Bridge_Inspection_Report_5460-075P_GRSM_Institute_Bridge.pdf

PDF 3 MB Posted

Attached to
Smoky Mountains National Park Project NP-GRSM 15(2), 16(1)
Solicitation number
693C73-18-B-000011
Issued by

About this file

Bridge Inspection Report_5460-075P_GRSM Institute Bridge

View the file

Other files

File Type Posted
Amendment_0001_-_NP-NATR_2A18,_2B7,_2C6,_2D12.pdf PDF
Results_of_Bid_Opening,_NP-GRSM_15(2),_16(1)_(1.9.18).pdf PDF
Bridge_Inspection_Report_5460-164P_Laurel_Culvert__4.pdf PDF
IFB_Solicitation-GRSM_15(2),16(1).pdf PDF
Bridge_Inspection_Report_5460-017P_West_Prong_Little_River_Bridge.pdf PDF
Bridge_Inspection_Report_5460-023P_Laurel_Culvert__1.pdf PDF
Bridge_Inspection_Report_5460-015P_Tremont_Junction.pdf PDF
Uniguide_Sign_Layout.pdf PDF
Bridge_Inspection_Report_5460-071P_Tremont_Road_Bridge__1.pdf PDF
NEPA_Document_CE.pdf PDF
Bridge_Inspection_Report_5460-016P_Bote_Mountain_Tunnel.pdf PDF
Bridge_Inspection_Report_5460-025P_Laurel_Culvert__3.pdf PDF
Plans-NP-GRSM_15(2)__16(1).pdf PDF
FP14_Eng.pdf PDF
VETS-4212.pdf PDF
Bridge_Inspection_Report_5460-014P_Wye_Bridge.pdf PDF
Bridge_Inspection_Report_5460-020P_Laurel_Creek_Bridge__3.pdf PDF
Bridge_Inspection_Report_5460-024P_Laurel_Culvert__2.pdf PDF
Bridge_Inspection_Report_5460-022P_Pinkroot_Branch_Bridge.pdf PDF
Bridge_Inspection_Report_5460-072P_Tremont_Road_Bridge__2.pdf PDF
Bridge_Inspection_Report_5460-019P_Laurel_Creek_Bridge__2.pdf PDF
Bridge_Inspection_Report_5460-021P_Laurel_Creek_Bridge__4.pdf PDF
Bridge_Inspection_Report_5460-018P_Laurel_Creek_Bridge__1.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Synopsis_-_GRSM_15(2)_16(1).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

GRSM INSTITUTE BRIDGE

GRSM INSTITUTE ENTRANCE RD OVER MIDDLE PRONG LITTLE RIVER

GREAT SMOKY MOUNTAINS NATIONAL PARK

LE

STRUCTURE NO. 5460-075P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 5/17/16

Report prepared by: ND

Federal Highway Administration FLH Office of Bridges and Structures 21400 Ridgetop Circle Sterling, VA 20166 703-404-6201 https://bridge.flhd.fhwa.dot.gov http:https://bridge.flhd.fhwa.dot.gov

STRUCTURE NO. 5460 075P

GRSM INSTITUTE BRIDGE INSPECTION DATE: 5/17/16

STRUCTURE SUMMARY

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... NO. OF MAIN SPANS:

STEEL

MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER

# OF BEAMS, MAIN SPAN: .. STRUCT. TOTAL LENGTH: .. 2

DECK TYPE: ......................... MAX. SPAN LENGTH: .......... WOOD OR TIMBER

WEARING SURFACE: .......... DECK WIDTH: ......................NONE

ABUT. FOUNDATIONS: ........ CURB TO CURB WIDTH: ..... SPREAD FTG ON BEARING MAT'L

PIER FOUNDATION(S): ........ N/A YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: ..

PROJ./PLAN REF. NO: ......... SKEW ANGLE:

NPS ROAD CLASS:

000000000000 / NONE

FRACTURE CRITICAL:

STRUCTURE HISTORY: ...... 1982-MAJOR RECONSTRUCTION/SUPERSTRUCTURE.

2 - CONNECTOR ROAD

LOCATION

62.2 FT (19.0 M)

62.2 FT (19.0 M)

12.3 FT (3.7 M)

11.1 FT (3.4 M)

0 °

YES

GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 4.38 (KM PT 7.05)

STATE: ................................. TENNESSEE LOCATION: 0.1 MILES TO NPS ROUTE 128

FACILITY CARRIED: ............ GRSM INSTITUTE ENTRANCE RD

FEATURE INTERSECTED: .. MIDDLE PRONG LITTLE RIVER

STRUCTURE EVALUATION SUMMARY

This weathering steel beam bridge is in good condition overall. Problems include deteriorated elastomeric bearing pads, a loose section of railing at the southwest corner, undermining of the west abutment footing, and missing object markers and "One Lane Bridge" signs at both approaches.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: G. GOODLIN, H. SALAD

CONDITION ASSESSMENT:

GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 9/30/16

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460 075P

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

222.7 INSTALL TYPE 3 REFLECTIVE OBJECT MARKERS AND "ONE LANE BRIDGE" SIGNS

AT BRIDGE APPROACHES.

6 EA

222.3 SECURE LOOSE SECTION OF SOUTHWEST APPROACH RAIL. 1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

REHABILITATION/RECONSTRUCTION

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

NO (TYPICALLY NEEDED WITHIN 5 YEARS)

REHAB. RECONSTR.

222.4 REPAVE WEST APPROACH. 1 LS

59.1 REPLACE ELASTOMERIC BEARING PADS AT BOTH ABUTMENTS. 1 LS

60.9 INJECT GROUT INTO UNDERMINED AREA OF WEST ABUTMENT

FOOTING AND PLACE ADDITIONAL RIPRAP.

1 LS

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)

PLUS PARK LOCATION FACTOR.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5460 075P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 7

DECK SLAB1. G

EXPANSION JOINTS2. N

WEARING SURFACE3. N

RIDEABILITY4. G

CURBS, SIDEWALKS, AND MEDIAN 5. G

PARAPETS AND/OR RAILINGS6. G

DRAINS AND DRAINAGE7. G

UTILITIES8. G

DEFLECTION AND/OR VIBRATION9. G

OTHER10. N

59. SUPERSTRUCTURE 7

BEARING DEVICES1. F

GIRDERS OR BEAMS2. G

ARCH(ES) OR SLAB(S)3. N

FLOOR BEAMS AND STRINGERS4. N

TRUSSES5. N

DIAPHRAGMS AND BRACING6. G

7. PAINT N

FASCIA(E)8. N

DEFLECTION AND/OR VIBRATION9. G

ALIGNMENT10. G

OTHER11. N

60. SUBSTRUCTURE 7

ITEM REFERENCE AND REMARKS

ABUTMENTS

58.1 MINOR ABRASION AND CHECKING OF 2" X 8" (NOMINAL)

NAIL-LAMINATED TIMBER DECK; MINOR SPLINTERING AND

DETERIORATION AT ISOLATED LOCATIONS.

58.5,6 MINOR CHECKING AND SPLITTING OF CURB AND RAILING TIMBERS;

MODERATE ON NORTH SIDE.

MINOR WARPING OF RAILS THROUGHOUT. MINOR TO MODERATE

DECAY THROUGHOUT TOP OF RAIL POSTS. MINOR COLLISION

DAMAGE ON SOUTH RAILING AND CURB AT WEST END.

58.7 MINOR ACCUMULATION OF DEBRIS ALONG CURBLINE AND UNDER

CURBS.

58.8 UTILITY LINE ALONG BOTH SIDES OF DECK.

59.1 BULGING AND CRACKING OF ELASTOMERIC BEARING PADS AT

BOTH ABUTMENTS; PADS ARE SLIDING OUT FROM UNDER STEEL

BEARING PLATES TOWARD STREAM.

59.2,6 A588 WEATHERING STEEL BEAMS AND DIAPHRAGMS; MINOR

CORROSION AND PITTING OF STEEL TYPICAL THROUGHOUT.

59.9 MINOR PERMANENT DEFLECTION OF BEAMS.

60.1 MINOR VERTICAL CRACKING OF EAST ABUTMENT BREASTWALL

WITH STAINING.

60.6 LOOSE STONES AT NORTHEAST WINGWALL.

60.7 LARGE TREE ROOT COMING OUT OF NORTH WEEP HOLE AT EAST

ABUTMENT.

11.

1 0.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12. OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS G

N

G

G

G

G

G

N

F

G

N

N

PIER(S)

N 13. WALLS AND/OR COLUMNS

N 14. PILE BENTS

N 15. CAPS AND/OR BEARING SEATS

N 16. FOUNDATIONS

N 17. EROSION AND/OR SCOUR

N 18. SETTLEMENT OR DEFLECTION

N 19. OTHER

FIELD INSPECTION REPORT STRUCTURE NO. 5460 075P

AND REMARKSITEM REFERENCE

61. CHANNEL 7

G 1. ALIGNMENT

G2. EROSION AND/OR SCOUR

N 3. CHANNEL PROTECTION

G 4. WATERWAY OBSTRUCTIONS

N 5. OTHER

SUFF ADEQUACY OF OPENING 6.

7. MEDNORMAL VELOCITY

11 FT. 8. AVERAGE CLEAR OPENING

9. STREAM BED COMPOSITION :

ROCK, SAND, STONES

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

APPROACH SLABS 1. N

N

F

F

G

G

N

G

N

223. RETAINING WALL N

OTHER6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

WALL1.

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 1

N N N

60.9 BOTH ABUTMENT FOOTINGS ARE PARTIALLY EXPOSED; HOWEVER,

LARGE BOULDERS SHELTER FOOTINGS. MINOR SCOUR WITH 4" OF

UNDERMINING AT WEST ABUTMENT FOOTING.

222.3 SOUTH TIMBER RAILING AT WEST APPROACH IS LOOSE.

222.4 MINOR RANDOM CRACKING THROUGHOUT WEST APPROACH

PAVEMENT; MINOR POTHOLE AT NORTH SIDE.

222.7 OBJECT MARKERS AND "ONE LANE BRIDGE" SIGNS MISSING AT

BRIDGE APPROACHES.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE NO. 5460 075P

INSPECTION DATE: 5/17/16

TRUCK TYPE

TONS

INVENTORY RATING (NORMAL TRAFFIC)

METRIC TONS METRIC TONSTONS

OPERATING RATING (MAXIMUM LOAD)

H

HS

TYPE 3

TYPE 3S2

TYPE 3-3

DESIGN LOADING:

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS:

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

BEAM MOMENT CAPACITY

10/10

X

X

STRUCTURE LOAD RATING

GRSM INSTITUTE BRIDGE

UNKNOWN

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460 075P

STRUCTURE IDENTIFICATION

(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK (1) STATE: ....................................... 474 - TENNESSEE (TN)

(202) STRUCTURE NAME: .......... GRSM INSTITUTE BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 009 - BLOUNT

(4) CITY/PLACE CODE:

(204) STRUCTURE NUMBER: ..... 5460-075P

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 433 (6) FEATURES INTERSECTED:....... MIDDLE PRONG LITTLE RIVE

(207) ROAD SECTION NO: ..........075P (7) FACILITY CARRIED: .................. GRSM INSTITUTE ENTRANCE

(208) NPS ROAD CLASS: ............ 2 - CONNECTOR ROAD (8) STATE STRUCTURE NO: .......... 5460075P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.1 MILES TO NPS ROUTE 12

(210) OPERATING UNIT: ............. N. DIST. (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 000000000000 (11) MILE POINT: ............................. 4.38 (KM PT 7.05)

(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

02 - STRINGER/MULTI-BEAM or GIRDER

62.2 FT (19.0 M)

62.2 FT (19.0 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

6 - N/A

6 - N/A

8 - WOOD OR TIMBER

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 0 - NONE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION:

0 - NONE

NO(218) IS SALT USED?:

LOAD RATING AND POSTING

(31) DESIGN LOAD:

0 - UNKNOWN (41) LOAD RESTRICTION:

A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 39.0 TONS (35.4 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 65.0 TONS (59.0 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 5/16 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... YES

INSP. EVERY: 24 MONTHS - LAST INSP. : 5/16(220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE:

INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460 075P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 35°38'27.50" (51) CURB TO CURB WIDTH: ........... 11.1 FT (3.4 M)

(17) LONGITUDE: ......................... 83°41'25.00" (52) DECK WIDTH: ............................ 12.3 FT (3.7 M)

(19) DETOUR LENGTH: ............... 5 MI (8 KM) (32) APPR. ROADWAY WIDTH: ........ 17.0 FT (5.2 M)

(28A) LANES ON STRUCT: .......... 01 (213) APPR. PAVEMENT WIDTH: ..... 17.0 FT (5.2 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 0.0 FT (0.0 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 0.0 FT (0.0 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 100 (34) SKEW ANGLE: ............................ 0 °

(30) YEAR OF ADT: ...................... 2010 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 110 (47) TOTAL HORIZ. CLEARANCE: .... 11.1 FT (3.4 M)

(115) YEAR OF FUTURE ADT: ..... 2030 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 7 - TIMBER

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 3.42 FT (1.04 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

4 - Stable; action required to pro

2 - REHAB/RECONSTRUCTION

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1982-MAJOR RECONSTRUCTION/SUPERSTRUCTURE.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:83�41'25.00 http:35�38'27.50

APPENDIX STRUCTURE NO. 5460 075P

PHOTOGRAPHS STRUCTURE NO. 5460 075P

FLOW

PHOTO #1 - LOOKING WEST TOWARD NPS ROUTE 433

PHOTO #2 - SOUTH (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING EAST

PHOTO #4 - GENERAL UNDERSIDE VIEW LOOKING EAST

PHOTO #5 - TYPICAL ABRASION AND CHECKING OF TIMBER DECK,

NEAR WEST END SHOWN

PHOTO #6 - SPLINTERING OF DECK AT ISOLATED LOCATIONS, NEAR

WEST END SHOWN

PHOTO #7 - TYPICAL DECAY THROUGHOUT TOP OF RAIL POSTS,

SOUTH RAILING NEAR WEST END SHOWN

PHOTO #8 - GENERAL VIEW OF SOUTH TIMBER RAILING AT WEST

APPROACH; NOTE RAILING IS LOOSE

PHOTO #9 - COLLISION DAMAGE ON SOUTH RAILING AND CURB AT

WEST END

PHOTO #10 - ELASTOMERIC BEARING PADS ARE SLIDING OUT FROM

UNDER STEEL BEARING PLATES; ALSO NOTE BULGING AND CRACKING

OF PADS, SOUTHEAST BEARING SHOWN

PHOTO #11 - TYPICAL BULGING AND CRACKING OF ELASTOMERIC

BEARING PADS, NORTHEAST BEARING SHOWN

PHOTO #12 - GENERAL VIEW OF A588 WEATHERING STEEL BEAMS

PHOTO #13 - GENERAL VIEW OF WEST ABUTMENT; NOTE SCOUR WITH

EXPOSED FOOTING AND UNDERMINING

PHOTO #14 - SCOUR WITH UNDERMINING AT WEST ABUTMENT

FOOTING

STRUCTURE NO. 5460 075PPHOTOGRAPHS

PHOTO #15 - LARGE TREE ROOT COMING OUT OF NORTH WEEP HOLE

AT EAST ABUTMENT

PHOTO #16 - RANDOM CRACKING THROUGHOUT WEST APPROACH

PAVEMENT WITH POTHOLE AT NORTH SIDE

STRUCTURE NO. 5460 075PPHOTOGRAPHS

PHOTO #17 - VIEW FROM BRIDGE LOOKING UPSTREAM

PHOTO #18 - VIEW FROM BRIDGE LOOKING DOWNSTREAM