Amendment_0001_-_NP-NATR_2A18,_2B7,_2C6,_2D12.pdf

PDF 258 KB Posted

Attached to
Smoky Mountains National Park Project NP-GRSM 15(2), 16(1)
Solicitation number
693C73-18-B-000011
Issued by

About this file

The Bid Opening date of May 14, 2019, at 2:00 p.m. EST will remain the same.

View the file

Other files

File Type Posted
Results_of_Bid_Opening,_NP-GRSM_15(2),_16(1)_(1.9.18).pdf PDF
Bridge_Inspection_Report_5460-164P_Laurel_Culvert__4.pdf PDF
IFB_Solicitation-GRSM_15(2),16(1).pdf PDF
Bridge_Inspection_Report_5460-017P_West_Prong_Little_River_Bridge.pdf PDF
Bridge_Inspection_Report_5460-023P_Laurel_Culvert__1.pdf PDF
Bridge_Inspection_Report_5460-015P_Tremont_Junction.pdf PDF
Uniguide_Sign_Layout.pdf PDF
Bridge_Inspection_Report_5460-071P_Tremont_Road_Bridge__1.pdf PDF
NEPA_Document_CE.pdf PDF
Bridge_Inspection_Report_5460-016P_Bote_Mountain_Tunnel.pdf PDF
Bridge_Inspection_Report_5460-025P_Laurel_Culvert__3.pdf PDF
Plans-NP-GRSM_15(2)__16(1).pdf PDF
FP14_Eng.pdf PDF
VETS-4212.pdf PDF
Bridge_Inspection_Report_5460-014P_Wye_Bridge.pdf PDF
Bridge_Inspection_Report_5460-020P_Laurel_Creek_Bridge__3.pdf PDF
Bridge_Inspection_Report_5460-024P_Laurel_Culvert__2.pdf PDF
Bridge_Inspection_Report_5460-075P_GRSM_Institute_Bridge.pdf PDF
Bridge_Inspection_Report_5460-022P_Pinkroot_Branch_Bridge.pdf PDF
Bridge_Inspection_Report_5460-072P_Tremont_Road_Bridge__2.pdf PDF
Bridge_Inspection_Report_5460-019P_Laurel_Creek_Bridge__2.pdf PDF
Bridge_Inspection_Report_5460-021P_Laurel_Creek_Bridge__4.pdf PDF
Bridge_Inspection_Report_5460-018P_Laurel_Creek_Bridge__1.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Synopsis_-_GRSM_15(2)_16(1).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7319B000011 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

See Block 1405/09/20190001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/11/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project NP-NATR 2A18, 2B7, 2C6, 2D12

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J-pages) Section 401 to delete 15% RAP content from top lift.

2) Provide a summary of responses to questions/clarifications asked by potential bidders.

The Bid Opening date of May 14, 2019, at 2:00 p.m. EST will remain the same.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0001

Info Page 1 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project NP-NATR 2A18, 2B7, 2C6, 2D12

Natchez Trace Parkway Solicitation: 693C73-19-B-000011

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J-pages) Section 401 to delete 15% RAP content from top lift.

2) Provide a summary of responses to questions/clarifications asked by potential bidders.

The Bid Opening date of May 14, 2019, at 2:00 p.m. EST will remain the same.

Special Contract Requirement changes

Delete Subsection 401.03(a) of the Special Contract Requirements, page J-14, and substitute the following:

(a) RAP. Do not use RAP in the top lift of surface course. Limit the quantity of RAP by mass in the JMF for intermediate and base courses to 30 percent. For intermediate and base courses containing 20 to 30 percent by mass RAP, reduce the asphalt binder performance grade by 6°C for both high temperature and low temperature performance grades.

Questions/Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.

The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.

The Government’s direct response to the sender may also have been updated below for better clarity.

1. There is a note on page J-9 of the solicitation documents that states that “Once the Parkway closure work is complete, no construction traffic will be allowed on the Tennessee River Bridge” during construction of the remaining elements of the project. So, if the contractor chooses to perform the “closure work” towards the end of the schedule, can the contractor haul asphalt across the bridge (from south end to north end) in order to perform the paving required on schedule B until the actual closure work is started?

mailto:eflhd.contracts@dot.gov

Info Page 2 of 2

Response: No Construction equipment will be allowed to cross the Tennessee River Bridge except while performing the work on the bridge itself.

2. Is the Asphalt on the above referenced project tied to a “Liquid Asphalt Index” of some sort. If so, can you reference which one.

Response: If the question is referring to an adjustment to Liquid AC costs over the course of the project, there are no adjustments set up in the contract for changes to the costs of Liquid AC.

3. On previous Natchez Trace projects, the Top Lift of Asphalt has always required No RAP in the mix. On page J-14 of this solicitation, it states that the top lift can be limited to a 15% RAP content. Is the Trace going to allow Recycle Asphalt to be final surface course on this project?

Response: No RAP is to be used in the top lift of the asphalt. An amendment will be issued to delete 15% RAP content.

Amendment 1 info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project NP-NATR 2A18, 2B7, 2C6, 2D12
Solicitation: 693C73-19-B-000011

File details come from the government source that posted it.