Price Form 01
| Price Form 01 | ||
| Price Proposal Summary for: | ||
| PROJECT No. VA ST NASA 1(9) | ||
| NASA Wallops Island Causeway Bridge Over Cat Creek |
Offeror:
Table 1. Contract Bid Price
| Price Form Number | Description | Form Subtotal |
| 02 | Base Contract Lump Sum Bid Item Price Proposal | $ 0 |
| 03 | Option 1 Lump Sum Bid Item Price Proposal | $ 0 |
| Contract Bid Price = | $ 0 |
| 2. Contract Administration Cost for Project | ||
| (a) Number of calendar days necessary to complete the contract work for the base contract from Notice to Proceed (NTP). The number of calendar days cannot exceed ??? calendar days for the base contract. | ||
| calendar days x $5,200 per calendar day = | $ 0 | |
| (b) Number of calendar days necessary to complete the contract work for option 1 from option 1's NTP. The number of calendar days cannot exceed a mximum of ??? calendar days for the option 1. | ||
| calendar days x $5,200 per calendar day = | $ 0 |
| NOTE: | ||
| If funding for option 1 is not available at the time of award, the Government has the right to exercise any option or options at the unit prices bid no later than 365 calendar days after the base contract's NTP. | ||
| 3. Total Cost of Project | ||
| Contract Bid Price and Contract Administration Costs = | $ 0 | |
| Note: Offeror is responsible for ensuring the equations within all Forms are calculating correctly. |
Price Form 02A
| Price Form 02A | |
| Lump Sum Bid Item Price Proposal Form | |
| Base Contract |
Offeror:
| Bid Item Number | Bid Item Description | Quantity | Unit | Price |
| 103 | Partnering | ALL | CTSM | $ 20,000.00 |
| 151 | Mobilization | ALL | LS | $ |
| 152 | Construction Survey and Staking | ALL | LS | $ |
| 154 | Contractor Sampling and Testing | ALL | LS | $ |
| 157 | Soil Erosion Control | ALL | LS | $ |
| 203 | Clearing and Removals | ALL | LS | $ |
| 204 | Excavation | ALL | LS | $ |
| 305 | Full Depth Reclamation | ALL | LS | $ |
| 401 | Asphalt Concrete Pavement | ALL | LS | $ |
| 550 | Bridge | ALL | LS | $ |
| 601 | Drainage | ALL | LS | $ |
| 615 | Pedestrian Facilities | ALL | LS | $ |
| 625 | Permanent Erosion Control | ALL | LS | $ |
| 633 | Permanent Traffic Control | ALL | LS | $ |
| 635 | Temporary Traffic Control | ALL | LS | $ |
| 637 |
tc={CC04F8DF-13DE-44D7-B59C-A41B5FE501A7}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Is Item 645 to be included or is this in LS item? | Field Office | ALL | LS | $ |
| 66801-0000 |
tc={BCB31605-860D-46E9-BBB9-A00C46929B00}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Confirm Bid Item number and remove MP note. | Design-Build (Design MP 121 to MP 152) | ALL | LS | $ |
| 66801-0000 | Design-Build (Design MP 152 to MP 204) |
tc={4CF22E3F-F7BA-4031-9391-75CBE4EA80E7}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Item 66801-0000 confirm if needed or if this is duplicated. | ALL | LS | $ | |
| Form Subtotal = | $ |
| Note: |
| With the exception of Items 0151, 0152, 0154, and 0637, breakdown each Lump Sum Bid Item shown. Additional Lump Sum Items not already shown may be added at the Contractor’s discretion. |
Price Form 02B
| Price Form 02B | |
| Lump Sum Bid Item Price Proposal Form | |
| Option 1 |
Offeror:
| Bid Item Number | Bid Item Description | Quantity | Unit | Price |
| 151 | Mobilization | ALL | LS | $ |
| 152 | Construction Survey and Staking | ALL | LS | $ |
| 154 | Contractor Sampling and Testing | ALL | LS | $ |
| 157 | Soil Erosion Control | ALL | LS | $ |
| 203 | Clearing and Removals | ALL | LS | $ |
| 204 | Excavation | ALL | LS | $ |
| 305 | Full Depth Reclamation | ALL | LS | $ |
| 401 | Asphalt Concrete Pavement | ALL | LS | $ |
| 550 | Bridge (Demolition of Existing Bridge) | ALL | LS | $ |
| 601 | Drainage | ALL | LS | $ |
| 615 | Pedestrian Facilities | ALL | LS | $ |
| 625 | Permanent Erosion Control | ALL | LS | $ |
| 633 | Permanent Traffic Control | ALL | LS | $ |
| 635 | Temporary Traffic Control | ALL | LS | $ |
| Form Subtotal = | $ |
| Note: |
| With the exception of Items 0151, 0152, 0154, and 0637, breakdown each Lump Sum Bid Item shown. Additional Lump Sum Items not already shown may be added at the Contractor’s discretion. |