ELEVATION
D
D
C C
BB
RV0501, RV0502, RV0503
Max. spacing = 12"
L groove min. lap
4'-1" typ.
BPB-4
C
Scale: 1" = 1'-0" unless otherwise shown.
S&B DIV
S&B DIV
S&B DIV
and RT0401 @ ea. spa.
SECTION B-B
Full scale
Groove detail for ƒ "ƒ both sides of parapet
SECTION C-C
Full scale ƒ "ƒ both sides of parapet
Deflection joint detail for
B P
B
4‡"
3…"
RV0501
R
RV0503
RV0502
SECTION D-D
Face of curb
1'-8" for parapet.
included in price bid
RT0401 - cost to be
11ƒ"
2"
Mark Size Length Location
#5
RV0502
RV0501
#4
#5RV0503
RT0401 4'-0"
No.
#5
Pin o
3ƒ"
3ƒ"
3ƒ"
#8
2'-7"
9'-5"
Parapet
Parapet5'-0" to skew of bridge.
Used only when deck transverse reinforcement is parallel
1'-6"
Barrier delineator
LC
LC
deflection joint groove and
Date Plan No. Sheet No.
Designed:
Drawn:
Checked: ............2021, Commonwealth of Virginiac
No. Description Date
STRUCTURE AND BRIDGE DIVISION
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
Revisions
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.
VA.
STATE
STRUCTURAL ENGINEER
RICHMOND, VA
VDOT S&B DIVISION
b p b .d g n
Terminal wall
Central Office.
is on file in the standard drawing sealed and signed
A copy of the original
April 30, 2021
On the date of
Lic. No. 033572
Junyi Meng
Sealed and Signed by:
Parapet deck slab
Top of deck slab
Top of
Deck slab
C
3'-2" typ.
superstructure
Terminal wall on
ABUTMENT
ABUTMENT
2"
(BPB-4)
CONCRETE PARAPET (F-SHAPE)
42" CAST-IN-PLACE
L groove
RL08 series EF
RL08 series FF
2 - RL0503 NF (see terminal wall details) on abutment wingwall
Terminal wall and parapet
BB
RL08 series EF
Parapet and terminal wallRL08
RL08 series EF
R L s e r ie s 1•" cl.
sheet __.
For details and reinforcing steel schedule of terminal wall, see fencing will be attached.
Parapet (including terminal wall) shall not be extruded if pedestrian the Specifications.
Barrier delineator size, color and spacing shall be in accordance with deflection joints shall not exceed three groove spaces.
approximately 4'-0" from centerline of light standard. Spacing of is used (see bridge conduit system), groove shall be located
Spacing of grooves is to be approximately 8'-0". If lighting standard
Use groove and deflection joint over pier.
Class __.
All reinforcing steel shall be Corrosion Resistant Reinforcing Steel, and slab depths.
shall adjust the reinforcing steel as required for other cross slopes
‚" per foot cross slope and for an 8•" slab depth. The Contractor
The reinforcing steel shown has been detailed based on a standard
All chamfers for concrete shall be ƒ".
All concrete shall be Low Shrinkage Class A4 Modified.
for installation.
The Contractor shall determine all dimensions and details necessary vertical planes.
Plan dimensions shown are measured in the respective horizontal and
Notes:
PART ELEVATION
For use with terminal wall on wingwall
RV0501
t y p
12•"
RV0502
10"
RV0503
1'-9"
1'-3„"
"5 ƒ
SECTION A-A
A
A
RL08 series
D
D with 2-RL0503
RL08 series lapped
8•" shown, see Section D-D
For dimensions and details not
REINFORCING STEEL SCHEDULE
All concrete above deck slab.
Gross concrete quantities (C.Y.) = Lin. Ft. x 0.158
Dimensions in bending diagram are out-to-out of bars, except as shown.
1•" cl.
s p a
4"
STANDARD BPB-4: NOTES TO DESIGNER
PART 3
DATE: 30Apr2021
SHEET 2 of 2
FILE NO. BPB-4-2
42” CAST-IN-PLACE CONCRETE PARAPET (F-SHAPE)
BPB-4
NOTES TO DESIGNER:
The F-shape concrete parapet has a height of 3’-6” and is used for Adjusted Test Level TL-5 for MASH criteria. It is used as the normal traffic barrier unless an open rail is required. If architectural treatment is required, use standard BPB-4-AT.
The appropriate terminal wall standard from BPBT-4A thru BPBT-4D is to be included in the plans when using this standard.
The dimensions shown are established from the top of the roadway surface. If an initial bituminous overlay is used on the bridge at the time of construction, vertical dimensions and dimensions for reinforcing steel must be adjusted. For example, if a 1” overlay at the curb is set, the 3” curb dimension and the overall 3’-6” height of the parapet would need to be adjusted to 4” and 3’-7” respectively (Section D-D).
It is the Contractor’s responsibility to determine the number of reinforcing bars required as well as any other details or dimensions (for example, the length of the RL08 series bars) for installation.
Therefore, the remainder of the Reinforcing Steel Schedule including the number of bars required is to be left blank by the designer.
ADD THE FOLLOWING NOTES, DIMENSIONS, DETAILS, ETC. TO STANDARD:
SECTION D-D:
For projects with bituminous overlay, modify vertical dimensions (3” curb and 3’-6” parapet height) so that these dimensions will be established from top of overlay surface as noted above.
REINFORCING STEEL SCHEDULE:
For projects with bituminous overlay, modify rebar lengths to allow for dimension changes.
NOTES:
Complete corrosion resistant reinforcing steel (CRR) note by adding the Class I, II or III. For additional information on CRR, see Structure and Bridge Division Instructional and Informational Memorandum (current IIM-S&B-81).
TITLE BLOCK:
Replace standard designation with plan number.