M_109.07 Price Proposal Forms.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
NASA Wallops Island Causeway Bridge Project VA ST NASA 1(9)
Solicitation number
693C73-23-R-000023
Issued by

View the file

Other files

File Type Posted
Shortlist - VA ST NASA 1(9).pdf PDF
J_Geotechnical Subsurface Data.pdf PDF
Amendment 0003 - VA ST NASA 1(9).pdf PDF
Amendment 0002 - VA ST NASA 1(9).pdf PDF
Amendment 0001 - VA ST NASA 1(9).pdf PDF
Draft RFP - VA ST NASA 1(9).pdf PDF
NPR 8621.1 Procedural Requirements for Mishap and Close Call Reporting, Investigating, and Recordkeeping.pdf PDF
E_NASA WALLOPS ISLAND BRIDGE FHWA CE.pdf PDF
B_Wallops_Island_Causeway As-Builts.pdf PDF
F_VDOT BPB-4 parapet details.pdf PDF
I_2022 Wallops Island In-Depth Inspection Report_Final_Redacted.pdf PDF
NASA-STD 8719.9 Lifting Standard.pdf PDF
NPR 3713.3 Anti-Harassment Procedures.pdf PDF
N_109.08 Request for Progress Payment Forms.xlsx XLSX spreadsheet
NASA-STD 8719.12 Safety Standard for Explosives, Propellants, and Pyrotechnics.pdf PDF
G_Owner-Specified Special Design Vehicle.pdf PDF
A_VA ST NASA 1(9)_plans_draft.pdf PDF
GPR 1700.1 Occupational Safety Program at Goddard Space Flight Center.pdf PDF
C_Utilities Relocation Alignment Drawings.pdf PDF
NPD 1600.3 Policy on Prevention of and Response to Workplace Violence.pdf PDF
NPR 1800.1 NASA Occupational Health Program Procedures.pdf PDF
NASA-STD 8719.11 Standard for Fire Protection and Life Safety.pdf PDF
NPR 8715.3 NASA General Safety Program Requirements.pdf PDF
D_VA ST NASA 1(9)_hyd.pdf PDF
HQ_PR_8715_0001.pdf PDF
H_2022 Wallops Island Underwater Inspection Report_Final.pdf PDF
VA ST NASA 1(9) - RFQ.docx DOCX document
Synopsis - VA ST NASA 1(9).doc DOC document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Form 01

Price Form 01
Price Proposal Summary for:
PROJECT No. VA ST NASA 1(9)
NASA Wallops Island Causeway Bridge Over Cat Creek

Offeror:

Table 1. Contract Bid Price

Price Form NumberDescriptionForm Subtotal
02Base Contract Lump Sum Bid Item Price Proposal$ 0
03Option 1 Lump Sum Bid Item Price Proposal$ 0
Contract Bid Price =$ 0
2. Contract Administration Cost for Project
(a) Number of calendar days necessary to complete the contract work for the base contract from Notice to Proceed (NTP). The number of calendar days cannot exceed ??? calendar days for the base contract.
calendar days x $5,200 per calendar day =$ 0
(b) Number of calendar days necessary to complete the contract work for option 1 from option 1's NTP. The number of calendar days cannot exceed a mximum of ??? calendar days for the option 1.
calendar days x $5,200 per calendar day =$ 0
NOTE:
If funding for option 1 is not available at the time of award, the Government has the right to exercise any option or options at the unit prices bid no later than 365 calendar days after the base contract's NTP.
3. Total Cost of Project
Contract Bid Price and Contract Administration Costs =$ 0
Note: Offeror is responsible for ensuring the equations within all Forms are calculating correctly.

Price Form 02A

Price Form 02A
Lump Sum Bid Item Price Proposal Form
Base Contract

Offeror:

Bid Item NumberBid Item DescriptionQuantityUnitPrice
103PartneringALLCTSM$ 20,000.00
151MobilizationALLLS$
152Construction Survey and StakingALLLS$
154Contractor Sampling and TestingALLLS$
157Soil Erosion ControlALLLS$
203Clearing and RemovalsALLLS$
204ExcavationALLLS$
305Full Depth ReclamationALLLS$
401Asphalt Concrete PavementALLLS$
550BridgeALLLS$
601DrainageALLLS$
615Pedestrian FacilitiesALLLS$
625Permanent Erosion ControlALLLS$
633Permanent Traffic ControlALLLS$
635Temporary Traffic ControlALLLS$
637

tc={CC04F8DF-13DE-44D7-B59C-A41B5FE501A7}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Is Item 645 to be included or is this in LS item?Field OfficeALLLS$
66801-0000

tc={BCB31605-860D-46E9-BBB9-A00C46929B00}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Confirm Bid Item number and remove MP note.Design-Build (Design MP 121 to MP 152)ALLLS$
66801-0000Design-Build (Design MP 152 to MP 204)

tc={4CF22E3F-F7BA-4031-9391-75CBE4EA80E7}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Item 66801-0000 confirm if needed or if this is duplicated.ALLLS$
Form Subtotal =$
Note:
With the exception of Items 0151, 0152, 0154, and 0637, breakdown each Lump Sum Bid Item shown. Additional Lump Sum Items not already shown may be added at the Contractor’s discretion.

Price Form 02B

Price Form 02B
Lump Sum Bid Item Price Proposal Form
Option 1

Offeror:

Bid Item NumberBid Item DescriptionQuantityUnitPrice
151MobilizationALLLS$
152Construction Survey and StakingALLLS$
154Contractor Sampling and TestingALLLS$
157Soil Erosion ControlALLLS$
203Clearing and RemovalsALLLS$
204ExcavationALLLS$
305Full Depth ReclamationALLLS$
401Asphalt Concrete PavementALLLS$
550Bridge (Demolition of Existing Bridge)ALLLS$
601DrainageALLLS$
615Pedestrian FacilitiesALLLS$
625Permanent Erosion ControlALLLS$
633Permanent Traffic ControlALLLS$
635Temporary Traffic ControlALLLS$
Form Subtotal =$
Note:
With the exception of Items 0151, 0152, 0154, and 0637, breakdown each Lump Sum Bid Item shown. Additional Lump Sum Items not already shown may be added at the Contractor’s discretion.

File details come from the government source that posted it. Updated .