1 (Schedule B):

Option 1 contract is for the construction of the Mount Vernon Trail on Columbia Island in the District of Columbia, Washington, D.C.

The project design shall be completed and approved by the Contracting Officer (CO) prior to construction. Temporary traffic control, erosion sediment control, and other non-earth disturbing measures can be implemented in advance of the start of construction to facilitate project design, fieldwork, and time of year restrictions such as survey, staking, tree cutting, and design submittals.

A.2. Roadway Design

A.2.a. General

In accordance with the National Environmental Policy Act (NEPA), the National Park Service (NPS) and Federal Highway Administration (FHWA) are preparing an analysis of potential environmental effects and corresponding regulatory consultations. The Contractor shall design and construct the project within the Limits of Disturbance (LOD) described in the NEPA documentation. The Contractor has flexibility to produce benefits or savings to FHWA and/or the Contractor, without impairing essential project functions and characteristics such as safety, maintainability, environmental protection, drainage, and other permitted constraints.

Develop a horizontal alignment, vertical profile, and bridge design conforming to applicable design codes and using the provided Conceptual Plans as a guide to commencing the design.

Design the Project using CAD files format compatible with OpenRoads Designer (ORD) or OpenSite Designer software.

A.2.b. Scope of Work

Site Access. The primary construction access to the project site is the Northbound lanes of the George Washington Memorial Parkway (GWMP). Additionally, there is limited space for staging throughout the project site. Staging areas can be located in the parking lots (Columbia Island Marina, Gravelly Point, and Daingerfield Island) adjacent to the Mount Vernon Trail (MVT) within the project limits and/or at the southern end of the Arlington Memorial Bridge (AMB). Localized “off-trail” staging areas will be permitted outside of any sensitive archaeological and environmental sites. Develop an Access Plan that describes the means to stage and store equipment, materials, etc. at the project site. Describe the means and methods that will be required to access the site and construct the proposed bridges. Propose methods of access that minimizes adverse impacts to environmental resources.

Roadway Design. Provide plan sheets similar in nature to the Conceptual Plans, as well as the ground survey and mapping with stationing for the Project corridor to develop the design in accordance with the Highway Design Standards.

Develop an alignment, profile, and other geometric requirements according to Subsection 111.05.

The alignment and profile shown in the Conceptual Plans convey the Government's intent for the proposed roadway, trail and bridges.

Pavement Design. Provide a pavement structure that consists of a combination of base and/or subbase, and asphalt concrete pavement placed in layers above the subgrade. Design a pavement section that provides for surface and subsurface drainage, considering the in-situ soil types. Perform subsurface investigation to confirm existing conditions.

Include the following, at a minimum, in the Pavement report:

Pavement design life (including both the construction year and design year) AASHTO and the Unified Soil Classification System (USCS) based soil classifications of the subgrade soils.

The subgrade strength and a methodology to assure that this strength is provided throughout the project limits.

The resilient modulus design value(s) used for the structural pavement design.

All design assumptions used.

Detailed design computation.

Roadway Obliteration. The Conceptual Plans show the design intent to obliterate existing sections of the MVT and the northbound lanes of the GWMP. Obliterate these areas according to Section 211. Restore to approximate original or proposed ground contours and blend with the adjacent areas.

Tree Inventory. Complete a tree inventory of the project limits including all trees and their critical root zones (CRZ). The inventory is to include an ID number, species, size (DBH), percent of CRZ impacted from disturbance, removal or conservation of tree, tree protection methods in case of conservation, and replacement calculations according to the National Capital Planning Commission tree replacement calculations. Determine the tree CRZ using either the Arlington County CRZ detail or a detail that meets or exceeds it. Trees with more than 30% CRZ impacted should be evaluated for replacement. Trees with a lower impact may still require evaluation depending on the location of the impact or the species. The Contractor is responsible for providing an ISA-certified arborist to complete the tree inventory.

Gravelly Point Pedestrian Plaza. Design and construct the proposed pedestrian plaza at Gravelly Point as shown in the Conceptual Plans. The Contractor is responsible for finalizing the design of the pedestrian plaza. Maintain the proposed MVT width through the plaza.

Provide a minimum 6-foot-wide concrete sidewalk on the north side of the trail separated by a hardscaped plaza. Remove the existing Capital Bikeshare station and replace it within the new hardscaped plaza. Provide trailhead features (i.e., picnic tables, benches, water fountain, etc.).

Arlington Memorial Circle Proposed Crosswalks. Design and construct a new pedestrian mid-block crossing on the northbound GWMP lanes south of the AMB and a road diet for the northbound GWMP lanes as shown in the Conceptual Plans. The Contractor is responsible for finalizing the design of the road diet and the design and location for the proposed crosswalk.

Remove the existing crosswalk. Provide passive detection rectangular rapid flashing beacons (RRFBs) at the proposed crosswalk.

Design a new pedestrian mid-block crossing on the northbound GWMP lanes north of the AMB.

Design additional trail spurs needed to connect the crossing with the AMB pedestrian trails.

Conduct a review meeting with FHWA and NPS to discuss the design, location, and impacts of the new crosswalk and trail spurs. Construction of the new crosswalk and trail spurs north of the AMB is not part of this project.

Pedestrian/Bicyclist Circles. Design and construct pedestrian/bicyclist circles at the Four Mile Run Trail Connector intersection and the 14th Street Bridge Trail intersection as indicated in the Conceptual Plans. The Contractor is responsible for developing the design of the pedestrian/bicyclist circles, which must accommodate trail maintenance vehicles. Remove and replace any trailhead features (i.e., information signs, benches, etc.) within the intersections.

At Grade Crossings. Design and construct at grade crossings (Marina Drive, NB GWMP On Ramp, and Gravelly Point) as indicated in the Conceptual Plans. The Contractor is responsible for developing the design of the at grade crossings. Provide safety improvement recommendations for each at grade crossing during .

Trail Spur Intersections. Design and construct trail spur intersections as indicated in the Conceptual Plans. The Contractor is responsible for finalizing the design of the trail spur intersections. Provide a design that prioritizes the MVT trail and minimizes the need for social trails.

Trailhead Features. Remove and replace all existing benches within the project limits.

Proposed benches must be consistent with the details provided in the Conceptual Plans. Remove and replace all water fountains within the project limits. Proposed water fountains must be ADA compliant (two level) and have a water bottle filler and pet bowl. The Contractor is responsible for selecting a water fountain that matches these criteria and providing details to the CO for approval prior to installation. Remove and replace all milepost markers within the project limits.

Proposed milepost markers must be consistent with the details provided in the Conceptual Plans.

Utility Relocation By Others. The Contractor is responsible for the location, maintenance, protection, safety, and continuation of service of all existing utilities within the project limits for the life of the contract. Locate these utilities according to Sections 107 and 645.

Right-Of-Way. The proposed project limits are within NPS, USA, and private property.

Provide property ownership and easements rights within the project corridor on plan sheets.

A.3. Environmental Management and Permit Coordination

A.3.a. General

Provide an Environmental Protection Specialist and Permitting Coordinator according to Subsection 101.04.

A.3.b. Scope of Work

Perform all aspects of environmental compliance including, but not limited to, the following:

Development of an environmental compliance and permitting plan. Create an environmental compliance plan narrative. Outline the expected permits, approvals, and mitigation measures that are likely to be required. This plan will describe how the project will comply with the descriptions, impact thresholds, and protective measures described in the FHWA and NEPA documents. The plan shall also identify any additional actions and recommendations required for the project. Provide expected completion dates for submitting permit applications and deadlines for receiving final approved permits. Describe how any expected mitigation measures have been or will be met through the design and construction process. Submit the Environmental Compliance Plan to the CO for review and approval.

The design, construction and maintenance of erosion control and stormwater management measures Documentation of efforts to avoid, minimize, and mitigate impacts to wetlands.

If needed and in coordination with NPS and FHWA, update consultation with the USFWS, NOAA, or other environmental regulatory agency, based on proposed plans and associated impacts.

Implementation of conservation measures to protect sensitive fish species and habitat, birds, vegetation, and other natural resources.

Design, coordination, and implementation of mitigation related to wetlands, stormwater, shellfish, and/or other resources as required.

Identification, testing, and handling of hazardous materials, if encountered.

Drafts and final of all permit applications shall be submitted to FHWA for review and comment.

Anticipated permits and approvals include, but are not limited to, the following:

VDEQ CWA Section 401, Water Quality Certification/VSMP Permit VDEQ CWA Section 402, Virginia Pollutant Discharge Elimination System (VPDES) Permit and project-specific Stormwater Pollution Prevention Plan (SWPPP) VDEQ CZMA Consistency Determination

DC EPA NPDES

DCRA Building Permit USACE CWA Section 404 Dredge and Fill Permit USACE Section 408 Authorization to Use or Alter a Federal Civil Works Project USACE Rivers and Harbors Act Section 10, Navigable Waters Permit USFWS ESA Section 7 Letter of Concurrence NOAA Fisheries ESA Section 7 Letter of Concurrence NOAA Fisheries EFH Letter of Concurrence

Additionally, the following plans would be implemented prior to starting construction:

Project specific SPCC

ESC and stormwater best practices Project specific Dewatering Plan

A.4 Geotechnical Design

A.4.a. General

Conduct all work necessary to perform the geotechnical investigation and design for the project. Elements of the work include, but are not limited to, the following:

Evaluating the requirements of the work, and performing geotechnical/geological explorations, geotechnical analyses, and laboratory testing sufficient to design and construct the project.

Designing permanent and temporary retaining walls, bridge foundations, ground improvement and slope stability.

Provide geotechnical designs, investigation data reports, recommendations, and construction support to EFLHD as stated in the Scope of Work and requested by the

CO.

The Geotechnical designer shall be a licensed Professional Engineer in the Commonwealth of Virginia and the District of Columbia, Washington, D.C.

A.4.b. Scope of Work

Geotechnical Investigation. Perform a design level geotechnical investigation for all geotechnical and pavement structures, to meet or exceed the requirements in the Project Development and Design Manual (PDDM) Chapters 6 and 11 and as follows:

1. Collect appropriate data for geotechnical evaluation of roadway and bridge design and construction and soil analysis and infiltration testing for stormwater best management practice (BMP) features. The Contractor is responsible for obtaining all required permits, temporary traffic control, and utility locates and markings.

2. Submit a detailed Field Investigation Plan for approval at least 21 days prior to performing the field investigation. Supplemental investigation, if necessary, should be approved by the CO.

3. Perform all boring, in-situ testing, and inspection by geologists, engineering geologists, or geotechnical engineers under the onsite direct supervision of a Professional geologist or geotechnical engineer with a minimum of 10 years of experience in the performance and supervision of subsurface geotechnical investigations. This individual shall be a licensed Professional Engineer in the Commonwealth of Virginia and the District of Columbia, Washington, D.C.

4. Determine and document the coordinate location and ground surface elevation for each boring and field investigation site, and show the coordinates, station, offset, and elevation for each individual boring log or investigation record. Reference coordinates, stations and offsets to the project survey control.

5. Reference elevations to the project datum and horizontal control system.

6. Provide boring horizontal coordinates with an accuracy of +/-1.0 foot and vertical coordinates with an accuracy of +/- 0.5 foot.

7. Backfill borehole, after drilling, in accordance with Federal, State, County and NPS guidelines. Dispose of bored material offsite.

8. Retain rock and soil samples and make the samples available to FHWA until after final acceptance. After final acceptance, all untested samples should be delivered to:

Laboratory Manager Eastern Federal Lands Highway Division 1827 Jack Delozier Drive John L. Marshall Technology Park Sevierville, TN 37876

Complete laboratory tests in accordance with pertinent ASTM or AASHTO standards and analyze the data to provide design and construction requirements. Soils and materials tests conducted for the project shall be performed by an accredited AASHTO Laboratory, AASHTO resource Laboratory (formerly AMRL), and Cement and Concrete Reference Laboratory (CCRL), unless otherwise approved by the CO.

Provide all records of subsurface explorations and describe the soils and rocks encountered and their depth limits. Collect photographs showing the location of all borings (before and after boring completion) as well as typical and any unusual soil conditions encountered.

Provide geotechnical design and construction reports that summarize pertinent subsurface investigations, tests, and engineering evaluations. Provide technical specifications for construction methods that are not adequately addressed in the standard specifications. Review the construction documents to assure that they have appropriately incorporated the geotechnical components. Provide quality management processes that document how each specific geotechnical recommendation or requirement is addressed in the construction documents and reference the drawing(s) that incorporate the pertinent results. The results of the geotechnical investigation and laboratory results shall support design and construction efforts to meet the following performance requirements:

1. Provide construction recommendations to address soil-structure interaction and to accommodate the unique construction methods applied to this project. All geotechnical survey work shall be completed to satisfy baseline and post-construction contract performance requirements.

2. Design pavements, subgrades and embankments for the following post-construction settlement tolerances:

Longitudinal settlement less than one inch over 200 feet; Settlement in cross section less than two inches over 24 feet.

Settlement less than one inch over the initial 20 years.

Settlement less than a magnitude that will result in damage to adjacent or underlying structures, including utilities.

3. Design foundations such that the maximum post-construction foundation settlement shall:

Be less than one inch over the life of the structure.

Settlement less than one inch within 100 feet of bridge abutments, beyond the approach slabs, over the initial 20 years;

Have a maximum differential settlement between structure foundations in accordance with AASHTO requirements, or in accordance with the requirements of the Contractor’s structural engineer, whichever requires less settlement.

4. Design stable cut slopes and embankment slopes. Evaluate stability for interim construction stages, for the end of construction condition, and for the design-life conditions. The following factors of safety are to be used with limit equilibrium methods of analysis to determine factors of safety for representative sections of all soil cut and soil embankment fill slope areas greater than 10’ in height and/or where slopes are supporting on, or are supported by, retaining structures. Approval of site-specific investigation plans with reduced boring frequency may require higher factors of safety. Table 1 is not applicable for rock cut slopes.

Table 1 Minimum Factors of Safety for Soil Cut/Fill Slopes

Slope analysis parameters based on: Factor of Safety Involves Structure or

Critical Slope(1) Non-Critical Slope

In-situ or lab. tests and measurements(2)(3)

1.50 1.30

No site-specific tests N/A(3) 1.50

(1) A critical slope is defined as any slope that is greater than 25’ in height, affects or supports a structure, or whose failure would result in significant cost for repair, or damage to, private property.

(2) Site specific in-situ tests include both groundwater measurements and SPT testing but may also include CPT or DMT.

(3) Parameters for critical slopes involving structures must be based on specific laboratory testing.

(4) Problem soils (very soft soils, very loose soils, or heavily over-consolidated soils) must be analyzed using shear strength parameters determined from appropriate laboratory strength tests.

(5) Problem soils should be analyzed in accordance with specialized local practices.

(6) Construction plans shall specify use of soil types consistent with the parameters used in slope analyses.

The geotechnical reports should have detailed computations, computer results, and references.

Geotechnical memos and reports should be sealed and stamped by a professional engineer registered in the State of Virginia. The final geotechnical report should address all the comments submitted by the federal government.

The Contractor shall prepare and incorporate the geotechnical recommendations from the Final

Geotechnical Report into the plans, typical sections, profiles and cross-sections as applicable.

This includes drainage and subdrainage requirements to ensure positive drainage both within the pavement structure and on the pavement surface.

A.5. Bridge Design

A.5.a. General

Design the replacement bridges according to the AASHTO LRFD Bridge Design Specifications and LRFD Guide Specifications for the Design of Pedestrian Bridges. The Design-Build team shall take into consideration the negative impact of the marine environment on the service life of the bridge to ensure that the provided design will meet the 75-year design life specified in the AASHTO LRFD Bridge Design specifications.

A.5.b. Scope of Work

Demolish the existing bridges and construct new bridges to replace the existing bridges, meeting the cross-section requirements provided in the Conceptual Plans (16 feet wide, with the new bridge #26 matching the existing width), without impacting NPS’s and other local partners’ missions. New bridges shall be designed to meet pedestrian and H-10 loadings as specified in AASHTO LRFD Bridge Design Specifications and LRFD Guide Specifications for the Design of Pedestrian Bridges.

A.6. Hydraulic/Drainage Design

A.6.a. General

Provide a well-drained corridor and a safe environment for the individuals who use and maintain the trails. In the design and construction of all drainage structures and appurtenances, adequately address functionality, durability, ease of maintenance, maintenance access, safety according to the requirements of roadways and geometric design, and the coastal environment including scour countermeasures design, storm surge and water levels, type and size of revetment if needed.

A.6.b. Scope of Work

Drainage and Erosion Control. The trail drainage structures shall be designed by the Contractor to meet all applicable hydraulic requirements, including current FEMA, PDDM Chapter 7, DDOE/DDOT, Arlington County, City of Alexandria, and VDEQ guidelines.

Drainage design criteria shall be provided to the CO for review and acceptance by the CO in consultation with the applicable storm drainage and stormwater management review and permitting agencies prior to detail design by the Contractor. The CO will review and approve these analyses in consultation with applicable storm drainage and stormwater management review and permitting agencies prior to the commencement of construction.

Several areas of poor drainage and/or flooding have been indicated in the Conceptual Plans. The Contractor is responsible for determining the extents of the drainage issues and developing recommendations to address the issues.

The Contractor shall provide all temporary drainage needed for Maintenance of Traffic sequence. The Contractor shall perform a wetland delineation for any proposed in-channel or in-stream work. The final drainage design work shall include the capacity and stability design of culverts, open channels, underdrains, storm sewers and inlets, bridge drainage assemblies and structures, adequate outfall analysis, stormwater management facilities, and erosion and sediment control in compliance with the standards and reference documents listed in the RFP.

A Multiple…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .