Appendix J_109.07 Price Proposal Forms.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- George Washington Memorial Parkway Mount Vernon Trail Reconstruction - VA NP GWMP MVT(4)
- Solicitation number
- 693C73-24-R-000018
About this file
This document is a set of price proposal forms for a federal contract opportunity. It includes a Price Proposal Summary form, as well as separate forms for the Base Contract and Option 1 Lump Sum Bid Items.
The contract opportunity is for the George Washington Memorial Parkway Mount Vernon Trail Reconstruction project (VA NP GWMP MVT(4)) in Alexandria, Arlington County, Virginia, and Washington D.C. The solicitation number is 693C73-24-R-000018, and the awarding agency is the Department of Transportation Federal Highway Administration. The document provides instructions and details for the offeror to fill out pricing information, including base contract and option pricing, contract administration costs, and total project cost. It also includes a note about the Price Evaluation Preference for HUBZone Small Business Concerns. The offeror is responsible for ensuring the pricing forms are calculated correctly.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Form 01
| Price Form 01 | NOTES: | ||
| Price Proposal Summary for: | Yellow highlights are for the Offeror to fill out. | ||
| PROJECT No. VA NP GWMP MVT(4) | Red text is the minimum text for the Designer to change to match their project. | ||
| City of Alexandria and Arlington County, Virginia and Washington, D.C. |
Offeror:
Table 1. Contract Bid Price
| Price Form Number | Description | Form Subtotal | |
| 02A | Base Contract Lump Sum Bid Item Price Proposal | $ 0 | Insert rows as needed for the number of Schedules and Options for your project. Ensure the Price Form 02X tabs match this Table. |
| 02B | Option 1 Lump Sum Bid Item Price Proposal | $ 0 | |
| Contract Bid Price = | $ 0 |
| 2. Contract Administration Cost for Project | Insert or delete rows as needed to match the number of Schedules and Options for your project. | |||
| Number of calendar days necessary to complete all contract work for the base contract from Notice to Proceed (NTP) to final construction completion. | Copy and Paste the calendar days section for each Schedule and Option. | |||
| calendar days x $5,200 per calendar day = | $ 0 | |||
| Note: The number of calendar days cannot exceed a maximum of XXX calendar days for the base contract. | Insert calendar days per CPM and Cal_days spreadsheet. | |||
| Number of calendar days necessary to complete all contract work for option 1 from NTP to final construction completion. | Discuss with PM and COE on how the calendar days for administration costs will be calculated for your project. | |||
| calendar days x $5,200 per calendar day = | $ 0 | |||
| Note: The number of calendar days cannot exceed a maximum of XXX calendar days for option 1. | ||||
| 3. Total Cost of Project | ||||
| Contract Bid Price and Contract Administration Costs = | $ 0 | Update formula as needed to calculate properly. | ||
| Note: Offeror is responsible for ensuring the equations within all Forms are calculating correctly. | ||||
| Does the Bidder claim the Price Evaluation Preference for HUBZone Small Business Concerns | ||||
| as defined in FAR Clause 52.219-4? Circle: Yes or No |
Price Form 02A
| Price Form 02A | NOTES: | |
| Lump Sum Bid Item Price Proposal Form | Adjust the Bid Items to match your project's scope matching FP-14 sections. | |
| Base Contract | ||
| PROJECT No. VA NP GWMP MVT(4) | ||
| City of Alexandria and Arlington County, Virginia and Washington, D.C. |
Offeror:
| Bid Item Number | Bid Item Description | Unit | Price | |
| 103 | Partnering | CTSM | $ 20,000.00 | Percentage of the Base Contract EE. |
| 151 | Mobilization | LS | $ | Discuss with PM and COE on how the Design work should be broken up or not. |
| 152 | Construction Survey and Staking | LS | $ | |
| 154 | Contractor Sampling and Testing | LS | $ | |
| 157 | Soil Erosion Control | LS | $ | |
| 203 | Clearing and Removals | LS | $ | |
| 403 | Asphalt Concrete Pavement | LS | $ | |
| 601 | Drainage | LS | $ | |
| 625 | Permanent Erosion Control | LS | $ | |
| 633 | Permanent Traffic Control | LS | $ | |
| 635 | Temporary Traffic Control | LS | $ | |
| 637 | Field Office | LS | $ | |
| 645 | Utilities | LS | ||
| 66801-0000 | Design-Build (Design) | LS | $ | |
| Form Subtotal = | $ 20,000.00 |
| Note: |
| With the exception of Items 0151, 0152, 0154, and 0637, breakdown each Lump Sum Bid Item shown. Additional Lump Sum Items not already shown may be added at the Contractor’s discretion. |
Price Form 02B
| Price Form 02B | NOTES: | |
| Lump Sum Bid Item Price Proposal Form | Adjust the Bid Items to match your project's scope matching FP-14 sections. | |
| Option 1 | ||
| PROJECT No. VA NP GWMP MVT(4) | ||
| City of Alexandria and Arlington County, Virginia and Washington, D.C. |
Offeror:
| Bid Item Number | Bid Item Description | Unit | Price |
| 151 | Mobilization | LS | $ |
| 152 | Construction Survey and Staking | LS | $ |
| 154 | Contractor Sampling and Testing | LS | $ |
| 157 | Soil Erosion Control | LS | $ |
| 203 | Clearing and Removals | LS | $ |
| 403 | Asphalt Concrete Pavement | LS | $ |
| 601 | Drainage | LS | $ |
| 625 | Permanent Erosion Control | LS | $ |
| 633 | Permanent Traffic Control | LS | $ |
| 635 | Temporary Traffic Control | LS | $ |
| 637 | Field Office | LS | $ |
| 645 | Utilities | LS | $ |
| Form Subtotal = | $ 0 |
| Note: |
| With the exception of Items 0151, 0152, 0154, and 0637, breakdown each Lump Sum Bid Item shown. Additional Lump Sum Items not already shown may be added at the Contractor’s discretion. |
File details come from the government source that posted it. Updated .