Title Sheet
Symbols And Abbreviations
Location Map
Summaries
Waters of the U.S. Impacts
Standards & Details
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 0.56 Mile
SPECIFICATIONS:
BRIDGE:
DESIGN DESIGNATION:
ACCOMACK COUNTY, VIRGINIA
BRIDGE OVER CAT CREEK
REPLACEMENT OF WALLOPS ISLAND CAUSEWAY
Cycle #(miles)
Length RIP Milepost/ Station to Station Schedule Description Administration
Federal Highway
U.S. Department of Transportation
SHEET
NO
A01
LANE MILES:
SPACE ADMINISTRATION
NATIONAL AERONAUTICS AND
Bridge Plans
WALLOPS FLIGHT FACILITY
PROJECT VA ST NASA 1(9)
ROAD: WIDTH
22'
SURFACE BASE
concrete
Asphalt N/A
Last inspected October, 2018
Structure no. N/A
Wallops Island Causeway Bridge Over Cat Creek
Causeway Road
JANUARY, 2023
1.12 Mile
Project Manager
Katerina Roman
Lead Designer
Alazar Feleke
Highway Design Manager
Ashley Timm
N
0 4040
SCALE IN MILES
Richmond
Arlington
Charlottesville
Front
Royal
KEY MAP
STATE OF VIRGINIA
N
A See above description 20+76.75 TO 50+38.25 0.76 N/A
Project VA ST NASA 1(9)
NOT TO SCALE
Wallops Island Causeway Bridge.
Schedule B: Work includes removal of existing work.
construction of approaches, and other miscellaneous
Island Causeway Bridge over Cat Creek, Schedule A: Work includes replacement of Wallops
This project consists of the following:
N/A
None
40 (posted)
N/A
50/50
N/A e (max)
C/A
V (mph)
% Truck
D
DHV
ADT (2039)
ADT (2019)
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
Tabulation Of Quantities
Erosion & Sediment Control Narrative
Know what'sbelow.
before you dig.Call
R
30% PLANS
Horizontal Alignment Data
A02-A03
A04
A05
C01
M01
M02-M04
M05-M06
R01-R10
S01-S14
Erosion & Sediment Control Plans
B01-B03 Typical Sections
D01-D06 Plan & Profile - Causeway Road
C02-C03
B See above description 0.76 N/A20+76.75 TO 50+38.25
NOT FOR CONSTRUCTION
PRELIMINARY
Project VA ST NASA 1(9)
:5
P
M
J a n u a r y
A
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\A -N
A S
A (9 tt l.
d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) A01
NASA Drwg No. 19205 c
Inside diameter ID
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transition)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve central angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline C
Concrete Pavement
GACPGyratory Mix, Asphalt
Gage(gauge) ga.
Galvanized galv.
Expansion joint exp. jt.
Excavation exc.
ESALEquivalent Single Axle Load
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
BWBroken White
Bench mark BM
Beginning beg.
Bearing brg.
Balance point BP
BATBackslope Anchor Terminal
Back BK
Footing ftg.
FATFlared Anchor Terminal
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
DSYDouble Solid Yellow
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
West W
Vertical point of intersection VPI
Vehicle per hour vph embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transition)
Tangent distance Ts
(tangent length)
Tangent distance T
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original ground OG
North N
Normal crown NC or NCR
Nominal Max. Size Aggregate NMSA
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
Pavement pvmt.
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
SBTSteel Backed Timber
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
SWSolid White
Section Sec.
x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
P/LP/L
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
26 25 69426 25 694ROUTE NUMBERS
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
DIVERSION CHANNEL
TEST PIT
B-1
TP-1
EOP
EOG
N
PAVEMENT REMOVAL/ROADWAY OBLITERATION
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
INTERSTATE U.S. STATE
AREA PATTERN
MATERIAL SOURCE
NORTH ARROW
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
Sheet 1 of 2
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SYMBOLS AND ABBREVIATIONS
FHWA, Office of Federal Lands Highway
L
:5 a r c h
A
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a
(9
H W
Y
D E
S \C
A D
D \A
-0
-N A
S A
(9 s y m .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) A02
R/W R/W
R/W R/W
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
P/E C/E
FOUND
36 31
6 1
PROJECTED
SECTION CORNER
SECTION CORNER4
SECTION16
P/E C/E
TB or TP
P P or
UD UD
W W
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fiber optics SD=storm drain, T=telephone, W=water G=gas, O=oil, P=power, SS=sanitary sewer, UNDERGROUND UTILITIES
No Symbol
TB or TP
P P or or
UD UD
W W
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
wall facewall face
TB or TP or
MEDIAN & SIDE (CONCRETE) BARRIER
No Symbol
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:PROPOSEDEXISTING
Sheet 2 of 2
LIMITS OF DISTURBANCE
STABILIZED CONSTRUCTION EXIT
SYMBOLS AND ABBREVIATIONS
:5 a r c h
A
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a
(9
H W
Y
D E
S \C
A D
D \A
-0
-N A
S A
(9 s y m .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) A03
N
Causeway Bridge
Wallops Island
Project VA ST NASA 1(9)
LOCATION MAP
0 1.0 2.0
SCALE IN MILES
:1
A a r c h
A
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\A -N
A S
A (9 lo c .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) A04
U.S. DEPARTMENT OF TRANSPORTATION
HORIZONTAL ALIGNMENT DATA
CAUSEWAY ROAD
SCHEDULE A
FHWA, Office of Federal Lands Highway
:5 a r c h
A
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a
(9
H W
Y
D E
S \C
A D
D \A
N
A S
A
(9 h o ri z .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) A05
NOTES:
the travel lane and adjacent shoulder is 8 percent.
The maximum shoulder cross slope is 8 percent. The maximum rolleover rate between
Locations and lengths of propsed MGS guardrail to be finalized upon further design. 4.
Construct pavement transitions according to Detail E401-01.3.
Apply turf establishment to disturbed areas according to Section 625.2.
Obtain CO approval of all work limits before beginning work.
Work limits may be changed to fit field conditions as approved or directed by the CO. 1.
PROPOSED PAVEMENT STRUCTURE
Type III-B Roughness, 1.5-inch depth nch NMSA, 0.3 to <3 million ESAL, 3/8-iACP, 2% 2%
CL
Asphalt tack coat
Roadway
3/8-inch NMSA,1.5-inch depth
ACP, 0.3 to <3 million ESAL, Asphalt tack coat
CAUSEWAY ROAD TANGENT SECTION
Sta. 49+81.86 - Sta. 50+50.00
Sta. 44+72.41 - Sta. 46+08.14
Sta. 29+17.41 - Sta. 42+07.59
Sta. 25+11.86 - Sta. 26+42.59
Sta. 21+00.00 - Sta. 21+33.14
Existing ground inch NMSA, 3-inch depth
ACP, 0.3 to <3 million ESAL, base course, 3/4-
Aggregate base, 8-inch depth variesva rie s
MGS guardrail, type 4 and apply turf establishment, see Note 2
Aggregate-topsoil course, 4" depth
Emabankment material, variable depth
PROPOSED PAVEMENT STRUCTURE
Type III-B Roughness, 1.5-inch depth
ACP, 0.3 to <3 million ESAL, 3/8-inch NMSA, varies
CL
Asphalt tack coat
Roadway
3/8-inch NMSA, 1.5-inch depth
ACP, 0.3 to <3 million ESAL, Asphalt tack coat
CAUSEWAY ROAD SUPERELEVATED AND TRANSITION SECTION
Existing ground inch NMSA, 3-inch depth
ACP, 0.3 to <3 million ESAL, base course, 3/4-
Aggregate base, 8-inch depth variesva rie s
MGS guardrail, type 4 and apply turf establishment, see Note 2
Aggregate-topsoil course, 4" depth
Emabankment material, variable depth
Sta. 46+08.14 - Sta. 49+81.86
Sta. 42+07.59 - Sta. 44+72.41
Sta. 26+42.59 - Sta. 29+17.41
Sta. 21+33.14 - Sta. 25+11.86
U.S. DEPARTMENT OF TRANSPORTATION FHWA, Office of Federal Lands Highway
TYPICAL SECTIONS
CAUSEWAY ROAD
SCHEDULE A
NO SCALE
Sheet 1 of 2
12'-0"
Travel lane
12'-0"
Travel lane
2'-0"+/-
Shoulder
2'-0"+/-
Shoulder
Construction limits
12'-0"
Travel lane
12'-0"
Travel lane
2'-0"+/-
Shoulder
2'-0"+/-
Shoulder
Construction limits
:0
J a n u a r y
B
S h e e t]
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a
(9
H W
Y
D E
S \C
A D
D \B
-N A
S A
(9 ty p
.d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) B01
PROPOSED PAVEMENT STRUCTURE
Type III-B Roughness, 1.5-inch depth nch NMSA, 0.3 to <3 million ESAL, 3/8-iACP, varies varies
CL
Asphalt tack coat
Roadway
3/8-inch NMSA,1.5-inch depth
ACP, 0.3 to <3 million ESAL, Asphalt tack coat
Existing ground inch NMSA, 3-inch depth
ACP, 0.3 to <3 million ESAL, base course, 3/4-
Aggregate base, 8-inch depth va rie s
MGS guardrail, type 4 and apply turf establishment, see Note 2
Aggregate-topsoil course, 4" depth
Emabankment material, variable depth varies
2'-0" +/- 12'-0" 12'-0" 2'-0" +/-
NOTES:
for quantity calculations only.
This sheet is for information only. Design not finalized. Typical section shown assumed 5.
the travel lane and adjacent shoulder is 8 percent.
The maximum shoulder cross slope is 8 percent. The maximum rolleover rate between
Locations and lengths of propsed MGS guardrail to be finalized upon further design. 4.
Construct pavement transitions according to Detail E401-01.3.
Apply turf establishment to disturbed areas according to Section 625.2.
Obtain CO approval of all work limits before beginning work.
Work limits may be changed to fit field conditions as approved or directed by the CO. 1.
LOAD TRANSFER PLATFORM SECTION
Sta. 45+36.95 - Sta. 47+75.00
Sta. 23+50.00 - Sta. 25+86.95 sand, 36-inch
Compacted reinforement layers) lifts between geogrid stone), 40-inch (placed in 8"
Select granular backfill (#57 height pile cap (typ.)
Pile with 24" dia x 12"
Sheet 2 of 2
NO SCALE
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
CAUSEWAY ROAD
SCHEDULE A
NASA WALLOPS FLIGHT FACILITY
from toe of embankment = 15' Maximum lateral extent of pile
Shoulder Travel Lane Travel Lane Shoulder from toe of embankment = 15' Maximum lateral extent of pile
Construction limits
:4
J a n u a r y
B
S h e t]
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a
(9
H W
Y
D E
S \C
A D
D \B
-N A
S A
(9 ty p
.d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) B02
U.S. DEPARTMENT OF TRANSPORTATION
TABULATION OF QUANTITIES
CAUSEWAY ROAD
:5
J a n u a r y
C
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a
(9
H W
Y
D E
S \C
A D
D \C
-N A
S A
(9 ta b
.d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) C01
U.S. DEPARTMENT OF TRANSPORTATION
SOIL EROSION CONTROL SUMMARY
CLEARING & REMOVALS SUMMARY
SCHEDULE A
:5
J a n u a r y
C
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a
(9
H W
Y
D E
S \C
A D
D \C
-N A
S A
(9 ta b
.d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) C02
EARTHWORK SUMMARY
SCHEDULE A
:5
J a n u a r y
C
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a
(9
H W
Y
D E
S \C
A D
D \C
-N A
S A
(9 ta b
.d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) C03
#200
RBAR/CAP
Photo Control #2
MON
TELE
TELE
S49°02'59"E
.0
P
O B
S49°02'59"E
.0
P
N
-2.00%
+00
U.S. DEPARTMENT OF TRANSPORTATION NASA WALLOPS FLIGHT FACILITY
PLAN & PROFILE
CAUSEWAY ROAD
SCALE IN FEET
0 25 50
M A
T C
H L
IN
E
S T
A
S H
E E
T D
M
A T
C H
L
IN
E S
T A
S
H E
E T
D
E 12,350,696.68
N 3,848,644.92
STATION 20+76.75
BEGIN WORK
Causeway Road
Ex. edge of pavement (typ.)
Ex. edge of pavement (typ.)
Proposed profile
Existing grade
See Detail E401-01
Pavement transition;
E 12,350,696.68
N 3,848,644.92
STATION 20+76.75
BEGIN WORK
1400 1500 1600 1700 1800 1900 2000 2100
-10 -10
0 0
10 10
20 20
+0.235%
.7
:2
J a n u a r y
D
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\D -N
A S
A (9 p p .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) D01
#201
#202
RBAR/CAP
P. C. P. C.
Photo Control #2
Photo Control #7
MON
NO DEED REFERENCE
TAX MAP 28-A-75
TELE
S54°35'2 1"E
.5
PC
.8
T
.2
C
22 2 3 2 4 2
5 2 6 2
7 2
+10 +35 +11.86+33.14
-2.00%
+42.59 +80
SCALE IN FEET
0 25 50
M A
T C
H L
IN
E
S T
A
S H
E E
T D
M A
T C
H L
IN
E
S T
A
S H
E E
T D
M A
T C
H L
IN
E
S T
A
S H
E E
T D
M A
T C
H L I N
E S
T A
S H
E E
T D
Proposed profile
Begin approach slab, +66.92 begin bridge, +86.92
End approach slab, Existing ground
See Bridge Plans
Wallops Island Causeway Bridge;
begin bridge, +86.95
End approach slab, Begin approach slab, +66.95
Construction centerline
Limit of disturbance, (typ.)
Ex. edge of pavement (typ.)
Prop. edge of pavement (typ.)
Causeway Road
U.S. DEPARTMENT OF TRANSPORTATION NASA WALLOPS FLIGHT FACILITY
PLAN & PROFILE
Confirm final location in field (to be relocated by others prior to construction);
Proposed bore path for relocated utilities
Confirm final location in field (to be relocated by others prior to construction);
Proposed entrance/exit pit for relocated utilitiesSee Detail E401-01
Pavement transition;
L = 212.33'
T = 106.25'
R = 2,200.00'
Δ = 05°31'48" (RT)
PI 27+80.51
L = 106.35' T = 53.22' R = 1,100.00'
Δ = 05°32'22" (LT)
PI 23+20.76
2200 2300 2400 2500 2600 2700 2800
0 0
10 10
20 20
30 30
+0.500%
+2.793%
+0.235% +0.500%
+2.793%
.6
.2
.3
' VC135
118.13K =
'1011.84SSD = ' VC79
298K =
'INFHLSD =
' VC181
79K =
'751.09HLSD =
Transition -6.45% Transition -2.00% Transition -4.00%
:2
J a n u a ry
D
P
R O
J E
C T
S
S P
E C
IA
L \N
A S
A \n a s a (9
H
W Y
D
E S
\C A
D D
\D -N
A S
A (9 p p .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) D02
#203
X in CONC
P. C. P. C.
H421
NGS DISK
Elev. = 20.62
Photo Control #3 Photo Control #4
TELE
Power
X .3 ,Y
.9
30 35
S49°03'34"E
.6
PT
29 30 31 32 33 34 35 36
N
-4.00%
+80 +17.41
U.S. DEPARTMENT OF TRANSPORTATION NASA WALLOPS FLIGHT FACILITY
T C
H L I N
E S
T A
S H
E E
T D
M A
T C
H L
IN
E
S T
A
S H
E E
T D
M A
T C
H L
IN
E
S T
A
S H
E E
T D
M A
T C
H L
IN
E
S T
A
S H
E E
T D
Proposed profile
Existing grade
See Bridge Plans
Wallops Island Causeway Bridge;
Ex. edge of pavement (typ.)
Centerline of existing bridge (to be removed)
Construction centerline
Confirm final location in field (to be relocated by others prior to construction);
Proposed bore path for relocated utilities
Limit of disturbance, (typ.)
SCALE IN FEET
0 25 50
2900 3000 3100 3200 3300 3400 3500 3600
0 0
10 10
20 20
30 30
+1.650% +1.650%
.1
' VC1,100
333.33K =
'848.21SSD =
Transition -2.00%
:2
J a n u a r y
D
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\D -N
A S
A (9 p p .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) D03
#204
X in CONC.
#205
X in CONC.
P. C. P. C. P. C.
P. C.
AZ MK
NGS DISK
Elev. = 20.63
Photo Control #9 Photo Control #8
Photo Control #11 Photo Control #10
TELE
EM
Power
.6
PC
36 37 38 39 40 41 42 4
N
+7.59 +45
Confirm final location in field (to be relocated by others prior to construction);
Proposed bore path for relocated utilities
See Bridge Plans
Wallops Island Causeway Bridge;
Existing grade
Proposed profile
M A
T C
H L
IN
E
S T
A
S H
E E
T D
M A
T C
H L
IN
E
S T
A
S H
E E
T D
M
A T
C H
L
IN
E S
T A
S
H E
E T
D
M A
T C
H L I N
E S
T A
S H
E E
T D
Causeway Road
Centerline of existing bridge (to be removed)
Construction centerline
Ex. edge of pavement (typ.)
Limit of disturbance, (typ.)
U.S. DEPARTMENT OF TRANSPORTATION NASA WALLOPS FLIGHT FACILITY
PLAN & PROFILE
CAUSEWAY ROAD
SCALE IN FEET
0 25 50
3700 3800 3900 4000 4100 4200 4300
10 10
-1.650% -1.650%
.8
' VC135
118.07K =
'1011.37SSD =
Transition -4.00%-2.00%
:2
J a n u a r y
D
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\D -N
A S
A (9 p p .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) D04
#206
P. C.
MON
TELE
S43°43'54"E
.3
.7
.1
8 4 9 5
+35 +72.41 +8.14 +85 +05
-6.45%
+81.86 +50
Confirm final location in field (to be relocated by others prior to construction);
Proposed bore path for relocated utilities
Confirm final location in field (to be relocated by others prior to construction);
Proposed entrance/exit pit for relocated utilities
M A
T C
H L
IN
E
S T
A
S H
E E
T D
M A
T C
H L
IN
E
S T
A
S H
E E
T D
Existing grade
Proposed profile
See Bridge Plans
Wallops Island Causeway Bridge;
M A
T C
H L I N
E S
T A
S H
E E
T D
M A
T C
H L I N
E S
T A
S H
E E
T D
Causeway Road
Construction centerline Prop. edge of pavement (typ.)
End approach slab, +56.92 begin aproach slab, +36.92
End bridge, See Bridge Plans
Wallops Island Causeway Bridge;
begin aproach slab, +36.92
End bridge, Limit of disturbance, (typ.)
End aproach slab, +56.92
U.S. DEPARTMENT OF TRANSPORTATION NASA WALLOPS FLIGHT FACILITY
See Detail E401-01
Pavement transition;
E 12,350,960.29
N 3,846,702.07
STATION 50+38.25
END WORK
E 12,350,960.29
N 3,846,702.07
STATION 50+38.25
END WORK
SCALE IN FEET
0 25 50
L = 101.40'
T = 50.74'
R = 1,100.00'
Δ = 05°16'54" (LT)
PI 47+95.11
L = 204.56' T = 102.36' R = 2,200.00'
Δ = 05°19'39" (RT)
PI 43+41.96
4400 4500 4600 4700 4800 4900 5000
-10 -10
0 0
10 10
20 20
30 30
-2.793%
-0.500% -0.076%
-2.793%
-0.500% -0.076%
.4
.2
' VC181
79K =
'750.50HLSD =
' VC79
186K =
'INFHLSD =
-4.00% Transition -2.00% Transition Transition -2.00%
:2
J a n u a ry
D
P
R O
J E
C T
S
S P
E C
IA
L \N
A S
A \n a s a (9
H
W Y
D
E S
\C A
D D
\D -N
A S
A (9 p p .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) D05
#207
MON
TELE
Power
S49°00'48"E
.3
P
E
S49°00'48"E
.3
P
E
N
M A
T C
H L I N
E S
T A
S H
E E
T D
Construction centerline
SCALE IN FEET
0 25 50
U.S. DEPARTMENT OF TRANSPORTATION NASA WALLOPS FLIGHT FACILITY
Causeway Road
5100 5200 5300 5400 5500 5600
-10 -10
0 0
10 10
20 20
30 30
:3
J a n u a r y
D
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\D -N
A S
A (9 p p .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) D06
outside the construction limits.
project site. Perimeter controls include fiber rolls, and other specified measures
Prior to any excavation, construct perimeter controls to ensure that disturbed sediment does not leave the
Phase I Establish Perimeter Controls
Sequence of Construction
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802. Provide a spill containment kit for each bridge according to Subsection 107.08(q).
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the
Federal, State, and local regulations.
materials. Do not dispose of hazardouswaste materials into the on-site dumpsters. Dispose of material according to water. Store all hazardous waste materialsin appropriate and clearly marked containers away from other non-waste diesel, gasoline, and battery fluid. If feasible,conduct these activities in a covered area to avoid contact with storm activities. Equipment fueling and maintenance could generate spills, leaks, and hazardous wastes like motor oil, Keep hazardous materials away from streams. Hazardous waste will not be generated from normal construction and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty containers. Collect contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to prevent
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges any earth disturbing activities.
U.S. Impacts sheets for areas of impacts. Construction General Stormwater Permit coverage is required prior to initiating miscellaneous repairs. The total disturbed area for the project is approximately 8.7275 acres. Refer to the Waters of the
Soil disturbing activities include roadway obliteration, embankment construction, temporary water crossings, and other
Road approaches; and other miscellaneous work.
Work consists of removal and replacement of Wallops Island Causeway Bridge over Cat Creek; construction of Causeway
Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
vehicles passing through stabilized exit track sediment, replenish stone or replace it completely.
Stabilized construction exit - Inspect every 7 days and after a storm event of 0.5 inch or greater. If as designed. See Section 208 for additional requirements for cofferdams.
every 14 days, regardless of storm events. Remove accumulated debris and maintain the structures
Cofferdams, and water crossings - Inspect after every rainfall event and at least once it becomes 0.5 feet deep at the fence.
becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when
Silt fence - Inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric when it reaches half the height of the device. Replace damaged fiber roll within 24 hours of inspection.
Fiber roll - Inspect weekly and after each runoff event. Removal sediment deposits from the fiber roll end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
Remove fiber roll only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization
Do not stage milled asphalt material on site. Remove from park the same day as milling operations occur.
areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to runoff.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm slopes according to Section 625.
others that will remain exposed within 14 days. Apply permanent turf establishment to the finished Apply temporary turf establishment in disturbed areas of slopes 35% grade or greater within 7 days, all plans and/or summaries.
surrounding shoulder reconditioning areas as called out in the Erosion and Sediment Control Apply intermediate controls prior to beginning earth disturbing activities. Install fiber roll in areas
Phase II Intermediate Controls
U.S. DEPARTMENT OF TRANSPORTATION
CONTROL NARRATIVE
EROSION & SEDIMENT
:5
J a n u a ry
M
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a
(9
H
W Y
D
E S
\C A
D D
\M
-N
A S
A
(9 e s .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) M01
#200
Photo Control #2
MON
TELE
TELE
N
S49°02'59"E
#201
RBAR/CAP
#202
RBAR/CAP
P. C. P. C.
Photo Control #2
Photo Control #7
MON
NO DEED REFERENCE
TAX MAP 28-A-75
TELE
U.S. DEPARTMENT OF TRANSPORTATION NASA WALLOPS FLIGHT FACILITY
EROSION AND SEDIMENT CONTROL
CAUSEWAY ROAD
SHEET SUB-TITLE 2
M A
T C
H L
IN
E
S T
A
T H
IS
S
H E
E T
Wetland boundary, (typ.)
Construction centerline
Wetland boundary, (typ.)
Construction centerline
Causeway Road
Causeway Road
M A
T C
H L
IN
E
S T
A
T H
IS
S
H E
E T
M A
T C
H L I N
E S
T A
T H I S S
H E
E T
Stabilized construction exit (typ.)
Silt fence, typ. Temporary bridge
Limit of disturbance, (typ.) Stabilized construction exit (typ.)
E 12,350,696.68
N 3,848,644.92
STATION 20+76.75
BEGIN WORK
SCALE IN FEET
0 25 50
S54°35'2 1"E
3 2 4 2
5 2 6 2
7 2
:2
J a n u a r y
M
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\M -N
A S
A (9 e s .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) M02
#203
X in CONC
P. C. P. C.
H421
NGS DISK
Elev. = 20.62
Photo Control #3 Photo Control #4
TELE
Power
X .3 ,Y
.9
N
30 35
S49°03'34"E
29 30 31 32 33 34 35 36
#204
X in CONC.
#205
X in CONC.
P. C. P. C. P. C.
P. C.
AZ MK
NGS DISK
Elev. = 20.63
Photo Control #9 Photo Control #8
Photo Control #11 Photo Control #10
TELE
EM
Power
N
M A
T C
H L I N
E S
T A
S H
E E
T M
M A
T C
H L
IN
E
S T
A
T H
IS
S
H E
E
U.S. DEPARTMENT OF TRANSPORTATION NASA WALLOPS FLIGHT FACILITY
EROSION AND SEDIMENT CONTROL
T C
H L I N
E S
T A
S H
E E
T M
M A
T C
H L I N
E S
T A
T H I S S
H E
E T
Cat Creek
F lo w
Cat Creek
F lo w
Construction centerline
Temporary bridge (40' wide)
Limit of disturbance, (typ.)
Mean high water, (typ.)
Silt fence, (typ.)
Mean low water, (typ.)
Construction centerline
Temporary bridge (40' wide)
Limit of disturbance, (typ.)
Mean high water, (typ.)
Silt fence, (typ.)
Mean low water, (typ.)
Temporary construction access
Temporary construction access
SCALE IN FEET
0 25 50
4036 37 38 39 40 41 42 4
:2
J a n u a r y
M
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\M -N
A S
A (9 e s .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) M03
#206
P. C.
MON
TELE
N
S43°43'54"E
8 4 9 5
#207
RBAR/CAP
MON
TELE
Power
N
M A
T C
H L I N
E S
T A
T H I S S
H E
E T
M A
T C
H L I N
E S
T A
S H
E E
T M
M A
T C
H L
IN
E
S T
A
T H
IS
S
H E
E T
Temporary bridge (40' wide)
Stabilized construction exit (typ.)
boundary, (typ.)
Wetland
Silt fence, (typ.)
Limit of disturbance, (typ.)
Construction centerline
Construction centerlineWetland boundary
E 12,350,960.29
N 3,846,702.07
STATION 50+38.25
END WORK
U.S. DEPARTMENT OF TRANSPORTATION NASA WALLOPS FLIGHT FACILITY
EROSION AND SEDIMENT CONTROL
CAUSEWAY ROAD
SCALE IN FEET
0 25 50
S49°00'48"E
:2
J a n u a r y
M
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\M -N
A S
A (9 e s .d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) M04
#201
#202
RBAR/CAP
#203
X in CONC
P. C. P. C.
P. C. P. C.
H421
NGS DISK
Elev. = 20.62
Photo Control #2 Photo Control #7 Photo Control #3 Photo Control #4
MON
TELE
TELE
Power
X .3 ,Y
.9
U.S. DEPARTMENT OF TRANSPORTATION
WATERS OF THE U.S. IMPACTS
CAT CREEK
NASA WALLOPS FLIGHT FACILITY
SCALE IN FEET
0 50 100
M A
T C
H L
IN
E
S T
A
S H
E E
T M
Vegetated wetland boundary
Causeway Road
2. This sheet is for information only. Waters of the U.S. impacts to be finalized upon further design by the Contractor.
1. See Erosion and Sediment Control Plans for erosion and sediment control measures.
NOTES:
Temporary Upland Impacts = 0.7114 ac
Temporary Vegetated Wetlands Impacts = 0.4684 ac
LEGEND:
Temporary Intertidal Zone Impacts = 1.6970 ac
Temporary Open Water Impacts = 0.3983 ac
Permanent Upland Impacts = 2.2305 ac
Permanent Vegetated Wetlands Impacts = 0.0188 ac
Permanent Intertidal Zone Impacts = 0.8801 ac
Permanent Open Water Impacts = 0.2021 ac
Vegetated wetland boundary
Mean high water
Mean low water
Bridge Demolition Upland Impacts = 0.0565 ac
Bridge Demolition Intertidal Zone Impacts = 0.5949 ac
Bridge Demolition Open Water Impacts = 0.1409 ac
Temporary construction access
Centerline of existing bridge (to be removed)
Construction centerline
Temporary bridge
Bridge Demolition Vegetated Wetlands Impacts = 0.0033 ac
5 30 35
S54°35'2 1"E
S49°03'34"E
4 2 5 2 6 2
29 30 31 32 33 34 35
:1
J a n u a r y
M
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\M -N
A S
A (9 im p a c ts
.d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) M05
#204
X in CONC.
#205
X in CONC.
#206
RBAR/CAP
P. C. P. C. P. C. P. C.
P. C.
AZ MK
NGS DISK
Elev. = 20.63
Photo Control #9 Photo Control #8 Photo Control #11
Photo Control #10
MON
TELETELE
EM
Power
U.S. DEPARTMENT OF TRANSPORTATION
WATERS OF THE U.S. IMPACTS
CAT CREEK
NASA WALLOPS FLIGHT FACILITY
A
T C
H L
IN
E
S T
A
S H
E E
T M
Vegetated wetland boundary
Mean low water Mean high water
Causeway Road
SCALE IN FEET
0 50 100
2. This sheet is for information only. Waters of the U.S. impacts to be finalized upon further design by the Contractor.
1. See Erosion and Sediment Control Plans for erosion and sediment control measures.
NOTES:
Temporary bridge
Construction centerline
Temporary construction access
Centerline of existing bridge (to be removed)
Temporary Upland Impacts = 0.7114 ac
Temporary Vegetated Wetlands Impacts = 0.4684 ac
LEGEND:
Temporary Intertidal Zone Impacts = 1.6970 ac
Temporary Open Water Impacts = 0.3983 ac
Permanent Upland Impacts = 2.2305 ac
Permanent Vegetated Wetlands Impacts = 0.0188 ac
Permanent Intertidal Zone Impacts = 0.8801 ac
Permanent Open Water Impacts = 0.2021 ac
Bridge Demolition Upland Impacts = 0.0565 ac
Bridge Demolition Intertidal Zone Impacts = 0.5949 ac
Bridge Demolition Open Water Impacts = 0.1409 ac
Bridge Demolition Vegetated Wetlands Impacts = 0.0033 ac
S49°03'34"E
S43°43'54"E
36 37 38 39 40 41 42 4
:1
J a n u a r y
M
P R
O J E
C T
S
S P
E C
IA
L
\N A
S A
\n a s a (9
H
W Y
D
E S
\C A
D D
\M -N
A S
A (9 im p a c ts
.d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) M06
Work area boundary
2.
1.
18' (m in.)
50' (m in.)
entire area prior to placing the aggregate.
Place Geotextile, Class 2, Type C, over the crosses existing drainage ditches.
where the stabilized construction exit
Install temporary 18-inch pipe culverts stabilized construction exit when required.
Construct drainage ditches along the
(6" minimum depth)
Size Number 3
Aggregate, AASHTO M 43, pipe culvert (if required)
Temporary 18" shoulder
Existing
Exis ting Ro adway
E157-01
NO SCALE
EXIT
STABILIZED CONSTRUCTION
Flo w
Flo w
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MARCH 2015
:0 a r c h
S h e t
U s e r s \c a r l.
d o r v il \D e s k to p
\N A
S A
\S s t1 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S01
EFLHD DETAIL
9.
8.
7.
6.
5.
4.
3.
2.
1.
into trench.
Extend reinforcement mesh and geotextile diameter wood posts.
Use 70-inch minimum height by 3-inch of the self-fastener angle steel type.
Use 60-inch minimum height steel posts the CO.
to the reinforcement mesh as directed by inches in width and fasten adequately
Use geotextile that is a minimum of 45 of 6 line wires with 12-inch stay spacing.
of 32 inches in width and has a minimum
Use reinforcement mesh that is a minimum for approval.
detail for attaching to steel posts to the CO so they do not slide down posts. Provide
Attach geotextile and reinforcement mesh water from running around the ends.
Curve ends of silt fence upgrade to prevent
Install silt fence along ground contours.
to the manufacturer's recommendations.
Install pre-assembled silt fence according on the Erosion and Sediment Control Plan.
low-flow drainage ditches where shown
Install silt fence with Class 1 riprap only in
6"
8" trench
6"
24"
A A
JOINING TWO ADJACENT SILT FENCE SECTIONS
Flow
Staple
Posts Staple
Section A
A A
T o e o f s lo p e
Flow
Varies
Fi ll slo pe
SECTION A-A
PLAN
Varies
Flow
ELEVATION
F lo w m in
Flow
Backfilled and compacted soil
Limits of clearing vertical wires
" dia. middle and32 3Min.
6' long post (max.)
m a x im u m
S p a c in g
Geotextile
(See Note 4) reinforcement mesh
Spacing 4' max. with Reinforcement mesh
Spacing 10' max. with reinforcement mesh g r o u n d m in
P o s t a b o v e
Section B
Section B
E157-02
PLAN
ELEVATION
of the silt fence.
flowing around the end to prevent water from
Provide sufficient length
(undisturbed)
Existing ground of the silt fence water from flowing around the end
Provide sufficient length to prevent bottom strand
" dia. top and8 1Min.
Section A
(typ.)
Geotextile
Geotextile (typ.)
6" (max.)
Staple spacing
Installation Detail (this sheet)
See Post and Geotextile into ground (min.)
Steel post driven 24"
Wood post driven 35"
Geotextile (typ.)
Geotextile (typ.)
Staple (typ.)
F lo w
WIRE-BACKED SILT FENCE WITH CHECK DAM
INSTALLATION
POST AND GEOTEXTILE
INSTALLATION AT TOE OF FILL
WIRE-BACKED SILT FENCE
vertical wires
" dia. middle and32 3Min.
bottom strand
" dia. top and8 1Min.
See Note 1 of silt fence check dam) (Use only with installation Riprap, Class 1
NO SCALE
WIRE-BACKED SILT FENCE
REVISED: SEPTEMBER 2020
APPROVED: MARCH 2015
DETAIL APPROVED FOR USE
:1 a r c h
S h e
U s e r s \c a r l.
d o r v il \D e s k to p
\N A
S A
\S s t1 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S02
h h
C L
Shoulder L
Cu t s lop e h
SECTION E
D it c h l in e
SECTION D
SECTION C
SECTION B
SECTION A
Roadway Shoulder
Fill slope
S h o u ld r li n e flatter than 20: 1
Variable slope not
S lo p e s ta k e l in e
S lo p e s ta k e l in e
L
L
A
B
C
D
E
L
Var iab le s lop e n ot flat ter th an 10:
Ground line (typ.)
Slope rounding (typ.)
Slope rounding (typ.)
E204-01
NO SCALE
slopes into the original ground.
stakes to establish the blend of cut and fill
Maintain distance L as the distance to slope
NOTE:
TRANSITIONS
CUT AND FILL SLOPE
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
:3
F e b r u a r y
S h e
U s e r s \c a r l.
d o r v il \D e s k to p
\N A
S A
\S s t2 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S03
See Note 3
1V:3H or flatter
Existing slope
Backfill layer, 12" max. (typ.)
TYPICAL SECTION B
TYPICAL SECTION A
SLOPES 1V:3H OR FLATTER
SLOPES STEEPER THAN 1V:3H
steeper than 1V:3H
Existing slope
Backfill material
Backfill material
See Note 2
See Note 2
Backfill layer, 12" max. (typ.)
See Note 2
48" max. (typ.)
See Note 3
12" max. (typ.)
Varies
Top of slope
As shown in Plans
Proposed embankment slope
Embankment
Top of slopeEmbankment
As shown in Plans
Proposed embankment slope
See Note 2
NOTES:
until the top of slope is reached.
Excavate and backfill in a similar manner to vary. Place embankment material.
reached, allowing the horizontal distance slope until a maximum height of 1 foot is
Typical Section B. Cut into the existing
For slopes 1V:3H or flatter, refer to manner until the top of slope is reached.
reached. Excavate and backfill in a similar layers until a backfill height of 4 feet is placed and compacted in 1-foot thick
Bench the slope as the embankment is horizontal benches in the existing slope.
Typical Section A. Cut 8-foot wide
For slopes steeper than 1V:3H, refer to embankment is being constructed.
bench the foundation while the side-hill or another existing embankment, Where the embankment foundation is on
3.
2.
1.
NO SCALE
E204-02
BENCHING FOR EMBANKMENT
Varies
8' (typ.)
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
DETAIL APPROVED FOR USE
:3
F e b r u a r y
S h e
U s e r s \c a r l.
d o r v il \D e s k to p
\N A
S A
\S s t2 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S04
K VALUE TABLE (ft/in)
30 35 40 45 50 55 60 65 70 75
30 32.5 35 37.5 40 42.5 45 47.5 50 52.5
* Use a K Value of 30 for speeds less than 30 MPH.
K
(MPH) *
POSTED SPEED
NOTE:
2 inches x 42.5 ft./in. = 85 feet.
Then the minimum transition length =
Effective overlay thickness = 2 inches
If the posted speed is 55 MPH
Example :
(Minimum transition length=30 feet) applies), to obtain the transition length.
Use K*[e1-e2]=T, or K*[d1-d2]=T (whichever the posted speed of the roadway.
elevations) by the K value from the Table for
(difference between the existing and overlaid the effective overlay thickness in inches less than the value obtained by multiplying
Provide a transition length in feet that is not
E401-01
NO SCALE
Existing asphalt pavement
Existing base course
New asphalt pavement
New base course
Existing asphalt pavement
Existing base course
Remove pavement (mill)
NEW PAVEMENT
(Final course)
Asphalt overlay
(Depth equals overlay thickness)
Saw cut
Existing elevation (e2)
Overlaid elevation (e1)
(Full depth of existing asphalt pavement Saw cut
K Transition length variable (See table)
(for table e - e = effective overlay thickness)
OVERLAY
d
Existing asphalt pavement
Existing base course d1
OVERLAY - DEPTH TRANSITIONS
(depth 2)
Asphalt overlay
(depth 1)
Asphalt overlay
K Transition length (Variable, see Table)
(for Table, d - d = effective overlay thickness)
1 PAVEMENT TRANSITIONS
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: FEBRUARY 2013
:0
M a r c h
S h e
U s e r s \c a r l.
d o r v il \D e s k to p
\N A
S A
\S s t4 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S05
20'-0"
20'-0"
37.5
25.0
2.5 - 4.0
1.67 - 2.67
37.5 3.0 or 4.0
3 (> 45 mph)
2 (≤ 45 mph)
PLAN
PLAN
TEST LEVEL
L W shoulder widening Edge of shoulder widening Edge of
TEST LEVEL
L W
MGS AND G4 W-BEAM GUARDRAIL
STRAIGHT FLARED OPTION
G4 W-BEAM GUARDRAIL
PARABOLIC FLARED OPTION
Varies by manufacturer impact head not shown.
Terminal posts and
Varies by manufacturer impact head not shown.
Terminal posts and of the rail in the standard post section Tangent line projected from the face of the rail in the standard post section Tangent line projected from the face
Hinge point line
Hinge point line
(FT) (FT)
(FT)(FT)
NOTES:
6.
5.
4.
3.
2.
1.
guardrail terminal grading extents where practical.
Construct a 1V:4H or flatter slope outside of the head.
Install a reflectorized object marker on the impact when indicated in the plans.
Pave widened shoulder on both ends of guadrail runs the manufacturer's recommendations.
necessary to install the flared terminal according to manufacturer of a specific product. Adjust grading as to begin as shown. Verify the length of need with the For design purposes, the length of need is assumed to the manufacturer's recommendations.
is provided, construct grading as shown and according staking notes or model. If no staking notes or model Construct the terminal grading as shown in the manufacturer's drawings for other details.
to the manufacturer's recommendations. See Install flared W-beam guardrail terminal according
AND GRADING
TYPE FLARED TERMINAL
W-BEAM GUARDRAIL
MGS AND G4
ET 617-19
NO SCALE
3 (> 45 mph)
12'-6"
Back of post
Back of post
G4 or MGS
See Note 6 Guardrail terminal grading
See Note 6 Guardrail terminal grading
"2 114'-
12'-6"
2' (min.)
3'-0"
3'-0"
2' (min.)
W
Guardrail system G4
Pay limits post section
Standard
See Note 3
Length of Need (MGS)
Guardrail system
Pay limits post section
Standard L
See Note 3
Length of Need (G4)
W s lo p e m a x
V
:1
H s lo p e m a x
V
:1
H
REVISED: 2/2019 9/2020
DETAIL APPROVED FOR USE 2/2019
:1
F e b ru a ry
S h e
U s e rs \c a rl .d o rv il\ D e s k to p \N
A S
A \S s t6
M
G S
E
F L
T
E M
P .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S06
(FT)
50 (for MGS)
37.5 or 50 (for G4)
3 (> 45 mph)
2 (≤ 45 mph)
TEST LEVEL
L
PLAN
embankment Edge of widened embankment Edge of widened
PLAN
post section. See Note 4 face of the rail in the standard Tangent line projected from the post section. See Note 4 face of the rail in the standard Tangent line projected from the
Hinge point line
Back of post
AND GRADING
TYPE TANGENT TERMINAL
W-BEAM GUARDRAIL
MGS AND G4
ET 617-20
NO SCALE
NOTES:
6.
5.
4.
3.
2.
1.
guardrail terminal grading extents where practical.
Construct a 1V:4H or flatter slope outside of the head.
Install a reflectorized object marker on the impact manufacturer's recommendations.
shoulder, or use a taper according to the position the end farther away from the edge of the Install the terminal at a 1V:25H or flatter taper, to to the manufacturer's recommendations.
as necessary to install the tangent terminal according manufacturer of a specific product. Adjust grading to begin at post 3. Verify the length of need with the For design purposes, the length of need is assumed layout.
because of site limitations, use the alternative grading as practical within site constraints. If necessary is provided, use the preferred grading layout as much staking notes or model. If no staking notes or model Construct the terminal grading as shown in the
See manufacturer's drawings for other details.
according to the manufacturer's recommendations.
Install tangent W-Beam guardrail terminal
Length of Need
See Note 3
Length of Need
See Note 3
Back of post
Front of rail face
Front of rail face
PREFERRED GRADING
See Note 6 Guardrail terminal grading
Hinge point line
ALTERNATIVE GRADING
Varies by manufacturer impact head not shown.
Terminal posts and
See Note 6 Guardrail terminal grading
Varies by manufacturer impact head not shown.
Terminal posts and
(m in
(m in
12'-6"
12'-6"
(m in
(min.)
10'-0"
(m in
Post section o r fl a tt e r
V
:1 H
Guardrail system
Pay limits
Pay limits terminal section type tangent or type MGS tangent r fl a tt e r
V
:1
H post section
Guardrail system
Pay limits
Pay limits terminal section type tangent or type MGS tangent
REVISED: 4/2019 9/2020
DETAIL APPROVED FOR USE 2/2019
:1 e b ru a ry
S h e
U s e rs \c a rl .d o rv il\ D e s k to p \N
A S
A \S s t6
M
G S
E
F L
T
E M
P .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S07
"2
9030""2
10"
"2
"2
25-407 Bars at 3
8" 8"
9"
2" Clr.
10"
"2
2"
"4
C lr
7"
6" (min.)
8"
"2
"2
(max.)
11"
3"3"
118" "2
118" 41"
WINGWALL ISOMETRIC VIEW
Shape to match bridge rail
PLAN VIEW
ELEVATION VIEW
2" Clr.
A
A B
B
W-beam or thrie beam anchor system
Adjust reinforcement to accomodate
9-404, 405, 406
"2
Bars at 9 C
C
REINFORCING BARS
SECTION A-A SECTION B-B SECTION C-C
to fit
Cut end
BARS
BARS
BARS
BARS
BARS
BARS
403 Bars continous 412 Bars continous 410 Bars
C lr
C lr
Bars pin
2#dia.
pin 4" dia.
407 Bar to fit 409 Cut
407 Bar continous 413 Bars continous 411 Bars
406 Bar
404 Bar at curbline
Roadway grade as required
405 Bar, field bend
NOTES:
1.
Requirements.
specified in the Special Contract surfaces a Class 1 finish unless otherwise
FINISHING CONCRETE: Give all concrete otherwise shown. All bars are #4.
covering to the face of any bar unless inch concrete -2
Provide a minimum 1 additives in the concrete.
shown. Do not use calcium chloride inch unless otherwise 4 exposed edges
4.35 kips/in. Vibrate all concrete. Chamfer
28-day compressive strength (F'c) of
Class A(AE), with a specified minimum
CONCRETE: Furnish Structural Concrete
2.
3.
AND SAFETY SHAPE TRANSITION
FLARED BACK PARAPET WALL
MGS W-BEAM GUARDRAIL
E617-32A
NO SCALE
:2 a r c h
S h e
U s e r s \c a r l.
d o r v il
\D e s k to p \N
A S
A \S s t6
A d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S08
guardrail post bolt
" x 10" or 14"8
8" or 12" block
8" or 12" block
8" Block
8' Post
6' Post 6' Post
(one omitted post)
Unsupported span
3" x 4" (min.)
sheeting
Retroreflective
" x 10" or 14" guardrail bolt8
Note 2
See
" plain round washer4
W6 x 9 or W6 x 8.5
" dia.4
" dia. (typ.)4
Note 2
See
N o te
S e e
6' POST, 8" OR 12" BLOCK 8' POST ON SLOPE, 8" BLOCK
" recess nut8
6' POST CENTERED ON HINGE, 8" OR 12" BLOCK
fill slope
Variable
TOP symmetry ofCL
FRONTSIDE
BLOCK
GUARDRAIL MOUNT
FLEXIBLE DELINEATOR
Variable slope but not steeper than fill slope shown on Typical Section
Aggregate base or as
W-beam rail
(See Note 2)
Modified Block on terminal sections
All posts except those
SHAPE POST
STRUCTURAL
terminal sections approach and departure
Widening required for
Subgrade shoulder.
1V:10H or flatter slope
TYPICAL GUARDRAIL ELEVATION
terminal sections approach and departure
Widening required for
Subgrade shoulder.
Hinge point terminal sections approach and departure
Widening required for
Subgrade shoulder.
Hinge point
1V:2H or flatter slope
1V:2H or flatter slope
Hinge pointshown on Typical Section
Aggregate base or as shown on Typical Section
Aggregate base or asgroundline at face of rail
Edge of pavement or
1V:10H or flatter slope 1V:10H or flatter slope block (typ.)
Post and rail as applicable ground line at face of
Edge of pavement or
Traffic splice
Mid-span
Lap in direction of traffic
OMITTED POST PLAN VIEW
TYPICAL GUARDRAIL CROSS SECTION
POST AND BLOCK
See Note 4
NOTES:
4.
3.
2.
1.
the manufacturer's recommendations.
either an adhesive or mechanical means according to
Fasten delineator to the web of the steel post using
Install a flexible hinged delineator every fourth post.
and accepted manufacturing practices.
functioning of the part, including its appearance, intended to be those consistent with the proper
Dimensional tolerances not shown or implied are length of guardrail run.
material. Use consistent material throughout the
Modified block may be wood, plastic, or composite
Size of block shown elsewhere in the plans.
Section 617 and Details ET 617-13 or ET 617-37.
the hinge point. For all other locations, see distance between the back of the guardrail post and guardrail cross section includes a 2-foot minimum may be omitted in locations where the typical
When encountering impenetrable material, one post
ET 617-32
NO SCALE
STEEL POSTS
MGS W-BEAM GUARDRAIL
groundline at face of rail
Edge of pavement or
See Note 2
See Note 2
SIDE
TOP
See Note 1
POST FACE
bolts and nuts (8 per splice) " guardrail splice4
" x 18
6"
"4
" 4
"4
6"
43'-9" (min.)
56'-3" (min.) Distance between omitted posts
(max.)
12'-6"
5" (max.)
(t yp
6" ty p
(t y p
7"
8" or 12" o r
8" or 12"
6'-3" Post spacing"2
3 1
(typ.)
2' s t le n g th
P o s t le n g th
DETAIL APPROVED FOR USE 2/2019
REVISED: 4/2019 9/2020
:1 e b r u a r y
S h e
U s e rs
\c a rl
.d o rv il
\D e s k to p
\N A
S A
\S s t6
M
G S
E
F L
T
E M
P .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S09
into triangular shape
1" X 3" stock cut
Wood Stakes
12" - 18"
Space fasteners at 12" centers
Double row of fasteners at erosion stop
Overlap edges by 3" at 50' intervals (up slope face)
6'' deep x 6'' wide transverse trenchlower blanket and anchor
Place upper blanket over
Overlap RECP ends 6"
RECP
RECP
See Section A-A
Erosion stop (check slot)
See Step 2
See Step 1
See Step 4
See Step 3
DETAIL A
TYPICAL GROUND FASTENERS
SECTION A-A
EROSION STOP (CHECK SLOT)
A
Backfill with soil and tamp
Fastener (typ.)
No. 11 gauge wire
Typical staples
Step 4:
Step 3:
Step 2:
Step 1:
the slopes as follows:
Install Rolled Erosion Control Product (RECP) along
INSTALLATION PROCEDURES:
A
SLOPE STABILIZATION WITH RECP
CONTROL PRODUCT (RECP)
WITH ROLLED EROSION
SLOPE STABILIZATION
E629-01
NO SCALE
See Detail A with ground fasteners
Stake at 36" to 60" intervals by the manufacturer.
Apply seed and fertilizer as recommended
See Detail A.
Secure RECP with wood or metal fasteners.
slope. Do not stretch RECP.
(in the direction of flow). Anchor at top of face Unroll and lay RECP out down slope ground. Do not track slope face.
prevent the RECP from laying flush with the rocks, trash, and other material which will
Grade, smooth, and compact slope. Remove
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
:2
J a n u a r y
S h e
U s e r s \c a r l.
d o r v il \D e s k to p
\N A
S A
\S s t6 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S10
W
3W
H
H
H
W 4
W 4 W 4
W
W 6
W
W
W m in
6' (min.)
m in
W
W of curb
Front face
** See Note 3
* See Note 2 pavement
Edge of
6' (min.)
m in shoulder
Edge of
6' (min.)
m in pavement
Edge of
POST TYPE
POST
SINGLE
POST
DOUBLE
POST
TRIPLE
POST
QUADRUPLE
POST SIZE TABLE
MAXIMUM SIGN AREA (SQFT)
4" x 4"
SIZE
POST
4" x 6"
6" x 6"
2" 12 ga.
2" 12 ga.
Class B
10 ga.
2" x 2"
10*
10*
10*
10*
24**
SIGN STRUCTURES
m a x
H /5 o r m a x
H /5 o r m a x
H /5 o r
SINGLE POST DOUBLE POST TRIPLE POST QUADRUPLE POST
(min.)
2'
W
ROADSIDE SIGN IN RURAL DISTRICT
WITHOUT SHOULDER WITH SHOULDER
WITH ADVISORY SPEED PLAQUE
OR RESIDENTIAL DISTRICT
ROADSIDE SIGN IN BUSINESS
Wood
U-Channel Steel
Steel
Square Tubular
Resistant Steel
Corrosion m a x
W
W
W
(typ.)
2" (max.)
(typ.)
2" (max.)
(typ.)
2" (max.)
NOTES:
additional information.
Refer to Section 2A.21 of the MUTCD, latest edition, for
U-channel steel and square tubular steel posts.
Refer to Detail E633-04 for bracing details for wood, for wood, U-channel steel and square tubular steel posts.
Refer to Detail E633-03 for breakaway support details for corrosion resistant steel posts.
Refer to Detail E633-02 for breakaway support details according to manufacturer's recommendations.
panel area is equal to 24 square feet, use slip base
For square tabular steel double posts for which the sign feet or less but W is over 4 feet, use double posts.
steel posts for which the sign panel area is 10 square
For U-channel, square tubular, and corrosion resistant
Uniform Traffic Control Devices" (MUTCD), latest edition.
Locate and set sign height according to the "Manual on
7.
6.
5.
4.
3.
2.
1.
E633-01
NO SCALE
STOP
SPEED
LIMIT
M PH
DETAIL APPROVED FOR USE
APPROVED: MAY 2011
:2 a r c h
S h e
U s e r s \c a r l.
d o r v il \D e s k to p
\N A
S A
\S s t6 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
VA VA ST NASA 1(9) S11
PORTABLE SIGNS
FIXED ROADWAY SIGNS
RURAL AREA URBAN AREA
BREAKAWAY SIGN SUPPORT
4'' x 4''
4'' x 6''
6'' x 6''
6'' x 8''
1.5''
3''
2''
None Required
D
4'
4'
5'
5'
10 20
1 Post 2 Post 3 Post 4 Post
165125
Sign…