Plans-NP-GRSM_15(2)__16(1).pdf

PDF 21 MB Posted

Attached to
Smoky Mountains National Park Project NP-GRSM 15(2), 16(1)
Solicitation number
693C73-18-B-000011
Issued by

About this file

Plans-NP-GRSM 15(2) 16(1)

View the file

Other files

File Type Posted
Amendment_0001_-_NP-NATR_2A18,_2B7,_2C6,_2D12.pdf PDF
Results_of_Bid_Opening,_NP-GRSM_15(2),_16(1)_(1.9.18).pdf PDF
Bridge_Inspection_Report_5460-164P_Laurel_Culvert__4.pdf PDF
IFB_Solicitation-GRSM_15(2),16(1).pdf PDF
Bridge_Inspection_Report_5460-017P_West_Prong_Little_River_Bridge.pdf PDF
Bridge_Inspection_Report_5460-023P_Laurel_Culvert__1.pdf PDF
Bridge_Inspection_Report_5460-015P_Tremont_Junction.pdf PDF
Uniguide_Sign_Layout.pdf PDF
Bridge_Inspection_Report_5460-071P_Tremont_Road_Bridge__1.pdf PDF
NEPA_Document_CE.pdf PDF
Bridge_Inspection_Report_5460-016P_Bote_Mountain_Tunnel.pdf PDF
Bridge_Inspection_Report_5460-025P_Laurel_Culvert__3.pdf PDF
FP14_Eng.pdf PDF
VETS-4212.pdf PDF
Bridge_Inspection_Report_5460-014P_Wye_Bridge.pdf PDF
Bridge_Inspection_Report_5460-020P_Laurel_Creek_Bridge__3.pdf PDF
Bridge_Inspection_Report_5460-024P_Laurel_Culvert__2.pdf PDF
Bridge_Inspection_Report_5460-075P_GRSM_Institute_Bridge.pdf PDF
Bridge_Inspection_Report_5460-022P_Pinkroot_Branch_Bridge.pdf PDF
Bridge_Inspection_Report_5460-072P_Tremont_Road_Bridge__2.pdf PDF
Bridge_Inspection_Report_5460-019P_Laurel_Creek_Bridge__2.pdf PDF
Bridge_Inspection_Report_5460-021P_Laurel_Creek_Bridge__4.pdf PDF
Bridge_Inspection_Report_5460-018P_Laurel_Creek_Bridge__1.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Synopsis_-_GRSM_15(2)_16(1).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A02

STRUCTURE SUMMARY

AND

ROAD INVENTORY DATA

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D A g r s m tt l.

d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

STATE

TN

PROJECT

GREAT SMOKY MOUNTAINS NATIONAL PARK

NP-GRSM 15(2),16(1)

131,000

No.

SHEET

157536

No.

PMIS

No.

NPS

C01

TABULATION OF QUANTITIES

LAUREL CREEK ROAD

SCHEDULE A

A u g

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

TOWNSEND ENTRANCE ROAD

C02

SCHEDULE B

A u g

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

TREMONT ROAD

C03

SCHEDULE C

A u g

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C04

SCHEDULE D

A u g

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C05

CONTROL SUMMARIES

EROSION & SEDIMENT

SCHEDULE A, B, & C

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C06

PAVING SUMMARY

LAUREL CREEK ROAD

SCHEDULE A

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C07

TOWNSEND ENTRANCE ROAD

SCHEDULE B

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

SCHEDULE C

C08

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C09

SUMMARY

PAVEMENT MARKING

LAUREL CREEK ROAD

SCHEDULE AProvide Accessibility Parking Space Marking w/ Symbol & blue background.5.

installation.

plans or directed by the CO. Layout proposed locations of all pavement markings for review and approval of CO prior to

4. Match proposed pavement markings to existing pavement markings, gaps, and breaks unless shown otherwise in the

3. For line widths wider than 4 inches, the measured length of line is adjusted in the ratio of the required width to 4 inches.

2. Broken and dotted markings are measured from end to end of the line including gaps.

lines, gore areas for both lane seperation and accessible parking, stop lines, and stall lines for parking areas and pull-offs.

1. Centerline quantities are estimated assuming a double yellow centerline. Other solid line markings may include edge (fog)

NOTES

A u g

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C10

PAVEMENT MARKING

TOWNSEND ENTRANCE ROAD

SCHEDULE BProvide Accessibility Parking Space Marking w/ Symbol & blue background.5.

installation.

plans or directed by the CO. Layout proposed locations of all pavement markings for review and approval of CO prior to

4. Match proposed pavement markings to existing pavement markings, gaps, and breaks unless shown otherwise in the

3. For line widths wider than 4 inches, the measured length of line is adjusted in the ratio of the required width to 4 inches.

2. Broken and dotted markings are measured from end to end of the line including gaps.

lines, gore areas for both lane seperation and accessible parking, stop lines, and stall lines for parking areas and pull-offs.

1. Centerline quantities are estimated assuming a double yellow centerline. Other solid line markings may include edge (fog)

NOTES

A u g

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C11

PAVEMENT MARKING

TREMONT ROAD

SCHEDULE Cinstallation.

plans or directed by the CO. Layout proposed locations of all pavement markings for review and approval of CO prior to

4. Match proposed pavement markings to existing pavement markings, gaps, and breaks unless shown otherwise in the

3. For line widths wider than 4 inches, the measured length of line is adjusted in the ratio of the required width to 4 inches.

2. Broken and dotted markings are measured from end to end of the line including gaps.

lines, gore areas for both lane seperation and accessible parking, stop lines, and stall lines for parking areas and pull-offs.

1. Centerline quantities are estimated assuming a double yellow centerline. Other solid line markings may include edge (fog)

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C12

PERMANENT SIGNING

LAUREL CREEK ROAD

SCHEDULE DSee Detail E633-C for modified and non-standard sign layouts.5.

to installation.

See the Construction Plan for approximate location of signs. Obtain CO approval for final sign location prior4.

See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend, and colors.3.

Furnish aluminum sign panels according to Section 633.2.

and Detail E633-01.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

PERMANENT SIGNING

C13

LAUREL CREEK ROAD

See Detail E633-C for modified and non-standard sign layouts.5.

to installation.

See the Construction Plan for approximate location of signs. Obtain CO approval for final sign location prior4.

See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend, and colors.3.

Furnish aluminum sign panels according to Section 633.2.

and Detail E633-01.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C14

LAUREL CREEK ROAD

SCHEDULE D

(UNIGUIDE) SUMMARY

PERMANENT SIGNING

installation.

See the Construction Plan for approximate location of signs. Obtain CO approval for final sign location prior to4.

Submit shop drawings of all signs to the CO for approval prior to fabrication.3.

"National Park Service UniGuide Sign System Manual" and Detail E633-A.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices",2.

for layout, sizing, and font details.

Sign layout based on "National Park Service UniGuide Sign System Manual". See provided NPS UniGuide Sign Layout document1.

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C15

LAUREL CREEK ROAD

SCHEDULE D

(UNIGUIDE) SUMMARY

PERMANENT SIGNING

installation.

See the Construction Plan for approximate location of signs. Obtain CO approval for final sign location prior to4.

Submit shop drawings of all signs to the CO for approval prior to fabrication.3.

"National Park Service UniGuide Sign System Manual" and Detail E633-A.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices",2.

for layout, sizing, and font details.

Sign layout based on "National Park Service UniGuide Sign System Manual". See provided NPS UniGuide Sign Layout document1.

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C16

TOWNSEND ENTRANCE ROAD

See Detail E633-C for modified and non-standard sign layouts.5.

to installation.

See the Construction Plan for approximate location of signs. Obtain CO approval for final sign location prior4.

See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend, and colors.3.

Furnish aluminum sign panels according to Section 633.2.

and Detail E633-01.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.

NOTES

SCHEDULE D

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C17

TOWNSEND ENTRANCE ROAD

See Detail E633-C for modified and non-standard sign layouts.5.

to installation.

See the Construction Plan for approximate location of signs. Obtain CO approval for final sign location prior4.

See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend, and colors.3.

Furnish aluminum sign panels according to Section 633.2.

and Detail E633-01.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.

NOTES

SCHEDULE D

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

TOWNSEND ENTRANCE ROAD

(UNIGUIDE) SUMMARY

PERMANENT SIGNING

C18

SCHEDULE Dinstallation.

See the Construction Plan for approximate location of signs. Obtain CO approval for final sign location prior to4.

Submit shop drawings of all signs to the CO for approval prior to fabrication.3.

"National Park Service UniGuide Sign System Manual" and Detail E633-A.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices",2.

for layout, sizing, and font details.

Sign layout based on "National Park Service UniGuide Sign System Manual". See provided NPS UniGuide Sign Layout document1.

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

PERMANENT SIGNING

C19

See Detail E633-C for modified and non-standard sign layouts.5.

to installation.

See the Construction Plan for approximate location of signs. Obtain CO approval for final sign location prior4.

See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend, and colors.3.

Furnish aluminum sign panels according to Section 633.2.

and Detail E633-01.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.

NOTES

SCHEDULE D

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

C20

(UNIGUIDE) SUMMARY

PERMANENT SIGNING

TREMONT ROAD

SCHEDULE Dinstallation.

See the Construction Plan for approximate location of signs. Obtain CO approval for final sign location prior to4.

Submit shop drawings of all signs to the CO for approval prior to fabrication.3.

"National Park Service UniGuide Sign System Manual" and Detail E633-A.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices",2.

for layout, sizing, and font details.

Sign layout based on "National Park Service UniGuide Sign System Manual". See provided NPS UniGuide Sign Layout document1.

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

SCHEDULE A

CONSTRUCTION SIGN SCHEDULE

TEMPORARY TRAFFIC CONTROL

LAUREL CREEK ROAD

C21

Mount signs on single 4 x 4 wood post unless otherwise noted.5.

sign location prior to installation.

See Temporary Traffic Control Advanced Signing Plan for approximate location of signs. Obtain CO approval for4.

See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend and colors.3.

Furnish aluminum sign panels according to Section 635.2.

and Section 635 details.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

SCHEDULE B

TEMPORARY TRAFFIC CONTROL

TOWNSEND ENTRANCE ROAD

C22

Mount signs on single 4 x 4 wood post unless otherwise noted.5.

sign location prior to installation.

See Temporary Traffic Control Advanced Signing Plan for approximate location of signs. Obtain CO approval for4.

See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend and colors.3.

Furnish aluminum sign panels according to Section 635.2.

and Section 635 details.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

TEMPORARY TRAFFIC CONTROL

SCHEDULE C

TREMONT ROAD

C23

Mount signs on single 4 x 4 wood post unless otherwise noted.5.

sign location prior to installation.

See Temporary Traffic Control Advanced Signing Plan for approximate location of signs. Obtain CO approval for4.

See the latest edition of the "Standard Highway Signs" manual for sign dimensions, legend and colors.3.

Furnish aluminum sign panels according to Section 635.2.

and Section 635 details.

Install signs and supports in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices"1.

NOTES

J u l-

P

M M P

R O J E

C T S g r s m P r o j_

D e v C

A D

D C g r s m q ty .d g n

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

131,000

No.

SHEET

157536

No.

PMIS

A
A02.pdf
A_Shts
A01-grsm15(2)_ttl
B
C
C_Shts
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
C01-grsm15(2)_qty
D-E-F
M-N
S

File details come from the government source that posted it.