Amendment 0002 - VA NP GWMP MVT(4).pdf

PDF 247 KB Posted

Attached to
George Washington Memorial Parkway Mount Vernon Trail Reconstruction - VA NP GWMP MVT(4)
Solicitation number
693C73-24-R-000018
Issued by

About this file

This document is an amendment to a solicitation for the George Washington Memorial Parkway Mount Vernon Trail Reconstruction project, identified as VA NP GWMP MVT(4) with solicitation number 693C73-24-R-000018.

The amendment provides a summary of responses to questions and clarifications submitted by potential offerors. Key details include:

  • The proposal due date of July 24, 2024 at 2:00pm EST remains unchanged.
  • Helical piles are anticipated to be used for the bridge replacements on Bridges 26, 27, 28, 29, and the Boardwalk, but not for Bridges 31 and 32.
  • The government is not specifying a contract duration, and is instead evaluating the offeror's proposed schedule and means and methods to meet the project requirements.

The solicitation is being issued by the Department of Transportation Federal Highway Administration for the reconstruction work on the George Washington Memorial Parkway Mount Vernon Trail.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

N/A

The purpose of this Amendment is to:

SEE SCHEDULE

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

QUANTUM PARK - ATTN: ACQUISITIONS, SUITE E2-3-300

22001 LOUDOUN COUNTY PARKWAY

ASHBURN, VA 20147

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

QUANTUM PARK - ATTN: ACQUISITIONS, SUITE E2-3-300

22001 LOUDOUN COUNTY PARKWAY

ASHBURN, VA 20147

693C73-24-R-000018

VA NP GWMP MVT(4)

1 3

07/15/2024

05/22/2024

693C73 693C73

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0002 Project VA NP GWMP MVT(4)

George Washington Memorial Parkway Mount Vernon Trail Reconstruction Solicitation: 693C73-24-R-000018

The purpose of this Amendment is to:

1) Provide a summary of responses to questions/clarifications asked by potential Offerors.

The Proposal due date of July 24, 2024, at 2:00 p.m. EST remains unchanged.

Questions / Clarifications

The following questions and issues were submitted to EFLHD at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.

1. Can you provide the name of the Surveyor who surveyed the project corridor for the Preliminary plans?

Response: The survey was completed by in-house staff and external consultants.

The name of the external consultant who assisted with the survey will not be provided.

2. Upon further reviewing the draft RFP, it does not provide the period of performance for this contract. But the RFQ section on Page 11, under Factor 1 - Project Specific Understanding and Approach & Quality Management, it requires "Provide the estimated duration of each project schedule/option including the total design and construction duration. ". Can EFL please provide the contractors with the contract duration from the date of the award, so a schedule can be developed to meet the requirements of the

RFQ/RFP.

Response: The Offeror is to provide an estimated reasonable schedule for the completion of the Base Contract and Option 1 based on their understanding and approach to the project. The Offeror is to address the means and methods to meet their schedule. The Offeror should also address any possibilities to accelerate their schedule. The government intends to evaluate the offerors understanding of the project based on the schedule the offeror provides. The government is not evaluating the number of days the offeror provides as a reasonable schedule.

mailto:eflhd.contracts@dot.gov

3. Confirmation that there are helical piles specified for this phase of the project is required.

The plans provided do include helical loads. I am trying to confirm that there are helical piles specified for this phase of the project. I have the plans but I do not see helical loads provided with the plan set. Would you be the best person for me to talk to?

Response: Helical piles are anticipated being used on the bridge replacements for Bridges 26, 27, 28, 29 and the Boardwalk (Sta. 523+25.19 to 527+59.04). It is not anticipated that helical piles will be a practical foundation type for bridge replacements for Bridges 31 and 32. These bridge designations can be found on the R-sheets of the “Appendix A_Conceptual Plans.pdf”.

ACQ_UPDATES_Amendment #2.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0002
Project VA NP GWMP MVT(4)
George Washington Memorial Parkway Mount Vernon Trail Reconstruction
Solicitation: 693C73-24-R-000018

File details come from the government source that posted it. Updated .