TUNNEL INSPECTION REPORT
BOTE MOUNTAIN TUNNEL
LAUREL CREEK ROAD THROUGH BOTE MOUNTAIN
GREAT SMOKY MOUNTAINS NATIONAL PARK
NP
STRUCTURE NO. 5460-016P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 5/17/16
SPReport prepared by:
Federal Highway Administration FLH Office of Bridges and Structures 21400 Ridgetop Circle Sterling, VA 20166 703-404-6201 https://bridge.flhd.fhwa.dot.gov http:https://bridge.flhd.fhwa.dot.gov
STRUCTURE NO. 5460 016P
BOTE MOUNTAIN TUNNEL INSPECTION DATE: 5/17/16
STRUCTURE SUMMARY
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE MINIMUM VERTICAL CLR: .... 13.1 FT (4.0 M)
SPRINGLINE LENGTH: ........ 30.0 FT (9.1 M) STRUCT. TOTAL LENGTH: ... 121.0 FT (36.9 M)
CURB TO CURB WIDTH: ..... 30.0 FT (9.1 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... 000000000000 / NONE YEAR RECONSTRUCTED: ....N/A
NPS ROAD CLASS:
1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 2002-ROADWAY AND APPROACHES RESURFACED. 2012 POTHOLES PATCHED AND
PAVEMENT RESTRIPED.
LOCATION
GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 1.15 (KM PT 1.85)
STATE: .................................. TENNESSEE LOCATION: 6.6 MI TO TOWNSEND WYE
FACILITY CARRIED: ............. LAUREL CREEK ROAD
FEATURE INTERSECTED: ... BOTE MOUNTAIN
STRUCTURE EVALUATION SUMMARY
This concrete lined tunnel is in fair to poor structural condition, and exhibits deterioration of the concrete lining and drain chases, with moderate to heavy water leakage through the lining and onto the roadway pavement. Loose concrete at the crown of the tunnel could pose a hazard to traffic passing through the tunnel, as could the wet pavement, particularly in freezing conditions.
Additional problems include potholes and faded striping at the north approach pavement; clogged drains at the north end, moderate soil and debris accumulation along the curblines, loose and fracture rocks near west shoulder at the north approach; and a 10" deep drop-off in the east shoulder at the north approach. The previously patched potholes along the centerline are starting to deteriorate.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: G. GOODLIN, H. SALAD
CONDITION ASSESSMENT:
GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 9/30/16
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460 016P
226 PRIORITY OF IMPROVEMENT B
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
222.5 BACKFILL EROSION AT NORTHEAST AND SOUTHEAST APPROACH SHOULDERS.
REMOVE LOOSE ROCKS NEAR WEST SHOULDER IN NORTH APPROACH AND
ABOVE PORTALS.
1 LS
59.4 REMOVE DEBRIS, UNCLOG DRAINS, AND REGRADE AROUND DRAINS AT NORTH
APPROACH. REMOVE SOIL AND DEBRIS FROM ALONG CURBLINES.
1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
REHABILITATION/RECONSTRUCTION
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
NO (TYPICALLY NEEDED WITHIN 5 YEARS)
REHAB. RECONSTR.
59.1,4 REPAIR CONCRETE TUNNEL LINING. REPLACE TUNNEL DRAINAGE
SYSTEM.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5460 016P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 5
F1. LINING
F PORTALS2.
NCURBS AND SIDEWALKS3.
P 4. DRAINS AND DRAINAGE
G 5. WEARING SURFACE
G 6. RIDEABILITY
N 7. LIGHTING
N 8. OTHER
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 6
N 1. APPROACH SLABS
N 2. RELIEF JOINTS
N 3. APPROACH GUARDRAIL
G 4. SURFACING
F 5. EROSION
G 6. SETTLEMENT
N 7. SIGNS
G 8. ALIGNMENT
N 9. OTHER
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
N C. APPROACH GUARDRAILS
N D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
ITEM REFERENCE AND REMARKS
59.1 MODERATE TO SEVERE SPALLS AT SPRINGLINE. SEVERAL LARGE
VOIDS ALONG SPRINGLINE AT CONSTRUCTION JOINTS WITH
LEAKAGE. MINOR DELAMINATION OF LINING ON EAST AND WEST
SIDES NEAR SOUTH PORTAL WITH 3.5' X 2' SPALLED AREA.
MODERATE FULL-DEPTH SPALL (8'L X 1.5'W X 8"D) WITH EXPOSED
REBAR AT CROWN AT SECOND CONSTRUCTION JOINT FROM SOUTH
PORTAL.
MINOR TO MODERATE CRACKING WITH EFFLORESCENCE AND
LEAKAGE ALONG TUNNEL LINING CONSTRUCTION JOINTS.
MODERATE DETERIORATION IN DRAIN CHASE AREAS WITH
CRACKING, SPALLING, EFFLORESCENCE, AND WATER LEAKAGE.
MINOR CRACKING WITH EFFLORESCENCE AT OTHER LOCATIONS.
AREAS OF MINOR SCALING AT VERTICAL CONSTRUCTION JOINTS;
MODERATE SCALING IN LOWER PORTION OF WALL THROUGHOUT.
59.2 MODERATE TO SEVERE LEAKAGE WITH MODERATE
EFFLORESCENCE ON NORTH PORTAL MASONRY. MODERATE
EFFLORESCENCE ON SOUTH PORTAL.
MODERATE MOSS, TREES, AND VEGETATION GROWTH IN RING
STONE MASONRY MORTAR JOINTS AND ABOVE BOTH PORTALS.
59.4 POOR DRAINAGE DUE TO DETERIORATED AND CLOGGED DRAIN
CHASES. DRAINS AT NORTH END CLOGGED AND COVERED WITH
DEBRIS. MODERATE SOIL AND DEBRIS ACCUMULATION (6"D) ALONG
CURBLINES.
59.5, 222.4 PATCHED POTHOLES ALONG CENTERLINE OF ROADWAY
THROUGHOUT TUNNEL, AND FADED STRIPING.
222.5 10" DEEP DROP-OFF AT NORTHEAST APPROACH SHOULDER.
SEVERE EROSION HOLE (8'L X 4'W X 3'D) AT SOUTHEAST CORNER,
15' FROM STRUCTURE.
FRACTURE AND LOOSE ROCKS AT NORTHWEST AND SOUTHEAST
APPROACHES.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460 016P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK
(202) STRUCTURE NAME:
(203) STRUCTURE KIND:
(204) STRUCTURE NUMBER:
(205) NPS REGION:
(206) ROUTE CODE NUMBER: ...
(207) ROAD SECTION NO:
(208) NPS ROAD CLASS:
(209) WITHIN NPS BNDRY?:
(210) OPERATING UNIT:
(211) PROJECT NO(S):
(212) DRAWING NUMBERS:
(21) MAINTAINED BY:
(22) OWNER:
BOTE MOUNTAIN TUNNEL
3 - TUNNEL
5460-016P
4 - SOUTHEAST
016P
1 - PRINCIPAL PARK ROAD
YES
N. DIST.
000000000000
NONE
66 - NATIONAL PARK SERVICE
66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
474 - TENNESSEE (TN)
009 - BLOUNT
264000150
BOTE MOUNTAIN
LAUREL CREEK ROAD
5460016P0000000
6.6 MI TO TOWNSEND WYE
14.20 FT (4.33 M)
1.15 (KM PT 1.85)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
30.0 FT (9.1 M)
121.0 FT (36.9 M)
0 - UNKNOWN
0 - UNKNOWN
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION:
0 - NONE
YES(218) IS SALT USED?:
LOAD RATING AND POSTING
(31) DESIGN LOAD:
0 - UNKNOWN (41) LOAD RESTRICTION:
A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 5/16 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE:
INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460 016P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°38'58.50" (51) CURB TO CURB WIDTH: ........... 30.0 FT (9.1 M)
(17) LONGITUDE: ......................... 83°42'54.90" (52) DECK WIDTH: ............................ 30.0 FT (9.1 M)
(19) DETOUR LENGTH: ............... 50 MI (80 KM) (32) APPR. ROADWAY WIDTH: ........ 34.0 FT (10.4 M)
(28A) LANES ON STRUCT: .......... 00 (213) APPR. PAVEMENT WIDTH: ..... 24.0 FT (7.3 M)
(28B) LANES UNDER STRUCT: ... 02 LEFT SHOULDER: .................. 5.0 FT (1.5 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 5.0 FT (1.5 M)
(42B) SERVICE UNDER: .............. 0 - OTHER (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 3060 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2012 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 3366 (47) TOTAL HORIZ. CLEARANCE: .... 30.0 FT (9.1 M)
(115) YEAR OF FUTURE ADT: ..... 2032 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... N RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 0 - N/A
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 0 - N/A
DESIGN TYPE: ........................ 0 - N/A
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 3.7 FT (1.1 M) (215) BRIDGE RAIL HEIGHT: ............ 0.00 FT (0.00 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 13.08 FT (3.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 13.08 FT (3.99 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: .................................N
(59) SUPERSTRUCTURE: .........N
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: ..........................N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
B - MAJOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2002-ROADWAY AND APPROACHES RESURFACED. 2012 POTHOLES PATCHED AND PAVEMENT RESTRIPED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:83�42'54.90 http:35�38'58.50
APPENDIX STRUCTURE NO. 5460 016P
PHOTOGRAPHS STRUCTURE NO. 5460 016P
PHOTO #1 - NORTH PORTAL
PHOTO #2 - SOUTH PORTAL
PHOTO #3 - GENERAL VIEW OF TUNNEL LINING LOOKING SOUTH;
NOTE LONGITUDINAL CRACKING WITH EFFLORESCENCE ALONG
CROWN
PHOTO #4 - TYPICAL SPALLING OF TUNNEL LINING AT SPRINGLINE,
WEST WALL NEAR NORTH PORTAL
STRUCTURE NO. 5460 016P
PHOTO #5 - TYPICAL SPALLING OF TUNNEL
LINING AT SPRINGLINE; EAST WALL NEAR
SOUTH PORTAL SHOWN
PHOTO #6 - SPALLING ALONG SECOND
CONSTRUCTION JOINT FROM SOUTH PORTAL
AT CROWN
PHOTOGRAPHS
PHOTO #7 - CLOSE UP OF SPALLING
REFERENCED IN PREVIOUS PHOTO
PHOTO #8 - TYPICAL CRACKING WITH
EFFLORESCENCE AND LEAKAGE ALONG
TUNNEL LINING CONSTRUCTION JOINTS,
EAST WALL NEAR NORTH PORTAL
PHOTO #9 - TYPICAL CRACKING WITH EFFLORESCENCE OF TUNNEL
LINING THROUGHOUT
PHOTO #10 - TYPICAL CRACKING WITH EFFLORESCENCE OF TUNNEL
LINING THROUGHOUT
PHOTO #11 - TYPICAL EFFLORESCENCE ON
RING STONES AT PORTALS WITH ACTIVE
WATER LEAKAGE, NORTH PORTAL SHOWN
PHOTO #12 - FRACTURE ROCKS AT
NORTHWEST APPROACH
PHOTO #13 - LOOSE ROCK AT SOUTHEAST APPROACH
PHOTO #14 - UNDERMINED TREE AT NORTHWEST APPROACH BANK
ABOUT 15FT FROM NORTH PORTAL; ALSO NOTE DEEP VOID BEHIND
ROCK ADJACENT TO ROADWAY
STRUCTURE NO. 5460 016PPHOTOGRAPHS
PHOTO #15 - CLOGGED DRAIN AT
NORTHWEST CORNER
BOTE MOUNTAIN TUNNEL INSPECTION DATE: 5/17/16
STRUCTURE NO. 5460 016P
PHOTO #16 - 10" DEEP DROP-OFF AT
NORTHEAST APPROACH SHOULDER
PHOTOGRAPHS
PHOTO #17 - TYPICAL SOIL AND DEBRIS
ACCUMULATION ALONG CURBLINES; WEST
CURBLINE SHOWN
PHOTO #18 - TYPICAL PATCHED POTHOLES
ALONG CENTERLINE, NEAR NORTH PORTAL
SHOWN