Appendix B_Bridge Inspection Reports.pdf
PDF 29 MB Posted
- Attached to
- George Washington Memorial Parkway Mount Vernon Trail Reconstruction - VA NP GWMP MVT(4)
- Solicitation number
- 693C73-24-R-000018
About this file
The provided document is Appendix B to a Request for Quotes (RFQ) for the reconstruction of the George Washington Memorial Parkway Mount Vernon Trail in Virginia. The RFQ is being issued by the Department of Transportation Federal Highway Administration (FHWA) under Solicitation Number 693C73-24-R-000018. This appendix contains bridge inspection reports for the project area. The RFQ does not provide details on the specific products or services required, response dates, award dates, pricing terms, set-asides, or other key information. This document appears to be a technical appendix to support the overall RFQ requirements, rather than addressing the core scope of work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-022P
FOUR MILE RUN BRIDGE INSPECTION DATE : 04/18/2023
226 PRIORITY OF IMPROVEMENT C
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
222.9
REMOVE TREE LIMBS OVERHANGING APPROACH RAIL AT
NORTHWEST AND SOUTHEAST CORNERS. 1 LS
PRELIM. MAINTENANCE TOTAL :
Item No.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST ESTIMATES
REHAB RECONSTR
58.7,59.1, 59.2,60.6, 59.7
CLEAN AND PAINT END 10' OF STRUCTURAL
STEEL BENEATH EXPANSION JOINTS. 1 LS
58.3,222.
REPAIR ASPHALT WEARING SURFACE OVER
BRIDGE AND APPROACHES AS NECESSARY. 1 LS
58.3,60.3, REMOVE UNSOUND CONCRETE ON SOUTH
60.4,60. ABUTMENT AND NORTH PIER BEARING SEATS, 1 LS
13 TOP OF BACKWALLS, AND DECK HEADERS AND
PLACE NEW CONCRETE TO ORIGINAL
DIMENSIONS. CLEAN EXPOSED REBAR ON
SOUTH PIER AND COAT WITH APPROVED
SEALANT.
58.2,60.8 CLEAN AND RESEAL VERTICAL JOINTS IN
ABUTMENT WINGWALLS AND PIER WALLS.
CLEAN DEBRIS FROM EXPANSION JOINTS.
1 LS
58.8,60. REPAIR LEAKING UTILITY AND REPLACE DRIP
12 GUARD AND SUPPORTS OVER PEDESTRIAN
TRAIL. REPLACE COVER PLATE ON WEST SIDE
OF NORTH ABUTMENT.
1 LS
222.9 REPLACE DECAYED PORTIONS OF
SOUTHEAST TIMBER RETAINING WALL. 1 LS
58.7 EXTEND DRAINS TO REDIRECT WATER AWAY
FROM BEAMS #8 AND #9. 1 LS
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-022P
FOUR MILE RUN BRIDGE INSPECTION DATE : 04/18/2023
PRIORITY OF IMPROVEMENT226
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C
36.D INSTALL APPROVED END TREATMENTS.
1 LS
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, AND CONTINGENCIES 1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
STRUCTURE LOAD RATING STRUCTURE NO. 3300-022P
FOUR MILE RUN BRIDGE INSPECTION DATE: 04/17/2023
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 12 11 20 18
HS 22 20 36 33
TYPE 3 26 24 43 39
TYPE 3S2 28 25 47 43
TYPE 3-3 30 27 50 45
DESIGN LOADING: 4 - H 20
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 06/01/2016
LOAD RATING CONTROLLED BY: GIRDER #1 - STEEL FLEXURE
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-022P
STRUCTURE IDENTIFICATION
(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY
(202) STRUCTURE NAME:..............FOUR MILE RUN BRIDGE
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........3300-022 P
2 - NATIONAL CAPITAL(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:............. 022P
(208) NPS ROAD CLASS:............... 7 - URBAN PARKWAY
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................PARK
(211) PROJECT NO(S):................... 15757-2
(212) DRAWING NUMBERS:...........NCP190
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
513 - VIRGINIA
51013 ARLINGTON
00000
1 6 1 00001 0
FOUR MILE RUN
GWMP
3300022P0000000
2 3 MILES SOUTH OF I-395.
99.99 FT ( 99.99 M)
13.26 (KM PT: 21.34)
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........4 - STEEL CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 02 - STRINGER/MULTI-BEAM OR (44B) APPR. STR. TYPE:.................... 00 - OTHER
GIRDER
(45) NO. OF MAIN SPANS:..............003 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............113. FT ( 34.6 M)
(49) STRUCTURE LENGTH:........... 336. FT ( 102.5 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS
(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... YES
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................4 - H 20 (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............22 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 20
LOADS
(64) OPERATING RATING:..............36 TONS ( 32.7 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 04/18/2023 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 5 - SCOUR INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-022P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 38° 50'28.60" (51) CURB TO CURB WIDTH:............ 66.0 FT ( 20.1 M)
(17) LONGITUDE:............................ 77°02 '50 80" (52) DECK WIDTH:.......................... 93.0 FT ( 28.3 M)
(19) DETOUR LENGTH:.................. 5 MI ( 8 KM) (32) APPR. ROADWAY WIDTH:...... 78 FT ( 23.8 M)
(28A) LANES ON STRUCT:.............04 (213) APPR. PAVEMENT WIDTH:... 78.0 FT ( 23.8 M)
(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 0 0 FT ( 0 M)
(42A) SERVICE ON:.........................5 - HIGHWAY-PEDESTRIAN RIGHT SHOULDER:.......... 0 0 FT ( 0 M)
(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 3 - CLOSED MEDIAN WITH NON-
MOUNTABLE BARRIERS
(29) AVG DAILY TRAFFIC:..............18200 (34) SKEW ANGLE:......................... 25 °
(30) YEAR OF ADT:......................... 2007 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................20020 (47) TOTAL HORIZ. CLEARANCE:.. 33 FT ( 10.1 M)
(115) YEAR OF FUTURE ADT:........2027 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 9 0 FT ( 2.7 M)
(38) NAVIGATION CONTROL:.........0 RIGHT:.................................. 0 0 FT ( 0 M)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
2 - MOUNTED ON PARAPET(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:
(111) ABUT OR PIER PROT:...........1 - NAVIGATION PROTECTION NOT MATERIAL:........................... 6 - ALUMINUM
REQUIRED
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 3.45 FT ( 1 05 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT:.................................N
(222) APPROACHES:
(223) RETAINING WALL:.................N
(36) TRAFFIC SAFETY FEAT: 1 1 1 0
(75A) TYPE OF WORK:................... 35 - REHABILITATION - DETERIORATION
(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT
(76) IMPROVEMENT LENGTH:....... FT ( 0 M)
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:................ N
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:.................... 5 - SCOUR WITHIN LIMITS OF
FOOTING OR PILES
(225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(226) PRIORITY OF IMPROVEMENT: C - MODERATE
(227) MAINTENANCE COST:
(228) REHAB / RECNSTR COST:
(229) CONSTRUCTION COST:
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2002-EXPANSION JOINTS REPLACED, NEW WEARING SURFACE.
(231) ADDITIONAL CONSIDERATIONS:
2015-UBIV INSP LIMITED TO BEAMS 7-12 DUE TO PEDESTRIAN SIDEWALK ON EAST SIDE
(330) ADDITIONAL CONFIGURATION INFORMATION:
Inspector: Nate Brown Structure Number: 3300022P0000000
Inspection Date: 04/18/2023 Facility Carried: GWMP
Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING SOUTH TOWARD MOUNT VERNON
PHOTO 4
Description WEST (UPSTREAM) SIDE
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW LOOKING NORTH
PHOTO 6
Description TYPICAL DETERIORATION OF ASPHALT WEARING SURFACE; NORTHBOUND LANES IN
NORTH APPROACH SHOWN
Bridge Inspection Report
Pictures
PHOTO 7
Description TYPICAL CRACKING OF DECK WEARING SURFACE; SOUTHBOUND LANES NEAR NORTH
ABUTMENT SHOWN
PHOTO 8
Description TYPICAL RUSTING OF PEDESTRIAN BRIDGE RAIL; NORTH SPAN SHOWN
Bridge Inspection Report
Pictures
PHOTO 9
Description OPEN JOINT IN MEDIAN; ALSO NOTE TYPICAL EXPOSED AGGREGATE FINISH
PHOTO 10
Description TYPICAL DEBRIS ACCUMULATION IN EXPANSION JOINTS; SOUTH ABUTMENT JOINT IN
NORTHBOUND LANES SHOWN; ALSO NOTE TYPICAL DETERIORATION OF DECK
HEADERS AND TOP OF ABUTMENT BACKWALLS
Bridge Inspection Report
Pictures
PHOTO 11
Description GUARDRAIL ON EAST SIDE OF SOUTH APPROACH SETTLED AND ROTATED
PHOTO 12
Description TYPICAL MISSING EXPANSION SLEEVES IN RAILS, EAST SIDE AT SOUTH APPROACH
SHOWN
Bridge Inspection Report
Pictures
PHOTO 13
Description TYPICAL VEGETATION GROWTH OVERHANGING ROADWAY; WEST SIDE OF SOUTH
APPROACH SHOWN
PHOTO 14
Description TYPICAL IMPACT DAMAGE TO MEDIAN GUARDRAIL; SOUTH APPROACH SHOWN
Bridge Inspection Report
Pictures
PHOTO 15
Description GENERAL VIEW OF RETAINING WALL AT SOUTHEAST APPROACH
PHOTO 16
Description GENERAL UNDERSIDE VIEW LOOKING SOUTH, NORTH SPAN SHOWN
Bridge Inspection Report
Pictures
PHOTO 17
Description GENERAL VIEW OF NORTH ABUTMENT
PHOTO 18
Description TYPICAL RUSTING AND SECTION LOSS AT BEARINGS; BEARING #8 AT NORTH ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 19
Description TYPICAL RUSTING AND SECTION LOSS ON BOTTOM FLANGE, WEB, AND BEARING
STIFFENERS OF BEAMS AT ABUTMENTS; BEAM #3 AT NORTH ABUTMENT SHOWN
PHOTO 20
Description MISSING UTILITY COVER AT WEST END OF NORTH ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 21
Description RUSTING OF UTILITY DRIP GUARD AND SUPPORT MEMBER BETWEEN BEAMS #2 AND #3
OVER PEDESTRIAN TRAIL IN NORTH SPAN; NOTE HOLES RUSTED THROUGH
PHOTO 22
Description TYPICAL RUSTING OF UTILITY PIPES; UTILITY BETWEEN BEAMS #10 AND #11 IN NORTH
SPAN SHOWN
Bridge Inspection Report
Pictures
PHOTO 23
Description TYPICAL RUSTING OF SCUPPERS; NORTH SPAN SHOWN
PHOTO 24
Description GENERAL VIEW OF NORTH PIER, NORTH FACE
Bridge Inspection Report
Pictures
PHOTO 25
Description DELAMINATION AT TOP OF SOUTH FACE OF NORTH PIER BELOW BEAM #8
PHOTO 26
Description LOOSE SPLICE BOLT ON BOTTOM FLANGE OF BEAM #11 IN CENTER SPAN
Bridge Inspection Report
Pictures
PHOTO 27
Description TYPICAL RUST SCALING OF WEB AND BOTTOM FLANGE OF BEAMS; BEAM #8 IN CENTER
SPAN SHOWN
PHOTO 28
Description TYPICAL TRANSVERSE CRACK WITH EFFLORESCENCE ON UNDERSIDE OF DECK; WEST
OVERHANG IN CENTER SPAN SHOWN
Bridge Inspection Report
Pictures
PHOTO 29
Description SPALL ON NORTH FACE OF SOUTH PIER BELOW BEAM #12
PHOTO 30
Description TYPICAL RUSTING OF METAL STAY-IN-PLACE DECK FORMS WITH SECTION LOSS;
BETWEEN BEAMS #10 AND #11 AT SOUTH ABUTMENT SHOWN
Bridge Inspection Report
Pictures
PHOTO 31
Description TYPICAL RUSTING AND SECTION LOSS ON BOTTOM FLANGE, WEB, AND BEARING
STIFFENERS OF BEAMS AT ABUTMENTS; BEAM #5 AT SOUTH ABUTMENT SHOWN
PHOTO 32
Description DELAMINATION AND SPALLING OF SOUTH ABUTMENT BACKWALL BETWEEN BEAMS #10
AND #11 AROUND UTILITY PENETRATION
Bridge Inspection Report
Pictures
PHOTO 33
Description TYPICAL OVERHANGING BEARING PLATE; BEARING #9 AT SOUTH ABUTMENT SHOWN
PHOTO 34
Description TYPICAL DETERIORATION OF VERTICAL JOINT FILLER MATERIAL AT CENTERLINE OF
ABUTMENTS; SOUTH ABUTMENT SHOWN
Bridge Inspection Report
Pictures
PHOTO 35
Description TYPICAL DETERIORATION OF MASONRY MORTAR JOINTS IN WINGWALLS; SOUTHWEST
WINGWALL SHOWN
PHOTO 36
Description TYPICAL DETERIORATION OF VERTICAL JOINT FILLER MATERIAL AT WINGWALLS;
SOUTHWEST WINGWALL SHOWN
Bridge Inspection Report
Pictures
PHOTO 37
Description UPSTREAM CHANNEL
PHOTO 38
Description DOWNSTREAM CHANNEL
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-042T
MOUNT VERNON BICYCLE TRAIL BRIDGE INSPECTION DATE : 03/07/2023
PRIORITY OF IMPROVEMENT226
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
59.1
REPLACE BROKEN OR MISSING ANCHOR BOLTS AT BOTH
ABUTMENT BEARINGS. 7 EA
58.10,60.
REMOVE VEGETATION ON AND ALONG EAST WINGWALLS.
TREE OVERHANGING BRIDGE AT SOUTH AND NORTH
END.
1 LS
222.4, 222.6
SEAL MODERATE TRANSVERSE AND LONGITUDINAL
CRACKING OF APPROACH PAVEMENT. 1 LS
58.6
REPLACE SOUTH RAIL POST ON EAST RAIL IN SOUTH
APPROACH. 1 LS
PRELIM. MAINTENANCE TOTAL :
Item No.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST ESTIMATES
REHAB RECONSTR
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other
STRUCTURE LOAD RATING STRUCTURE NO. 3300-042T
MOUNT VERNON BICYCLE TRAIL BRIDGE INSPECTION DATE: 03/06/2023
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 0 0 0 0
HS 0 0 0 0
TYPE 3 0 0 0 0
TYPE 3S2 0 0 0 0
TYPE 3-3 0 0 0 0
DESIGN LOADING: 7 - PEDESTRIAN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-042T
STRUCTURE IDENTIFICATION
(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY
(202) STRUCTURE NAME:..............MOUNT VERNON BICYCLE TRAIL
BRIDGE
(203) STRUCTURE KIND:............... 4 - TRAIL BRIDGE
(204) STRUCTURE NUMBER:.........3300-042 T
2 - NATIONAL CAPITAL(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:............. 042T
(208) NPS ROAD CLASS:............... 6 - RESTRICTED
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................PARK
(211) PROJECT NO(S):................... GWMP-331(1)
(212) DRAWING NUMBERS:
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
113 - DISTRICT OF COLUMBIA
11001 DISTRICT OF COLUMBIA
00000
1 6 0 00000 0
BOUNDARY CHANNEL
MOUNT VERNON BICYCLE TRAIL
3300042T0000000
0.1 MILES SOUTH OF SPOUT RUN
PKWY.
99.99 FT ( 99.99 M)
7 89 (KM PT: 2.4 )
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........3 - STEEL (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 02 - STRINGER/MULTI-BEAM OR (44B) APPR. STR. TYPE:.................... 00 - OTHER
GIRDER
(45) NO. OF MAIN SPANS:..............001 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............131. FT ( 40 M)
(49) STRUCTURE LENGTH:........... 135. FT ( 41.2 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 0 - NONE
(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................7 - PEDESTRIAN (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:.............. METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 0
LOADS
(64) OPERATING RATING:.............. TONS ( 0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 03/07/2023 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... Y
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY 24 MONTHS - LAST INSP: 04/01/2017
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-042T
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 38° 53'23.64" (51) CURB TO CURB WIDTH:............ 10.5 FT ( 3.2 M)
(17) LONGITUDE:............................ 77°03 '50.40" (52) DECK WIDTH:.......................... 12.0 FT ( 3.7 M)
(19) DETOUR LENGTH:.................. 0 MI ( 0 KM) (32) APPR. ROADWAY WIDTH:...... 10.0 FT ( 3 M)
(28A) LANES ON STRUCT:.............01 (213) APPR. PAVEMENT WIDTH:... 10.0 FT ( 3 M)
(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 0 0 FT ( 0 M)
(42A) SERVICE ON:.........................3 - PEDESTRIAN-BICYCLE RIGHT SHOULDER:.......... 0 0 FT ( 0 M)
(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
(29) AVG DAILY TRAFFIC:..............0 (34) SKEW ANGLE:......................... 0 °
(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................2 (47) TOTAL HORIZ. CLEARANCE:.. 10.5 FT ( 3.2 M)
(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........N - NOT APPLICABLE, NO RIGHT:.................................. 0 0 FT ( 0 M)
WATERWAY
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)
(111) ABUT OR PIER PROT:...........2 - IN PLACE AND FUNCTIONING MATERIAL:........................... 6 - ALUMINUM
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 4 58 FT ( 1.4 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:......................N
(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:................ N
(61) CHANNEL:................................7 (71) WATERWAY ADEQUACY:
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 8 - STABLE FOR SCOUR CONDITIONS
(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 1 - MAINTENANCE
(36) TRAFFIC SAFETY FEAT: N N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR
(75A) TYPE OF WORK:................... 35 - REHABILITATION - DETERIORATION (227) MAINTENANCE COST:
(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT (228) REHAB / RECNSTR COST:
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
STRUCTURE WAS FORMERLY INSPECTED WITH 3300-013P.
(231) ADDITIONAL CONSIDERATIONS:
Inspector: Joe Koenig Structure Number: 3300042T0000000
Inspection Date: 03/07/2023 Facility Carried: MOUNT VERNON BICY
Trail Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING SOUTH TOWARD MOUNT VERNON
PHOTO 4
Description WEST (DOWNSTREAM) SIDE
Trail Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW LOOKING NORTH
PHOTO 6
Description TYPICAL SCALING OF TOP OF BACKWALL, NORTH END SHOWN
Trail Bridge Inspection Report
Pictures
PHOTO 7
Description TYPICAL CRACKING OF GROUT PADS FOR RAIL POST, EAST RAILING SHOWN
PHOTO 8
Description TYPICAL VIEW OF SCALING ON TOP OF DECK
Trail Bridge Inspection Report
Pictures
PHOTO 9
Description IMPACT DAMAGE TO EAST RAIL SOUTH POST
PHOTO 10
Description SETTLEMENT IN APPROACH PAVEMENT, SOUTH APPROACH SHOWN
Trail Bridge Inspection Report
Pictures
PHOTO 11
Description TYPICAL CRACKING OF APPROACH PAVEMENT, SOUTH APPROACH SHOWN
PHOTO 12
Description GENERAL UNDERSIDE VIEW LOOKING SOUTH
Trail Bridge Inspection Report
Pictures
PHOTO 13
Description TYPICAL TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK UNDERSIDE, NEAR
NORTH ABUTMENT SHOWN
PHOTO 14
Description SPALLING OF EAST DECK OVERHANG UNDERSIDE AT SOUTH ABUTMENT
Trail Bridge Inspection Report
Pictures
PHOTO 15
Description GENERAL VIEW OF SOUTH ABUTMENT
PHOTO 16
Description SOUTHEAST BEARING PAD SHIFTED NORTH AND LEADS SOUTH; NOTE MISSING ANCHOR
BOLT
Trail Bridge Inspection Report
Pictures
PHOTO 17
Description TYPICAL RUSTING OF CONNECTION HARDWARE FOR CROSS BRACE FRAMES, WEST
GIRDER CONNECTION AT SOUTH ABUTMENT SHOWN
PHOTO 18
Description TYPICAL VERTICAL CRACKING WITH EFFLORESCENCE ON ABUTMENT BACKWALLS, SOUTH ABUTMENT SHOWN
Trail Bridge Inspection Report
Pictures
PHOTO 19
Description VEGETATION GROWTH ON SOUTHEAST WINGWALL
PHOTO 20
Description BROKEN ANCHOR BOLT AT EXTERIOR SIDE OF NORTHWEST BEARING
Trail Bridge Inspection Report
Pictures
PHOTO 21
Description GENERAL VIEW OF NORTH ABUTMENT
PHOTO 22
Description UPSTREAM CHANNEL
Trail Bridge Inspection Report
Pictures
PHOTO 23
STRUCTURE SUMMARY STRUCTURE NO. 3300-046T
MOUNT VERNON TRAIL SOUTH BRIDGE INSPECTION DATE: 03/07/2023
north and south abutments at the time of inspection.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-046T
MOUNT VERNON TRAIL SOUTH BRIDGE INSPECTION DATE : 03/07/2023
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.2
REPLACE EXPANSION JOINT MATERIAL AT BRIDGE ENDS.
1 LS
60.9
BACKFILL AND STABILIZE AREAS OF EROSION AND
UNDERMINING AT ABUTMENTS. 1 LS
58.6
REPLACE RAILING SLEEVES AND REALIGN RAILS AT
SOUTHEAST AND NORTHWEST CORNERS. 1 LS
59.11
REMOVE VEGETATION GROWTH UNDER SPAN #4.
1 LS
PRELIM. MAINTENANCE TOTAL :
Item REHABILITATION/RECONSTRUCTION
UNIT
UNIT PRELIM. COST ESTIMATES
No. (TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. COST
REHAB RECONSTR
222.4 RESURFACE NORTH AND SOUTH APPROACH
PAVEMENT. 1 LS
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, AND CONTINGENCIES. 1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
of 24
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-046T
MOUNT VERNON TRAIL SOUTH BRIDGE INSPECTION DATE : 03/07/2023
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
The structure will continue to be monitored for additional cracking and settlement.
STRUCTURE LOAD RATING STRUCTURE NO. 3300-046T
MOUNT VERNON TRAIL SOUTH BRIDGE INSPECTION DATE: 03/06/2023
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 0 0 0 0
HS 0 0 0 0
TYPE 3 0 0 0 0
TYPE 3S2 0 0 0 0
TYPE 3-3 0 0 0 0
DESIGN LOADING: 7 - PEDESTRIAN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-046T
STRUCTURE IDENTIFICATION
(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY
(202) STRUCTURE NAME:..............MOUNT VERNON TRAIL SOUTH
BRIDGE
(203) STRUCTURE KIND:............... 4 - TRAIL BRIDGE
(204) STRUCTURE NUMBER:.........3300-046 T
2 - NATIONAL CAPITAL(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:............. 046T
(208) NPS ROAD CLASS:............... 6 - RESTRICTED
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................PARK
(211) PROJECT NO(S):
(212) DRAWING NUMBERS:...........DJAC11
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
513 - VIRGINIA
51013 ARLINGTON
00000
1 6 7 00000 0
RAMP GW & CRYSTAL CITY TRAIL
CONN.
MOUNT VERNON TRAIL
3300046T0000000
ADJACENT TO GWMP NEAR REAGAN
NATIONAL AIRPORT.
14.75 FT ( 4.5 M)
(KM PT: 0 )
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 06 - BOX BEAM OR GIRDERS - (44B) APPR. STR. TYPE:.................... 00 - OTHER
SINGLE OR SPREAD
(45) NO. OF MAIN SPANS:..............004 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............75 FT ( 22.9 M)
(49) STRUCTURE LENGTH:........... 240. FT ( 73.2 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 0 - NONE
(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 0 - UNKNOWN (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................7 - PEDESTRIAN (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............0 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 0
LOADS
(64) OPERATING RATING:..............0 TONS ( 0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 03/07/2023 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-046T
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 38° 51'22.60" (51) CURB TO CURB WIDTH:............ 12.0 FT ( 3.7 M)
(17) LONGITUDE:............................ 77 02° '46 90 " (52) DECK WIDTH:.......................... 14.0 FT ( 4.3 M)
(19) DETOUR LENGTH:.................. 0 MI ( 0 KM) (32) APPR. ROADWAY WIDTH:...... 14.0 FT ( 4.3 M)
(28A) LANES ON STRUCT:.............00 (213) APPR. PAVEMENT WIDTH:... 14.0 FT ( 4.3 M)
(28B) LANES UNDER STRUCT:......01 LEFT SHOULDER:............... 0 0 FT ( 0 M)
(42A) SERVICE ON:.........................3 - PEDESTRIAN-BICYCLE RIGHT SHOULDER:.......... 0 0 FT ( 0 M)
(42B) SERVICE UNDER:................. 1 - HIGHWAY, WITH OR W/OUT (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
PEDESTRIAN
(29) AVG DAILY TRAFFIC:..............0 (34) SKEW ANGLE:......................... 0 °
(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................0 (47) TOTAL HORIZ. CLEARANCE:.. 72 FT ( 21.9 M)
(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........N - NOT APPLICABLE, NO RIGHT:.................................. 0 FT ( 0 M)
WATERWAY
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 2 - MOUNTED ON PARAPET
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 3 - CONCRETE/STEEL
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................10.00 FT ( 3.05 M) (215) BRIDGE RAIL HEIGHT:.......... 4 54 FT ( 1 38 M)
(56) LEFT:................................. FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... 14.75 FT ( 4.5 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:................................N
(62) CULVERT:.................................N
(222) APPROACHES:
(223) RETAINING WALL:.................N
(36) TRAFFIC SAFETY FEAT: N N N N
(75A) TYPE OF WORK:................... 35 - REHABILITATION - DETERIORATION
(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT
(76) IMPROVEMENT LENGTH:.......0 FT ( 0 M)
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:................ N
(71) WATERWAY ADEQUACY:........... N
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:.................... N - NOT OVER WATERWAY
(225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(226) PRIORITY OF IMPROVEMENT: D - MINOR
(227) MAINTENANCE COST:
(228) REHAB / RECNSTR COST:
(229) CONSTRUCTION COST:
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
SPANS #1 AND #4 - 45'; SPANS #2 AND #3 - 75'.
ADDITIONAL INFORMATION
Inspector: Joe Koenig Structure Number: 3300046T0000000
Inspection Date: 03/07/2023 Facility Carried: MOUNT VERNON TRAI
Trail Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING SOUTH TOWARD MT. VERNON
PHOTO 4
Description WEST SIDE
Trail Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO 6
Description ASPHALT PATCH ADJACENT TO BACKWALL AT EAST SIDE OF NORTH APPROACH HAS
FAILED; NOTE CRACK IN APPROACH PAVEMENT
Trail Bridge Inspection Report
Pictures
PHOTO 7
Description SETTLEMENT OF NORTH APPROACH PAVEMENT AT NORTH ABUTMENT
PHOTO 8
Description EDGE SPALLS AND HAIRLINE LONGITUDINAL CRACKS IN TOP OF NORTH ABUTMENT
BACKWALL
Trail Bridge Inspection Report
Pictures
PHOTO 9
Description CRACKING OF NORTHEAST WINGWALL MORTAR JOINTS
PHOTO 10
Description MISSING RAIL SLEEVES DUE TO MISALIGNMENT OF RAILS AT WEST SIDE NEAR NORTH
ABUTMENT
Trail Bridge Inspection Report
Pictures
PHOTO 11
Description SPALL IN DECK SURFACE OF NORTH SPAN; NOTE DETERIORATED LANE STRIPING
PHOTO 12
Description TYPICAL VIEW OF FLAKING PAINT ON BRIDGE RAILS, WEST RAILING IN NORTH SPAN
Trail Bridge Inspection Report
Pictures
PHOTO 13
Description RANDOM CRACKING IN DECK SURFACE, NORTH SPAN SHOWN
PHOTO 14
Description TYPICAL VERTICAL CRACKING OF PARAPETS WITH EFFLORESCENCE, WEST PARAPET
OVER SOUTH PIER SHOWN
Trail Bridge Inspection Report
Pictures
PHOTO 15
Description EXPANSION JOINT SEALANT AND ASPHALT DETERIORATED AT SOUTH ABUTMENT
PHOTO 16
Description APPROACH PAVEMENT DETERIORATION AT SOUTH APPROACH ON EAST SIDE ADJACENT
TO BACKWALL; NOTE GAP BETWEEN BRIDGE AND APPROACH PARAPET DUE TO FAILED
PATCH
Trail Bridge Inspection Report
Pictures
PHOTO 17
Description EROSION ALONG SOUTHWEST WINGWALL
PHOTO 18
Description GENERAL UNDERSIDE VIEW OF SPAN #3 LOOKING NORTH
Trail Bridge Inspection Report
Pictures
PHOTO 19
Description TYPICAL RANDOM CRACKING WITH EFFLORESCENCE ON SIDES OF BOX GIRDERS AT
PIERS, WEST SIDE OVER CENTER PIER SHOWN
PHOTO 20
Description TYPICAL RANDOM TRANSVERSE CRACKING WITH STAINING AND EFFLORESCENCE ON
BOX GIRDER UNDERSIDE, WEST SIDE OF SPAN #3 AT MIDSPAN SHOWN
Trail Bridge Inspection Report
Pictures
PHOTO 21
Description DELAMINATION ON EAST SIDE OF BOX GIRDER UNDERSIDE IN SPAN #3
PHOTO 22
Description SPALL ON BOX GIRDER UNDERSIDE IN SPAN #3 ON WEST SIDE
Trail Bridge Inspection Report
Pictures
PHOTO 23
Description GENERAL VIEW OF SOUTH ABUTMENT; NOTE HOMELESS ACTIVITY
PHOTO 24
Description GENERAL VIEW OF SOUTH PIER, SOUTH FACE
Trail Bridge Inspection Report
Pictures
PHOTO 25
Description GENERAL VIEW OF NORTH ABUTMENT
PHOTO 26
Description LEANING EAST BEARING PAD AT NORTH ABUTMENT
STRUCTURE SUMMARY STRUCTURE NO. 3300-047T
MOUNT VERNON TRAIL NORTH BRIDGE INSPECTION DATE: 03/07/2023
of the approach pavement adjacent to the backwall.
Since the previous inspection, erosion and undermining along the east side of the north abutment slope protection has been partially repaired.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-047T
MOUNT VERNON TRAIL NORTH BRIDGE INSPECTION DATE : 03/07/2023
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
60.9
REPAIR EROSION AND UNDERMINING ON BOTH SIDES OF
NORTH SLOPE PROTECTION. 1 LS
60.1
REPAIR LOOSE MASONRY STONE AT WEST END OF
SOUTH ABUTMENT. 1 LS
PRELIM. MAINTENANCE TOTAL :
Item REHABILITATION/RECONSTRUCTION
UNIT
UNIT PRELIM. COST ESTIMATES
No. (TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. COST
REHAB RECONSTR
222.4 REPAVE NORTH APPROACH. PATCH POTHOLE
AT SOUTHWEST AND SOUTHEAST CORNER OF
APPROACH PAVEMENT. RESEAL TRANSVERSE
CRACK AT SOUTH APPROACH.
1 LS
223.1 CLEAN AND COAT REBAR WITH APPROVED
PRODUCT AND PATCH SPALLS ON PANELS OF
NORTHEAST RETAINING WALL.
1 LS
58.2 REPLACE DECK EXPANSION JOINT SEALS
WITH PROPERLY SIZED MATERIAL. 1 LS
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, AND CONTINGENCIES. 1 LS
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-047T
MOUNT VERNON TRAIL NORTH BRIDGE INSPECTION DATE : 03/07/2023
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other
STRUCTURE LOAD RATING STRUCTURE NO. 3300-047T
MOUNT VERNON TRAIL NORTH BRIDGE INSPECTION DATE: 03/06/2023
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 0 0 0 0
HS 0 0 0 0
TYPE 3 0 0 0 0
TYPE 3S2 0 0 0 0
TYPE 3-3 0 0 0 0
DESIGN LOADING: 7 - PEDESTRIAN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-047T
STRUCTURE IDENTIFICATION
(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY
(202) STRUCTURE NAME:..............MOUNT VERNON TRAIL NORTH
BRIDGE
(203) STRUCTURE KIND:............... 4 - TRAIL BRIDGE
(204) STRUCTURE NUMBER:.........3300-047 T
2 - NATIONAL CAPITAL(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:............. 047T
(208) NPS ROAD CLASS:............... 7 - URBAN PARKWAY
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................PARK
(211) PROJECT NO(S):
(212) DRAWING NUMBERS:...........DJAC11
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
513 - VIRGINIA
51013 ARLINGTON
00000
2 6 7 00000 0
RAMP "M"
MOUNT VERNON TRAIL
3300047T0000000
ADJACENT TO GWMP NEAR REAGAN
NATIONAL AIRPORT.
15.75 FT ( 4.8 M)
(KM PT: 0 )
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 06 - BOX BEAM OR GIRDERS - (44B) APPR. STR. TYPE:.................... 00 - OTHER
SINGLE OR SPREAD
(45) NO. OF MAIN SPANS:..............004 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............85 FT ( 25.9 M)
(49) STRUCTURE LENGTH:........... 300. FT ( 91.4 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 0 - NONE
(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................7 - PEDESTRIAN (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............0 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 0
LOADS
(64) OPERATING RATING:..............0 TONS ( 0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 03/07/2023 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-047T
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 38° 51'35.60" (51) CURB TO CURB WIDTH:............ 11.2 FT ( 3.4 M)
(17) LONGITUDE:............................ 77°02 '43 90" (52) DECK WIDTH:.......................... 14.0 FT ( 4.3 M)
(19) DETOUR LENGTH:.................. 0 MI ( 0 KM) (32) APPR. ROADWAY WIDTH:...... 10.0 FT ( 3 M)
(28A) LANES ON STRUCT:.............00 (213) APPR. PAVEMENT WIDTH:... 10.0 FT ( 3 M)
(28B) LANES UNDER STRUCT:......01 LEFT SHOULDER:............... 0 0 FT ( 0 M)
(42A) SERVICE ON:.........................3 - PEDESTRIAN-BICYCLE RIGHT SHOULDER:.......... 0 0 FT ( 0 M)
(42B) SERVICE UNDER:................. 1 - HIGHWAY, WITH OR W/OUT (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
PEDESTRIAN
(29) AVG DAILY TRAFFIC:..............0 (34) SKEW ANGLE:......................... 0 °
(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................0 (47) TOTAL HORIZ. CLEARANCE:.. 11.2 FT ( 3.4 M)
(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........N - NOT APPLICABLE, NO RIGHT:.................................. 0 0 FT ( 0 M)
WATERWAY
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
2 - MOUNTED ON PARAPET(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:
(111) ABUT OR PIER PROT:...........2 - IN PLACE AND FUNCTIONING MATERIAL:........................... 3 - CONCRETE/STEEL
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................4.00 FT ( 1.22 M) (215) BRIDGE RAIL HEIGHT:.......... 4 54 FT ( 1 38 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... 15.58 FT ( 4.75 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:
(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:
(61) CHANNEL:................................N (71) WATERWAY ADEQUACY:........... N
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 5 (113) SCOUR CRITICAL:.................... N - NOT OVER WATERWAY
(223) RETAINING WALL:.................6 (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: N N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR
(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:
(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
SPANS #1 AND #4 - 65'; SPANS #2 AND #3 - 85'.
Inspector: Joe Koenig Structure Number: 3300047T0000000
Trail Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING SOUTH TOWARD MOUNT VERNON
PHOTO 4
Description EAST SIDE
Trail Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO 6
Description TYPICAL TRANSVERSE CRACKS AND POPOUT SPALLS ON TOP OF DECK, SPAN #1
Trail Bridge Inspection Report
Pictures
PHOTO 7
Description LONGITUDINAL CRACKS IN NORTH APPROACH PAVEMENT; NOTE AREA OF SETTLEMENT
ON WEST SHOULDER
PHOTO 8
Description TRANSITION BETWEEN APPROACH RAIL AND BRIDGE RAIL AT NORTHWEST CORNER;
NOTE DIFFERENCE IN HEIGHT OF RAILS
Trail Bridge Inspection Report
Pictures
PHOTO 9
Description TYPICAL GAP BETWEEN APPROACH PARAPET AND BRIDGE PARAPET, WEST SIDE OF
NORTH ABUTMENT SHOWN; NOTE GAP BETWEEN EXPANSION JOINT MATERIAL AND
BACKWALL OF NORTH ABUTMENT
PHOTO 10
Description DETERIORATION OF PATCH REPAIR AT NORTHEAST CORNER OF NORTH ABUTMENT
Trail Bridge Inspection Report
Pictures
PHOTO 11
Description SETTLEMENT ALONG NORTH APPROACH PAVEMENT, NORTHWEST CORNER SHOWN
PHOTO 12
Description TYPICAL VERTICAL CRACKING OF PARAPETS WITH EFFLORESCENCE, WEST PARAPET
OVER CENTER PIER SHOWN
Trail Bridge Inspection Report
Pictures
PHOTO 13
Description LONGITUDINAL SAWCUT IN WEST SHOULDER OF NORTH APPROACH
PHOTO 14
Description TRANSVERSE CRACK IN SOUTH APPROACH PAVEMENT; NOTE FAILED CRACK SEALANT
Trail Bridge Inspection Report
Pictures
PHOTO 15
Description POTHOLE ON WEST SIDE OF SOUTH APPROACH PAVEMENT ADJACENT TO SOUTH
ABUTMENT BACKWALL
PHOTO 16
Description EFFECTS OF WINGWALL LEANING TOWARDS THE WEST, OVER SOUTH EXPANSION JOINT
Trail Bridge Inspection Report
Pictures
PHOTO 17
Description GENERAL UNDERSIDE VIEW OF SPAN #2 LOOKING SOUTH
PHOTO 18
Description GENERAL OF NORTH ABUTMENT
Trail Bridge Inspection Report
Pictures
PHOTO 19
Description EROSION AND UNDERMINING ALONG WEST EDGE OF NORTH ABUTMENT SLOPE
PROTECTION
PHOTO 20
Description EROSION AND UNDERMINING ALONG EAST EDGE OF NORTH ABUTMENT SLOPE
PROTECTION
Trail Bridge Inspection Report
Pictures
PHOTO 21
Description DEBRIS ACCUMULATION ON NORTH ABUTMENT BREASTWALL
PHOTO 22
Description TYPICAL STAINING ON GIRDERS UNDER DRAIN PIPES, WEST SIDE OVER NORTH PIER
Trail Bridge Inspection Report
Pictures
PHOTO 23
Description TYPICAL RANDOM CRACKING WITH EFFLORESCENCE OF BOX GIRDER SIDES OVER
PIERS, EAST SIDE OVER NORTH PIER SHOWN
PHOTO 24
Description GENERAL VIEW OF NORTH PIER, NORTH FACE
Trail Bridge Inspection Report
Pictures
PHOTO 25
Description TYPICAL TRANSVERSE CRACKING OF BOX GIRDER UNDERSIDE AT MIDSPAN, EAST SIDE
OF SPAN #4 SHOWN
PHOTO 26
Description VIEW OF LOOSE MASONRY STONE ON WEST SIDE OF SOUTH ABUTMENT BREASTWALL
Trail Bridge Inspection Report
Pictures
PHOTO 27
Description EFFLORESCENCE ON NORTHWEST WINGWALL
PHOTO 28
Description BROKEN RETAINING WALL PANEL WITH EXPOSED REBAR ON EAST SIDE OF NORTH
APPROACH, APPROXIMATELY 75' FROM NORTH ABUTMENT
Trail Bridge Inspection Report
Pictures
PHOTO 29
Description BROKEN RETAINING WALL PANEL WITH EXPOSED REBAR ON EAST SIDE OF NORTH
APPROACH, APPROXIMATELY 150' FROM NORTH ABUTMENT
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-020P
HUMPBACK BRIDGE INSPECTION DATE : 04/17/2023
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.5
REPAIR SETTLEMENT OF EAST SIDEWALK AT NORTH
APPROACH. 1 LS
222.4
PATCH POTHOLES IN APPROACH PAVEMENT.
1 LS
61.5
VERIFY…